HomeMy WebLinkAbout011320_ca05 615 Sheridan Street
A( Port Townsend, WA 98368
. 094!Orson www.JeffersonCountyPublicHealth.org
Public Healt Consent Agenda
January 6, 2020
JEFFERSON COUNTY
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
TO: Board of County Commissioners
Philip Morley, County Administrator
FROM: Stuart Whitford, Environmental Public Health Director
Tami Pokorny, Natural Resources Program Coordinator
DATE: A1r( f 2) r'-'33 °
SUBJECT: Agenda Item – RCO Big Quilcene Riparian Protection Project Agreement
Amendment #3; January 19, 2018 – December 31, 202, Additional $91,384
for a total of$224,044
STATEMENT OF ISSUE:
Jefferson County Public Health requests approval of RCO Big Quilcene Riparian Protection (17-1052C)
Project Agreement Amendment #3 to fund acquisition of residential parcels and vacant land; January 19,
2018 – December 31, 202&; Additional $91,384 for a total of $224,044
ANALYSIS/STRATEGIC GOALS/PRO'S and CON'S:
The RCO Funding Board Project Agreement funds the acquisition from willing sellers of residential parcels
prone to flooding and their restoration to native vegetation as an ongoing effort to re-establish a channel
migration corridor for the lower Big Quilcene River. The project supports outreach and collaboration with
project partners, leading to the open spaces necessary in order to eventually reconnect the lower river with
its floodplain and distributary channels in order to support the recovery of Hood Canal Summer Chum and
other salmonids. This amendment increases funding by $91,384 to complete the project.
FISCAL IMPACT/COST BENEFIT ANALYSIS:
Funding for the RCO Big Quilcene Riparian Protection is through the SRFB—Salmon State Projects.
There is no impact to the general fund.
RECOMMENDATION:
JCPH Management recommends BOCC signature of the RCO Big Quilcene Riparian Protection (17-1052C)
Project Agreement Amendment #3 to fund acquisition of residential parcels and vacant land; January 19,
2018 – December 31, 2Q').O Additional $91,384 for a total of$224,044
• - I - ED BY4i
2
( _ .i.� , _I li 'r �'' .
ii ip Morley, pr- ty Administrator _,-' Date
Community Health Environmental Public Health
Developmental Disabilities 360-385-9444
360-385-9400 (f) 360-379-4487
360-385-9401 (f) Always working for a safer and healthier community
"y WASHINGTON STATE
Recreation and
Conservation Office Amendment to Project Agreement
Project Sponsor: Jefferson County Project Number: 17-1052C
Project Title: Big Quilcene Riparian Protection Amendment Number: 3
Amendment Type:
Cost Change
Amendment Description:
Increase project funding by$91,384,using returned PSAR funds. New project total is$224,044. Match amount of
$50,000 remains the same.
Project Funding:
The total cost of the project for the purpose of this Agreement changes as follows:
Old Amount New Amount
Amount % Amount %
RCO- PSAR $0.00 0.00% $91,384.00 40.79%
RCO-SALMON FED PROJ $82,660.00 62.31% $82,660.00 36.89%
Project Sponsor $50,000.00 37.69% $50,000.00 22.32%
Total Project Cost $132,660.00 100% $224,044.00 100%
Admin Limit $5,100.00 5.00% $9,155.00 4.69%
A&E Limit $0.00 0.00% $0.00 0.00%
Agreement Terms
In all other respects the Agreement, to which this is an Amendment, and attachments thereto, shall
remain in full force and effect. In witness whereof the parties hereto have executed this Amendment.
State Of Washington Jefferson County
Recreation and Conservation Office
( AGENCY:
BY: L t 'f"l, BY:
Kaleen Cottingha
TITLE: Directo
TITLE:
DATE: l 6(14
DATE:
Pre-approved as to form:
Apy�oved as totir:
o ���
BY: /S/ U, ( Date: % ' 20
Assistant Attorney General Philip C.Hunsucker,Chief Civil eputy Prosecu ng Attorney
Jefferson County Prosecuting Attorney's Office
SAL Project Cost Change Amendment
General Fund-Federal RCW 77.85.WAC 420
AMENAGR1.RPT
Amendment Agreement Description
Project Sponsor: Jefferson County Project Number: 17-1052 C
Project Title: Big Quilcene Riparian Protection Amendment Number: 3
Agreement Description
The goal of this acquisition project is to conduct planning, outreach, and education with potential willing sellers leading
specifically to the acquisition of properties, or property interests, necessary to realign the primary transportation corridor
across the Big Quilcene River floodplain to a superior location that maximizes channel function.
