HomeMy WebLinkAbout025 Application SubmittalDonna Frostholm
From: Ken Sheppard <KSheppard@sksp.com>
Sent: Monday, December 30, 2019 12:10 PM
To: Donna Frostholm; Philip Hunsucker
Subject: BDNLLC-MLA 19-0036
Attachments: Cumulative Impact Addendum - BDN LLC 12-30-19.pdf
LOG [TEM
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links,
especially from unknown senders.
Hello Donna and Phil —
Attached please find the updated Cumulative Impacts Addendum, which now incorporates all of the materials we
received from the Corps via our FOIA requests, and also references the
impact of the Coalition to Protect Puget Sound Habitat, v. U.S. Army Corps of Engineers case.
I have incorporated the Addendum and all of the referenced Appendices into one document, which I see is 17
MB. Please confirm if you have been able to receive and open this. I can send the base document and the
attachments separately, by two or more emails if need be, and this should keep the file sizes down.
It is my understanding that we have now fully addressed all matters raised in Donna's letter of July 10, 2019, and
that this matter is now ready to be noticed. If that is not the case, or if you need anything else from me to
complete the process, please let me know.
Thank you,
Ken Sheppard
Kenneth A. Sheppard
Simburg, Ketter, Sheppard & Purdy, LLP
999 Third Ave., Suite 2525
Seattle, WA, 98104
(206)382-2600
Fax: (206) 223 3929
www.sksp.com
- CONFIDENTIALITY NOTE -
The information contained in this electronic file is confidential information intended only for the use of the individual or entity named above and
may be legally privileged. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or
copy of this facsimile is strictly prohibited. If you have received this email in error, please immediately notify us by telephone or return
email. Thank you.
F
_ � ... .�
�! �j,
'�
r� ti
LUG ITEM
# ZS
Paw Zor 27
BDN Inc.
SMERSH FARM CUMULATIVE IMPACTS REPORT
REVISED
June 2018
DEC 3 0 2019
ADDENDUM 1 JEFFERSON COUNTY DC( i
4.0 CUMULATIVE EFFECTS FROM NEARBY CURRENT PROJECTS AND REASONABLY
FORESEEABLE FUTURE PROJECTS.
Conditional use permits require that consideration be given to the cumulative impact of additional
requests for like actions in the area. The total impact of a proposal and like proposals should remain consistent
with the policies of the Jefferson County Shoreline Master Program ("SMP") and should not produce
substantial adverse effects to the shoreline environment.
The SMP defines "Cumulative impacts" or "cumulative effects" as "the combined impacts of a
proposed development action along with past impacts and impacts of reasonably foreseeable future
development actions. (JCC 18.25.100(3)(aa)). "Reasonably foreseeable" is defined as "predictable by an
average person based on existing conditions, anticipated build -out, and approved/pending permits." (JCC
18.25.100(18)(d))
4.0.1 Other existing nearby projects
On October 2, 2019, BDN submitted to the U.S. Army Corps of Engineers, Seattle District,
("USACE" or "Corps") a request for information concerning all USACE approved aquaculture
projects within a 5 mile linear shoreline distance in either direction from the reference BDN project
NWS -2013-1268. This request was assigned FOIA number FA -20-002. On October 31, 2019, and
December 3, 2019 the USACE responded with materials identifying the following projects:
4.0.1.1 Former Wasbinaton Shellfish Farm 821334073. USACE Reference NWS -2017-
230. This parcel is a bit less than '/Z mile to the west of the proposed project. BDN acquired this
parcel in 2014, which was associated with an existing geoduck farm operated by Washington Shellfish
for several years and then operated by BDN pursuant to a lease from Washington Shellfish starting in
2013. Washington Shellfish had applied for coverage under the 2012 Nationwide Permit 48 for
existing shellfish farms in October 2012 (NWS -2012-1210), and the Corps had confirmed such
coverage. BDN applied for continuing coverage under the 2017 NEP 48,and on August 22, 2017 the
USACE confirmed this coverage, and confirmed that BDN could continue to farm the parcel within
the existing footprint previously farmed by Washington Shellfish. Similar to the current Smersh
parcel, the Corps required updated eelgrass maps. By letter dated September 14, 2017, the Jefferson
County Department of Community Development ("JCDCD") confirmed that the proposed continuing
operations at this location had not expanded so as to require a County Conditional Use Permit. (See
Appendix A)
4.0.1.2 BDN Parcel (821334011). USACE Reference NWS -2017-230. This parcel is a bit
less than % mile to the west of the proposed project, and is adjacent to the west side of the property
referenced in 4.0.1.1 above. BDN submitted its Corps application for this parcel at the same time as
the Corps application for the current Smersh parcel. Farming on this parcel was approved by the
Corps on August 22, 2017, and by letter dated September 14, 2017, the JCDCD confirmed that the
BDN Cumulative Impacts Addendum — Page 1
LOG' I I SIA
P, of
proposed continuing operations at this location had not expanded so as to require a County
Conditional Use Permit. (See Appendix A)
A 410.>1.3Former Mocean Shellfish Farm (821334079). USACE Reference NWS -2017-230.
This parcel is a bit less than '/z mile to the west of the proposed project, and is adjacent to the west
side :6f the property referenced in 4.0.1.2 above. BDN acquired this parcel in 2014, which was
associated with an existing geoduck farm operated by Mocean Shellfish. The parcel was approved by
the`Coros for'gegduck'cultivation in 2012 pursuant to Corps approval NWS -2012-1099. The parcel
was reverified by the Corps under Nationwide Permit 48 on August 22, 2017, and by letter dated
September 14, 2017, the JCDCD confirmed that the proposed continuing operations at this location
had not expanded so as to require a County Conditional Use Permit. (See Appendix A)
4.0.1.4 Rock Point Oyster Co. (721092001, 003). USACE Reference NWS -2010-1039. This
project is located at Case Shoal, about 3.5 miles by shoreline from the BDN proposed Smersh project.
While its primary activity is bottom cultivation of Pacific oysters and Manila clams, and cultivation
of Pacific and Kumamoto oysters in flip bags on longlines and trays, the permit includes permission
to cultivate up to 7.35 acres of geoducks on a 48 acre site in Thorndyke Bay. Farming on this parcel
was approved by the Corps on August 18, 2017. However, as per telephone conference with Mr.
David Steele of Rock Point Oyster Co. on December 23, 2019, only one acre of the potential geoduck
planting area has been found to be suitable for commercial geoduck cultivation, and it is anticipated
that about'/4 acre of geoducks will be harvested each year going forward. This project is visually and
geographically isolated from that of applicant, being 3.5 miles by shoreline from the BDN proposed
Smersh project. There is no physical or aesthetic interaction between these projects at all, and thus no
cumulative impact results from their co -existence and simultaneous operation. (See Appendix B)
4.0.1.5 Deep Blue Seafood 721194010. USACE Reference NWS -2007-1152. This project
is located at Thorndyke Bay, about 5 miles by shoreline from the BDN proposed Smersh project. The
permit is to cultivate 3.8 acres of geoducks on a 6 acre site in Thorndyke Bay, with 2 acres of active
cultivation, approximately 2 acres of fallow tidelands, and 2 acres with no aquaculture. Farming on
this parcel was approved by the Corps on August 18, 2017. As per telephone conference with Mr. Jim
Smith of Deep Blue Sea, LLC on December 23, 2019, less than two acres is currently planted in
geoducks. This project is visually and geographically isolated from that of applicant, being three miles
away at Thorndyke Bay. There is no physical or aesthetic interaction between these projects at all,
and thus no cumulative impact results from their co -existence and simultaneous operation. (See
Appendix C.)
4.0.1.6 Set & Drift LLC (954600122. 123). USACE Reference NWS -2015-5.68. This project
is located in Thorndyke Bay, about 5 miles by shoreline from the BDN proposed Smersh project. It
was approved by the Corps for the cultivation of up to 2.36 acres of a 3.5 acre project area with on
bottom Manila clam and Pacific oysters in bags, harvested by hand, and installation of geoduck grow -
out equipment, but no planting of geoduck seed, on a 15'x15' geoduck test tube plot. Farming on this
parcel was approved by the Corps on March 14, 2017. This project is visually and geographically
isolated from that of applicant. The presence of a 15' x15' geoduck tube test plot, containing no
geoducks, is miniscule and insignificant. There is no physical or aesthetic interaction between these
projects at all, and thus no cumulative impact results from their co -existence and simultaneous
operation. (See Appendix D.)
4.0.1.7 Hood Canal Mariculture Project. USACE Reference NWS -2008-502. This project is
operated by Hood Canal Mariculture, Inc., and is a floating farm located at Hood Head, about 2.5
BDN Cumulative Impacts Addendum — Page 2
*' 1 C)G ITEM
L2
Ar
miles from the subject project to the east of the Hood Canal Bridge. It primarily grows seaweed on
suspended cultivation lines located over 2.64 acres of aquatic lands leased from the Washington
Department of Natural Resources (Lease #20-1312535). There is some associated mussel and oyster
production, also using suspended bags or trays, but no geoduck production This project is visually
and geographically isolated from that of applicant. There is no physical or aesthetic interaction
between these projects at all, and thus no cumulative impact results from their co -existence and
simultaneous operation. (See Appendix E.)
4.0.2 Potential future nearby projects
4.0.2.1 Garten acid Tiemsland Parcels 821334078 82I334075 821334074 and 821334076).
BDN submitted its Corps application for these parcels at the same time as the Smersh parcel. The
Corps reference numbers are NWS -2013-1147 and NWS -2013-1223. These have not been approved
by the Corps for planting. BDN currently has no plans to seek approval of the Corps or County to
conduct any activities on these parcels, and could not do so without obtaining all necessary Corps or
County approvals.
4.0.2.2. Other pending or approvedAWlications before CoMs of En ineers. On November 4,
2019, BDN submitted to the USACE a request for information concerning all submitted and pending
applications before the USACE for aquaculture projects within a 5 mile linear shoreline distance in
either direction from the reference BDN project NWS -2013-1268. This request was assigned FOIA
number FA -20-023. On December 10, 2019 the USACE responded by letter indicating that there are
no pending applications. (See Appendix F.)
4.0.2.3. Other pending or approved applications before Jefferson County. It is our
understanding that there are currently no applications pending before Jefferson County for any similar
aquaculture projects within a 5 shoreline miles of the Smersh project, and that no county permits have
been granted for any other similar nearby projects that have yet to be constructed.
4.0.3 Cumulative Impacts Analysis.
As noted above, The Jefferson County SMP defines "Cumulative impacts" or "cumulative
effects" as applying only to impacts of reasonably foreseeable future development actions. (JCC
18.25.100(3)(aa)). The SMP then defines "Reasonably foreseeable" as projects "predictable by an
average person based on existing conditions wWcipgtcd build -out and approved/pending permits.'
(emphasis supplied.)( JCC 18.25.100(18)(d)). It is BDN's position that this analysis of the BDN
projects and the projects identified in 4.0.1 and 4.0.2 above satisfy this requirement, since there are no
known additional pending applications before either the USACE or Jefferson County. All of these
projects are addressed below so as to demonstrate that their cumulative impacts will not produce
substantial adverse effects to the shoreline environment.
4.0.3.1 Seattle District Corps of Engineers Approval of the Cumulative Impacts of the
Relevant Projects. Aquaculture projects are required to secure permits from the USACE in addition to
permits required by other state or local government agencies. NWP 48 is the nationwide permit
developed by the USACE for Commercial Shellfish Aquaculture Activities. In connection with NWP
48, the Corps has developed a Programmatic Biological Assessment (PBA), which includes
Programmatic Biological Opinions (PBGs) produced by the National Marine Fisheries Service and the
U.S. Fish and Wildlife Service. These PBO's focus on impacts to listed species, critical habitat, and
essential fish habitat (including eelgrass and forage fish), and are based on current baseline conditions
and projected future shellfish activities in Washington waters. Effects regarding water quality,
BDN Cumulative Impacts Addendum — Page 3
LOCA F F EM
# 25
page--!LLOI
substrate and sediments, vegetation, benthic community, fish and birds, contaminants, and noise are
examined in these PBO's. The language in the National Decision Document Determinations also
found generally that `...the issuance of this NWP will ... result in no more than minimal individual and
cumulative adverse effects on the aquatic environment." (Decision Document, Nationwide Permit 48,
December 21, 2016, pp 73-74)
The Corp's NWP 48 authorizes the District offices to make individual assessment of the
cumulative impact of historical conditions, current conditions, and future trends surrounding
commercial shellfish aquaculture activities in the Hood Canal area. NWP 48, Paragraph 23 directs
that "The district engineer will consider the following factors when determining appropriate and
practicable mitigation necessary to ensure that the individual and cumulative adverse environmental
effects are no more than minimal:" NWP 48, Paragraph 23 (b) then specifically requires the District
office to ensure that "Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or
compensating for resource losses) will be required to the extent necessary to ensure that the individual
and cumulative adverse environmental effects are no more than minimal."
As a condition of its approval of the BDN Smersh project (granted on December 19, 2016
under NWS -2013-1268, Appendix G) The Seattle District Office of the USACE required an extensive
individual -analysis --all of the activities that would take place under the subject project prior to
issuing its approval of the project under NWP 48. This included a detailed biological assessment,
multiple exhaustive eelgrass analyses for the site, and a detailed gear management plan, all of which
have been previously provided to the JCDCD. These studies resulted in permit conditions for the
current proposed project that, among other things, ensured that the permitted project would not
conduct operations in any native eelgrass areas, and that there would be no or minimal plastic
pollution from the project. Based on this individual analysis process, and as a prerequisite to the
NWP 48 approval, the Seattle District Office of the Corps concluded that there would be minimal
cumulative impacts from permitting the BDN Smersh project.
4.0.3.3 Effect of Recent Ruling in The Coalition to Protect Puzet Sound Habitat, v. US.
Army Corns afEngineers. Recently the Federal District Court, Western District of Washington
reviewed the Corps of Engineers administration of its Nationwide Permit 48 in the case of The
Coalition to Protect Puget Sound Habitat, v. U.S. Army Corps of Engineers, Case No 2:16 -CV -00950,
and 2:17 -CV -1209. The court issued a ruling that found NWP 48 to be deficient in that it made
nationwide generalized conclusions that all aquaculture activities meeting its general standards would
have no cumulative impact on the environment in the areas of permitted activity. (Appendix H.) In
particular, the court noted that while it did "not intend to suggest, and is not suggesting, that the
general terms and conditions imposed on a nationwide, regional, or state permit cannot be relevant to
and supportive of a finding of minimal impact,... [t]hey are simply too general to be the primary `data'
on which the agency relies when evaluating the impacts of the permitted activities." (P.17)
The court then went on to hold that "The Corps must analyze the individual and cumulative
impacts of the proposed activity against the environmental baseline", (P.15), and that while NWP 48
allowed for the potential imposition at the District level of additional conditions or restrictions, it did
not require that this take place:
"The problems here are that the Corps' [nationwide] minimal impact determinations
were entirely conclusory and the regional conditions that it assumed would minimize
impacts were not in place at the time NWP 48 was adopted. The record is devoid of
any indication that the Corps considered regional data, catalogued the species in and
BDN Cumulative Impacts Addendum — Page 4
characteristics of the aquatic environments in which commercial shellfish aquaculture
activities occur, considered the myriad techniques, equipment, and materials used in
shellfish aquaculture, attempted to quantify the impacts the permitted activity would
likely have on the identified species and characteristics, or evaluated the impacts of the
as -yet -unknown regional conditions." P.18
In particular the court was concerned that there was no individual project analysis required under
NWP 48 for the effects of projects on seagrass: "In some cases, such as when nets are placed over
planted clam beds, any eelgrass is likely to be permanently smothered and not recover.
This is because of the permanence of the nets, which are only removed between harvest and the next
planting cycle." P.12. The court was also concerned that there would be no individual analysis
required for such things as pesticides ("Having eschewed any attempt to describe the uses of
pesticides in commercial shellfish aquaculture or to analyze their likely environmental impacts, the
decision to permit such activities through NWP 48 cannot stand." P. 16) or plastics ("The Corps...
relies on the fact that `[d]ivision engineers can impose regional conditions to address the use of
plastics' in response to these concerns.")
As can be seen below, the materials submitted with the BDN application demonstrate that the
Seattle District Office of the Corps actually did make the exact detailed individual analysis of each of
these issues as raised by the Coalition to Protect Puget Sound Habitat court in its decision. No
operations in native eelgrass areas were permitted, and a very detailed gear management plan was
required to control possible plastics pollution. Moreover, no use of nets or pesticides is proposed
under the BDN operations plan.
4.0.4 Indivualized Cumulative Impacts Analysis
4.0.4.1 Cumulative Impact of Addition of Smersh Project on Hood Canal Generally. Hood
Canal has 342.6 kilometers (212.9 mi) of shoreline and 42.4 square kilometers (about 10,500 acres) of
tidelands. (Chapter 3 of the State of the Nearshore Report, King County Department of Natural
Resources, Seattle, Washington, 2001) The addition of 5.15 acres of geoduck aquaculture along an
additional 600 feet of Hood Canal would impact less than 1/20th of I% of Hood Canal tidelands
acreage, and a bit more than the same 1/20th of 1% of Hood Canal shoreline. Thus on a quantitative
basis, the cumulative impact of the proposed project is tiny.
4.0.4.2 Cumulative Impact of Addition of Smersh Project on All Existing Permitted 11roiccts
Within Five Shoreline Miles. The cumulative cultivated area of all of the existing aquaculture
projects within five shoreline miles of the proposed project is 11.02 acres, or less than 1/9th of 1% of
Hood Canal tidelands, and .0006857% (a bit more than 1/15th of 1%) of Hood Canal shoreline.
Adding the Smersh project to this total brings the cumulative impact of all of these operations to
.00154% (less than 1/6 of 1 %) of Hood Canal acreage, and .00116% (less than 1/8`h of I%) of Hood
Canal shoreline. Thus, even on a more local level specifically considering all other existing nearby
aquaculture projects, adding the Smersh project makes no significant quantitative impact on the tiny
overall percentage of Hood Canal acreage and shoreline devoted to aquaculture.
