HomeMy WebLinkAbout080519_ca11Public Hea
615 Sheridan Street
Port Townsend, WA 98368
www.JeffersonCountyPublicHealfh.org
Consent Agenda
July 11, 2019
JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
TO: Board of County Commissioners
Philip Morley, County Administrator
FROM: Stuart Whitford, Director
DATE:U94 �' 1-119
SUBJECT: Agenda Item — Interagency Agreement with Department of Ecology for
Local Source Control (LSC), C2000017; July 1, 2019 — June 30, 2021;
$163,858.02
STATEMENT OF ISSUE:
Jefferson County Public Health, Department of Environmental Health, requests Board approval of the
Interagency Agreement with Department of Ecology for Local Source Control, C2000017; July 1, 2019 —
June 30, 2021; $163,858.02
ANALYSIS/STRATEGIC GOALS/PRO'S and CON'S:
This interagency agreement with the Department of Ecology continues County efforts to eliminate the risk
associated with hazardous wastes. The agreement's purpose is to provide specialists who provide no -cost
technical assistance and educational outreach to small businesses in an effort to prevent pollution of waters
of the state. JCEH specialists will conduct site visits and pollution prevention activities in regards to small
quantity generators of dangerous and/or hazardous waste and other businesses and organizations with the
potential to pollute stormwater. Through individual consultations, the LSC specialist will work to help
business owners and organizations evaluate their business practices and will make recommendations to
reduce their environmental impact. Recommendations are based on industry Best Management Practices
and state and county regulatory requirements. Ecology coordinates and supports collaborative efforts in this
joint effort designed to reduce or eliminate hazardous waste and pollutants at the source.
FISCAL IMPACT/COST BENEFIT ANALYSIS:
This interagency agreement is fully funded by the Department of Ecology. There is no impact to the general
fund.
RECOMMENDATION:
JCPH management request approval of the interagency agreement with
Source Control, (C2000017); July 1, 2019 — June 30, 2021; $163,858.02
R ED Y:
P ICI orley a t o r Date
Community Health
Developmental Disabilities
360-385-9400
360-385-9401 (f)
Department of Ecology for Local
Always working for a safer and healthier community
Environmental Public Health
360-385-9444
(f) 360-379-4487
`rr
DEPARTMENT OF
ECOLOGY
State of Washington
IAA No. C2000017
INTERAGENCY AGREEMENT (IAA)
BETWEEN
THE STATE OF WASHINGTON, DEPARTMENT OF ECOLOGY
AND
JEFFERSON COUNTY ENVIRONMENTAL PUBLIC HEALTH
THIS INTERAGENCY AGREEMENT ("Agreement" or "IAA") is made and entered into by and between
the state of Washington, Department of Ecology, hereinafter referred to as "ECOLOGY," and Jefferson County
Environmental Public Health hereinafter referred to as the "CONTRACTOR," pursuant to the authority granted
by Chapter 39.34 RCW.
THE PURPOSE OF THIS AGREEMENT is for the CONTRACTOR to provide Pollution Prevention
Assistance (PPA) Specialists who will provide technical assistance and education outreach to small businesses
in an effort to prevent pollution of waters of the state as part of the Local Source Control Partnership. The PPA
Specialists will make referrals to ECOLOGY as needed and report results.
WHEREAS, ECOLOGY has legal authority (RCW 70.95C and RCW 70.105) and CONTRACTOR has
legal authority under RCW 70. 95—Solid Waste Management, and Ch. 8.10 Solid Waste Regulations or
WAC 173-350- Solid Waste Management Handling Standards that allows each party to undertake the
actions in this agreement.
WHEREAS, ECOLOGY will coordinate this Local Source Control (LSC) Partnership supporting
collaborative efforts to protect and restore Puget Sound, the Spokane River Watershed, and the Columbia River
Basin.
THEREFORE, IT IS MUTUALLY AGREED THAT:
1) SCOPE OF WORK
The CONTRACTOR shall furnish the necessary personnel, equipment, material and/or service(s) and
otherwise do all things necessary for or incidental to the performance of the work set forth in Appendix A,
Statement of Work and Appendix B, Budget Detail, attached hereto and incorporated herein.
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
2) PERIOD OF PERFORMANCE
The period of performance of this IAA shall commence on July 1, 2019, and be completed by June 30, 2021,
unless terminated sooner as provided herein. Amendments extending the period of performance, if any, shall
be at the sole discretion of ECOLOGY.
3) COMPENSATION
Compensation for the work provided in accordance with this IAA has been established under the terms of RC W
39.34.130 and RCW 39.26.180(3). This is a performance-based agreement, in which payment is based on the
successful completion of expected deliverables.
Compensation for this agreement will be released in two 1 -year phases. Phase One is limited to 50 percent
of the project budget and Phase Two is the remaining 50 percent of the project budget. On or before August
15, 2020, ECOLOGY will evaluate available funding and the CONTRACTOR's performance and progress
towards meeting contract deliverables and spending. To release the second year funding the
CONTRACTOR, by June 30, 2020, must:
1. Complete a minimum of 40% of the total site visit deliverables, and
2. Utilize 40% of the total compensation award.
If performance obligations have been met and funding is available per ECOLOGY's determination, the full
year 2 budget award will be considered available. Should the CONTRACTOR fail to make satisfactory
progress or funding is limited, ECOLOGY will determine the appropriate additional funding to release for
year 2 of the contract. ECOLOGY will consider various factors in determining year 2 funding including,
but not limited to, available funding, performance to date, staff vacancies, time and costs spent on unique
program elements, and potential circumstances beyond the CONTRACTOR's control.
The source of funds for this IAA is the Model Toxics Control Operating -State (Fund 23P) and Model Toxics
Control Capital - State (Fund 23N). Both parties agree to comply with all applicable rules and regulations
associated with these funds.
