Sheet I of 3 DEPARTMENT OF PUBLIC WORKS Change
JC Transfer Station Site Improvement Project Order I
Date. 5-Dec-19 CHANGE ORDER ttl Number
Ordered by County Engineer under terms of
RIContract documents Contract No.: 40120423
Chane proposed by Contractor TO:
Attn:Tom Johnson
Nordland Construction North West,Inc.
Endorsed by: Nordland Construction North West,Inc.
'.............----. 123 Ponderosa Place
r c'0,,,,y4.0,-P awl Name
NordlanW98
,.............„. • / -/---')//
UBI: 602 529 765
sigeflaure , d, A358/ Date
/ 67.t.'/7 71-
l
I tide
Consent given l't Surety:(when required) Project Title:
. JC Transfer Station:
By: Site Improvement Project
Arforney-inlart Date
You are directed to perform the following described work upon receipt of an approved copy of this change order:
Construction
DAYS ADDED COST WSST A 9.0% COST W/WSST REMARKS
COP No.
Construction $ See attached for 21,250.00 $ 1,912.50 =
COP AI 0 $ 23,162.50 breakdown
Construction See attached for
$ 4,633.73 $ 417.04 . $
COP#2 0 5.050.76 breakdown
TOTAL ADD 0 $ 25,883.73 $ 2.329.54 = S 28,213.26 with WSST
All work materials and measurement to be in accordance with the provisions of the specifications and
special provisions for the type of construction involved.
ORIGINAL CURRENT ESTIMATED ESTIMATED
CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL
AMOUNT AMOUNT It [S ORDER AFTER CHANGE
$237,620.00 $237,620.00 28,213.26 $265,833.26
ORIGINAL CONTRACT CURRENT CONTRACT TIME NEW CONTRACT
COMPLETION DATE CONTRACT ITME CHANGE tAddiDel) TIME
26-Jan-20 (110)days 0 26-Jan-20
APPROV/ :RECOMMENDED APPR VAL.. : OMMENDED
rx--
L
•
„ .,Alanager Date Counts.Eng, ."---1"."-- Dine
>
(,,APPROVAL RL : MMENDED Al PR- '-.)
El ,PP
V....,./-9-\...../... 1441
LI /Z -_77
EnglIJCIfring:i '• . ana)zer Out, C'hoir Jetkrson(.,mmy('ommtssionery Date
CONSTRUCTION CHANGE ORDER PROPOSAL NO. 1
REQUEST FOR PROPOSAL
Project:Jefferson County Department of Public Works Date:November 8, 2019
Project No: 40120423
TO: Nordland Construction Northwest Inc.
In connection with your Contract with Jefferson County please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
Description of Changes:
See attached Proposal Request for description of PRO3, PRO4 and PROS. See the attached marked up sign revised November
8, for locations
n r:BY: � �
;� v�%� ���� �� �" DATE: November 8, 2019
(Gordon Ramsttrom, Proje anager for J- ferson County) j
VIEWED BY: —wow
IN.- DATE: ii 4/7
I (<2.5k, En. ' -" ices Mgr.,>2.5k ty Engineer)
(i1 v
PROPOSAL
TO: Jefferson County
We propose to perform all changes described in the above request based upon the following unit costs. See the attached
Construction Cost Proposal dated October 31,2019.
PRO3 Asphalt Paving Revisions $18,050.00
PRO4 Change dimensions at the paving below the temporary tipping wall _0_
no cost change
PROS Expand modular access lane $3,200.00
Subtotal $21,250.00
1 WSST $1,912.50
Total Change Order Proposal $23,162.50
The foregoing amount covers all direct and indirect costs related to these changes and to the effect of the changes on the
remainder of the project. All other provisions remain in full force and effect.
We request the completion date be extended 0 working days because of this work.
BY: DATE:
(for (Contractor))
ACCEPTANCE OF PROPOSAL AND APPROVAL TO PROCEED WITH CHANGES
A future CHANGE ORDER TO THE CONTRACT will be prepared for execution by the Contractor and Jefferson County.
TO: Nordland Construction North West Inc.