4.0.4.3 Cumulative Impact of Addition of Smersh Project on All Existing Permitted Jefferson
Coun1y Projects Beyond Five Shoreline Miles. Appendix I is a listing of applications to or approvals
granted by the USACE between 2007 and 2016 for aquaculture projects located anywhere in Jefferson
County This listing was obtained from official court records for the case of The Coalition to Protect
Puget Sound Habitat, v. U.S. Army Corps of Engineers, Case No 2:16 -CV -00950, pending in the
Federal District Court, Western District of Washington. It includes the BDN proposed project. This
BDN Cumulative Impacts Addendum — Page 5
LOG ATE:
R
710`
list contains projects involving 85.95 acres of Jefferson County tidelands. What this demonstrates is
that in the 9 year period between 2007 and 2016, permits were granted by the USACE affecting less
than I% of all Jefferson County tidelands. There is simply no evidence of explosive or dramatic
cumulative growth of Jefferson County aquaculture projects in general, and geoduck related projects
have been a small percentage of those approved aquaculture activities.
4.0.4.4 Possible Cumulative Impact of All Pending Aquaculture Applications. BDN has no
current plans to seek a CUP for the Garten and Tjemsland projects, thus there are no applications
pending. Therefore, because there are no "anticipated build -out, and approved/pending permits" for
these parcels, they should not be included in the cumulative impacts analysis under JCC
18.25.100(18)(d). Even if they were included in the analysis, they would increase the acreage and
shoreline impact numbers by .00027%, a miniscule amount.
The Corps of Engineers indicates there are no pending applications for aquaculture operations
within five shoreline miles of the Smersh project (See Appendix F.) Thus, there are no "foreseeable
future actions" to be included in this cumulative impacts analysis under JCC 18.25.1009(3)(aa).
4.0.4.5 Potential future construction of residential in -water or over water appurtenant
structures. There is no planned construction by BDN of in -water or over water appurtenant structures
connected with the Project. All placement of any materials in or over the project will be on private
tidelands entirely owned by applicant, and will protrude only a few inches above bottom. Thus,
project activity would not impact construction of in -water or over water appurtenant structures by any
adjacent property owners, to the extent that those property owners could otherwise meet the applicable
permit requirements for such construction.
4.0.4.6 Cumulative Biological ic��act. In order for there to be substantial negative
cumulative biological effects of the proposed project, there must be some significant demonstrated
negative biological effect or effects flowing from it that can be cumulated with known or potential
negative biological effects from other projects or sources. However, an objective consideration of the
Biological Evaluation previously submitted with the application for the Smersh project simply does
not support a conclusion of any significant negative biological effects of the proposed project.
The biological area of most concern to the USACE has been eelgrass impact, and this has also
been raised in discussions and contacts with the JCDCD. The multiple, detailed eelgrass surveys and
analyses, coupled with the USACE requirement that no geoduck plantings take place in or near
existing eelgrass beds, shows that this cannot realistically be a cumulative biological impact concern.
The same is true as to fish and other marine organisms. There appears to be no realistic
substantial negative impact on species at or near the project site. Simply voicing concerns that some
type of biological impact might occur from the project is not a proper basis to conclude a negative
cumulative biological impact from the project within the meaning of JCC 18.25.100.
4.0.4.7 Cumulative Marine. Vehicle and Pedestrian Cumulative Marine, and Pedestrian Impact. The project will not impede
marine traffic at any time. Whenever the water is of sufficient depth in the surrounding areas for
small boat traffic, those vessels will be able to traverse the planted tract area freely. The minimal use
of vessels by BDN is addressed in the previously submitted annotated site plan (BDN004R). This tiny
additional vessel usage will have minimal cumulative impact the area environment.
By far the dominant vehicle traffic impact on the area is from the 24 -hour -per -day, seven -
days -per -week vehicle traffic on Shine Road, which passes a few hundred feet from both the existing
BDN Cumulative Impacts Addendum — Page 6
l..CC7 ITEM
pag 91.9_0�v_
and proposed BDN projects. The addition of the few additional vehicle trips and parking activities as
described in the annotated site plan (BDN004R) will have at most a tiny cumulative effect on the
project area when compared to the constant visual and noise impact from Shine Road and the
surrounding feeder roads, especially since non-public area parking will be provided for all beach
workers as necessary.
The cumulative impact on the use of W.R. Hicks County Park for recreational purposes is also
de minimis (See BDN004R, Paragraph 3.) There will be no significant interference of any kind with
public use of the park at any time.
The existence of the Smersh project, both by itself and in conjunction with the other nearby
BDN project, will have no substantial cumulative impact on pedestrian traffic along the area tidelands.
A 50' to 100' wide strip of beach and tidelands at the north edge of both projects will remain
undisturbed, and if the tide is out far enough to expose the planted areas, this northern edge strip will
also be exposed and available for pedestrian traffic across the area of both projects. A beach walker
crossing these private property areas might at worst have to alter their walking path slightly to go
around the planted areas instead of over them.
4.0.4.8 Cumulative Visual Effects. Visual effects are similarly minimal, with the planned
mesh tubes visible in the upper margins of the geoduck planting area a maximum of 16% of any
single month, and the entire planted area visible a maximum of only 2% of any month (Smersh Farm
Visual Assessment, Page 7.) Since mesh tubes will be present for only 2 years during a 6-7 year
planting/harvest cycle (JARPA, Page 6), the period of visual impact would be only .0066% , or 2/3 of
I% of that period. Again, this is a minimal cumulative visual impact.
Similarly, harvest and beach maintenance activities will be visible to neighboring residents
only for a limited time. Planting will take place over a period of 20-25 days, and harvesting activities
will take place about 5 hours per day, averaging 3-4 harvest days per week during the one to two year
harvest period. So for 84-98% of the time during the 6-7 year harvest cycle, there will be no mesh
tubes visible at all, even at low or minus tides, and on most days during that cycle there will be no
planting or harvesting activities at all.
The Smersh Project is located about 2000 feet to the east of the existing BDN farm project.
There are at most 25 homes between the two projects that might conceivably be able to see both
projects simultaneously. But as can be seen from photos 9 and 10 of the previously submitted June
2018 Visual Impacts Assessment, even at a distance of a few hundred feet, the project is barely visible
because the tubes extend only a few inches above the sand. As can also be seen from Photos 11 and
12, there are at most twenty houses that will be able to see the Smersh project at all. .
The tubes on the Smersh project will only be visible for 2-16% of the time. This is also true
of the existing BDN project. So tubes will exist on one farm or the other for at most 32% of the time.
There are at most ten homes that could realistically see both projects at once, and those homes would
be distant enough from one or both projects that someone at those properties would be barely able to
distinguish the tubes on either project during the maximum 32% of the time the tubes would be in
place.
So the cumulative visual impact of the Smersh project would at most affect 25 adjacent
properties 32% of the time, and the nature of that visual impact would be minimal. By far the
dominant visual impact on the area is from the busy Shine Road highway, which adds far more visual
disruption and noise from its 24 -hour -per -day, seven -days -per -week visual and noise impact than the
BDN Cumulative Impacts Addendum — Page 7
ft
2�
PAE..��.�
tiny cumulative visual impact of dark 6" diameter tubes sticking up from the sand a few inches on
both the existing BDN and proposed Smersh project.
4.0.4.9 Cumulative Debris, Plastics, and Chemical Impact.
4.0.4.9.1 Debris. Non -secured gear and equipment will be removed from the
farm area when crews are not present. The HDPE mesh tubes that will be used on the project are,
based on current BDN experience, less likely to come loose from their insertion points due to wave
action or geoduck activity. But in order to control any potential beach pollution or other impact from
dislodged tubes or other gear, BDN will implement a comprehensive program as follows:
A. Geoduck mesh tubes will be marked to identify ownership,
including an appropriate contact number. All gear installed in the project area will be kept neat and
secure.
B. Beaches within one-half mile of the farm will be patrolled by
BDN on a weekly basis and within a day following a severe storm event. Any observed geoduck farm
gear or equipment will be retrieved regardless of its source and will either be repaired and placed back
into service or properly disposed of. If more than 20 mesh tubes are observed to have escaped from
the project area, BDN will immediately contact the U.S. Army Corps of Engineers, Seattle District,
Regulatory Branch ("Corps"). Upon notification, BDN will initiate actions to secure any untethered
gear and resolve any navigational hazards, as appropriate, and will initiate an emergency inspection to
document the incident and determine the cause of the failure (e.g.storm conditions, etc.).
C. BDN will conduct semiannual cleanups in Squamish Harbor in
coordination with other interested parties or organizations, and will conduct an annual diver survey of
its farmed parcels and adjacent parcels, including photo and/or video documentation each parcel's
appearance. BDN will have a full-time manager living near the farm to quickly respond to potential
farm issues and implement the above maintenance tasks. The farm manager will maintain a log book
of all such gear management activities.
The BDN Gear Management Plan goes well beyond what is required by the Corps under NWP
48, which requires only that beaches be patrolled once every three months to retrieve aquaculture
debris that escapes from the Project area. The Shorelines Hearings Board has also determined that
monthly beach patrols of the type proposed by BDN adequately mitigate concerns associated with
marine debris. See Coalition to Protect Puget Sound Habitat v. Pierce County, et al., SHB No. 14-
024, Findings of Fact, Conclusions of Law, and Order (May 15, 2015)("Longbranch"), Findings of
Fact 41-47; Coalition to Protect Puget Sound Habitat v. Thurston County, et al., SHB No. 1 3-006c,
Findings of Fact, Conclusions of Law, and Order (Oct. 11, 2013), Findings of Fact 37-38; Coalition to
Protect Puget Sound Habitat v. Pierce County, et al., SHB No. 11-0 19, Findings of Fact, Conclusions
of Law, and Order (July 13, 2012), findings of Fact 10.
Thus, the immediate and cumulative impact of debris from the project on the surrounding
environment will be minimal. There are no other nearby similar projects that are situated such that
any gear or materials released from them would overlap with any of the materials that might be
released from the proposed project. Thus there will be no cumulative debris impact from the proposed
project on nearby areas.
4.0.4.9.2 Plastics impact. The mesh tubes used on the Project will be
constructed of HDPE plastic. By and large, HDPE is reported to be one of the "good" plastics,
BDN Cumulative Impacts Addendum — Page 8
LUG Film
m
approved for and widely used in food, beverage and potable water applications. The Pacific
Northwest Pollution Prevention Resource Center found no evidence of any widespread health
problems related to the use of HDPE. ("Is High-density Polyethylene (HDPE) a Good Choice For
Potable Water?: https:Hpprc.org/2015/p2-rapid/is-high-density-polyethylene-hdpe-a-good-choice-
for-potable-water/ June 2015.) Recent studies have concluded that to the limited extent HDPE leaches
plasticizers, such as phthalates (PAEs), into seawater during that aging process, most of the PAEs
produced are exhausted by marine prokaryotes within one month. (Andrea Paluselli et al., Phthalate
Release from Plastic Fragments and Degradation in Seawater. Environmental Science & Technology,
American Chemical Society, 2019, 53 (1), pp.166-175.) There are no known studies indicating that
the amount of HDPE components that might be introduced into the environment through the use of
HDPE mesh bags has any adverse effect, immediate or cumulative, on the marine environment.
4.0.4.9.3. Chemical Impact. No pesticide usage is planned for the project, and
so there will be no chemical pesticide impact, either immediate or cumulative.
Conclusion — Minor, Acceptable Cumulative Impacts.
As noted above, the SMP defines "Cumulative impacts" or "cumulative effects" as "the
combined impacts of a proposed development action along with past impacts and impacts of
reasonably foreseeable future development actions. (JCC 18.25.100(3)(aa)). "Reasonably
foreseeable" is defined as "predictable by an average person based on existing conditions, anticipated
build -out, and approved/pending permits." (JCC 18.25.100(18)(d))
Similarly, the National Environmental Policy Act ("NEPA") requires the consideration of the
cumulative impacts of the Project, which include both direct effects, defined as those impacts "caused
by the action and occur[ing] at the same time and place" and indirect effects, which are impacts
"caused by the action and are later in time or farther removed in distance, but are still reasonably
foreseeable." 40 C.F.R. §1508.8. Note that although indirect effects may be removed in distance from
the proposed action, they nonetheless must be caused by that action; i.e., there must be a "reasonably
close relationship" between the environmental effect and alleged cause. Department of Transportation
v. Public Citizen, 541 U.S. 752, 767 (2004).
Adding the Smersh aquaculture project will not introduce any qualitatively new activity into
the area. It would make only a small increase in the tiny amount of tidelands devoted to an
aquaculture usage that is preferred under Washington law (RCW 90.58.020.)
From a biological standpoint, the applicable biological data shows there is no evidence that
adding the Smersh project, and even potentially the Garten and Tjemsland projects, would have any
significant negative cumulative biological impact on the environment. In fact, the National Marine
Fisheries Service and the U.S. Fish and Wildlife Service PBO's cite cumulative environmental
benefits associated with shellfish aquaculture, including long term improved water quality,
sequestration of carbon and nutrients, creation of habitat via culturing equipment and materials;
nutrient enhancement that supports invertebrates, macroalgae, and seagrasses; and benefits to animal
and plant life of minor benthic disturbances that expose infauna to predation and increase the depth of
oxygenated sediments.
Thus, consistent with the SMP, NEPA, and JCC 18.25 the above analysis shows that the
Smersh proposal will not produce substantial adverse environmental effects, either individually or
cumulatively.
BDN Cumulative Impacts Addendum — Page 9
LOC;IiE:M
P���,�
APPENDIX A
JCDCD letter dated September 14, 2017
�sON c, JEFFERSON COUNTY
t� DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street I Port Townsend, WA 98368
� 0 360-379-4450 1 email: dcd@co.jefferson.wa.us
9S'►�I www.co.jefferson.wa.us/commdevelopment
September 14, 2017
Via email and regular mail
Kenneth A. Sheppard
Simburg, Ketter, Sheppard & Purdy, LLP
999 Third Ave., Suite 2525
Seattle, WA, 98104
Email: KSheppard@sksp.com
Robert M. Smith
Plauch6 & Carr, LLP
811 First Avenue, Suite 630
Suite 630
Seattle, Washington 98104
Email: Robert@plauchecarr.com
LOG ITEM
, �1
RE: BDN Shine Road Geoduck Aquaculture Farm — Decision on Requirement of an SMP
Conditional Use Permit for Commercial Geoduck Aquaculture Started Before the Adoption
of the County's 2014 SMP Update
Dear Mr. Sheppard and Mr. Smith:
This letter is written with the authority of the Jefferson County (the County) DCD Director. This letter
provides the County's final decision whether or not geoduck farming operations that were ongoing as of
February 21, 2014 on parcels now owned by BDN, namely parcels 821334011 (BDN Lease), 821334073
(BDN Lease, formerly Washington Shellfish) and 821334079 (BDN Lease, formerly Mocean) have
increased sufficiently to require a new permit per Jefferson County Code ("JCC") 18.25.440(4)(b)(ii).
As we have previously informed BDN, expanded pre -SMP operations require a Shoreline Conditional Use
Permit if: (1) the physical extent of these prior geoduck farming operations has expanded by more than 25
percent or more than 25 percent of the facility/farm changes operational/cultivation methods compared to
the conditions that existed as of the effective date of SMP; or, (2) the expansion or change in cultivation
method exceeds 25 percent in any 10 -year period. JCC 18.25.440(4)(b)(i).
Based upon evidence submitted after the County's April 28, 2017 code interpretation on which there is an
appeal pending before the Hearing Examiner, the County has determined that the geoduck farming
operations ongoing as of February 21, 2014 on parcels 821334011 (BDN Lease), 821334073 (BDN Lease,
formerly Washington Shellfish) and 821334079 (BDN Lease, formerly Mocean) have not been
impermissibly expanded and are exempt from the requirement of a Shoreline Conditional Use Permit.
We have copied Marilyn Showalter and Sue Corbett, parties of record, who requested this determination.
If you have any questions or comments, please let me know.
Sincere)
np f .
David 0reetham
Planning Manager
cc:
Marilyn Showalter via email at marilyn.showalter@gmail.com
Sue Corbett via email at sue71@gmail.com
LOG ITE A
' I 91-i
APPENDIX B
Rock Point Oyster Corps Approval
fi
R4
W rr=+ H
t3 '•?Ijll.. �,
i
Regulatory Branch
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
Mr. David Steele
Rock Point Oyster Company, Inc.
1733 Dabob Post Office Road
Quilcene, Washington 98376
Dear Mr. Steele:
AUG 18 2011
ESSEP 0 7 201?
LOG 11 -EV
Pw
Reference: NWS -2010-1039
Rock Point Oyster
Company, Inc.
(Case Shoal Aquaculture)
We have reviewed your permit file to cultivate 44.35 acres of Pacific oyster and Manila
clam bottom culture, Pacific and Kumamoto oysters in flip bags on longlines and trays, and
geoduck, on a 48 acre site, with 3.65 of no aquaculture in Case Shoal, Hood Canal near Port
Ludlow, Jefferson County, Washington verified under the 2012 Nationwide Permit (NWP) 48.
Your proposal as depicted on the enclosed drawings dated December 2, 2016 and as verified on
December 13, 2016 under the 2012 NWP 48 (hereinafter "activity") is eligible for verification
under the 2017 Nationwide Permit (NWP) 48 for Commercial Shellfish Aquaculture Activities
(Federal Register January 6, 2017, Vol. 82, No. 4). The activity will be verified under the 2017
NWP 48 upon return of this letter, bearing your signature, to the Seattle District in conformance
with the instructions below. If you would like to seek verification under NWP 48 for any
proposed work outside of the activity for which you were verified under the 2012 NWP 48 on
December 13, 2016, please contact the Project Manager listed in the cover letter accompanying
this letter.