The parties have determined that the cost of accomplishing the work identified herein will not exceed
$163,858.02, including any indirect charges. Payment for satisfactory performance of the work shall not
exceed this amount unless the parties mutually agree via an amendment to a higher amount. Compensation for
services shall be based on the terms and tasks set forth in Appendix A, Statement of Work and Appendix B,
Budget Detail. ECOLOGY will not make payment until it has reviewed and accepted the completed work.
Travel expenses (meals, lodging, and mileage) will be reimbursed according to current state rates at the time
of travel, not to exceed the budget (see Appendix B, Invoice and Budget).
Purchase of source control tools or equipment (e.g. spill kits, plastic drum covers) and promotional items for
distribution to businesses under this contract must be listed in Goods and Services budget or Equipment budget
in Appendix B. Any purchases of equipment or goods and services over $1,000.00 not specifically listed in
Appendix B must be pre -approved by ECOLOGY. When the agreement expires, or when the equipment is no
longer needed for the originally authorized purpose (whichever comes first) the disposition of equipment shall
be at Ecology's sole discretion.
Indirect rates will be paid as indicated in Appendix B. Changes to the indirect rate may be considered by
Ecology. Contractor shall provide supporting documentation necessitating the change to Ecology.
Ecology's approval will be communicated by e-mail. An increase in indirect rate does not increase the
total contract award. Changes are handled by adjusting the budget between categories listed in Appendix
2
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
B. Changes to the total budget cost of the contract shall require an amendment. The budget referenced in
Appendix B may be adjusted between categories with Ecology's preapproval, and as long as the total budget
is not exceeded.
4) BILLING AND PAYMENT PROCEDURE
Payment requests shall be submitted on state form, Invoice Voucher A194A. Invoices shall describe and
document to ECOLOGY's satisfaction a description of the work performed, the progress of the work, and
related costs. Each invoice voucher shall reference the Agreement (IAA) number and clearly identify those
items that relate to performance under this Agreement. Payment will be made within thirty (30) days of
submission of a properly completed invoice (form A19 -1A) with supportive documentation. All expenses
invoiced shall be supported with copies of invoices paid.
Send invoices to:
State of Washington
Department of Ecology
Hazardous Waste & Toxics Reduction Program
Attn: Elaine Snouwaert
Elaine.SnouwaertCa�.cy.w. a.gnv
or
4601 N. Monroe Street
Spokane, WA 99205
Payment requests shall be submitted on a quarterly basis. Invoices must be submitted by the dates outlined in
Appendix A, Section IX. Upon expiration of this Agreement, any claim for payment not already made shall be
submitted to ECOLOGY within 30 days after the expiration date or the end of the fiscal year, whichever is
earlier.
Payment will be issued through Washington State's Office of Financial Management's Statewide Payee
Desk. To receive payment you must register as a statewide vendor by submitting a statewide vendor
registration form and an IRS W-9 form at website, https://ofm.wa.gov/it-systems/statewide-vendoroayee-
services. If you have questions about the vendor registration process, you can contact Statewide Payee Help
Desk at (360) 407-8180 or email PayeeRegistration pfrn.wa, ogay.
5) ALTERATIONS AND AMENDMENTS
This Agreement may be amended by mutual agreement of the parties. Such amendments shall not be binding
unless they are in writing and signed by personnel authorized to bind each of the parties.
6) ASSIGNMENT
The work to be provided under this Agreement, and any claim arising thereunder, is not assignable or delegable
by either party in whole or in part, without the express prior written consent of the other party, which consent
shall not be unreasonably withheld.
7) ASSURANCES
Parties to this Agreement agree that all activity pursuant to this agreement will be in accordance with all
the applicable current federal, state, and local laws, rules, and regulations.
3
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
8) CONFORMANCE
If any provision of this Agreement violates any statute or rule of law of the state of Washington, it is
considered modified to conform to that statute or rule of law.
9) DISPUTES
Parties to this Agreement shall employ every effort to resolve a dispute themselves without resorting to
litigation. In the event that a dispute arises under this Agreement that cannot be resolved among the parties,
it shall be determined by a Dispute Board in the following manner. Each party to this Agreement shall
appoint one member to the Dispute Board. The members so appointed shall jointly appoint an additional
member to the Dispute Board. The Dispute Board shall review the facts, agreement terms, and applicable
statutes and rules, and then make a determination of the dispute. The determination of the Dispute Board
shall be final and binding on the parties hereto, unless restricted by law. The cost of resolution will be
borne by each party paying its own cost. As an alternative to this process, if state agencies, either of the
parties may request intervention by the Governor, as provided by RCW 43.17.330, in which event the
Governor's process will control. The parties may mutually agree to a different dispute resolution process.
10) FUNDING AVAILABILITY
ECOLOGY's ability to make payments is contingent on availability of funding. In the event funding from
state, federal, or other sources is withdrawn, reduced, or limited in any way after the effective date and prior
to completion or expiration date of this Agreement, ECOLOGY, at its sole discretion, may elect to terminate
the Agreement, in whole or part, for convenience or to renegotiate the Agreement subject to new funding
limitations and conditions. ECOLOGY may also elect to suspend performance of the Agreement until
ECOLOGY determines the funding insufficiency is resolved. ECOLOGY may exercise any of these
options with no notification restrictions, although ECOLOGY will make a reasonable attempt to provide
notice.
In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the
CONTRACTOR through the effective date of termination or suspension. Reimbursed costs must be agreed
to by ECOLOGY and the CONTRACTOR. In no event shall ECOLOGY's reimbursement exceed
ECOLOGY's total responsibility under the agreement and any amendments.