You are hereby directed to proceed with the changes described above.
/ 7'
j
BY: io 4 DATE: (� (
( ordon Ramstrom, Project Man.: or •fferson County)
REVIEWED BY: DATE: 1/ kij
(<2.5k, En:. -.-'c-. . gr., >2.5k County Engineer)
Nordland Construction NW Inc.
123 Ponderosa Place
Nordland,WA 98358 __ _ -
Tel: (360) 379-1352 Fax: (360)360-5182
CONSTRUCTION COST PROPOSAL REQUEST
TO: Gordon Ramstrom 11/7/2019
Jefferson County Public Works
623 Sheridan Street Thomas Johnson
Port Townsend,WA 98368 Tel: (360)379-1352
360-385-9380 Cell: (360) 774-1274
nordlandconstructionnwt hotmail.com
RE: Transfer Station Site Improvments Proposal Request#1 
Items PRO3&PRO5 and PRO4
Please find below our Lump Sum Pricing for PRO3&PRO5 Including all their components and response to PRO4
No. Item Quantity Amount
PRO3 ASPHALT PAVING REVISIONS LS $ 18,050.00
PRO5 EXPAND MODULAR ACCESS LANE LS $ 3,200.00
PRO4 NO COST CHANGE FOR DIMENSION CHANGE $
Subtotal: $ 21,250.00
WA Sales Tax 9%: $ 1,912.50
Sum Total of BID $ 23,162.50
1 of 1
•
CONSTRUCTION CHANGE ORDER PROPOSAL NO. 2
REQUEST FOR PROPOSAL
Project:JC TRANSFER STATION SITE IMPROVEMENTS Date: December 4, 2019
Project No: 40120423
TO: Nordland Construction Northwest Inc.
In connection with your Contract with Jefferson County please furnish your proposal for performing the changes outlined
below and/or detailed on the attachments referred to:
Description of Changes:
See attache:, Proposal Rm.lue-r/Or description of COP 6,7,8 and 9.
BY: /1/4 lay DATE: December 4, 2019
(Gordon Rain in. Project Manage or Jefferson County)
REVIEWED BY: _ . DATE:
> 2.5k County Engineer)
PROPOSAL
TO: Jefferson County
We propose to perform all changes described in the above request based upon the following unit costs. See the attached
Construction Cost Proposal dated October 31. 2019.
DESCRIPTION AMOUNT
NCNW COP #6 Sewer drops tic-in under Modular Building $2,540.16
NCNW COP #7 Adding Roof Drain to Modular#4 $374.55
NCNW COP #8 Grade changes to the West Side Sidewalk: $874.16
NCNW COP #9 Locate and repair culvert at Transfer Exit: S844.86
Subtotal $4,633.73
WSST $417.04
TOTAL $5,050.76
The foregoing amount covers all direct and indirect costs related to these changes and to the effect of the changes on the
remainder of the project. All other provisions remain in full force and effect.
We request the completion date be extended 0 working days because of this work.
BY: DATE: /.22/4ZA?
(for (Contractor))
ACCEPTANCE OF PROPOSAL AND APPROVAL TO PROCEED WITH CHANGES
A future CHANGE ORDER TO THE CONTRACT will be prepared for execution by the Contractor and Jefferson County.
TO: Nordland Construction North West Inc.
You are hereby directed to prpeeed with the changes described above.
BY: 114 I/L7' DATE: L
v
(Gordon Ramstrom, Project Manager for Jefferson County)
REVIEWED BY: DATE:
(< 2.5k, Eng. . _ gr., > 2.5k County Engineer)
CHANGE ORDER PROPOSAL Jefferson County Department of Public Works
SCHEDULE Transfer Station: Site Improvement Project
Project#40120423
Location: DATE: December 4, 2019
JC Transfer Station,325 County Landfill Road. REV:
TO: Tom Johnson, NCNW, Inc
BY: Gordon Ramstrom, Architectural Projects Planner IJ
Cc: Jennifer Taylor,NCNW, Inc
Tom Boatman,JCPW-SW
George Puopolo,JCPW-SW
Eric Kuzma, JCPW
Monte Reinders,JCPW
DESCRIPTION PROPOSAL AMOUNT JCPW ACTION
COP#6 Sewer drops tie-in under Modular Building: 2,540.16 ACCEPT
Required to add as not included in the modular. 228.61 = WSST
$2,768.77= TOTAL
This work is pending.