In order for this authorization to be valid, you must ensure the work is performed in
accordance with the enclosed NWP 48, Terms and Conditions and with the Services Biological
Opinions - National Marine Fisheries Service (NMFS) Biological Opinion (BO) and Errata dated
September 2, 2016 and September 30, 2016, respectively (NMFS Reference Number WCR-
2014-1502), and U.S. Fish and Wildlife Service (USFWS) BO dated August 26, 2016 (USFWS
Reference Number OIEWFW00-2016-F-0121). The BOs contain mandatory terms and
conditions to implement the reasonable and prudent measures associated with the specified
"incidental take". You are also required to comply with the special conditions listed below.
L 0 G lTE.M
5-
a. This U.S. Army Corps of Engineers (Corps) permit does not authorize you to take a
threatened or endangered species. In order to legally take a listed species, you must have
authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or ESA
Section 7 consultation Biological Opinion with non -discretionary "incidental take" provisions
with which you must comply). The Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number 01EWFW00-2016-F-0121), contain mandatory
terms and conditions to implement the reasonable and prudent measures associated with the
specified "incidental take". The authorization under this Corps permit is conditional upon your
compliance with all of the mandatory terms and conditions associated with incidental take of the
BOs. These terms and conditions are incorporated by reference in this permit. Failure to comply
with the terms and conditions associated with incidental take of the BOs, where a take of the
listed species occurs, would constitute an unauthorized take, and it would also constitute non-
compliance with your Corps permit. The USFWS and NMFS are the appropriate authorities to
determine compliance with the terms and conditions of its BO and with the ESA.
b. In order to meet the requirements of the Endangered Species Act (ESA) and Magnuson -
Stevens Fishery Conservation and Management Act (MSA), you must comply with the
conservation measures in the Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number OIEWFW00-2016-F-0121). These conservation
measures are included in the enclosed document, Enclosure 1, Conservation Measures for
Activities Covered under the Shellfish Activities Programmatic Consultation Biological
Opinions. If you cannot comply with these conservation measures, you must, prior to
commencing your activity, contact the U.S. Army Corps of Engineers, Seattle District,
Regulatory Branch for individual ESA/MSA consultation. The USFWS and NMFS are the
appropriate authorities to determine compliance with the ESA.
c. Incidents where any individuals of fish species, marine mammals and/or sea turtles listed
by National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) under the
Endangered Species Act appear to be injured or killed as a result of discharges of dredged or fill
material into waters of the U.S. or structures or work in navigable waters of the U.S, authorized
by this Nationwide Permit verification shall be reported to NOAA Fisheries, Office of Protected
Resources at (301) 713-1401 and the Regulatory Office of the Seattle District of the U.S. Army
Corps of Engineers at (206) 764-3495. The finder should leave the animal alone, make note of
any circumstances likely causing the death or injury, note the location and number of individuals
involved and, if possible, take photographs. Adult animals should not be disturbed unless
circumstances arise where they are obviously injured or killed by discharge exposure or some
1-00 ITEM.
-3- —�
unnatural cause. The finder may be asked to carry out instructions provided by NOAA Fisheries
to collect specimens or take other measures to ensure that evidence intrinsic to the specimen is
preserved.
Enclosed for your convenience is a Iist of the conservation measures and mandatory terms
and conditions referenced in the above; special conditions. The complete Programmatic
Biological Opinions, are available on our website at
http:/Iwww.nws.usace.army millMissions/CivilWorks/Regulatory/Permit-Guidebook.aspx.
The authorized activity complies with the Washington State Department of Ecology's
(Ecology) Water Quality Certification (WQC) requirements and Coastal Zone Management
(CZM) consistency determination response for this NWP. No further coordination with Ecology
for WQC and CZM is required.
You have not requested a jurisdictional determination for this activity. if you believe the
Corps does not have jurisdiction over all or portions of your project you may request a
Preliminary or approved jurisdictional determination (JD). If one is requested, please be aware
that we may require the submittal of additional information to complete the JD and work
authorized in this letter may not occur until the JD has been completed.
modified, reissued, or revoked prior to that date. If the authorized work has not beOur verification of this NWP authorization is valid until March 18, 2022, unless the NWP is
by that date and you have cornrnenced or are under contract to commence this actien completed
vity before
March 18, 2022, you will have until March 18, 2023, to complete the activity under the enclosed
terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP
verification invalidates this authorization and could result in a violation of Section 404 of the
Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all
local, State, and other Federal permits that apply to this project.
You are cautioned that any change in the activity's location or plans will require you to
submit a copy of the revised plans to this office and obtain our approval before you begin work.
note we may need to reinitiate consultation with the NMFS and/or USFWS in ordeDeviating from the approved plans and activity could result in an enforcement action. Please
to au
any work not already included in the enclosed pians. r thorize
Thank you for your cooperation during the permitting process. We ace interested in your
experience with our Regulatory Program and encourage you to complete a customer service
survey form. This form and information about our program is available on our website at
-4- _ _ E YFi
SEP 0 T 20V
www.nws.usace.army-mil, select "Regulatory Branch, Permit Information" and then "Contact
Us." If you have any questions, please contact me at pamela.sanguinetti@usace.army.milp b.
phone at (206) 764-6904. ITE'J
16G ;
Sincerely,
Aiv_ � /+
Pamela Sanguinetti, Project Manager
Regulatory Branch
Enclosures
By signing below I certify the activity described in the enclosed drawings and descriptions as
verified under the 2012 NWP 48 on December 13, 2016 accurately describes my proposed on-
going activities For the period from March 2018 through March 2022 and constitutes a complete
and accurate Pre, Construction Notification for authorization under the 2017 Nationwide Permit
48. By signing below I accept verification for the activity under the 2017 Nationwide Permit, as
described and conditioned in this verification letter. I further acknowledge any changes to the
activity from the enclosed drawings and descriptions require further coordination with the U.S.
Army Corps of Engineers and are not authorized by this letter.
J)at/f%of Sce_le.
Print Applicant Name
REFERENCE NUMBER: NWS -2010-1039
Applicant Signature and date
Case Shoal Farm
Tidal Datum: MLLW = 0.0'
Parcels: 721092 001 & 721092 003
Latitude: 47.848304° N
Longitude: 122.683619° W
Shi: •Gri-Ln
1
Rock Point Oyster Company, Inc.
Total area: 48 acres
Case Shoal, Hood Canal
Jefferson County, State of WA
Section 9, T27N R1E, WM
.jpographic & Driving Directions Map
Sheet 1 of 4
Date: December 2, 2016
Port Ludlow V '�
Stone
S[j�( IV,���J
-DOWa!
Rock
Island
Route to Project
From the West and of the Hood Canal Floating Bridge;
head NW on WA -104 toward Shine Rd. for 2.9 miles;
Tum off onto the South Point Road for 1.5 miles to skiers
„d jot. with Thomdyke Road; continue straight to stay on
2' South Point Road for 0.3 miles to a private driveway
g and gate on the left and entrance to the Project Area.
6� Walk south down gravel road for 0.2 miles to
o tideland entrance.
Case
Shoo)
�r
Project Area
ff /
idgehaven
fbIM
SorR /
,
/
/
i
/ � N! OTiTlR PORl10R
/
Of STENAM LN
Me
Termination Pohl
Hood Canal Brldp
-1110A
fA!/gKR."41
/ 3
Valley
•�;1aI. Sr
/ Four Corners
/
ai'M C4�
= Wall
bit
Case Shoal Farm
Rock Point Oyster Company, Inc.
Farm Pacific Oysters, Manila Clams
Tidal Datum: MLLW = 0.0'
Total area: 48 acres
& Geoduck
Parcels: 721092 001 & 721092 003
f Case Shoal, Hood Canal
430
Latitude: 47.848304' N
Jefferson County, State of WA
NI S ��ID �!Q'� Sheet 2 of 4
Longitude: 122.683619° W
Section 9, T27N 1111E, WM
Scale 1" = 350' j
Date: December 2, 2016 1
150•
X10 b 1� ll�i3
31 a/"e's xkivf'L
q$w4 }rYlantU- chum
1aoiiv"o LM 1+11 i, -p—
�.{q,r+�7.n►:Y+� art Zd..{�S
47.e5370r N
122.6960U• W
0-05Gooduck
wigs erre �-�— t7cg—?l
Island
4ra5c34r N
X122,581239' W
¢� 2014 can ■
�j 0 2 awes
2014 oyster
send
Wsler01pba0& \J
tray area 1A acre gy,
N R
'eAMRwlarfidefiMa.r
In
oN
I N
430
b
yeeducll arae
6.5 acres���`.�'��/`'`�`'�'��
D _�
ecce: Pathr
d d
m,
724' 216'
94a
47.945287 N
47.902WN
122.6e5030• W
enoW property lies
122.x51424' W
MHHW +10.7'
LOG ITEM
Case Shoal Farre
Rock Point Oyster Company, Inc.
Farm Pacific Oysters, Manila Clams
Tidal Datum: MLLW = 0.0'
Total area: 48 acres
& Geoduck
Parcels: 721092 001 & 721092 003
Case Shoal, Hood Canal
�.n Sheet 4 of 4
05 /Ivto �l day
Latitude: 47.848304" N
Jefferson County, State of WA
Scale 1" = 350'
Longitude: 122.683619" W
Section 9, T27N RIE, WM
Date: December 2, 2016
■ 0C
3.(Os
C(4, Ls
O'D C"lom-h-Dn
+5 -fit- trial
eltviwliwii. 04
.W, Ve
APPENDIX C
Deep Blue Seafood Corps Approval
�lyT UF.
qty b�.n
i'l,� •�lal �:� u1
Regulatory Branch
Mr. James Addison Smith
Deep Blue Seafood
4136 Meridian North
Seattle, Washington 98103
Dear Mr. Smith:
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
AUG 18 2017
LOG, 1-1
Reference: NWS -2007-1152
Deep Blue Seafood
We have reviewed your permit file to cultivate 3.8 acres of geoduck with 2 acres of active
cultivation and approximately 2 acres of fallow tidelands, and 2 acres with no aquaculture, on a 6
acre site in Thomdyke Bay, Hood Canal near Port Ludlow, Jefferson County, Washington
verified under the 2012 Nationwide Permit (NWP) 48. Your proposal as depicted on the
enclosed drawings dated December 13, 2016 and as verified on December 14, 2016 under the
2012 NWP 48 (hereinafter "activity") is eligible for verification under the 2017 Nationwide
Permit (NWP) 48 for Commercial Shellfish Aquaculture Activities (Federal Register January 6,
2017, Vol. 82, No. 4). The activity will be verified under the 2017 NWP 48 upon return of this
letter, bearing your signature, to the Seattle District in conformance with the instructions below.
If you would like to seek verification under NWP 48 for any proposed work outside of the
activity for which you were verified under the 2012 NWP 48 on December 14, 2016, please
contact the Project Manager listed in the cover letter accompanying this letter.
In order for this authorization to be valid, you must ensure the work is performed in
accordance with the enclosed NWP 48, Terms and Conditions and with the Services Biological
Opinions - National Marine Fisheries Service (NMFS) Biological Opinion (BO) and Errata dated
September 2, 2016 and September 30, 2016, respectively (NMFS Reference Number WCR-
2014-1502), and U.S. Fish and Wildlife Service (USFWS) BO dated August 26, 2016 (USFWS
Reference Number OIEWFW00-2016-F-0121). The BOs contain mandatory terms and
conditions to implement the reasonable and prudent measures associated with the specified
"incidental take". You are also required to comply with the special conditions listed below.
a. This U.S. Army Corps of Engineers (Corps) permit does not authorize you to take a
threatened or endangered species. In order to legally take a listed species, you must have
authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or ESA
Section 7 consultation Biological Opinion with non -discretionary "incidental take" provisions
with which you must comply). The Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number 0IEWFW00-2016-F-0121), contain mandatory
terms and conditions to implement the reasonable and prudent measures associated with the
specified "incidental take". The authorization under this Corps permit is conditional upon your
compliance with all of the mandatory terms and conditions associated with incidental take of the
BOs. These terms and conditions are incorporated by reference in this permit. Failure to comply
with the terms and conditions associated with incidental take of the BOs, where a take of the
listed species occurs, would constitute an unauthorized take, and it would also constitute non-
compliance with your Corps permit. The USFWS and NMFS are the appropriate authorities to
determine compliance with the terms and conditions of its BO and with the ESA.
b. In order to meet the requirements of the Endangered Species Act (ESA) and Magnuson -
Stevens Fishery Conservation and Management Act (MSA), you must comply with the
conservation measures in the Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number OIEWFW00-2016-F-0121). These conservation
measures are included in the enclosed document, Enclosure 1, Conservation Measures for
Activities Covered under the Shellfish Activities Programmatic Consultation Biological
Opinions. If you cannot comply with these conservation measures, you must, prior to
commencing your activity, contact the U.S. Army Corps of Engineers, Seattle District,
Regulatory Branch for individual ESA/MSA consultation. The USFWS and NMFS are the
appropriate authorities to determine compliance with the ESA.
c. Incidents where any individuals of fish species, marine mammals and/or sea turtles listed
by National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) under the
Endangered Species Act appear to be injured or killed as a result of discharges of dredged or fill
material into waters of the U.S. or structures or work in navigable waters of the U.S. authorized
by this Nationwide Permit verification shall be reported to NOAA Fisheries, Office of Protected
Resources at (301) 713-1401 and the Regulatory Office of the Seattle District of the U.S. Army
Corps of Engineers at (206) 764-3495. The finder should leave the animal alone, make note of
any circumstances likely causing the death or injury, note the location and number of individuals
involved and, if possible, take photographs. Adult animals should not be disturbed unless
circumstances arise where they are obviously injured or killed by discharge exposure or some
unnatural cause. The finder may be asked to carry out instructions provided by NOAA Fisheries
to collect specimens or take other measures to ensure that evidence intrinsic to the specimen is
preserved.
t?
ITEM
Enclosed for your convenience is a list of the conservation measures and mandatory terms
and conditions referenced in the above special conditions. The complete Programmatic
Biological Opinions, are available on our website at
http://www.nws.usace.army.mil/Missions/Civil Works/Regulat.ory/Permit-Guidebook. aspx.
The authorized activity complies with the Washington State Department of Ecology's
(Ecology) Water Quality Certification (WQC) requirements and Coastal Zone Management
(CZM) consistency determination response for this NWP. No further coordination with Ecology
for WQC and CZM is required.
You have not requested a jurisdictional determination for this activity. If you believe the
Corps does not have jurisdiction over all or portions of your project you may request a
preliminary or approved jurisdictional determination (JD). If one is requested, please be aware
that we may require the submittal of additional information to complete the JD and work
authorized in this letter may not occur until the JD has been completed.
Our verification of this NWP authorization is valid until March 18, 2022, unless the NWP is
modified, reissued, or revoked prior to that date. If the authorized work has not been completed
by that date and you have commenced or are under contract to commence this activity before
March 18, 2022, you will have until March 18, 2023, to complete the activity under the enclosed
terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP
verification invalidates this authorization and could result in a violation of Section 404 of the
Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all
local, State, and other Federal permits that apply to this project.
You are cautioned that any change in the activity's location or plans will require you to
submit a copy of the revised plans to this office and obtain our approval before you begin work.
Deviating from the approved plans and activity could result in an enforcement action. Please
note we may need to reinitiate consultation with the NMFS and/or USFWS in order to authorize
any work not already included in the enclosed plans.
Thank you for your cooperation during the permitting process. We are interested in your
experience with our Regulatory Program and encourage you to complete a customer service
survey form. This form and information about our program is available on our website at
www.nws.usace.army.mil, select "Regulatory Branch, Permit Information" and then "Contact
Us." If you have any questions, please contact me at Pamela.sanguinetti@usace.army.mil or by
phone at (206) 764-6904.
Sincerely,
AA* j +
Pamela Sanguinetti, Project Manager
Regulatory Branch
Enclosures
By signing below I certify the activity described in the enclosed drawings and descriptions as
verified under the 2012 NWP 48 on December 14, 2016 accurately describes my proposed on-
going activities for the period from March 2018 through March 2022 and constitutes a complete
and accurate Pre -Construction Notification for authorization under the 2017 Nationwide Permit
48. 13y signing below I accept verification for the activity under the 2017 Nationwide Permit, as
described and conditioned in this verification letter. I further acknowledge any changes to the
activity from the enclosed drawings and descriptions require further coordination with the U.S.
Army Corps of Engineers and are not authorized by this Ietter.
JAr"Es Maptsop 5MrTN
Print Applicant Name
REFERENCE NUMBER: NWS -2007-1152
` - 11 3 ?017
ppli ant Signature and date
L 0 G
# Port Hadlock
PawSSC Discovery Day
104
P6ukbo
.303'
Vicinity Map Silverdale
Bainbridge
Island
IMA.
Port Ludlow
Hansvllle
Lelard
Project Pon Gamble
pul
Location Lily
F F F
4r,
Wzar.: Kingston
AL
4 00-
Vmbald
VS
PL:' Y fi
CON Indianola
Poulsbo
say Suquamish
Bangor
kk
Bfinnon cc* ptympic vim Killyport Stabold
Reference: NWS- 2007-1152 Application by: Deep Blue Seafood
Waterbody: Thorndyke Bay, Hood Canal
Project Description: Existing shellfish farm
County: Jefferson County State: WA
Location: 22 Groves Way, Port Ludlow Lat/Long: 47.81265, -122.72025
Date-' December 13, 2016 Sheet 1 of
LCK, ITEM
0 5 �J
"I—Y/S,alc 1 133.000
120 0 5 10
..NORTH
NUMBER
2 1 N 1 1
O \of
v ti _ Co
—
IGHT-Or- .�, O
40JACFNT
I a• � �
ER S SHORT
ES ARE
PLACED
E SU9O1-
.NOOLPH AND
EO, OECLAAE
1977 ,
JF
M.62-%4-90%
..
EVA
ICODING
Imr AG HER
MENTIONED.
;TTEV.
0,9AWN BY' C.I. W.
RZ Ar CNECK•aq
FINAL CNCC&:..
1 Ca
H
1
r• , .:��.. SAI`
. i � Aor
CO
m:::_�'
ry�
aid 4,, .r
...`
s
��
'.J
Z
N
cv
,t
0
dar6�
n
I
•
II�
,
4
� �J
! �
Q
1
{aP
J
N
{�i� 06
4P
.