11) GOVERNING LAW AND VENUE
This Agreement is entered into pursuant to and under the authority granted by the laws of the state of
Washington and any applicable federal laws. The provisions of this Agreement shall be construed to conform
to those laws. This Agreement shall be construed and interpreted in accordance with the laws of the state
of Washington, and the venue of any action brought hereunder shall be in the Superior Court for Thurston
County.
12) INDEPENDENT CAPACITY
The employees or agents of each party who are engaged in the performance of this Agreement shall continue
to be employees or agents of that party and shall not be considered for any purpose to be employees or agents
of the other party.
13) ORDER OF PRECEDENCE
In the event of an inconsistency in the terms of this Agreement, or between its terms and any applicable statute
or rule, the inconsistency shall be resolved by giving precedence in the following order:
a. Applicable federal and state of Washington statutes, regulations, and rules.
b. Mutually agreed upon written amendments to this Agreement.
4
version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
c. This Agreement, number C2000017.
d. Appendix A, Statement of Work.
e. Appendix B, Budget Detail.
f. Appendix C, Special Terms and Conditions.
g. Exhibit 1.
h. Any other provisions or term of this Agreement, including materials incorporated by reference or
otherwise incorporated.
14) RECORDS MAINTENANCE
The parties to this Agreement shall each maintain books, records, documents, and other evidence that
sufficiently and properly reflect all direct and indirect costs expended by either party in the performance of the
service(s) described herein. These materials shall be subject to inspection, review, or audit by personnel of
both parties, other personnel duly authorized by either party, the Office of the State Auditor, and federal
officials so authorized by law. All books, records, documents, and other materials relevant to this Agreement
must be retained for six years after expiration of this Agreement. The Office of the State Auditor, federal
auditors, and any persons duly authorized by the parties shall have full access and the right to examine any of
these materials during this period. Each party will utilize reasonable security procedures and protections for all
materials related to this Agreement. All materials are subject to state public disclosure laws.
15) RESPONSIBILITIES OF THE PARTIES
Each party of this Agreement hereby assumes responsibility for claims and/or damages to persons and/or
property resulting from any act or omissions on the part of itself, its employees, its officers, and its agents.
Neither party will be considered the agent of the other party to this Agreement.
16) RIGHTS IN DATA
Unless otherwise provided, data which originates from this Agreement shall be "work made for hire" as defined
by the United States Copyright Act, Title 17 U.S.C. section 101 and shall be owned by state of Washington,
ECOLOGY. Data shall include, but not be limited to, reports, documents, pamphlets, advertisements, books
magazines, surveys, studies, computer programs, films, tapes, and/or sound reproductions. Ownership includes
the right to copyright, patent, register, and the ability to transfer these rights.
17) SEVERABILITY
If any provision of this Agreement or any provision of any document incorporated by reference shall be held
invalid, such invalidity shall not affect the other provisions of this Agreement which can be given effect without
the invalid provision, if such remainder conforms to the requirements of applicable law and the fundamental
purpose of this Agreement, and to this end the provisions of this Agreement are declared to be severable.
18) SUBCONTRACTORS
CONTRACTOR agrees to take complete responsibility for all actions of any Subcontractor used under this
Agreement for the performance. When federal funding is involved there will be additional contractor and
subcontractor requirements and reporting.
Prior to performance, all subcontractors who will be performing services under this Agreement must be
identified, including their name, the nature of services to be performed, address, telephone, WA State
Department of Revenue Registration Tax number (UBI), federal tax identification number (TIN), and
anticipated dollar value of each subcontract. Provide such information to ECOLOGY's Agreement manager.
5
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
19) TERMINATION FOR CAUSE
If for any cause, either party does not fulfill in a timely and proper manner its obligations under this Agreement,
or if either party violates any of these terms and conditions, the aggrieved party will give the other party written
notice of such failure or violation. The responsible party will be given the opportunity to correct the violation
or failure within fifteen (15) business days. If failure or violation is not corrected, this Agreement may be
terminated immediately by written notice of the aggrieved party to the other.
20) TERMINATION FOR CONVENIENCE
Either party may terminate this Agreement without cause upon thirty (30) calendar day prior written notification
to the other party. If this Agreement is so terminated, the parties shall be liable only for performance rendered
or costs incurred in accordance with the terms of this Agreement prior to the effective date of termination.
21) WAIVER
A failure by either party to exercise its rights under this Agreement shall not preclude that party from subsequent
exercise of such rights and shall not constitute a waiver of any other rights under this Agreement unless stated
to be such in a written amendment to this Agreement signed by an authorized representative of the parties.
22) AGREEMENT MANAGEMENT
The representative for each of the parties shall be responsible for and shall be the contact person for all
communications, notifications, and billings questions regarding the performance of this Agreement. The parties
agree that if there is a change in representatives that they will promptly notify the other party in writing of such
change, such changes do not need an amendment.
The ECOLOGY Representative is:
Name:
Elaine Snouwaert
Address:
4601 N. Monroe Street
Spokane, WA 99205
Phone:
509-329-3503
Email:
Elaine.Snouwaert@ecy.wa.gov
ON
Version 10/24/18
The CONTRATOR Representative is:
Name:
Pinky Feria Mingo
Address:
615 Sheridan Street
Port Townsend, WA 98368
Phone:
360 379-4476
Email:
pmingo@co.jefferson.wa.us
Fax:
360 379-4487
State of Washington, Department of Ecology
IAA No. C2000017
23) ALL WRITINGS CONTAINED HEREIN
This Agreement contains all the terms and conditions agreed upon by the parties. No other understandings,
oral or otherwise, regarding the subject matter of this Agreement shall be deemed to exist or to bind any of the
parties hereto.
The signatories to this Agreement represent that they have the authority to bind their respective
organizations to this Agreement.
