Loading...
HomeMy WebLinkAbout201806322 ECY Comments STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775  Olympia, Washington 98504-7775  (360) 407-6300 711 for Washington Relay Service  Persons with a speech disability can call 877-833-6341 November 28, 2018 Shannen Cartmel, Project Planner Jefferson County Community Development Department 621 Sheridan Street Port Townsend, WA 98368 Dear Shannen Cartmel: Thank you for the opportunity to comment on the optional determination of nonsignificance/notice of application for the Thacker-Gibson 6-Year Development Moratorium Release Request (MLA18-00099) located at 10697 Center Road in Quilcene as proposed by Jared Thacker and Meghan Gibson. The Department of Ecology (Ecology) reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Chris Montague-Breakwell (360) 407-6364 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. a) This includes forest practices (including, but not limited to, class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State; and Shannon Brenner, Environmental Specialist November 28, 2018 Page 2 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. If there are known soil/ground water contaminants present on-site, additional information (including, but not limited to: temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s); and additional studies/reports regarding contaminant(s)) will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.ecy.wa.gov/programs/wq/stormwater/construction/ - Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. SOLID WASTE MANAGEMENT: Derek Rockett (360) 407-6287 All grading and filling of land must utilize only clean fill. All other materials may be considered solid waste and permit approval may be required from your local jurisdictional health department prior to filling. All removed debris resulting from this project must be disposed of at an approved site. Contact the local jurisdictional health department for proper management of these materials. Ecology’s comments are based upon information provided by the lead agency. As such, they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (MLD:201806322) cc: Derek Rockett, SWM Chris Montague-Breakwell, WQ Jared Thacker and Meghan Gibson (Proponents)