�ilOT1
1
N le;l
J
$4
Is
i p9r �T6
f /+ySe'
Morz,= O N141t I PvcWors
rr,!5,-,LAh00s ALVOINI.Or
PP
0OO
0
CLARK & ASSOCIATES Rl
Card Surveyors . Engineers . Manners
Cunsrrucniaa Crmrd,'npliun . Metennls Teslrny
# LOG ITEM
Of
i
Reference: NWS -2007-1152
— -Applicant: Deep -Blue -Seafood
December 13, 2016
Sheet 3 of 4
4W USING THE THE-JREOCAL
PERFORMED IN
X94
7025
& TL
94Ch.)
H
(NE 1/4 19-27N—IE)
No aquaculture, 2 acres above
+3 ft tidal elevation
•'L
R
TL A6 �
1R.21'1,. `
C P
�o� 1101,
(NE 1/4 30 -27N -1E)
Reference: NWS -2007-1152
Applicant: Deep -Blue -Seafood------- -
December 13, 2016
Sheet 4 of 4
SE 1/4
SEC 19
TWP 27N
RGE 1 E
Project Area: 6 acres
SCALE:
1 "=200'
Geoduck cultivation area
(3.8 acres)
2 acres active; 1.8 acres fallow
5/92
REMSIONS
7/29/92 88
1420 9/24/92 PP
]/10/95 DS
30 29 7/7/97 D5
e/1Vw PP
JEFFERSON COUNTY ASSESSOR I 14/24/00 M0/1/99 MF
F
LOG iTEAR
5
P 6(n
APPENDIX D
Set & Drift Corps Approval
3 fNx OA-4�
-14
Regulatory Branch
Ms. Alice and Mr. Van Helker
Set & Drift, LLC
9817 3l" Avenue Southwest
Seattle, Washington 98126
Dear Ms. and Mr. Helker:
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
AUG 19 2017 !r SEP 1 , 201?
L.C.C.7" ITEM
Pam
Reference: NWS -2015-568
Set & Drift, LLC
(Shellfish Farm)
We have reviewed your permit file to cultivate up to 2.36 acres of a 3.5 acre project area
with on bottom Manila clam and Pacific oyster in bags, harvested by hand, and installation of
geoduck grow -out equipment, but no planting of geoduck seed, in Hood Canal near Port Ludlow,
Jefferson County, Washington verified under the 2012 Nationwide Permit (NWP) 48. Your
proposal as depicted on the enclosed drawings dated September 16, 2016 and as verified on
March 16, 2016 under the 2012 NWP 48 (hereinafter "activity") is eligible for verification under
the 2017 Nationwide Permit (NWP) 48 fbr Commercial Shellfish Aquaculture Activities (Federal
Register January 6, 2017, Vol. 82, No. 4). The activity will be verified under the 2017 NWP 48
upon return of this letter, bearing your signature, to the Seattle District in conformance with the
instructions below. If you would like to seek verification under NWP 48 for any proposed work
outside of the activity for which you were verified under the 2012 NWP 48 on March 16, 2016,
please contact the Project Manager listed in the cover letter accompanying this letter.
In order for this authorization to be valid, you must ensure the work is performed in
accordance with the enclosed NWP 48, Terms and Conditions and with the Services Biological
Opinions - National Marine Fisheries Service (NMFS) Biological Opinion (BO) and Errata dated
September 2, 2016 and September 30, 2016, respectively (NMFS Reference Number WCR-
2014-1502), and U.S. Fish and Wildlife Service (USFWS) BO dated August 26, 2016 (USFWS
Reference Number OIEWFW00-2016-F-0121). The BOs contain mandatory terms and
conditions to implement the reasonable and prudent measures associated with the specified
"incidental take". You are also required to comply with the special conditions listed below.
a. This U.S. Army Corps of Engineers (Corps) permit does not authorize you to take a
threatened or endangered species. In order to legally take a listed species, you must have
authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or ESA
L�'t .
-2-
Section 7 consultation Biological Opinion with non -discretionary "incidental take" provisions
with which you must comply). The Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2.014.1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number OIEWFW00-2016-F-0121), contain mandatory
terms and conditions to implement the reasonable and prudent measures associated with the
specified "incidental take". The authorization under this Corps permit is conditional upon your
compliance with all of the mandatory terms and conditions associated with incidental take of the
BOs. These terms and conditions are incorporated by reference in this permit. Failure to comply
with the terms and conditions associated with incidental take of the BOs, where a take of the
listed species occurs, would constitute an unauthorized take, and it would also constitute non-
compliance with your Corps permit. The USFWS and NMFS are the appropriate authorities to
determine compliance with the terms and conditions of its BO and with the ESA.
b. In order to meet the requirements of the Endangered Species Act (ESA) and Magnuson -
Stevens Fishery Conservation and Management Act (MSA), you must comply with the
conservation measures in the Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated. September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR 2014-1502), and the U.S. Fish acrd Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number OIEWFW00-2016-F-0121). These conservation
measures are included in the enclosed document, Enclosure 1, Conservation Measures for
Activities Covered under the Shellfish Activities Programmatic Consultation Biological
Opinions. If you cannot comply with these conservation measures, you must, prior to
commencing your activity, contact the U.S. Army Corps of Engineers, Seattle District,
Regulatory Branch for individual ESA/MSA consultation. The USFWS and NMFS are the
appropriate authorities to determine compliance with the ESA.
c. Incidents where any individuals of fish species, marine mammals and/or sea turtles listed
by National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) under the
Endangered Species Act appear to be injured or killed as a result of discharges of dredged or fill
material into waters of the U.S. or structures or work in navigable waters of the U.S. authorized
by this Nationwide Permit verification shall be reported to NOAA Fisheries, Office of Protected
Resources at (301) 713-1401 and the Regulatory Office of the Seattle District of the U.S. Army
Corps of Engineers at (206) 764-3495. The finder should leave the animal alone, make note of
any circumstances likely causing the death or injury, note the location and number of individuals
involved and, if possible, take photographs. Adult animals should not be disturbed unless
circumstances arise where they are obviously injured or killed by discharge exposure or some
unnatural cause. The finder may be asked to carry out instructions provided by NOAA Fisheries
to collect specimens or take other measures to ensure that evidence intrinsic to the specimen is
preserved.
1-004 PTM
F'2 j Of
Enclosed for your convenience is a list of the conservation measures and mandatory terms
and conditions referenced in the above special conditions. The complete Programmatic
Biological Opinions, are available on our website at
http://www.nws.usace. army.mil/Missions/CivilWorks/Regulatory/Pennit-Guidebook.aspx.
The authorized activity complies with the Washington State Department of Ecology's
(Ecology) Water Quality Certification (WQC) requirements and Coastal Zone Management
(CZM) consistency determination response for this NWP. No further coordination with Ecology
for WQC and CZM is required.
You have not requested a jurisdictional determination for this activity. If you believe the
Corps does not have jurisdiction over all or portions of your project you may request a
preliminary or approved jurisdictional determination (JD). If one is requested, please be aware
that we may require the submittal of additional information to complete the JD and work
authorized in this letter may not occur until the JD has been completed.
Our verification of this NWP authorization is valid until March 18, 2022, unless the NWP is
modified, reissued, or revoked prior to that date. If the authorized work has not been completed
by that date and you have commenced or are under contract to commence this activity before
March 18, 2022, you will have until March 18, 2023, to complete the activity under the enclosed
terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP
verification invalidates this authorization and could result in a violation of Section 404 of the
Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all
local, State, and other Federal permits that apply to this project.
You are cautioned that any change in the activity's location or plans will require you to
submit a copy of the revised plans to this office and obtain our approval before you begin work.
Deviating from the approved plans and activity could result in an enforcement action. Please
note we may need to reinitiate consultation with the NMFS and/or USFWS in order to authorize
any work not already included in the enclosed plans.
Thank you for your cooperation during the permitting process. We are interested in your
experience with our Regulatory Program and encourage you to complete a customer service
survey form. This form and information about our program is available on our website at
LW1 ITEM
-4- �-- -
www.nws.usace.army.mil, select "Regulatory Branch, Permit Information" and then
"Contact Us." If you have any questions, please contact me at
pamela.sanguinetti@usace.army.mil or by phone at (206) 764-6904.
Sincerely,
k* a �*
Pamela Sanguinetti, Project Manager
Regulatory Branch
Enclosures
By signing below I certify the activity described in the enclosed drawings and descriptions as
verified under the 2012 NWP 48 on March 16, 2016 accurately describes my proposed on-going
activities for the period from March 2018 through March 2022 and constitutes a complete and
accurate Pre -Construction NotiIicatiosi fog• authorization under the 2017 Nationwide Permit 48.
By signing below I accept verification for the activity under the 2017 Nationwide Permit, as
described and conditioned in this verification letter. I further acknowledge any changes to the
activity from the enclosed drawings and descriptions require further coordination with the U.S.
Army Corps of Engineers and are not authorized by this letter.
1\ LC C V\ E cy— C',
Print Applicant Name
REFERENCE NUMBER: NWS -2015-568
SEP 1 1 2017
CQk"11,`=' ?tee. t-z�
Applicant Signature and date
Pull 4
+, ,Tpv►gsauH •
,
r r 111 f? � •,- �l
Shelton , f • Jill'....
r Tacoma
LOG ITEM
c # ?.5,
VICINITY MAP:
Set & Drift LLC
I
nuq 2 .w� S 4
�.
CORr�, = E: NWS -2015-568 SITE NAME: Sol &Drill LLC PROPOSED PROJECT'
PARCEL ID/Owner: Expanded shellfish aquecuiture
APPLICANT: Set & Drift LLC 954600122& 954600123 on private tidelands.
9792 Edmonds Way #243, Set & Drift LLC
Edmonds, WA 98020
ADJACENT PROPERTY OWNERS: SITE ADDRESS: Sheet 1 of 2
954600121: MAURITZ LARSON 2691 Thomdyke Road, Port Ludlow, WA 98365 DATE: 09/16/2015
4817 S 144TH ST, TUKWILA WA 98168 In: Hood Canal N
721173002: ROBERT G WOODMAN Near. Port Ludlow Tidal datum: It MLLW
12093 VIEWCREST PL NE, County: Jefferson Coordinate System:
BAINBRIDGE ISLAND WA98110-1311 Stale: WA Washington State Plane South (Feel)
Scale: 1:70,000
Set & Droft LL6
Aquaculture Project
Site Plan' & Habitat Survey
Sumey date_ Ta 1.`15
L-agend
_ D - ZM GPS Points I -q-10 to
• -- MKed bed ZJ-ZR1
Z1.1
< 6 ZIA shoots in dsaete locations
WM (11.4')
ODnh"5
Z- marina bed begins
Property boundary (est)
�," • � . ,�, . r, ZM Bulfer 1ta
NIP" + MiKedZJ/ZM bed
F : A/ Chamels VAth ZJ
k Clams and Oysters (2.39 acres)
Geoduck Tube Test Plot (15' x 151.
Courcy Parcel Data
Species to be grown:
Manila gains
Pacific oysters
Olympia oysters
UVa off•'`
O
f i
l
=.1
'= iii • .. .
0 50 100 200 300 400
Feet
CORFS REFERENCE: NWS -2015-568 S[ -= 1e=,IdE: Se: F LPift LLC
F -RCEL IL:C-avr_p:
APPLECANT: SEA & G ft LL,- Sf-453-3 122 & 5845.Dn.12S
W512 Ednwmds W9Jay 2L�, Se, -k D7 LLC
Edrnv-.d_ , VVA SU
,AC. ACENT PROPERTY C•W NERS :
SITE ADDRESS:
�.��v I�1: P:1r.liR[Tr L:..RSCi•e
spa � o �:�a ,
-ihti
`Tnd�{ F' Fc-tL� E
4817 S 144TK ST, T:�1K0iILA. "SV_Ae'81E'9
Ir.: r-!c_.a O-ar,al
T--117300---: ROBERT i ViOIDC �b
Pea. F.1rt Luck
120 93 V] EW -C R EST PL NE,
C'r-,an y: Jeff sacr-
BAINSRIC'GE ISL -,26'_ 'v",iA,x'8113-1'11
S1t-=:
8 L
F°ROFOSED FROJECT_
Expandsh 3fchaquacuft-i _
SM pTroVate wd lands.
Shs t 2 cT 2
.ATE: 89-1'=.,M 1
Tidal daturn1 ft N1LLV'a 1%
Ccwdin;Ete Sy -.L -m:
Nszhingtcn, Sfats Plar.e S-auth ;F ---i1
So-s1G: 1: p,' IF
LOQ; iTEm
APPENDIX E
Hood Canal Mariculture Corps Approval
DEPARTMENT OF THE ARMY PERMIT r
Permittee: Hood Canal Mariculture, Inc. Attention: Jonathan P. Davis
10610 Northeast Manitou Park Boulevard
Permit No: NWS -2008-502 Bainbridge Island, Washington 98110
Issuing Office: Seattle District
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee.
The term "this office" refers to the appropriate district or division office of the U.S. Army Corps of Engineers (Corps)
having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the
commanding officer.
You are authorized to perform work in accordance with the terms and conditions specified below.
Project Description: Construct a suspended algae and shellfish mariculture facility in accordance with the plans
and drawings dated September 17, 2015, attached hereto which are incorporated in and made a part of this permit.
A 500 -foot by 230 -foot (2.64 acres) seaweed array will be suspended and centered within the 1,000 -foot by
250 -foot (5.74 acres) lease area from Washington Department of Natural Resources. Oysters and/or rock scallops
will be cultivated in grow -containers below and along the perimeter of the seaweed cultivation. Additionally, two
proposed instrument buoys will be independently anchored at upstream and downstream locations within the lease
area. The purpose of the project is to investigate seaweed cultivation as a potential mitigation strategy for ocean
acidification in Puget Sound. The project will evaluate the potential of a commercial -scale seaweed mariculture
demonstration to modulate carbon and nitrogen in the marine environment. An additional purpose of the project is
to provide shellfish for human consumption.
Project Location: In Hood Canal near Port Ludlow, Jefferson County, Washington.
Permit Conditions:
Genera! Conditions:
MAR -1) 2 0 Z I
1. The time limit for completing the work authorized ends on If you find that
you need more time to complete the authorized activity, submit your request for a time extension to this office for
consideration at least 1 month before the above date is reached.
2. You must maintain the activity authorized by this permit in good condition and in accordance with the terms
and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity,
although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should
you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith
transfer, you must obtain a modification to this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity
authorized by this permit, you must immediately notify this office of what you have found. We will initiate the
Federal and State coordination required to determine if the! remains warrant a recovery effort or if the site is eligible
for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the
space provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the
conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the
certification is attached if it contains such conditions.
6. You must allow representatives from this office to insngQt_t .e WhpjzedactMtyataay_time- eemed
necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your
` we
Hood Canal Mariculture, Inc.P� �~� � NWS-2008-502
permit.
7. After a detailed and careful review of all the conditions contained in this permit, the permittee
acknowledges that, although said .conditions were required by the Corps, nonetheless the permittee agreed to
those conditions voluntarily to facilitate issuance of the permit; the permittee will comply fully with all the terms of all
the permit conditions.
Special Conditions:
a. You must provide a copy of the permit transmittal letter, permit form, and drawings to all contractors
performing any of the authorized work.
b. The permittee understands and agrees that, if future operations by the United States require the
removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of
the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required,
upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural
work or obstructions caused thereby, without expense to the United States. No claim shall be made
against the United States on account of any such removal or alteration.
c. You must implement and abide by the Endangered Species Act (ESA) requirements and/or
agreements set forth in the Biological Evaluation for Informal ESA Consultation dated
September 29, 2015, in their entirety. The National Marine Fisheries Service (NMFS) concurred with a
finding of "may affect, not likely to adversely affect" based on this document on December 9, 2015
(NMFS Reference Number WCR-2015-3713), The U.S. Fish and Wildlife Service (USFWS) concurred
with a finding of "may affect, not likely to adversely affect" based on this document on January 15, 2016
(USFWS Reference Number 01 EWFW00-2016-1-0147). Both agencies will be informed of this permit
issuance. Failure to comply with the commitments made in this document constitutes non-compliance
with the ESA and your U.S. Army Corps of Engineers permit. The USFWS/NMFS is the appropriate
authority to determine compliance with ESA.
d. Unsuitable material (e.g., trash, debris, car bodies, asphalt, tires) shall not be discharged or used as fill
(e.g., used to secure nets, create berms, provide nurseries).
e. A Pacific herring spawn survey shall be conducted prior to any in -water aquaculture or maintenance
activities if any of these activities will occur outside the approved work window for the project area's
Tidal Reference Area 13. The approved work window is April 15 through January 14. Between
January 15 and April 14, vegetation and aquaculture materials (e.g., nets, lines) shall be inspected for
Pacific herring spawn. If Pacific herring spawn is present, disturbance of the eggs is prohibited in the
areas where spawning has occurred until such time as the eggs have hatched and Pacific herring
spawn is no longer present. The U.S. Army Corps of Engineers (Corps) encourages the permittee to
complete a training class on identifying Pacific herring spawn with the Washington Department of Fish
and Wildlife (WDFW). You shall maintain a record of Pacific herring spawn surveys, including the date
and time of surveys; the area, materials, and equipment surveyed; results from the survey; etc. The
record of Pacific herring spawn surveys shall be made available upon request to the Corps, NMFS, and
USFWS.
f. Shellfish activities (e.g., rafts, anchors, lines, nets, bags) shall not be placed within 16 horizontal feet of
eelgrass (Zostere marina) or kelp (rooted/attached brown algae in the order Laminariales).
LOG f i SAA
Hood Canal Mariculture, Inc.