IN WITNESS WHEREOF, the parties below, having read this Agreement in its entirety, including all
attachments, do agree in each and every particular as indicated by their signatures below.
State of Washington
Department of Ecology
By:
Signature Date
Darin Rice
HWTR Program Manager
Approved as to form only:
Unice of Rllomey General
7
version 10/24/18
Jefferson County Environmental Public
Health
Signature
Print Name: Kate Dean, Chair
Date
Title: Jefferson Co. Board of Commissioners
APPROVED AS TO FORM ONLY:
By: • t:
21 I
Philip Hunsucker, Chief Civil De uty rosecuting Atty
State of Washington, Department of Ecology
IAA No. C2000017
APPENDIX A
STATEMENT OF WORK
Jefferson County Environmental Public Health
Section I. Introduction
This Statement of Work is for the 2019-2021 biennial Interagency Agreement for the Local Source
Control (LSC) Partnership which is overseen by the Washington State Department of Ecology
(ECOLOGY) Hazardous Waste and Toxics Reduction Program.
The CONTRACTOR, through their Pollution Prevention Assistance (PPA) program, will conduct
multimedia source control site visits and pollution prevention activities to Small Quantity Generators
(SQGs) of dangerous waste and other businesses and organizations that may have potential to pollute
ECONTRACTOR will be designed to reduce or eliminate hazardous waste and pollutants at the source.
To further facilitate the reduction or elimination of hazardous chemical use at the source, the
CONTRACTOR will seek and discuss opportunities to assist businesses with switching processes,
products, or equipment to use effective safer -alternatives. This program will be known as the
"Product/Equipment Replacement Incentive Program" or PERIP.
The LSC work is expected to fall within these general proportions:
Technical Assistance visits *
65%
(see Section III)
0.1
*approximately 10-15% of TA visits will involve PERIP
Sara Groth
Laura Tucker
Unique Program Elements
20%
(see Section II)
PPA Specialist
Training
10%
see Section VII
Susan Parke
Other admin, staff meetings, etc.
5%
Key staff, estimated FTE and their roles are identified in Table 1.
Table 1• Kev Staff
Staff Name
Estimated FTE
Role
Pin!&y Feria Mingo
0.1
Contract Management
Sara Groth
Laura Tucker
0.3
PPA Specialist
0.3
PPA Specialist
Sara Groth
0.05
PERIP Coordinator and
Oversight
Susan Parke
N/A
Billin
8
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
The CONTRACTOR is expected to interact with other partners within the Partnership to provide
technical assistance and training, and share resources and experiences. The CONTRACTOR should set up
alerts to receive notifications when requests for information have been made on the SharePoint
Discussion Board. The CONTRACTOR must ensure at least one staff member is available to provide
timely information and feedback to ECOLOGY's LSC Coordinator and to attend mandatory meetings and
trainings. Feedback on Partnership goals, direction, and projects will occasionally be requested via online
surveys and email requests.
CONTRACTOR shall act in a professional and ethical manner, and shall avoid any conflict of interest that
might influence the CONTRACTOR's actions or judgment.
CONTRACTOR must disclose immediately to ECOLOGY any interest, direct or indirect, that might be
construed as prejudicial in any way to the professional judgment of the CONTRACTOR in rendering
service under this agreement.
Section II. Unique Program Elements
The CONTRACTOR will conduct the unique elements for their PPA program, outlined in Table 2.
Table 2: Uniaue Proeram Elements
Program Element
Deliverable(s)
Product/Equipment Replacement
Incentive Program (PERIP)
Report on number of businesses where PERIP opportunity was
discussed
List of businesses & Type of replacement o portunity
Number of businesses incentive issued to
Workshops for Marine Trade
Industry
Measure participant's pollution prevention awareness through
lire and post testing
Report on workshop attendance, results, and lessons learned
Pollution Prevention and
Stormwater Workshops for
Landscapers
Conduct two workshops tar eted to landscaping industry
Measure participant's pollution prevention awareness through
pre and post testing
Report on workshop attendance, results, and lessons learned
Planning Committee for In -Person
Training
Participation in 90% of planning meetings and review of
materials
1 one-day,training event for Partnership
Ecology Sector Checklist
Committee
Participation in 90% of the checklist committee meetings
Lead or co -lead author for at least one sector checklist & tip
sheet
When unique outreach or educational materials are developed by the CONTRACTOR using Local Source
Control (LSC) funds, a draft must be sent to ECOLOGY for review and approval. Finalized materials
which may be useful to other Partners should be provided for upload to the resource Document Library on
the Partnership SharePoint Site.
9
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Section III. Technical Assistance Visits
The CONTRACTOR will conduct technical assistance site visits to small quantity generators of
dangerous wastes, and to businesses or organizations that have the potential to pollute stormwater.
Approximately 60% of the visits will be Initial Visits. If Initial Visits fall below 60%, then combined
Initial Visits and Follow-up Visits must account for at least 80% of the total visits. While necessary,
efforts should be made to minimize Screening Visits.
An Initial Visit occurs at the actual site and results in a completed `checklist' (or enough data
gathered to complete data entry into the LSC database). It will either be the first complete visit to
a site OR the first visit in two or more years.
A Screening Visit is an attempted visit to the site, but the business declined or put off the visit,
OR you were interrupted during the visit and were unable to gather complete data, OR you
discover that the facility does not exist anymore OR you discover that the business does not
qualify for a visit under the LSC program.
A Follow -Up Visit should occur within 90 days of the Initial Visit. Follow-up should generally
be done through an on-site visit. However a phone conversation, mail or email exchange may
count as a Follow -Up Visit if it includes confirmation that the issues that were identified in the
initial visit were resolved. Follow-up Visits must be conducted to resolve High Priority
Environmental Issues (See section below).