Adding Roof Drain to Modular#4:
COP#7 Required to add as downspout receptors were not included 374.55 ACCEPT
for the east side of the modular roof. 33.71 =WSST
$408.26_= TOTAL
This work is completed.
Grade changes to the West Side Sidewalk:
Required to comply with revisions to the grade at the 874.16 ACCEPT
sidewalk at the west side of the tipping approach area. At 78.67=WSST
COP#8 the east front of the modular building. $952.83= TOTAL
This work is completed
Locate and repair culvert at Transfer Exit:
East end of this culvert was buried, and required extension 844.86 ACCEPT
COP#9 to suit added paving at this turn. This culvert was blocked, 76.04= WSST
and cleared out by County Forces. $920.90= TOTAL
This work is completed
SUB TOTAL $4,633.73
WSST $417.04
TOTAL $5,050.76
Page 1 of 1
JEFFERSON COUNTY PUBLIC WORKS
TRANSFER STATION SITE IMPROVMENTS
PROJECT NO. 4012043
11/27/2019
Change Order Proposal (42
Sewer Drops tie-in under Modular Buidling
Contractor Labor: Quant. Unit Price Cost
CARPENTER HR $ 72.70 $0.00
OPERATOR HR $ 77.42 $0.00
TRUCK DRIVER HR $ 69.92 $0.00
total: $0.00
Contractor Equipment:
CAT EXCAVATOR HR $ 28.13 $0.00
2017 KENWORTH TRUCK HR $ 94.22 $0.00
total: $0.00
Contractor Materials:
LS $0.00
total: $0.00
Subcontractor
SILVERDALE PLUMBING $ 2,268.00
total: $2,268.00
Markup $0.00
Contractor Markup on Labor @ 29% $0.00
Contractor Markup on Equipment @ 21% $0.00
Contractor Markup on Materials @ 21% $2$0 16
Contractor Markup on Subcontractor @ 12% total: $272.16
SubTotal: $2,540.16
Sales Tax $228.61
Grand Total COP: $2,768.77
silverdale plumbing & heating inc,
e f (o
Date: November 27, 2019
From: Dennis Dlugosh - Silverdale Plumbing 86 Heating, Inc.
Re: Jefferson County Transfer Station
Port Townsend, WA
PLUMBING SCOPE OF WORK AS FOLLOWS:
Silverdale Plumbing and Heating, Inc. proposes to furnish labor and material to
install the following:
IF ANY OF THE EXCLUSIONS LISTED BELOW NEED TO BE INCLUDED IN OUR
SCOPE OF WORK, PLEASE CONTACT US FOR PRICING.
G eneral Exclusions:
.6 Concrete cut, core, remove 86 patch
.6 Underground utility locating
.6 Select fill
.6 Any electrical
•6 Any sheetrock
.6 Any painting
.6 Condensate piping & drain
.6 Roof flashings
.6 Any exterior grease traps
.6 Washington State Sales Tax
Job Specie Inclusions:
Tie modular unit sewer drops together under modular building
Prevailing wages
For the Sum of: $2,268.00
Considering the volatility of the market, our vendors are unable to guarantee
pricing. Therefore this proposal will expire in 30 dmfs and will need to be re-
quoted after that time.