NWS -2008-502
g All pump intakes (e.g., washing down gear) that use seawater shall be screened in accordance with
National Marine Fisheries Service and Washington Department of Fish and Wildlife criteria. Note: This
does not apply to work boat motor intakes (jet pumps) or through -hull intakes.
h. All foam material (whether used for floatation of for any other purpose) must be encapsulated within a
shell that prevents breakup or loss of foam material into the water and is not readily subject to damage
by ultraviolet radiation or abrasion. Un -encapsulated foam material used for current on-going activities
shall be removed or replaced with the encapsulated type.
i. All tubes, mesh bags, and area nets used waterward of Mean Higher High Water shall be clearly,
indelibly, and permanently marked to identify the permittee name and contact information (e.g.,
telephone number, email address, mailing address). On the nets, identification markers will be placed
with a minimum of one identification marker for each 50 feet of net.
j. At least once every three months beaches in the project vicinity shall be patrolled by crews who will
retrieve aquaculture debris (e.g., anti -predator nets, tubes, tube caps, stakes, lines) that escapes from
the project area. Within the project vicinity, locations shall be identified where debris tends to
accumulate due to wave, current, or wind action, and after weather events these locations shall be
patrolled by crews who will remove and dispose of aquaculture debris appropriately. You shall maintain
a record with the following information and the record shall be made available upon request to the U.S.
Army Corps of Engineers, National Marine Fisheries Service, and U.S. Fish and Wildlife Service: date
of patrol, location of areas patrolled, description of the type and amount of retrieved debris, other
pertinent information.
k. Tires shall not be used as part of above and below structures or where tires could potentially come in
contact with the water (e.g., floatation, fenders, hinges). Tires used for floatation currently shall be
replaced with inert or encapsulated materials, such as plastic or encased foam, during maintenance or
repair of the structure.
Vessels shall not ground or anchor in native eelgrass (Zosters marina) or kelp (rooted/attached brown
algae in the order Laminaria/es) and paths through native eelgrass or kelp shall not be established. If
there is no other access to the site or the special condition cannot be met due to human safety
considerations, a site-specific plan shall be developed describing specific measures and/or best
management practices that will be undertaken to minimize negative effects to eelgrass and kelp from
vessel operation and accessing the shellfish areas. The access plan shall include the following
components: (a) frequency of access at each location, (b) use of only the minimum number of boats
and/or crew members needed to conduct the work and a description of the minimum number of boats
and crewmembers needed at each visit, and (c) consistency in anchoring/grounding in the same
location and/or walking on the same path to restrict eelgrass disturbance to a very small footprint.
m. In order to meet the requirements of the Endangered Species Act and protect listed species, you may
install the anchors from July 16 through January 14 in any year this permit is valid. You shall not install
the anchors authorized by this permit from January 15 through July 15 in any year this permit is valid.
n. When performing other activities on-site, the grower shall routinely inspect for and document any fish or
wildlife found entangled in nets or other shellfish/mariculture equipment. In the event that any fish,
birds, or mammals are found entangled, the grower shall: 1) provide immediate notice (within 24 hours)
to the Washington Department of Fish and Wildlife (all species), Services (ESA listed species), and/or
Marine Mammal Stranding Network (marine mammals), 2) attempt to release the individual(s) without
harm, and 3) provide a written and photographic record of the event, including dates, species
identification, number of individuals, and final disposition, to the Corps and Services. Contact the U.S.
Hood Canal Mariculture, Inc. NWS -2008-502
Fish and Wildlife Service Law Enforcement Office at (425) 883-8122 with any questions about the
preservation of specimens.
o. You must implement and abide by the enclosed Infrastructure Inspection and Reporting Plan dated
February 2016.
Further Information:
1. Congressional Authorities. You have been authorized to undertake the activity described above pursuant to:
® Section 10 of the Rivers and Harbor Act of 1899 (33 United States Code (U.S.C.) 403).
❑ Section 404 of the Clean Water Act (33 U.S.C. 1344).
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.0 1413).
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, State, or local authorization required by law
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal project.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted activities or from natural
causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or
on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the
activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
4. Reliance on Applicant's Data. The determination of this office that issuance of this permit is not contrary to the
public interest was made in reliance on the information you provided.
5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the
circumstances warrant. Circumstances that could require include, but are not limited to, the following:
a. You fail to comply with the terms and conditions of the permit.
b. The information provided by you in support of your application proves to have been false, incomplete, or
4
Hood Canal Mariculture, Inc.
inaccurate (See 4 above).
{
L0G ITE A
PWV �. N
NWS -2008-502
c. Significant new information surfaces which this office did not consider in reaching the original public interest
decision.
Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 Code of Federal Regulations (CFR), Part 325.7 or enforcement procedures
such as those contained in 33 CFR, Parts 326.4 and 326.5. The referenced enforcement procedures provide for
the issuance of an administrative order requiring you to comply with the terms and conditions of your permit and for
the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by
this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified
in 33 CFR, Part 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.
6. Extensions. General condition 1 establishes a time limit for the completion of the activity authorized by this
permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a
reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an
extension of this time limit.
Your signature below, as permittee, indicates that you accept and agree to comply with the terms and conditions of
this permit.
Jonat P. Davis
Hood Canal Mariculture, Inc.
311120,(
(DATE)
This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed
below.
-22t�'tl JAOV�
I(/John G. Buck
Colonel, Corps of Engineers
District Engineer
I MARc tf zo
(DATE)
When the structures or work authorized by this permit are still in existence at the time the property is transferred,
the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate
the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions,
have the transferee sign and date below.
(TRANSFEREE)
(DATE)
' . _ . • ? e�:;; •..+�M^'• :war.. �;%_;'' ':�.'':._ ' �'?!�i
' sti "-" '� %y�.4 :y,,;ti,"�,�r.l-• •y; M1••'lti�r�.` -, �'' •�_-;-�':: • w
:.5En
LO
_�•.�Ln 1.
' t' ,
00 E
1 •ra
01,
cz
pal
• : i�: x. -
Kt
• _� • •
OL4 3 '
a.
�� ::�
L� � ITEM
c�
d �
� m �
O N N ry N
lu
G' '17",
N M
o m ,- o
U Lr.,N N �p
00 00 00
00
It N
azcn
a
c
u •�
J c ,
(1 ¢ 9
m m
51- Ln
O N
ri V U
rl
F ' ~
� � Q
? b u "� U
N
� Ln m
Lo
O N cr
y L d
N
zz'a o
Z
h
U � G [
O -0
rO N
v O
co E
QJ N
w Q U
CA 0-
p�r�tw
J
ray him
�_
p�r�tw
,y
I
.4
LOG ITEM
#
psm-�7210-31
NI) U N
HS
Al
RoQ
LO
CD
C*4
AC) Qj
I
I
cu
Fu
rL
,y
I
.4
LOG ITEM
#
psm-�7210-31
NI) U N
HS
Al
RoQ
LO
CD
C*4
AC) Qj
I
Fu
rL
CL
,y
I
.4
LOG ITEM
#
psm-�7210-31
RF
rrat�.
Shoreline
tip',
"i Propose&
�Ivk4a�4
zG-vn'
k.00, B`iEP
Pi5i
�q
PLAN VMW : A
Retrofit south row mooring
anchors within WDNR Lease
20-BI2535 by adding up to 17-
new
Enew embedment anchors.
I Add up to 12 additional new
embedment anchors throughout
the lease area to moor the
proposed seaweed array and
oceanographic instrument buoys.
47.8'85384-
122.61313
NR
;e 20-BI2535
ICP#994000090
Dswa? a, Marie 1 "� ` oir�
`? Seven Sisters Beach n�'
Tracts 98 & 99
� ACOE Seattle
NWS -2Q08-502
n ! �
Pro osed 2
j Additional embedment anchors
—�' within Aquaculture lease area (6)
50"A,6, r0 QD
Reference Number: NWS -2008-502
Applicant Name: Hood Canal Mariculture, Inc.
Proposed Project: 2015 PAFF Ocean Acidification
Location: WDNR Aquatic Lands Lease 20-B12535
Hood Head, Jefferson County, WA
S25 T28N R01E
Page 5 of 7
September 17, 2015
J
tmaoa ed,ar•}
NE PATOlV Buoy
USCG-LLNR-17731
II-Z:w
1. Proposed #2
Additional embedment anchors
within Aquaculture lease area (6)
HOOD CANAL
SE PATON Buoy
USCG-LLNR-17731
remNwL a�Lk&F--
N 47.882667
R W 122.6141673
Pro og sed #1
retrofit embedment anchors
on south anchprrow (12)
a 250
Scale in Feet
GPS deciinal degree VIWGS 84
Tide datum MLLW
Seattle, Elliott Bay (NOAA)
Station ID: 1033
Sao
c
50"A,6, r0 QD
Reference Number: NWS -2008-502
Applicant Name: Hood Canal Mariculture, Inc.
Proposed Project: 2015 PAFF Ocean Acidification
Location: WDNR Aquatic Lands Lease 20-B12535
Hood Head, Jefferson County, WA
S25 T28N R01E
Page 5 of 7
September 17, 2015
J
tmaoa ed,ar•}
NE PATOlV Buoy
USCG-LLNR-17731
II-Z:w
1. Proposed #2
Additional embedment anchors
within Aquaculture lease area (6)
HOOD CANAL
SE PATON Buoy
USCG-LLNR-17731
remNwL a�Lk&F--
N 47.882667
R W 122.6141673
Pro og sed #1
retrofit embedment anchors
on south anchprrow (12)
a 250
Scale in Feet
GPS deciinal degree VIWGS 84
Tide datum MLLW
Seattle, Elliott Bay (NOAA)
Station ID: 1033
Sao
# E
�tW
A
INTERTIDAL
ZONE
0 PAT ONBUOY
Sm ft. 4-- 2 50 ft. --10� - USCG-LLX1 17731
SEVEN
SISTERS
BEACH
Oceanographic
�lnstrument Buoy
mariculture array !
24" mooring buoy 1
�I j
4' double backbone
surface longline{ mariculture array
+ } ' subsurface longline dropper
500 ft. f� mariculture array
Q 24 mooring buoy
jPC#994000090
F
OSW'ALD, MARIE ' .
Seven Sisters Beach 0-1 ii 11000 ft.
Tracts 98 &. 99
t? I 4' double backbone Ebb
.kCOIr Seattle `1 surFace longline
NWS -2008-502,1
�MWWH, �
WDNR �. 5E PATON Buoy �
.� +10.3 Lease 20-gI2535 jUSCG-LLNR-17731 �d
F Oceanographic
Instrument Buoy l
f' Proposed:
'1.) Utilize the existing and proposed
Lenumber: NWS -2008-502 anchors to moor the 254 ft. x 500 f .
ame: Hood Canal Mariculture, Inc. mariculture array, subsurface longlines
roject: 2015 PAFF Ocean Acidification spaced 10 #t. and held at 10-15 ft. depth.
DNR Aquatic Lands Lease 20-B12535 2) Utilize the double -backbone surface
ood Head, Jefferson County. WA longlines to suspend bivalve shellfish
25 T2QN-R01E grow containers Ce.g trays] at 20-40 ft. depth.
r 17, 2015
O - 2S0 SOD ..
Scale in Feet
decimal degree WGS 84
Tide datum MLLW
f Seattle, Elliott Bay C-ROAA]
Station ID-. 1033
w
01
0
x
Q�
` � N
f W
cc
G O
O O
U
C
U
Ncu
h
"a
:= bJ
:= QI
s LO
ro�
++ M
CJ
ro
m
q �
Q)
c
�
b
�'u o
co v
o
'� ai ami
0,
UO
� K
Co
m ro O
13
zCL
v� n�.~a w
U
ON
cn Y a rn
crczz
+ � 2 CO CU
LO
o
N m z -OF
o O LO
EE
a A
CA
�-
v N O
O .O
c� r" O Z3
U O, cC
CL
r
cu CL p
�¢c,a
f0) CL
(U
w
3
CO
O
Q'
LO r�
�f
LZ a m °
!
M
Ln
y
li L
a�. o o
m >,
�;,co�
C! O fB M Y
-
by 1
C? U `O E
N a
Z Q Tt ?, ?
Am
a
" : 0 G F C
p 0
N N
Cl O L
3
y
0
m
�
yao)
CD
bo
ULO
uy
V.0 V.
CG V.
R
I t N
rr
CU
LU n`
Cq
Jy -)
O Ln
Q,
U -J
cud d N
a
N.acl)�
N
^O O V A
Lail
rC
W
'H
.L�
.
$
c
—
se7i
m q cr
y?
Rei
N�
GaV3
w
01
0
x
Q�
` � N
f W
cc
G O
O O
U
C
U
Ncu
h
"a
:= bJ
:= QI
s LO
ro�
++ M
CJ
ro
m
q �
Q)
c
�
b
�'u o
co v
o
'� ai ami
0,
UO
� K
Co
m ro O
13
zCL
v� n�.~a w
U
ON
cn Y a rn
crczz
+ � 2 CO CU
LO
o
N m z -OF
o O LO
N
a A
CA
�-
v N O
O .O
c� r" O Z3
U O, cC
E
O
cu CL p
�¢c,a
f0) CL
(U
a.ci)
ro�
ro
Q)
c
co v
o
0,
Co
m ro O
13
zCL
cn Y a rn
tr J
m Y
c0`]
.n m
C
(13
3
CO
O
Q'
m
o,a E
�f
LZ a m °
!
U O LO y
y
li L
a�. o o
Lk cn
�;,co�
C! O fB M Y
-
tS Q. Q 00
C? U `O E
inlaw'O o
LOG ITEM
L%
P O
APPENDIX F
Corps Letter "No Applications Pending" 12-9-19
Office of Counsel
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, SEATTLE DISTRICT
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
December 9, 2019
Mr. Kenneth Sheppard
Simburg, Ketter, Sheppard & Purdy, LLP
999 Third Ave., Suite 2525
Seattle, WA 98104
Dear Mr. Sheppard.
Your Freedom of Information Act (FOIA) request, received November 4, 2019 and
assigned FOIA number FA -20-023, requested a copy of permit applications and
drawings for all pending applications before the USACE for aquaculture projects within
a 5 mile linear shoreline distance from either direction of the reference project NWS -
2013 -1268. Our Regulatory Branch searched and did not find any documents. We do
not have any records responsive to your request.
Please be advised the District of Columbia Circuit Court of Appeals held in Ogelsby
v. Department of the Army, 920 F.2d 57 (D.0 Cir. 1990) that a "no records"
determination is an appealable denial. You have the right to appeal this determination
through the District Counsel's Office to the Secretary of the Army (ATTN: General
Counsel). Should you decide to file an appeal, it must be received by this office within
90 days of the date of this letter. The envelope containing the appeal should bear the
notation "Freedom of Information Act Appeal" and should be sent to:
Office of Counsel
U.S. Army Corps of Engineers
P.O. Box 3755
Seattle, WA 98124-3755
If you have any questions, please contact me at (206) 764-6943 or via e-mail at
Craig.M.Juckn'I_ess@usace.army.mil. Alternatively, you may contact the Corps' FOIA
Public Liaison for any further assistance and to discuss any aspect of your request. The
contact information for the FOIA Public Liaison is as follows: U.S. Army Corps of
Engineers, ATTN: CECC-L, 441 G Street, NW, Washington, DC 20314-1000; e-mail at
foia-Iiaison@usace.army.mil; telephone at (202) 761-4791.
Additionally, you may contact the Office of Government Information Services (OGIS)
at the National Archives and Records Administration to inquire about the FOIA
mediation services they offer. The contact information for OGIS is as follows: Office of
Government Information Services, National Archives and Records Administration, 8601
Adelphi Road-OGIS, College Park, Maryland 20740-6001, e-mail at ogis�nara.gov;
LOG ITEM
-2- P 5
telephone at (202) 741-5770; toll free at 1-877-684-6448; or facsimile at (202) 741-
5769.
Because the cost of processing your request was minimal, there is no charge.
Sincerely,
� 'r /
ralqcl, Juct Couel
DIST pF
4q ' fid
• �, r P�a
�+ui.nsn.
Regulatory Branch
Mr. Brad Nelson
BDN, LLC
3011 Chandler Street
Tacoma, Washington 98409
Dear Mr. Nelson:
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 3755
SEATTLE, WASHINGTON 98124-3755
AUG 2 2 2011
Reference:
" �
NWS -2013-1268
BDN, LLC
(Smersh Lease)
We have reviewed your permit file to cultivate 5.15 acres of geoduck in Squamish Harbor,
near Port Ludlow, Jefferson County, Washington verified under the 2012 Nationwide Permit
(NWP) 48. Your proposal as depicted on the enclosed drawings dated July 22, 2016 and as
verified on January 3, 2017 under the 2012 NWP 48 (hereinafter "activity") is eligible for
verification under the 2017 Nationwide Permit (NWP) 48 for Commercial Shellfish Aquaculture
Activities (Federal Register January 6, 2017, Vol. 82, No. 4). The activity will be verified under
the 2017 NWP 48 upon return of this letter, bearing your signature, to the Seattle District in
conformance with the instructions below. if you would like to seek verification under NWP 48
for any proposed work outside of the activity for which you were verified under the 2012 NWP
48 on January 3, 2017, please contact the Project Manager listed in the cover letter
accompanying this letter.