Table 3: Number of Technical Assistance Visits
Number of Total Visits 130
Target for Initial Visits 78
Business sectors, organizations, waste streams, and/or geographical area that will provide a focus for the
2019-2021 technical assistance visits are listed in Table 4.
Table 4: Technical Assistance Tarizets
Target
Rationale for selecting
Marine Trades
The Marine Trades are a large sector and a majority are located within the
Port of Port Townsend which has exceeded water quality benchmarks for
several years.
Painting/Coatings
This sector makes up a significant portion of the county's small quantity
generators. There is high turnover in this sector, and a need for continued
site visits.
ECOLOGY may direct a portion of technical assistance visits toward specific priority sources or
contaminants.
Hiah Priority Environmental Issues
The below list are ECOLOGY's high priority environmental issues because they have the potential to
directly impact human health and/or the environment. If one or more of these issues are found during a
site visit, a Follow-up visit is justified (although not required). The severity of the issue will help
determine if a Follow-up visit is necessary. A Follow-up visit to a business for other (non -high priority)
issues is at the discretion of the CONTRACTOR. When unable to resolve high priority environmental
issues, the Pollution Prevention Specialist will refer the issue to ECOLOGY or other appropriate agency.
10
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
• Hazardous waste being improperly designated
• Hazardous waste being improperly disposed
• Hazardous products/wastes being improperly stored
• Compromised dangerous waste containers need to be repaired or replaced
• Illegal plumbing connection
• Illicit discharge of wastewater to storm drain
• Improperly stored containerized materials
• Improperly stored non -containerized materials
• Leaks and spills in dangerous waste storage areas
Visit Guidance
The following guidance applies to technical assistance visits, unless otherwise discussed with
ECOLOGY:
1. Prior to the visit:
• Check the TurboWaste list provided by ECOLOGY on an annual basis to try and ensure that
the business is not a Medium or Large Quantity Dangerous Waste Generator.
• Check with ECOLOGY Urban Waters staff (where applicable) to ensure that business is not
currently being visited by Urban Waters staff.
• Coordinate with other entities that may be conducting business visits in the area to reduce
potential "inspection fatigue."
• Research site and issues prior to the visit using a combination of data sources such a LSC
Database for previous visits or visits to similar businesses, industry resources, news articles,
etc.
2. During the visit:
• Provide technical assistance on proper management of dangerous waste, prevention of
stormwater pollution, spill prevention, and reduction of hazardous substance use (when
applicable).
• If appropriate, encourage businesses to participate in local green business programs, such as
the EnviroStars business certification program.
• If appropriate, discuss spill response preparedness and offer spill kit for developing a plan.
• If appropriate, photograph observed issues for before and after success stories.
• Activities that may be beneficial during the visit include, but are not limited to walking the
site (interior and exterior), checking storm drains, checking for illicit connections, checking
dumpster and waste storage, providing handouts, and ensuring necessary permits are in place.
3. At the end of the visit or after the visit:
Provide written follow-up to document the results of the visit. This can be done by leaving a
copy of the `checklist' or other documentation with the business at the end of the visit, by
using the Commitment Postcard, by sending a follow-up letter/email, or alternatively by
sending a `thank you' postcard if no issues were identified.
If necessary, coordinate with other agencies (e.g. the fire marshal, code enforcement,
stormwater, wastewater treatment, and/or moderate risk waste staff) to ensure that the
information you are providing is consistent with the other agency's regulations and/or best
management practices.
11
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Section IV. Product/Equipment Replacement Incentive Program (PERIP)
CONTRACTOR will seek and discuss opportunities to assist businesses with switching processes,
products, or equipment to use effective safer -alternatives.
The first set of targeted chemicals and products include:
1. Disposal of PFAS-containing firefighting foam used by local fire departments.
2. Replacement of dry cleaning technology that uses perchloroethylene.
3. Disposal of PCB -containing light ballasts in schools.
4. Disposal of PCB -containing caulk from public or private buildings.
5. Disposal of mats, play pads, and gym foam pit materials containing PBDE flame -retardants at
daycares.
6. Disposal of mercury thermostats in public or private buildings.
ECOLOGY will develop and approve criteria which must be met to receive incentives for any of the
above chemicals or products. Additional chemicals and products may also be added to this list.
PERIP incentive payments will be made through direct disbursement from ECOLOGY to the business
implementing the product or equipment replacement. In order to facilitate these payments, the
CONTRACTOR must maintain a record indicating how the business qualified for the incentive per the
PERIP program's eligibility criteria. Eligibility criteria will be developed for each type of incentive
offered.
For technical assistance visits, where PERIP is discussed, CONTRACTOR will record in the LSC
Database the type of product or equipment replacement opportunity the business is interested in and other
required information.
Prior to disbursement of a payment to a business, the following steps will be required:
1. CONTRACTOR conducts technical assistance visit and provides entities with recommendations
to reduce or eliminate a qualifying chemical or product. These recommendations must be
recorded in the LSC Database.
2. CONTRACTOR must communicate to the business that it may take up to 4 months to receive
payment from ECOLOGY after purchase and that the business must respond to inquiries from
ECOLOGY or the Office of Financial Management (OFM) in a timely manner to avoid delays in
payment.
3. CONTRACTOR assists business as needed with paperwork required to apply for incentive,
including a state payee registration form.
4. Business purchases approved product or equipment and converts fully to utilization of new
product or equipment in accordance with the eligibility criteria for the incentive.
5. Business submits receipts for the product or equipment purchase and installation to the
CONTRACTOR's representative.
12
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
6. CONTRACTOR verifies through a site visit and review of records that product or equipment has
been installed per PPA Specialist or ECOLOGY recommendations, old product or equipment has
been legally disposed of or decommissioned, and all other eligibility criteria have been met. This
site visit will be entered as a follow-up visit in the LSC Database. If there are still issues or
concern, the CONTRACTOR will schedule a follow-up visit or phone call to confirm product or
equipment installation meets eligibility criteria.