Submitted by Dennis Dlugosh
(360) 340-1393 cell
11875 Silverdale Way NW, Suite 104 • Silverdale, WA 98383 • (360) 692-8840 • Fax (360) 692-1867
JEFFERSON COUNTY PUBLIC WORKS
TRANSFER STATION SITE IMPROVMENTS
PROJECT NO. 4012043
11/27/2019
Change Order Proposal 1
Adding Roof Drain to Modular
Contractor Labor: Quant. Unit Price Cost
CARPENTER 2 HR $ 72.70 $145.40
OPERATOR HR $ 77.42 $0.00
TRUCK DRIVER HR $ 69.92 $0.00
total: $145.40
Contractor Equipment:
CAT EXCAVATOR HR $ 28.13 $0.00
2017 KENWORTH TRUCK HR $ 94.22 $0.00
total: $0.00
Contractor Materials:
CARLS BUILDING SUPPLY LS $ 154.53 $154.53
total: $154.53
Subcontractor
total: $0.00
Markup
Contractor Markup on Labor @ 29% $42.17
Contractor Markup on Equipment @ 21% $0.00
Contractor Markup on Materials @ 21% $32.45
Contractor Markup on Subcontractor @ 12% $0.00
total: $74.62
Sub Total: $374.55
Sales Tax: $33.71
Grand Total COP: $408.26
JEFFERSON COUNTY PUBLIC WORKS
TRANSFER STATION SITE IMPROVMENTS
PROJECT NO. 4012043
11/27/2019
Change Order Proposal
Grade changes to West Side Sidewalk
Contractor Labor: Quant. Unit Price Cost
CARPENTER 2 HR $ 72.70 $145.40
OPERATOR 1 HR $ 77.42 $77.42
TRUCK DRIVER 1 HR $ 69.92 $69.92
total: $292.74
Contractor Equipment:
CAT EXCAVATOR 1 HR $ 28.13 $28.13
2017 KENWORTH TRUCK 1 HR $ 94.22 $94.22
total: $122.35
Contractor Materials:
SHOLD EXCAVATING 1 LS $ 288.00 $288.00
total: $288.00
Subcontractor
total: $0.00
Markup
Contractor Markup on Labor @ 29% $84.89
Contractor Markup on Equipment @ 21% $25.69
Contractor Markup on Materials @ 21% $60.48
Contractor Markup on Subcontractor @ 12% $0.00
total: $171.07
Sub Total: $874.16
Sales Tax: $78.67
Grand Total COP: $952.83
JEFFERSON COUNTY PUBLIC WORKS
TRANSFER STATION SITE IMPROVMENTS
PROJECT NO. 4012043
11/27/2019
Change Order Proposal# I
Locate and Repair Culvert at Transfer exit
Contractor Labor: Quant. Unit Price Cost
CARPENTER 3 HR $ 72.70 $218.10
OPERATOR 4 HR $ 77.42 $309.68
TRUCK DRIVER HR $ 69.92 $0.00
total: $527.78
Contractor Equipment:
CAT EXCAVATOR 2 HR $ 28.13 $56.26
2017 KENWORTH TRUCK HR $ 94.22 $0.00
2007 JD BACKHOE 2 HR $ 39.65 $79.30
total: $135.56
Contractor Materials:
LS $ - $0.00
total: $0.00
Subcontractor
total: $0.00
Markup
Contractor Markup on Labor @ 29% $153.06
Contractor Markup on Equipment @ 21% $28.47
Contractor Markup on Materials @ 21% $0.00
Contractor Markup on Subcontractor @ 12% $0.00
total: $181.52
Sub Total: $844.86
Sales Tax: $76.04
Grand Total COP: $920.90
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Philip Morley, County Administrator
From: Monte Reinders, Public Works Director/County Engineer
Agenda Date: December 16, 2019
Subject: Execute Change Order #1 for the
Transfer Station Site Improvement Project
Project #401204023
Statement of Issue: The Execution of a Change Order #1 to the Construction Contract
for Site Improvements, including the installation of a modular office facility at the JC
transfer Station site at 325 County Landfill Road.
Analysis/Strategic Goals/Pro's &t Con's: This added work was necessary to address
undiscovered conditions, extend paving, and resolve construction conflicts.
Fiscal Impact/Cost Benefit Analysis: This project is funded with local funds. The
contract change is $28,213.26 tax inclusive.
Recommendation: We recommend that this Contract Change Order be signed by the
Board. Please sign the three originals, retaining one for your records, and return two
originals to Public Works.
Department Contact: Gordon D. Ramstrom, Architectural Projects Planner,
360-385-9380
Reviewed By:
f ��✓l lel/