In order for this authorization to be valid, you must ensure the work is performed in
accordance with the enclosed NWP 48, Terms and Conditions and with the Services Biological
Opinions - National Marine Fisheries Service (NMFS) Biological Opinion (BO) and Errata dated
September 2, 2016 and September 30, 2016, respectively (NMFS Reference Number WCR-
2014-1502), and U.S. Fish and Wildlife Service (USFWS) BO dated August 26, 2016 (USFWS
Reference Number OIEWFW00-2016-F-0121). The BOs contain mandatory terms and
conditions to implement the reasonable and prudent measures associated with the specified
"incidental take". You are also required to comply with the special conditions listed below.
a. This U.S. Army Corps of Engineers (Corps) permit does not authorize you to take a
threatened or endangered species. In order to legally take a listed species, you must have
authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or ESA
Section 7 consultation Biological Opinion with non -discretionary "incidental take" provisions
LW IT
APPENDIX G
USACE approval of the BDN Smersh project
(granted on December 19, 2016 under NWS -2013-1268)
l -G ITEM
-2- � 70
with which you must comply). The Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number 01EWFW00-2016-F-0121), contain mandatory
terms and conditions to implement the reasonable and prudent measures associated with the
specified "incidental take". The authorization under this Corps permit is conditional upon your
compliance with all of the mandatory terms and conditions associated with incidental take of the
BOs. These terms and conditions are incorporated by reference in this permit. Failure to comply
with the terms and conditions associated with incidental take of the BOs, where a take of the
listed species occurs, would constitute an unauthorized take, and it would also constitute non-
compliance with your Corps permit. The USFWS and NMFS are the appropriate authorities to
determine compliance with the terms and conditions of its BO and with the ESA.
b. In order to meet the requirements of the Endangered Species Act (ESA) and Magnuson -
Stevens Fishery Conservation and Management Act (MSA), you must comply with the
conservation measures in the Programmatic Biological Opinions for Shellfish Activities in
Washington State Inland Marine Waters (BOs) - the National Marine Fisheries Service (NMFS)
and Errata, dated September 2, 2016 and September 30, 2016, respectively (NMFS Reference
Number WCR-2014-1502), and the U.S. Fish and Wildlife Service (USFWS), dated
August 26, 2016 (USFWS Reference Number OIEWFW00-2016-F-0121). These conservation
measures are included in the enclosed document, Enclosure 1, Conservation Measures for
Activities Covered under the Shellfish Activities Programmatic Consultation Biological
Opinions. If you cannot comply with these conservation measures, you must, prior to
commencing your activity, contact the U.S. Army Corps of Engineers, Seattle District,
Regulatory Branch for individual ESA/MSA consultation. The USFWS and NMFS are the
appropriate authorities to determine compliance with the ESA.
c. Incidents where any individuals of fish species, marine mammals and/or sea turtles listed
by National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) under the
Endangered Species Act appear to be injured or killed as a result of discharges of dredged or fill
material into waters of the U.S. or structures or work in navigable waters of the U.S, authorized
by this Nationwide Permit verification shall be reported to NOAA Fisheries, Office of Protected
Resources at (301) 713-1401 and the Regulatory Office of the Seattle District of the U.S. Army
Corps of Engineers at (206) 764-3495. The finder should leave the animal alone, make note of
any circumstances likely causing the death or injury, note the location and number of individuals
involved and, if possible, take photographs. Adult animals should not be disturbed unless
circumstances arise where they are obviously injured or killed by discharge exposure or some
unnatural cause. The finder may be asked to carry out instructions provided by NOAA Fisheries
to collect specimens or take other measures to ensure that evidence intrinsic to the specimen is
preserved.
Enclosed for your convenience is a list of the conservation measures and mandatory terms
and conditions referenced in the above special conditions. The complete Programmatic
Biological Opinions, are available on our website at
http://www,nws.usace.army.mil/Missions/Civil Works/Regulatory/Permit-Guidebook.aspx.
The authorized activity complies with the Washington State Department of Ecology's
(Ecology) Water Quality Certification (WQC) requirements and Coastal Zone Management
(CZM) consistency determination response for this NWP. No further coordination with Ecology
For WQC and. CZM is required.
You have not requested a jurisdictional determination for this activity. If you believe the
Corps does not have jurisdiction over all or portions of your project you may request a
preliminary or approved jurisdictional determination (JD). If one is requested, please be aware
that we may require the submittal of additional information to complete the JD and work
authorized in this letter may not occur until the JD has been completed.
Our verification of this NWP authorization is valid until March 18, 2022, unless the NWP is
modified, reissued, or revoked prior to that date. If the authorized work has not been completed
by that date and you have commenced or are under contract to commence this activity before
March 18, 2022, you will have until March 18, 2023, to complete the activity under the enclosed
terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP
verification invalidates this authorization and could result in a violation of Section 404 of the
Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all
local, State; and other Federal permits that apply to this project.
You are cautioned that any change in the activity's location or plans will require you to
submit a copy of the revised plans to this office and obtain our approval before you begin work.
Deviating from the approved plans and activity could result in an enforcement action. Please
note we may need to reinitiate consultation with the NMFS and/or USFWS in order to authorize
any work not already included in the enclosed plans.
Thank you for your cooperation during the permitting process. We are interested in your
experience with our Regulatory Program and encourage you to complete a customer service
survey form. This form and information about our program is available on our website at
LOG 1TEOO
-4-
p �(>
www.nws.usace.ar ny.mil, select "Regulatory Branch, Permit Information" and then "Contact
Us." If you have any questions, please contact me at pamela.sanguinetti@usace.army.mil or by
phone at (206) 764-6904.
Sincerely,
hoL a A�
Pamela Sanguinetti, P oject Manager
Regulatory Branch
Enclosures
By signing below I certify the activity described in the enclosed drawings and descriptions as
verified under the 2012 NWP 48 on January 3, 2017 accurately describes my proposed on-going
activities for the period from March 2018 through March 2022 and constitutes a complete and
accurate Pre -Construction Notification for authorization under the 2017 Nationwide Permit 48.
By signing below I accept verification for the activity under the 2017 Nationwide Permit, as
described and conditioned in this verification letter. I further acknowledge any changes to the
activity from the enclosed drawings and descriptions require further coordination with the U.S.
Army Corps of Engineers and are not authorized by this letter.
JIB LCC- /44o)
Print Applicant Name
REFERENCE NUMBER: NWS -2013-1268
AJ -31 [s.
a
1r
Applicant Signature and date
x
.0 LL > a7 � r
I
NC]
W C
Z
;
_
� � � W
� z a 4
�
s�
[.i�� ��=
� ¢ � _ 1� � �
Jai/ j
i 1
�r��•.
a��
o� x y o, w
M- .?
c
- JLC U Cl (a vi Hl,
c
c
4 m
1 pa <[ 4 p)
D C W (a
J C C
C U 0
N Q �
Y, IL
•
�! � W lV CI d y
F
U 1•- f •�
6iW V
j
JC�'1
11T1 wo N0 C,
+ •+ C4 A, C, N
";
&C kf""f'IYf:
a, .o
J
_ onpap7
K
�
Y
C of
O
i
W
A
U
J
J
'�E
L �I C� LL5 4l n1
IL oy v n+ m
m
LL m ' Ni 4,
o ' +� `.
Q.
u'
z
RwR V
Jai
JI
til c ei [i
9).G
Z l
f
� G 1` ; uq u
E a� Wa°om
w M Jrni "' 4 u'
� c vaia+;i y
m
w_,
tL
LU
2 t a4 j
m
jF I� Iti ly 1•.
b. J J• f ?
C + �, m (O f0 A]
-� l) [I W I'J.
41 r
41
i'1
�S
(J Y+ E
A ..
R 11
J
�JJ C
LOCA
O
W
a
A
On
r.7
W
z
z
W
I�1
Qn
1
N
V
O
O
w
m
0 '
` (PA""w UI mdea
m�
d
M
$
X30
i
011
Hill
g
za 90o
N
>
F -UCC roti
cd rA
RO I J A
M
4,6
�
� �
y
�y
I i(�
a
W�
W 2
b
`j<
NF 1i
LOG ITER r
P86�-
APPENDIX H
Order in Coalition to Protect Puget Sound Habitat, v. U.S. Army Corps of Engineers
Case No 2:16 -CV -00950, and 2:17 -CV -1209.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 1 of 24
LOG ITEM
Pli*kSECRM
UNITED STATES DISTRICT COURT
WESTERN DISTRICT OF WASHINGTON
AT SEATTLE
THE COALITION TO PROTECT PUGET
SOUND HABITAT,
Plaintiff,
V.
U.S. ARMY CORPS. OF ENGINEERS, et al.,
Defendants,
and
TAYLOR SHELLFISH COMPANY, INC.,
Intervenor - Defendant.
CENTER FOR FOOD SAFETY,
Plaintiff,
V.
U.S. ARMY CORPS OF ENGINEERS, et al.,
Defendants,
and
PACIFIC COAST SHELLFISH GROWERS
ASSOCIATION,
Intervenor - Defendant.
Case No. C 16-0950RSL
Case No. 17-1209RSL
ORDER HOLDING NWP 48
UNLAWFUL IN THE STATE OF
WASHINGTON AND
REQUESTING ADDITIONAL
BRIEFING
This matter comes before the Court on cross-motions for summary judgment filed by the
parties and intervenors in the above -captioned matters. Dkt. # 36, # 44, and # 45 in C16-
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
LOG ITEM,
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 PaW 2 of of 24
�-q}q
0950RSL; Dkt. # 31, # 43, and # 44 in C17-1209RSL. The Court has also considered the
Swinomish Indian Tribal Community's submission in a related case, C 18-0598RSL (Dkt. # 28).
Plaintiffs challenge the U.S. Army Corps of Engineers' issuance of Nationwide Permit 48
("NWP 48") authorizing discharges, structures, and work in the waters of the United States
related to commercial shellfish aquaculture activities. Plaintiffs argue that the Corps failed to
comply with the Clean Water Act ("CWA"), the National Environmental Policy Act ("NEPA"),
and the Endangered Species Act ("ESA") when it reissued NWP 48 in 2017. They request that
the decision to adopt NWP 48 in Washington' be vacated under the Administrative Procedures
Act ("APA") and that the Corps be required to comply with the environmental statutes before
issuing any new permits or verifications for commercial shellfish aquaculture in this State.z
I:I O;5"Ml01L, El
The CWA authorizes the Army Corps of Engineers to issue permits for the discharge of
dredged or fill material into the navigable waters of the United States. 33 U.S.C. § 1344(a). If the
Corps determines that activities involving discharges of dredged or fill material "are similar in
nature, will cause only minimal adverse environmental effects when performed separately, and
will have only minimal cumulative adverse effect on the environment," it may issue general
permits on a state, regional or nationwide basis permitting the activities for a five year period. 33
' The Coalition to Protect Puget Sound Habitat seeks to bar the use of NWP 48 only in Puget
Sound.
z The Court finds that one or more members of plaintiff Center for Food Safety has/have
standing to pursue the CWA, NEPA, and ESA claims based on their concrete, particularized, and
imminent injuries arising from activities in Washington that are permitted under the 2017 version of
NWP 48.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
LW ITEM
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 3 of 24
U.S.C. § 1344(e). "[T]he CWA imposes substantive restrictions on agency action" (Greater
Yellowstone Coalition v, Flowers, 359 F.3d 1257, 1273 (10th Cir. 2004)): if "the effect of a
general permit will be more than minimal, either individually or cumulatively, the Corps cannot
issue the permit" (Wvoming Outdoor Council v. U.S. Army CoEps of En 'rs, 351 F. Supp. 2d
1232, 1255-57 (D. Wyo. 2005)). General permits often impose requirements and standards that
govern the activities undertaken pursuant to the permit, but they relieve operators from the more
burdensome process of obtaining an individual, project -based permit.
In 2017, the Corps reissued NWP 48, thereby authorizing "the installation of buoys,
floats, racks, trays, nets, lines, tubes, containers, and other structures into navigable waters of the
United States. This NWP also authorizes discharges of dredged or fill material into waters of the
United States necessary for shellfish seeding, rearing, cultivating, transplanting, and harvesting
activities." NWP003034. The nationwide permit authorizes(a) the cultivation of nonindigenous
shellfish species as long as the species has previously been cultivated in the body of water at
issue, (b) all shellfish operations affecting '/z acre or less of submerged aquatic vegetation, and
(c) theall operations affecting more than '/z acre of submerged aquatic vegetation if the area had
been used for commercial shellfish aquaculture activities at any point in the past 100 years.
NWP003034-35.3
In addition to the CWA's requirement that the Corps make "minimal adverse effect"
findings before issuing a general permit, "NEPA imposes procedural requirements on federal
agencies to analyze the environmental impact of their proposals and actions." O'Reilly v. U.S.
3 The 100 -year look back provision was not in the 2012 version of NWP 48.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
LOG ITEM
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Pag:0 4 of 24
Army Corps of Engr's, 477 F.3d 225, 228 (5th Cir. 2007). Federal agencies are required to do an
environmental assessment ("EA") of their proposed action, providing a brief discussion of the
anticipated environmental impacts and enough evidence and analysis to justify a no -significant -
impact determination. 40 C.F.R. § 1508.9. If the agency, after conducting an EA, is unable to
state that the proposed action "will not have a significant effect on the human environment," a
more detailed and comprehensive environmental impact statement ("EIS") must be prepared. 40
C.F.R. § 1508.11 and § 1508.13.4
The Corps' EA regarding the 2017 reissuance of NWP 48 is presented in a Decision
Document dated December 21, 2016. NWP003034-3116. An additional condition was later
imposed by the Seattle District through its Supplemental Decision Document dated March 19,
2017. COE 127485-611. The Court has considered both Decision Documents to the extent they
reflect the Corps' analysis of the anticipated environmental impacts of issuing the nationwide
permit and imposing the additional regional condition. The Decision Documents set forth the
Corps' discussion of anticipated environmental impacts and the evidence and analysis justifying
its determination "that the issuance of [NWP 48] will not have a significant impact on the quality
of the human environment," making an EIS unnecessary under NEPA. NWP003106. The
Decision Documents also reflect the Corps' determination that the "activities authorized by
[NWP 48] will result in no more than minimal individual and cumulative adverse effects on the
aquatic environment" for purposes of the CWA. NWP003107. The Seattle District, for its part,
concluded that if it added a regional condition preventing the commercial harvest of clams by
4 "Impact" and "effect" are used interchangeably in the regulations and are deemed synonymous.
40 C.F.R. § 1508.8.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 4
2
3
4
6y
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
LOG ITEM
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page of 241
rL
Paw
rc �j
means of hydraulic escalator equipment and evaluated proposed activities as they were verified
under the reissued permit, the effects of the permitted activities would be individually and
cumulatively minimal. COE 127592-93.
Plaintiffs argue that these conclusions must be invalidated under the APA because the
record does not support the Corps' conclusions regarding the environmental effects of individual
shellfish aquaculture activities or their cumulative impacts and the EA does not accurately
describe the anticipated environmental impacts of NWP 48 or otherwise justify a no -significant -
impact determination. Under the APA, a reviewing court must set aside agency actions, findings,
or conclusions that are "arbitrary, capricious, an abuse of discretion, [] otherwise not in
accordance with law" or "without observance of procedure required by law." 5 U.S.C.
§ 706(2)(A) and (D). Agency action is arbitrary and capricious "if the agency has relied on
factors which Congress has not intended it to consider, entirely failed to consider an important
aspect of the problem, offered an explanation for its decision that runs counter to the evidence
before the agency, or is so implausible that it could not be ascribed to a difference in view or the
product of agency expertise." Motor Vehicle Mfrs. Assn v. State Farm Mut. Auto. lips. Co., 463
U.S. 29, 43 (1983). Although agency predictions within the agency's area of expertise are
entitled to the highest deference, they must nevertheless have a substantial basis in fact. Ctr. for
Biological Diversity v. Zinke, 900 F.3d 1053, 1067 (9th Cir. 2018). In determining whether a
decision is supported by substantial evidence in the record, the Court will not substitute its own
judgment for that of the agency but rather considers whether the decision is based on relevant
evidence that a reasonable mind might accept as adequate to support the agency's conclusion.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 5
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
Pia
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 6 "G
San Luis & Delta -Mendota Water Auth. v. Jewell, 747 F.3d 581, 601 (9th Cir. 2014).5
DISCUSSION
Having reviewed the submissions of the parties and the administrative record, and having
heard the arguments of counsel, the Court finds that there is insufficient evidence in the record to
support the agency's conclusion that the reissuance of NWP 48 in 2017 would have minimal
individual and cumulative adverse impacts on the aquatic environment for purposes of the CWA
and that the Corps' environmental assessment does not satisfy NEPA's requirements. Although
the minimal impacts finding is repeated throughout the Corps' Decision Document (see
NWP003038, NWP003045-46, NWP003049, NWP003051, NWP003091, NWP003107), it is
based on little more than (1) selectively chosen statements from the scientific literature, (2) the
imposition of general conditions with which all activities under nationwide permits must
comply, and (3) the hope that regional Corps districts will impose additional conditions and/or
require applicants to obtain individual permits if necessary to ensure that the adverse impacts
will be minimal. Each of these considerations is discussed below.
(1) Effects Analysis
At various points in its analysis, the Corps acknowledges that commercial shellfish
aquaculture activities can have adverse environmental impacts. See NWP003040 (commercial
s Plaintiffs also argue that the agency action should be invalidated because the Corps (a) failed to
analyze a reasonable range of alternative actions in the EA, (b) failed to allow for meaningful public
participation, and (c) failed to re-initiate consultation with expert wildlife agencies under the ESA when
the 2017 version of NWP 48 was modified to increase the acreage on which commercial shellfish
production was authorized, failed to incorporate assumed conservation measures and conditions, and
failed to analyze the impacts of pesticides on endangered species. Because the Court finds that the Corps
violated the CWA and NEPA, it has not considered these alternative theories for why NWP 48 should
be invalidated.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 6
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
L0G' 1T�:&i
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Paqe 7of 241
Pte- 64 5::-,
shellfish aquaculture activities "have some adverse effects on the biotic and abiotic components
of coastal waters, including intertidal and subtidal areas"); Id. (noting that "at a small spacial
scale (e.g., the site directly impacted by a specific aquaculture activity) there will be an adverse
effect."); NWP003041 (acknowledging "some impacts on intertidal and subtidal habitats, fish,
eelgrass, and birds"); NWP003042 (recognizing that "commercial shellfish aquaculture activities
do have some adverse effects on eelgrass and other species that inhabit coastal waters"); COE
127559 (stating that "marine debris is a serious impact on the marine environment"); COE
127570 (acknowledging "potential adverse impacts" to riffle and pool complexes); COE 127584
(noting that "[c]ommercial shellfish aquaculture activities can result in conversion of substrates
(e.g. mudflats to gravel bars), impacts to submerged aquatic vegetation, alteration in aquatic
communities from native to non-native shellfish species, and water quality impacts from harvest
activities"). It concludes that these impacts are no more than minimal, however, (a) when
considered on a landscape rather than a site -by -site scale, (b) because the relevant ecosystems
are resilient, and (c) because the impacts are "relatively mild" in comparison "to the disturbances
and degradation caused by coastal development, pollution, and other human activities in coastal
areas." NWP003040 and NWP003044.