7. CONTRACTOR provides all required documentation that product or equipment installation met
eligibility criteria and was installed per requirement, a signed voucher form, and receipts to
ECOLOGY.
Section V. Timeline
Table 5: Timeline
Section VI. LSC Database
Information gathered during technical assistance visits must include all of the elements that are listed in
the LSC checklist v. 5.0. (Exhibit 1) and be entered into ECOLOGY's LSC database. The following
guidance applies to all technical assistance visits, unless otherwise discussed with ECOLOGY:
• Collect enough information to complete all of the applicable fields in ECOLOGY's LSC database
and enter it into the database within 15 work days of the visit
• If you make a referral to a regulatory agency enter the information about the referral into the
database within 15 work days of the referral
• Ensure that data entry is complete and accurate
• Refer to the LSC database instructions, or contact ECOLOGY support staff, for assistance with
database entry
• If using paper checklists or equivalent documentation, maintain originals in accordance with your
local public disclosure laws
• Sector Specific Checklists may be available on the ECOLOGY LSC (PPA) SharePoint Site
13
Version 10/24/18
Goal for
number
Unique Program Element
Technical Assistance
Time Period
of Site
activities
Target activities
Visits
July 1, 2019 — December 31,
32
.
PERIP
•
Marine Trade
2019
•
Marine Trade Workshops
•
Painting/Coating
•
Checklist Committee
January 1, 2020 — June 30,
32
•
PERIP
•
Marine Trade
2020
•
Landscaper Workshops
•
Painting/Coating
•
Checklist Committee
July 1, 2020 — December 31,
33
•
PERIP
•
Marine Trade
2020
.
Marine Trade Workshops
•
Painting/Coating
January 1, 2021— June 30,
33
•
PERIP
•
Marine Trade
2021
•
Planning Committee for
•
Painting/Coating
In -Person Training
•
Landscaper Workshops
Section VI. LSC Database
Information gathered during technical assistance visits must include all of the elements that are listed in
the LSC checklist v. 5.0. (Exhibit 1) and be entered into ECOLOGY's LSC database. The following
guidance applies to all technical assistance visits, unless otherwise discussed with ECOLOGY:
• Collect enough information to complete all of the applicable fields in ECOLOGY's LSC database
and enter it into the database within 15 work days of the visit
• If you make a referral to a regulatory agency enter the information about the referral into the
database within 15 work days of the referral
• Ensure that data entry is complete and accurate
• Refer to the LSC database instructions, or contact ECOLOGY support staff, for assistance with
database entry
• If using paper checklists or equivalent documentation, maintain originals in accordance with your
local public disclosure laws
• Sector Specific Checklists may be available on the ECOLOGY LSC (PPA) SharePoint Site
13
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Section VII. Training
ECOLOGY expects that the CONTRACTOR will provide basic training to the Pollution Prevention
Specialists on topics relevant to their position. ECOLOGY will provide additional training to ensure that
CONTRACTOR's staff are properly trained and supported to conduct PPA activities, and that
experienced staff are exposed to new information, and have opportunities to share their expertise for the
benefit of the LSC Partnership. The following types of training are provided. Table 6 below contains a
tentative training schedule.
New Staff Mentoring and Training
ECOLOGY staff and experienced PPA Specialists will provide a variety of training support to new PPA
staff.
1. SharePoint New Specialists Resources
The LSC SharePoint site contains resource materials for new PPA specialists. A new hire must review
these materials within the first two weeks of work as a PPA Specialist. ECOLOGY staff will also provide
additional resources as needed.
2. Field Mentoring & Training Review
The CONTRACTOR will provide training to their new staff to ensure they can perform the work. In
addition, ECOLOGY will assign two experienced PPA Specialists as a mentor to provide field training
and support to a new hire. If available, one mentor will be from the CONTRACTOR's organization and
the other mentor from another PPA partner jurisdiction in as close proximity as possible. Mentors will be
assigned within two weeks of notifying ECOLOGY of new staff hires.
Field mentoring will involve a series of accompanied field visits designed by the mentor and ECOLOGY
staff to support the needs of the new hire. When the mentor and new hire determine they are ready, an
ECOLOGY staff will accompany the new hire on a few technical assistance visits, to ensure that they are
providing accurate information on proper waste management, spill prevention, storm water pollution
prevention, and toxics reduction opportunities.
3. In-person New Staff Training
A New Staff in-person training will be offered once or twice a year depending on need and resources
available. This training will be planned and conducted by ECOLOGY staff and experienced PPA
Specialists.
In-person Trainings for all PPA Specialists
Each In-person Training will be planned and conducted by teams of PPA Specialists from two to three
LSC partners. Training topics are intended to help new staff become more competent in their work, and
experienced staff to gain greater technical depth on relevant topics. ECOLOGY staff will determine the
teams, provide initial guidance, review agendas, and provide support for planning and logistics.
Schedule: Typically these trainings are held the second Wednesday in September and March. The
trainings are usually scheduled between 8:30 a.m. and 3:30 p.m. with overnight travel allowed for
jurisdictions if needed (see state travel rules). ECOLOGY must pre -approve overnight travel if it is being
charged to the LSC budget.
If staff and resources become available, ECOLOGY will add an additional in-person training event. An
additional training event would likely be held in June.
14
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Attendance Requirement: Unless prior approval has been given by ECOLOGY, it is mandatory for at
least one PPA specialist per jurisdiction to attend the in-person trainings. This person is responsible for
disseminating information back to the PPA specialists from that jurisdiction. Managers are welcome but
not required to attend. Generally, training substitutions are not allowed for the In-person Trainings.
However, exceptions may apply. ECOLOGY staff must approve non -emergency absences or training
substitutions at least two weeks prior to the training.
Webinar Trainings
ECOLOGY conducts Webinars during most of the months that do not have In-person Trainings. These
sessions are intended to expose PPA Specialists to new information or technical topics relevant to their
work. Suggestions on topics and speakers are welcomed from PPA partners.
Schedule: These are one and a half hour sessions, held on the second Wednesday of the month.
Occasionally these sessions will need to be scheduled at alternative times to accommodate speaker
availability. Up to eight Webinars will be scheduled each year.
Attendance Requirement: Each PPA Specialist must attend at least six of the eight Webinars each year.
Another type of training that is relevant to PPA Specialists' work may be substituted for up to two of the
Webinars. Notification of the substitution must be provided to and pre -approved by ECOLOGY at least
two weeks in advance of the Webinar.
Table 6: Tentative Trainina Schedule subject to change)
July, 2019
No training
August 14, 2019
Webinar
September 11, 2019
Webinar or In -Person Training
October 2, 2019
Webinar or In -Person Training
November 6-7, 2019
New Specialists' Training Location: TBD
December 11, 2019
Webinar
January 8, 2020
Webinar
February 12, 2020
Webinar
March 11, 2020
Webinar or In-person training*
April 8, 2020
Webinar or In-person training*
May 13, 2020
Webinar
June 10, 2020
Webinar
July, 2020
No training
August 12, 2020
Webinar
September 9, 2020
Webinar or In -Person Training*
October 14, 2020
Webinar or In -Person Training*
November 11-12, 2020
New S ecialists' Training Location: TBD
December 9, 2020
Webinar
January 13, 2021
Webinar
February 10, 2021
Webinar
March 10, 2021
In-person training Location: TBD
April 14, 2021
Webinar _
May 12, 2021
Webinar
June 9, 2021
Webinar
* When possible an In -Person Training will be held in conjunction with the NW
Chapter Annual Conference. The next NW NAHMMA conference is planned for
Spring 2020.
15
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Section VIII. Reporting and Contract Changes
Quarterly Progress Reports
A brief progress report shall be submitted quarterly with the invoicing (see schedule in Section IX). This
report should indicate the work completed during the quarter and billed on the invoice, including the type
and number of visits conducted, progress on Unique Program Elements, and any other information
regarding contract performance that should be brought to ECOLOGY's attention. The Progress report
must also include the number of visits where the PERIP was presented and discussed.
Annual Reports
Annual reports, briefly summarizing contract status including: number of site visits performed, Unique
Program Element activities conducted, Technical Assistance Target activities conducted, lessons learned,
and budget status shall be provided to ECOLOGY by July 31, 2020 and July 31,, 202 1. The report shall
include two to three `case studies' of a business or organization that benefitted from a PPA site visit, with
if possible a few photos of the business (preferably before and after the visit). A template will be made
available.
Any of the following changes shall be reported to the ECOLOGY LSC Partnership Coordinator within 10
business days:
■ Key personnel changes (staff or manager leaving, new hires, etc.)
■ Initiation of or changes to a subcontract (see Section 18 of the Interagency Agreement for specific
information that is required regarding subcontractors)
Section IX. Invoicing
Invoice (billing) procedures are outlined in the Interagency Agreement, (see Section 4). In addition the
following information is provided:
• See also Appendix A, Statement of Work, Section IV, for PERIP information.
• The Invoice Voucher (form A19 -1A) must have a wet signature or scanned if submitted
electronically. If submitting a scanned copy, the CONTRACTOR will retain original signed A-
19 -1A in CONTRACTOR records per record retention requirements.
• Support documents may be submitted via email.
• Quarterly invoicing will follow the due date schedule in Table 7.
Tnhle 7! Invnicino Schedule
uarter
Months
Due Date
1
July, August, September 2019
November 10, 2019
2
October, November, December 2019
February 10, 2020
3
January, February, March 2020
May 10, 2020
4
April, May, June 2020
July 31, 2020 (earlier Due Date due to end of
fiscal year requirements)
5
July, August, September 2020
November 10, 2020
6
October, November, December 2020
February 10, 2021
7
January, February, March 2021
May 10, 2021
8
April, May, June 2021
July 31, 2021 (earlier Due Date due to end of
biennium requirements)
16
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
APPENDIX B
BUDGET DETAIL
*See Section 3 Compensation, for additional detail.
Category
Amount
*Salaries
$82,339.62
*Benefits
$36,344.00
Subcontracts
$0.00
Goods & Services (see Table A)
$1,200.00
Equipment (see Table B)
$0.00
Travel/Training
$3,800.00
Subtotal Direct Costs
$123,683.62
Indirect Costs*
Rate %
33.85%
Indirect amount
$40,174.40
Total Award
$163,858.02
* Applied to Salaries & Benefits only
Table A.
*See Section 3 Uom ensation, for aclaitional aetau.
Goods & Services (items over $1000 must Estimated Cost
be listed here or approved by ECOLOGY
prior to reimbursement)
Table B.
*See Section 3 Com ensation for additional detail.