(a) Scale of Impacts Evaluation
In determining the potential effects of a proposed discharge of dredged or fill material in
an aquatic environment, the Corps is required to determine the nature and degree of the
environmental impact the discharge will have, both individually and cumulatively.
"Consideration shall be given to the effect at the proposed disposal site of potential changes in
substrate characteristics and elevation, water or substrate chemistry, nutrients, currents,
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 7
7
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Pag of 44 1T
RW 7'
circulation, fluctuation, and salinity, on the recolonization and existence of indigenous aquatic
organisms or communities." 40 C.F.R. § 230.11(e) (emphasis added). Ignoring or diluting site-
specific, individual impacts by focusing solely on a cumulative, landscape -scale analysis is not
consistent with the governing regulations.
(b) Resilient Ecosystems
The Decision Document issued by Corps Headquarters acknowledges that "[t]he effects
of commercial shellfish aquaculture activities on the structure, dynamics, and functions of
marine and estuarine waters are complicated, and there has been much discussion in the
scientific literature on whether those effects are beneficial or adverse." NWP003040. Relying in
large part on a.paper published by Dumbauld and McCoy for the U.S. Department of Agriculture
in 2015, the Corps concluded that the individual and cumulative impacts of the activities
authorized by NWP 48 would be minimal "because the disturbances caused by these activities
on intertidal and subtidal ecosystems are temporary and those ecosystems have demonstrated
their ability to recover from those temporary disturbances." NWP003045-46.6
6 The Corps also cites a 2009 paper co -written by Dumbauld, which it describes as "a review of
empirical evidence of the resilience of estuarine ecosystems and their recovery (including the recovery
of eelgrass) after disturbances caused by shellfish aquaculture activities." NWP003044. The Corps relies
on the 2009 Dumbauld paper to support its conclusion that commercial shellfish production can have
beneficial impacts on some aspects of the aquatic environment. See NWP003406 ("Many species co-
exist with commercial shellfish aquaculture activities and many species benefit from these activities.");
NWP003086 (noting improved water and habitat quality at moderate shellfish population densities);
NWP003087 ("Activities authorized by this NWP may alter habitat characteristics of tidal waters. Some
species of aquatic organisms will benefit from those changes, while others will be adversely affected.");
NWP003104 ("Sessile or slow-moving animals in the path of discharges of dredged or fill material and
aquaculture equipment may be destroyed. Some aquatic animals may be smothered by the placement of
fill materials. Some aquatic organisms will inhabit the physical structure created by equipment used for
commercial shellfish aquaculture activities."). The fact that there are environmental winners and losers
when activities authorized under NWP 48 are undertaken does not resolve the issue of whether the
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 8
pi
4
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 9 c�LAG ITEM
24 r1��
Dumbauld and McCoy's research cannot justify such a broad, sweeping conclusion
regarding the resilience of entire ecosystems in both the intertidal and subtidal zones. According
to the Corps' own summary of the paper, the authors evaluated only the effects of oyster
aquaculture activities on submerged aquatic vegetation. NWP003044. The paper itself shows
that Dumbauld and McCoy were studying the effects of intertidal oyster aquaculture on the
seagrass Zostera marina. There is no discussion of the impacts on other types of aquatic
vegetation, on the benthic community, on fish, on birds, on water quality/chemistry/structures, or
on substrate characteristics. There is no discussion of the subtidal zone. There is no discussion
regarding the impacts of plastic use in shellfish aquaculture and only a passing reference to a
possible side effect of pesticide use. The Corps itself does not remedy these deficiencies:
although it identifies various resources that will be adversely impacted by issuance of the
national permit (along with resources that may benefit from shellfish production), it makes
virtually no effort to characterize the nature or degree of those impacts. The Decision
Document's "Impact Analysis" consists of little more than an assurance that district engineers
will consider the direct and indirect effects caused by the permitted activity on a regional or
case-by-case basis. NWP003073-74.
proposed agency action has more than minimal impacts or obviate the need for a "hard look" at all
impacts, beneficial and adverse. Native Ecosys. Council v. U.S. Forest Serv., 428 F.3d 1233, 1238-39
(9th Cir. 2005). The 2009 review clearly shows, and the Corps acknowledges, that at least some aquatic
species and characteristics are adversely affected by commercial shellfish aquaculture. The Ninth
Circuit, faced with a similar situation under NEPA, noted that "even if we had some basis for assuming
that [the agency's] implementation of the BiOp would have exclusively beneficial impacts on the
environment, we would still lack a firm foundation for holding that [the agency] need not prepare an EA
and, if necessary, an EIS." San Luis & Delta -Mendota Water Auth. v. Jewell, 747 F.3d 581, 652 n.52
(9th Cir. 2014).
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 9
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
•^M
9 d t* m
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 1q?of 24
Pte' 7? __J
Under the CWA, the Corps must find that the proposed activity "will cause only minimal
adverse environmental effects when performed separately, and will have only minimal
cumulative adverse effect on the environment" before it issues a general permit. 33 U.S.C.
§ 1344(e). Under NEPA, the Corps is required to "[b]riefly provide sufficient evidence and
analysis for determining whether to prepare an environmental impact statement or a finding of
no significant impact." 40 C.F.R. § 1508.9(a)(1). The agency is required to take a "hard look" at
the likely environmental impacts of the proposed action and prepare an EA to determine whether
the impacts are significant enough to necessitate the preparation of an EIS. Native Ecosys.
Council, 428 F.3d at 1238-39. The analysis, though brief, "must be more than perfunctory" and
must be based on "some quantified or detailed information; ... [g]eneral statements about
possible effects and some risk do not constitute a hard look absent a justification regarding why
more definitive information could not be provided." Klamath-Siskiyou Wildlands Ctr. v. Bureau
of Land Mgmt., 387 F.3d 989, 993-94 (9th Cir. 2004) (alteration in original, citations omitted).
In this case, the Corps acknowledged that reissuance of NWP 48 would have foreseeable
environmental impacts on the biotic and abiotic components of coastal waters, the intertidal and
subtidal habitats of fish, eelgass, and birds, the marine substrate, the balance between native and
non-native species, pollution, and water quality, chemistry, and structure, but failed to describe,
much less quantify, these consequences. The Corps cites the two Dumbauld papers for general
statements regarding the positive or negative effects of shellfish aquaculture on certain aquatic
resources or characteristics (focusing on seagrass), but it makes no attempt to quantify the
effects or to support its conclusion that the effects are no more than minimal.
Even if the health and resilience of seagrass were the only concern - and, as discussed
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 10
Pj
4
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page #of 24'
above, it is not - the 2015 Dumbauld and McCoy paper cannot reasonably be interpreted as
evidence that seagrass is only minimally impacted by commercial shellfish aquaculture. As
noted above, the paper evaluated only the effect of oyster aquaculture. In that context, it
recognized the research suggesting that oyster aquaculture has direct impacts on native
seagrasses at the site of the activity and in short temporal spans. These impacts are then ignored
by both Dumbauld and the Corps in favor of a landscape, cumulative analysis which, as
discussed above, is inadequate. Just as importantly, NWP 48 authorizes the discharge of dredged
and fill material from not only oyster operations, but also from mussel, clam, and geoduck
operations carried out on bottom substrate, in containers, and/or on rafts or floats. Thus,
Dumbauld and McCoy did not evaluate, and drew no conclusions regarding, the impact that
many of the activities authorized by NWP 48 would have on seagrass (much less other aquatic
resources). The Seattle District, for its part, acknowledged the breadth of species and cultivation
techniques that are encompassed in the phrase "commercial shellfish aquaculture." A draft
cumulative impact assessment generated in February 2017 dedicated twenty-five pages to
discussing the wide range of work and activities covered by NWP 48 and noting the species -
dependent variability in cultivation techniques, gear, and timing. COE 125591-616.7 These
variations gave rise to a wide array of effects on the aquatic habitat (COE 125635-36), none of
which is acknowledged or evaluated in the national Decision Document. In its Supplement, the
Seattle District noted:
' The Corps acknowledges that the draft regional impact assessment "was a NEPA-level
analysis," but faulted the author because that level of analysis should be performed by Headquarters for
a nationwide permit. COE 125856. No comparable analysis is included in the national Decision
Document, however.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 12 of 24
m� H,:
The impacts to eelgrass from aquaculture can be temporary, depending on the
activity, because the habitat conditions themselves (elevation, water quality, etc.)
are not permanently altered which allows eelgrass to eventually recover given
sufficient time. In Washington State, the timeframe for recovery has been
documented to be about 5 years depending on the activity and other factors. For
example, when a geoduck farm is seeded it is covered with tubes and nets for 2 or
more years and then the tubes and nets are removed until harvest, 3-5 years later.
The eelgrass would have died back under the nets, had a chance to return when
nets were removed, and then eelgrass is disturbed/removed again when harvest
occurs. While this process allows for eelgrass return at the site, the frequency of
disturbance and relatively long recovery times result in a local habitat condition
where eelgrass more often than not is either not present or present at a much
reduced functional state. This effect would persist as long as aquaculture is
occurring at the site. In some cases, such as when nets are placed over planted
clam beds, any eelgrass is likely to be permanently smothered and not recover.
This is because of the permanence of the nets, which are only removed between
harvest and the next planting cycle. The time between harvest and planting may
only be a matter of weeks or months. Other impacts are discussed in the national
decision document. This existing cycle of impacts to eelgrass represents the
existing environment from aquaculture activities authorized under NWP [48] 2012;
and these or similar effects may continue if verification under 48 2017 is
requested and received.
COE 127587-88. Pnm— —7q 4- FT
Agency predictions within their areas of expertise are entitled to the highest deference,
but they must have a substantial basis in fact. The Corps recognized that certain shellfish
operations would displace eelgrass entirely for extended periods of time. In some cases, nets are
used to smother the vegetation, precluding any chance of recovery. Where smothering nets are
not in use, the eelgrass may recover to some extent, but was not likely to return to is full
functional state before being disturbed and/or removed again for the next harvest or seeding
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 12
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
06K
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page, 31a�' ITEM
Ir ;- �5-
PAM -2L01
activity. The impacts of commercial shellfish aquaculture on eelgrass (and presumably on all
species that rely on eelgrass) would continue as long as the permitted activiV.continued. Under
the 2017 version of NWP 48, a significant number of additional acres that were not cultivated
under the 2012 NWP could be put into shellfish aquaculture if the area had been commercially
productive during the past 100 years. See COE 118145-49; COE 127584. Any such "reopened"
beds could result in additional losses of seagrass and the benefits it provides. COE 127589
("[F]or many current operations, verification under NWP 2017 will create no appreciable change
to the baseline environmental conditions, and the impacts will be minimal both individually and
cumulatively! For other operations, however, activities may create a change in current
conditions, for example if activities are proposed on land populated with recovered eelgrass.").
The national Decision Document does not quantify the periodic and permanent losses of
seagrass9 or the impact on the wider aquatic environment. A reasonable mind reviewing the
s By quoting this portion of the Seattle District Supplement, the Court is not adopting its
reasoning. National, regional, and state permits issued under the authority of the CWA last for only five
years. When a NWP is reissued, the environmental impacts of the agency action logically include all
activities conducted 4pder the auspices of the permit, regardless of whether those operations are brand
new or are simply "verified" as covered by the reissued NWP. The governing regulations expressly
impose upon the Corps the obligation to consider the ongoing effects of past actions when conducting a
cumulative impacts analysis. 40 C.F.R. § 1508.7. See Ohio Valley Enytt. Coalition v. Hurst, 604 F.
Supp. 2d 860, 886-87 (S.D. W. Va. 2009) (rejecting the Corps' post hoc rationalization that past
authorizations of moutaintop mining had no continuing effects and noting that, in the court's "common
sense judgment," "[t]hese losses and impacts do not exist in a vacuum; they are not corrected or cured
every five years with the renewal of a new nationwide permit. Nor do these accumulated harms become
the baseline from which future impacts are measured. Before authorizing future activities with such
tremendous impacts, the Corps must at least consider the present effects of past activities ....").
9 The cumulative impacts of reissuing NWP 48 are to be analyzed in accordance with 40 C.F.R.
§ 230.7(b)(3), pursuant to which the Corps must predict "the number of activities expected to occur until
the general permit expires." NWP003043. The Corps' estimates of how many acres are likely to be
cultivated under the reissued national permit vary widely, however. The estimate provided in Section
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 13
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 14 of 24
record as a whole would not accept Dumbauld and McCoy's limited findings regarding the
landscape -level impact of oyster cultivation on a species of seagrass in the intertidal zone as
support for the conclusion that entire ecosystems are resilient to the disturbances caused by
shellfish aquaculture or that the impacts of those operations were either individually or
cumulatively minimal.
(c) Impacts of Other Human Activity Pig*
Although the Corps does not rely on this line of reasoning in opposing plaintiffs' motions
for summary judgment, its Decision Document is replete with various forms of the following
statement: "[c]ommercial shellfish aquaculture activities are a minor subset of human activities
that affect coastal intertidal and subtidal habitats and contribute to cumulative effects to those
coastal habitats." NWP003041. See also NW0003040; NWP003042-44; NWP003061;
NWP003068; NWP003075-76; NWP003081; NWP003083-85. To the extent the Corps'
minimal impacts determination is based on some sort of comparison between the environmental
impacts of shellfish aquaculture and the environmental impacts of the rest of human activity (see
7.2.2 of the Decision Document states that NWP 48 will be utilized 1,625 times over the five-year
period, resulting in impacts to approximately 56,250 acres of water. NWP003098. Those numbers are
reportedly based on past uses of the NWP plus an estimate of the number of activities that did not
require pre -construction notification and were not voluntarily reported to the Corps district. Id.
According to the Seattle District, however, over 56,000 acres of marine tidelands were permitted under
the 2012 version of NWP 48 in Washington State alone, and that number was only going to increase
under the 2017 version. COE 127590. Recognizing the long history of commercial shellfish operations
in the State's waters and the 100 -year look back for identifying "existing" operations, the Seattle
District estimated that 72,300 acres of Washington tidelands could be authorized for commercial
shellfish production under the 2017 NWP 48. COE 127590-92. Thus, even if Headquarters had
attempted to quantify the proposed action's impacts on seagrass (or any other aquatic resource) before
reissuing NWP 48, its data regarding past uses of the permit was incorrect and its estimates of future
uses are suspect.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 14
1
2
31
I
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
044
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 15WP-' I ! F
c
NWP003046 (commercial shellfish aquaculture activities "cause far less change to the
environmental baseline than the adverse effects caused by development activities, pollution, and
changing hydrology that results from the people living and working in the watersheds that drain
to coastal waters ..."); NWP003078 ("[T]here are many categories of activities that contribute
to cumulative effects to the human environment. The activities authorized by this NWP during
the 5 -year period it will bein effect will result in no more than minimal incremental
contributions to the cumulative effects to these resource categories."); NWP003081 ("The
activities authorized by this NWP will result in a minor incremental contribution to the
cumulative effects to wetlands, streams, and other aquatic resources in the United States
because, as discussed in this section, they are one category of many categories of activities that
affect those aquatic resources.")), the analysis is inadequate. NEPA and the CWA were enacted
because humans were adversely affecting the environment to a noticeable and detrimental extent.
See 42 U.S.C. § 4331(a) (Congressional recognition of "the profound impact of man's activity
on the interrelations of all components of the natural environment"); 33 U.S.C. § 1251(a) ("The
objective of [the CWA] is to restore and maintain the chemical, physical, and biological integrity
of the Nation's waters."). Noting that a particular environmental resource is degraded is not an
excuse or justification for further degradation. The Corps must analyze the individual and
cumulative impacts of the proposed activity against the environmental baseline, not as a
percentage of the decades or centuries of degrading activities that came before.
The Corps makes a similarly untenable argument whenever the use of pesticides in a
shellfish operation permitted under NWP 48 is discussed. While acknowledging that these
substances are used and released into the environment during permitted activities, the Corps
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 15
2
3
4
5
I
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19
Page 16 ofy,4 �OG �
co,
declines to consider the environmental impacts of pesticides because they are regulated by some
other entity. See NWP003077. Even if the Corps does not have jurisdiction to permit or prohibit
the use of pesticides, it is obligated to consider "other past, present, and reasonably foreseeable
future actions regardless of what agency (Federal or non -Federal) or person undertakes such
other actions." NWP003074 (quoting 40 C.F.R. § 1508.7). The Corps' decision to ignore the
foreseeable uses and impacts of pesticides in the activities it permitted on a nationwide basis
does not comport with the mandate of NEPA or with its obligations under the CWA. Having
eschewed any attempt to describe the uses of pesticides in commercial shellfish aquaculture or to
analyze their likely environmental impacts, the decision to permit such activities through NWP
48 cannot stand.
(2) General Conditions of NWP 48
In making its minimal impact determinations, the Corps relied in part on the general
conditions imposed on all nationwide permits. NWP003072. According to the Corps, the
prohibitions it has imposed against impacts on the life cycle movements of indigenous aquatic
species (general condition 2), spawning areas (general condition 3), migratory bird breeding
areas (general condition 4), concentrated shellfish beds (general condition 5), and endangered or
threatened species (general condition 18), and the requirements that permittees use non-toxic
materials (general condition 6) and confer with other regulatory agencies as needed (general
condition 19) will ensure that the individual and cumulative environmental effects of NWP 48
are minimal. Even if the Court were to assume that the general conditions will be universally
heeded, regulatory fiat does not satisfy NEPA's requirement that the EA contain "sufficient
evidence and analysis for determining whether to prepare an environmental impact statement or
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 16
1
2
3
4
5
I
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Pa y 17 of 24
Pawi
�- L& Sti
a finding of no significant impact." 40 C.F.R. § 1508.9(a)(1). The general conditions are just
Ithat: general. They apply to all NWPs and do not reflect a "hard look" at the environmental
sequellae of commercial shellfish aquaculture. For purposes of the CWA, the general conditions
on which the Corps relies do not necessarily prohibit substantial impacts: general condition 3,
for example, precludes the most destructive of activities in spawning areas but leaves
unregulated many activities that could significantly impact those areas. In addition, the general
conditions relate to only some of the environmental resources the Corps acknowledges are
impacted by the permitted activities and do not address the cumulative impacts of commercial
shellfish aquaculture at all. 40 C.F.R. § 1508.7 ("Cumulative impacts can result from
individually minor but collectively significant actions taking place over a period of time.").
The Court does not intend to suggest, and is not suggesting, that the general terms and
conditions imposed on a nationwide, regional, or state permit cannot be relevant to and
supportive of a finding of minimal impacts. They are simply too general to be the primary "data"
on which the agency relies when evaluating the impacts of the permitted activities.
(3) Regional Conditions and District Engineers
Any permit authorizing activities on a nationwide level runs the risk of sanctioning
activities that have more than minimal environmental impacts. In order to safeguard against that
risk, regional district engineers have the discretionary authority to modify, suspend, or revoke
the NWP within a particular region or class of waters, to add regional conditions to the NWP, to
impose special conditions on a particular project, and/or to require an applicant to seek an
individual permit. NWP003037 (citing 33 C.F.R. §§ 330.4(e) and 330.5). Although permittees
may generally proceed with activities authorized by an NWP without notifying the district
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 17
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1! d r% i
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 #age 18 f ?A
engineer, (33 C.F.R. § 330.1(e)(1)), general condition 18(c) requires the submission of a pre -
construction notification ("PCN") if the proposed activity may affect or is in the vicinity of a
species listed or habitat designated as critical under the ESA. Because all aquaculture operations
in the State of Washington occur in waters where there are threatened/endangered species and/or
critical habitat, applicants who seek to operate under the auspices of NWP 48 in this State must
submit a PCN and obtain a "verification" that the activity falls within the terms of the permit and
that the requirements of the ESA have been satisfied. COE 127592. "For a project to qualify for
verification under a general permit, a Corps District Engineer must conclude that it complies
with the general permit's conditions, will cause no more than minimal adverse effects on the
environment, and will serve the public interest." Sierra Club v. U.S. Army Corps of Eng�rs, 803
F.3d 31, 39 (D.C. Cir. 2015) (citing 33 C.F.R. §§ 330.1(e)(2), 330.6(a)(3)(i)).
There is nothing arbitrary, capricious, or unlawful about having the regional district
engineer review site-specific proposals to "cement [Headquarters'] determination that the
projects it has authorized will have only minimal environmental impacts." Ohio Valley Envtl.
Coalition v. Bulen, 429 F.3d 493, 501 (4th Cir. 2005). Tiering the review and decision-making
tasks is permissible, but there must be a national decision document that actually evaluates the
impacts of the proposed activity in light of any regional conditions imposed. The problems here
are that the Corps' minimal impact determinations were entirely conclusory and the regional
conditions that it assumed would minimize impacts were not in place at the time NWP 48 was
adopted. The record is devoid of any indication that the Corps considered regional data,
catalogued the species in and characteristics of the aquatic environments in which commercial
shellfish aquaculture activities occur, considered the myriad techniques, equipment, and
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 18
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 19 of ITEM
S
PAM
_4
materials used in shellfish aquaculture, attempted to quantify the impacts the permitted activity
would likely have on the identified species and characteristics, or evaluated the impacts of the
as -yet -unknown regional conditions.
Faced with incredible diversity in both the environment and the activities permitted under
NWP 48, the Corps effectively threw up its hands and turned the impact analyses over to the
district engineers. The "Impact Analysis" section of the national Decision Document simply
reiterates the district engineer's powers to revoke, modify, or condition the NWP and directs the
district engineers to make minimal adverse environmental effects determinations after
considering certain factors. NWP003073-74. Its "Cumulative Effects" analysis bluntly
acknowledges that "[i]t is not practical or feasible to provide quantitative data" regarding the
cumulative effects of NWP 48 other than the estimated number of times the permit will be used.
NWP003081.
Because a nationwide analysis was impossible, the task of conducting a cumulative
impacts analysis in specific watersheds was devolved to the district engineers. NWP003077.
Even where adverse impacts are acknowledged, the Corps ignores its obligation to analyze and
quantify them, instead relying on the district engineers to perform the analysis on a project -by -
project basis. In the context of the public interest discussion regarding impacts to fish and
wildlife, for example, the Corps recognizes that NWP 48 may "alter the habitat characteristics of
tidal waters," that "[s]ome species of aquatic organisms will benefit from those changes, while
other species will be adversely affected," and that equipment used in commercial shellfish
operations may impede bird feeding activities and trap birds." NWP003087. It then states:
The pre -construction notification requirement[] provides the district engineer with
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 19
2
3
4
5
6
7
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 20 of 24
an opportunity to review those activities and assess potential impacts on fish and
wildlife values and ensure that the authorized activity resin in r�o mo than
minimal adverse environmental effects. �- �-
Id. This abdication of responsibility is not authorized under the CWA or NEPA.10
As discussed in the preceding sections, Headquarters' prediction that the issuance of
NWP 48 would have minimal individual and cumulative impacts on the environment, though
repeatedly stated in the Decision Document, is not based on relevant evidence that a reasonable
mind might accept as adequate to support the agency's conclusion, and the inclusion of general
permit conditions does not obviate the need to analyze the impacts of proposed federal action.
Thus, the Corps' impact analyses are based in large part on the hope that district engineers will
mitigate any adverse environmental effects by revoking NWP 48, imposing regional or project -
based conditions, and/or requiring an applicant to seek an individual permit. In this context, the
Court finds that the Corps may not rely solely on post -issuance procedures to make its pre -
issuance minimal impact determinations. See Bulen, 429 F.3d at 502 ("We would have
substantial doubts about the Corps' ability to issue a nationwide permit that relied solely on post-
" The Corps' analysis with regards to plastic debris discharged into the marine environment is
even more problematic. The Corps acknowledges the many public comments raising concerns about the
introduction of plastics into the marine food web, but relies on the fact that "[d]ivision engineers can
impose regional conditions to address the use of plastics" in response to these concerns. NWP003402.
The Seattle District, for its part, declined to quantify the impact of plastics, instead noting that "it would
not be a practicable solution to regionally condition NWP 48 to not allow the use of PVC and HDPE
gear as there are no current practicable alternatives to use of the materials." COE 127559. The CWA
requires the Corps to make minimal adverse effect findings before issuing a general permit. If, as
appears to be the case with regards to the discharge of plastics from the permitted operations, the Corps
is unable to make such a finding, a general permit cannot issue. The Corps has essentially acknowledged
that it needs to individually evaluate the impacts of a particular operation, including the species grown,
the cultivation techniques/gear used, and the specific location, before it can determine the extent of the
impacts the operation will have.
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 21 of 24
issuance, case-by-case determinations of minimal impact, with no general pre -issuance
determinations. In such -a case, the Corps' `determinations' would consist of little more than its
LW 111110
own promise to obey the law.").
CONCLUSION
A nationwide permit can be used to authorize activities involving the discharge of
dredged or fill material only if the Corps makes a determination that the activity will have only
minimal individual and cumulative adverse effects on the environment. In issuing NWP 48, the
Corps has opted to interpret the "similar in nature" requirement of 33 U.S.C. § 1344(e)(1)
broadly so that all commercial shellfish aquaculture activities in the United States could be
addressed in a single nationwide permit. That choice has made assessing the impacts of disparate
operations difficult: the Corps essentially acknowledges that the permitted activity is performed
in such different ways and in such varying ecosystems that evaluating impacts on a nationwide
level is nearly impossible. It tries to avoid its "statutory obligations to thoroughly examine the
environmental impacts of permitted activities" by promising that the district engineers will do it.
Hurst, 604 F. Supp. 2d at 901-02. The Court finds that the Corps has failed to adequately
consider the impacts of commercial shellfish aquaculture activities authorized by NWP 48, that
its conclusory findings of minimal individual and cumulative impacts are not supported by
substantial evidence in the record, and that its EA does not satisfy the requirements of NEPA
and the governing regulations.
For all of the foregoing reasons, plaintiffs' motions for summary judgment (Dkt. # 36 in
C16-095ORSL and Dkt. # 31 in C17-1209RSL) are GRANTED and defendant's and intervenors'
cross-motions (Dkt. # 44 and # 45 in C16-095ORSL and Dkt. # 43 and # 44 in C17-1209RSL)
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 22 of 24
are DENIED. The Corps' issuance of a nationwide permit, at least with respect to activities in
the waters of the State of Washington, was arbitrary and capricious and not in accordance with
NEPA or the CWA. Pursuant to 5 U.S.C. § 706(2), the Court holdnlawful ets aside NWP
48 insofar as it authorizes activities in Washington.
The only remaining issue is whether NWP 48 should be vacated outright to the extent it
has been applied in Washington, thereby invalidating all existing verifications, or whether equity
requires that the permit be left in place while the agency performs an adequate impact analysis
and environmental assessment to correct its unlawful actions. Idaho Farm Bureau Fed'n v.
Babbitt, 58 F.3d 1392, 1405 (9th Cir. 1995).
Although not without exception, vacatur of an unlawful agency action normally
accompanies a remand. Alsea Valley All. v. Dep't of Commerce, 358 F.3d 1181,
1185 (9th Cir. 2004). This is because "[o]rdinarily when a regulation is not
promulgated in compliance with the APA, the regulation is invalid." Idaho Farm
Bureau Fed'n[, 58 F.3d at 1405]. When equity demands, however, the regulation
can be left in place while the agency reconsiders or replaces the action, or to give
the agency time to follow the necessary procedures. See Humane Soc. of U.S. v.
Locke, 626 F.3d 1040, 1053 n.7 (9th Cir. 2010); Idaho Farm Bureau Fed'n, 58
F.3d at 1405. A federal court "is not required to set aside every unlawful agency
action," and the "decision to grant or deny injunctive or declaratory relief under
APA is controlled by principles of equity." Nat'l Wildlife Fed'n v.EVY, 45 F.3d
1337, 1343 (9th Cir. 1995) (citations omitted).
All. for the Wild Rockies v. United States Forest Serv., 907 F.3d 1105, 1121 (9th Cir. 2018).
Courts "leave an invalid rule in place only when equity demands that we do so." Pollinator
Stewardship Council v. U.S. E.P.A., 806 F.3d 520, 532 (9th Cir. 2015) (internal quotation marks
and citation omitted). When determining whether to leave an agency action in place on remand,
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
K41
21
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 2:3 of 24
we weigh the seriousness of the agency's errors against "the disruptive consequences of an
interim change that may itself be changed." Cal. Cmties. Against Toxics v. U.S. E.P.A., 688
F.3d 989, 992 (9th Cir,2012). In the context of environmental regulation, courts consider
whether vacating the itri alid rule would risk environmental harm and whether the agency could
legitimately adopt the same rule on remand or whether the flaws were so fundamental that it is
unlikely the same rule would result after further analysis. Pollinator Stewardship, 806 F.3d at
532.
Despite the fact that both plaintiffs clearly requested vacatur as the remedy for unlawful
agency action, defendants provided very little evidence that would justify a departure from the
presumptive relief in this APA action. The federal defendants state that additional briefing as to
remedy should be permitted once the seriousness of the agency's error is determined. The
intervenors assert that vacatur would cause disruption in the Washington shellfish farms and
industry, including significant impacts to employees and the communities in which they live.
Neither tact is compelling. The substantive defects in the agency's analysis when adopting the
2017 NWP are significant, the existing record suggests that adverse environmental impacts will
arise if NWP 48 is not vacated, and, given the nature of the analytical defects and record
evidence that seagrass is adversely impacted in the immediate vicinity of shellfish aquaculture, it
seems unlikely that the same permit could issue following remand. As for the disruptive
consequences to Washington businesses, employees, and communities, more information is
required. As plaintiffs point out, shellfish growers can apply for individual permits (as they did
before 2007). In addition, the Court has the equitable power to allow a period of time in which
growers can avail themselves of that process before the existing verifications would be
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
►41
22
23
24
25
26
27
28
Case 2:17-cv-01209-RSL Document 65 Filed 10/10/19 Page 24 of 24 , ITEM
PMP C�
invalidated or to fashion some other equitable remedy to minimize both the risks of
11 environmental harm and any disruptive consequences.
While the current record does not support deviation from the presumptive remedy for an
APA violation, the Swinomish Indian Tribal Community has requested an opportunity to be
heard regarding the scope of the remedy. C18-0598RSL (Dkt. # 28). Swinomish also challenge
the Corps' minimal impacts analyses in reissuing NWP 48, but, unlike the plaintiffs in the
above -captioned matters, does not seek vacatur of verifications or permits issued under the
NWP. The Court will accept additional briefing regarding the appropriate remedy.
Because there is a presumption in favor of vacatur, defendants, intervenors, and
Swinomish will be the moving parties and may file motions, not to exceed 15 pages, regarding
the appropriate relief for the APA violations discussed above. Only one motion may be filed in
each of the three cause numbers at issue, C16-0950RSL, C17-1209RSL, and C18-0598RSL. The
motions, if any, shall be filed on or before October 30, 2019, and shall be noted for consideration
on November 15, 2019. Plaintiffs' responses, if any, shall not exceed 15 pages. Replies shall not
exceed 8 pages.
The Clerk of Court is directed to docket a copy of this order in Swinomish Indian Tribal
Community v. Army Corps of Engineers, C 18-0598RSL.
Dated this 10th day of October, 2019.
Robert S. Lasnik
United States District Judge
ORDER HOLDING NWP 48 UNLAWFUL
IN THE STATE OF WASHINGTON AND
REQUESTING ADDITIONAL BRIEFING - 24
# LOG ITEM
APPENDIX I
Corps Of Engineers Aquaculture Permit
Applications And Approvals — Jefferson County
2007-2016
LOG ITEM
#� -
pAgi-
CORPS OF ENGINEERS AQUACULTURE PERMIT
APPLICATIONS AND APPROVALS - JEFFERSON COUNTY
2007-2016
Corps
Name
Waterbody
N
�
-0 w
'O
m g �,
.�.
O -
r- n
N
<` �,
= m
W(0
N
8 z o
Number
- 'rn
w o
Ca A
C
JJ
j U
L) LL
<<
U
(D
.N
d W
W
2N
NWS -2007-
Coast Seafoods Co.
Quilcene Bay
47.80314
25
0
25
Exst
10+
01158
-122.86462
Miles
NWS -2007-
Penn Cove Shellfish,
Quilcene Bay
47.79098
21.57
0
21.57
Exst
10+
01412
LLC --Jefferson
J&G Gunstone Clams,
Scow Bay
-122.85165
Miles
NWS -2008-
48.03709
0.5
0
0.5
Exst
12+
00247
Inc.
-122.69741
Miles
NWS -2008-
Hood Canal
Hood Head
47.88373
5.74
5.74
Exst
3+
00502
Mariculture
-122.613858
Miles
NWS -2008-
AG Gunstone Clams,
Discovery Bay
47.99585
8
0
8
Exst
15
00564
Inc.
-122.85116
Miles
NWS -2008-
AG Gunstone Clams,
Diamond Point
48.07327
10
0
10
Exst
21+
00567
Inc. - Jefferson 9
-122.9253
Miles
NWS -2009-
J&G Gunstone Clams,
Scow Bay
48.03913
0.5
0
0.5
Exst
12+
01481
Inc.
-122.69844
Miles
NWS -2012-
Marrowstone Island
Marrowstone
48.06131
1.11
0
1.11
Exst
12+
00362
Shellfish LLC -
Island
-122.69074
Miles
Hoffstater Lease
NWS -2012-
Marrowstone Island
Marrowstone
48.0547
0.71
.18
0.89
Exst
12+
00377
Shellfish LLC - Erving
Island
-122.69123
Miles
Lease
NWS -2012-
Marrowstone Island
Marrowstone
48.0547
0.45
0.11
0.56
Exst
12+
00379
Shellfish LLC -
Island
-122.69324
Miles
Buckland Lease
NWS -2012-
Marrowstone Island
Marrowstone
48.05898
0.6
0.15
0.75
Exst
12+
00380
Shellfish LLC -
Island
-122.69729
Miles
Johnson N. Lease
NWS -2012-
Marrowstone Island
Marrowstone
48.05368
0.37
0.09
0.46
Exst
12+
00381
Shellfish LLC -
Island
-122.70137
Miles
Rem el Lease
NWS -2012-
Marrowstone Island
Marrowstone
48.041
0.39
0.1
0.49
Exst
12+
00421
Shellfish LLC - Lunde
Island
-122.69992
Miles
Lease
NWS -2012-
BDN LLC -
Squamish
47.868025
0.56
0
0.56
Exst
<1 Mile
1099
Mocean Shellfish
Harbor
-122.674814
3
E
Corps°
N
v
2
_C
Z
M
C oName
WaterbodY
w�06
M 3
2 o
c
<
==
cN
ch
opNumber
2co(0
Squamish
JJ
0 L
<<
U
C.
d W
to N
0ZO
NWS -2012-
BDN LLC (WA
47.867972
5.3
5.3
Exst
<1 Mile
1210
Shellfish)
Harbor
-122.67377
NWS -2013-
BDN Brad Nelson
Squamish
47.867 1
1
0.73 10.73
Exst I
<1 Mile
LOG 1 1, Em
# Z6
papi-q-0129.
01147
I jemsland Lease
Harbor
-122.67505
NWS -2013-
BDN (Brad Nelson)
Squamish
47.867
0.92
0.92
Exst
<1 Mile
01222
Harbor
-122.675
NWS -2013-
BDN (Brad Nelson)
Squamish
47.867
2.02
2.02
New
<1 Mile
01223
Garten Lease
Harbor
-122.675
NWS -2013-
BDN (Brad Nelson)
Squamish
47.865422
5.15
10.62
10.62
New
Subject
01268
Smersh Lease
Harbor
-122.661214
Project
NWS -2014-
Penn Cove
' Quilcene Bay
3.1
3.1
New
10+
00171
Miles
NWS -2016-
Dabob Bay Oyster Co.
Hood Canal
47.615667
11.28
11.28
New
20+
00021
-122.974537
Miles