Equipment (items over $1000 must be
listed here or approved by ECOLOGY
prior to reimbursement
Estimated Cost
None
17
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
APPENDIX C
SPECIAL TERMS AND CONDITIONS
1) Certification Regarding Suspension, Debarment, Ineligibility Or Voluntary Exclusion
a) CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred, proposed for
debarment, declared ineligible or otherwise excluded from contracting with the federal government,
or from receiving contracts paid for with federal funds. If the CONTRACTOR is unable to certify
to the statements contained in the certification, they must provide an explanation as to why they
cannot.
b) CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the
CONTRACTOR learns that its certification was erroneous when submitted or had become erroneous
by reason of changed circumstances.
c) The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction,
participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as
used in this clause, have the meaning set out in the Definitions and Coverage sections of rules
implementing Executive Order 12549. You may contact ECOLOGY for assistance in obtaining a
copy of those regulations.
d) CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction with a
person who is proposed for debarment under the applicable Code of Federal Regulations, debarred,
suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction.
e) CONTRACTOR further agrees by signing this agreement, that it will include this clause titled
"CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR
VOLUNTARY EXCLUSION" without modification in all lower tier covered transactions and in all
solicitations for lower tier covered transactions.
f) Pursuant to 2CFR180.330, the CONTRACTOR is responsible for ensuring that any lower tier
covered transaction complies with certification of suspension and debarment requirements.
g) CONTRACTOR acknowledges that failing to disclose the information required in the Code of
Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of
legal remedies, including suspension and debarment.
h) CONTRACTOR agrees to keep proof in its agreement file, that it, and all lower tier
CONTRACTORS or subcontractors, are not suspended or debarred, and will make this proof
available to ECOLOGY before requests for reimbursements will be approved for payment.
CONTRACTOR must run a search in littp://www.sani.gov and print a copy of completed searches to
document proof of compliance.
18
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
EXHIBIT 1
LSC CHECKLIST
At a minimum, information gathered during technical assistance visits must include all of the
elements that are listed in the LSC checklist v. 5.0 below. Alternative checklists for specific sectors,
which include all elements below, will also made available on the SharePoint site over the period of
this contract. If the LSC checklist v. 5.0 is updated, the most up to date checklist elements must be
used and will be available on the LSC SharePoint site.
SITE & BUSINESS INFO
BUSINESS IDENTIFICATION
FaGility..I Miall7e:.......................................................................... ................... ...,.........................,........................................,.........,...............,.....,........
DBA: _._ ............................................ _.......
StreetAddress:.............................................................. ........................................................................Cl..,.............................,..
County -11.1 ............................................................................................... zip:
BUSINESS INFORMATION
Business 'hyX'e..................................................
..................................,,.....................................,.......
arcel:..P
T ....
UBI Number: ax
Business License NAICS Code: Observed NAICS ff di Brent :
VISIT INFORMATION
Vis11
it Date:
Visit T....e:❑Fallow u ............................. .............. lnitial..................................................................El Screenin ...................
P..............................?......................................
Lead A enc
Second A=enc
....Y......................................................................................................... ........ ......Y..........Y.....................................................
-.
Lead S ecialist: Secondary Specialist:
Provided to Business; ❑ Skil! Kit ❑ ENVIROSTARS Information
.............si......,......,............................................,..,..........,.....,.... .
❑ Plastic Drum Lids ❑ Secandar Containment Voucher
WASTE STREAMS:
❑ Oil, antifreeze or petroleum
❑ Paints, stains, inks or painting
El Refrigerants
productsmaterials
..................................................................,.....................................-«-.....................................
.....
..... ...:...
[� .............................................. Solvents
❑Pharm aceuticals
,.,.................,........,.........................,........................
❑Pesticides
................................... ....... ..... ....................
.. ..�.,.,.,.......,......
..❑.Other Waste...............
SITE CONTACT INFORMATION 2:
UNIVERSAL WASTE:
❑ Mercury Thermostats I ❑ Lams ❑ Batteries ❑ Electronic Waste
SITE CONTACT INFORMATION 1:
FirstName-
Last Name: ..............»..,............................ .,...........................
..............
................ .....................................................................................
Phone Number:
Email:
❑Business Manager ❑ Business Owner
❑ Employee ❑ Property Manager ❑ Property Owner
❑ Other
SITE CONTACT INFORMATION 2:
First Name:Last
Name:
..Email:................................................,...................................................
PhoneNumber:...................................................>............,...............
❑ Business Manager ❑ Business Owner
❑ Employee ❑ Property Manager ❑ Property Owner
❑ Other
19
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
ISSUES / ACTION / RESOLUTION
* denotes high priority environmental issue & need to follow-up
ISSUE STATUS
Refer to
No
ISSUE CATEGORY and In Further Agency Resolved Comments
ISSUE TYPE Process Action *see below
list
Dangerous Waste
* Properly designate waste 4
* Properly store dangerous wastes
* Clean and eliminate leaks and
spills from dangerous waste
storage areas
* Replace compromised
containers of dangerous
waste
* Properly dispose of dangerous
waste
Educate employees on dangerous
waste management
Install secondary containment for
dangerous waste
Properly label containers of
dangerous waste
Properly document dangerous
waste disposal
Other dangerous waste storage or
disposal related issue
Industrial Wastewater
* Correct illegal plumbing
connection
Obtain proper permit for facility
discharge
Properly maintain pretreatment
system
Other industrial wastewater
related issue
20
Version 10/24/18
State of Washington, Department of Ecology
IAA No. C2000017
Spills
Improve or create spill response
procedures
Improve or purchase adequate
spill response materials
_
Other spill related issue J
Stormwater
_
* Halt discharges of wastewater
to storm drain
Maintain storm drain system
(remove solids or repair
system)
Install catch basin filter inserts
Other Stormwater related issue
Fats/Oils/Grease to stormwater
Other
* Properly storeproducts/ wastes
* Properly store containerized
materials
* Properly store non -
containerized materials
lrn lenient proper housekee in
Universal Waste
*Refer To Agency: ECY Air Quality, ECY Haz Waste, hUY 1 ur, ECY water Quanty, "uai Cluall tul tlul,1U11LY,
Local Haz Waste, Local Health Department, Local Industrial Waste, Local Stormwater, Local Wastewater
SITE VISIT
NOTES:
21
Version 10/24/18