A preliminary restoration design developed by the Hood Canal Salmon Enhancement Group (HCSEG) and its partners
will inform this project's acquisition priorities. The Design will"include actions that will allow the river to reconnect to
historic floodplain areas and that is consistent with community needs and benefits." One element will be the re-design of
an essential road and bridge to better accommodate the channel migration zone. The current Preferred Alternative
Design proposes a road realignment on or near Rodgers St. and removing portions of Linger Longer Rd. If implemented,
this alignment will provide an opportunity to reconnect more of the floodplain than the other alternatives considered. This
project will work directly with potential willing landowners towards accomplishing the acquisitions necessary to implement
the Restoration Design's road alignment. Up to the limit of available funding, and in combination with other RCO-funded
County acquisition projects, this project will acquire one or more properties or property interests.
AAGREEDSC.RPT December 17, 2019 Page 1
Amendment Special Conditions
Project Sponsor: Jefferson County Project Number: 17-1052 C
Project Title: Big Quilcene Riparian Protection Amendment Number: 3
Special Conditions
Subject to EO 05-05:
Cultural Resources Consultation: This project is subject to Governor's Executive Order 05-05 Archaeological and
Cultural Resources Consultation as described in Section 8 of this project agreement. After the Purchase and Sale
Agreement is signed, promptly notify your RCO grant manager of the properties that will involve any ground disturbance
or demolition or modification of structures older than 50 years, as cultural resources consultation will be required.
Completion of this consultation and a Notice to Proceed from RCO will be required before these activities can begin.
ASPECCOND.RPT December 17,2019 Page 1
Amendment Eligible Scope Activities
Project Sponsor: Jefferson County Project Number:17-1052
Project Title: Big Quilcene Riparian Protection Project Type:Planning &Acquisition
Program: Salmon Federal Projects Amendment#: 3
Acquisition Metrics
Property: Dias (Worksite #1, Lower Big Quilcene Floodplain)
Real Property Acquisition
Easement
Easement type : Other Easement
Acres by Acreage Type (easement):
Riparian 3.00
Incidentals
Appraisal
Appraisal Review
Closing, Recording,Taxes,Title
Cultural resources (Acq)
Survey(Acq)
Administrative Costs (Acq)
Administrative costs (Acq)
Property: McComb (Worksite #1, Lower Big Quilcene Floodplain)
Real Property Acquisition
Land
Acres by Acreage Type (fee simple):
Riparian 0.38
Existing structures on site: Structures to be demolished
Incidentals
Appraisal
Appraisal Review
Closing, Recording, Taxes, Title
Cultural resources (Acq)
Demolition
Buildings/structures to be demolished: 1
Noxious weed control
Acres treated for noxious weeds by method:
Chemical 0.10
Stewardship plan
Survey(Acq)
Administrative Costs (Acq)
Administrative costs (Acq)
Property: Ward, Charles (Nick) (Worksite #1, Lower Big Quilcene Floodplain)
Real Property Acquisition
Easement
Easement type : Other Easement
Acres by Acreage Type (easement):
Riparian 4.00
Incidentals
Appraisal
Appraisal Review
Closing, Recording, Taxes, Title
AELIGREIM.RPT December 17, 2019 Page: 1
Amendment Eligible Scope Activities
Cultural resources (Acq)
Survey (Acq)
Administrative Costs(Acq)
Administrative costs (Acq)
Planning Metrics
Worksite #1, Lower Big Quilcene Floodplain
Targeted salmonid ESU/DPS (A.23): Chinook Salmon-Puget Sound ESU,
Chum Salmon-Hood Canal Summer-run
ESU, Coho Salmon-Puget Sound/Strait
of Georgia ESU, Steelhead-Puget
Sound DPS
Targeted species (non-ESU species): Cutthroat
Area Encompassed (acres) (B.0.b.1): 10.0
This figure is dependent upon the
approach taken by each landowner-
conservation easement or fee-simple
and, if the latter, whether or not a
boundary line adjustment would be
possible to reduce the size of the
acquisition.
Miles of Stream and/or Shoreline Affected (B.0.b.2): 1.00
This is the extent of the Big Quilcene
River anticipated to be affected by
implementation of the Restoration
Design.
Miles of Stream and/or Shoreline Treated or Protected (C.O.b): 0.05
Project Identified In a Plan or Watershed Assessment C.O.c : Hood Canal Summer Chum ESA
Restoration Plan 01/11/05 WRIA 17
Salmon Habitat Limiting Factors
Analysis 1/01/02 Big Quilcene
Watershed Analysis USFS/WSDNR
01/01/1994 Big Quilcene River Linger
Longer Reach Feasibility Study and
Action Plan 06/2005 PSNERP Strategic
Restoration Conceptual Engineering -
Final Design Report Revised 2012; Big
Quilcene Restoration Design Preferred
Alternative- HCSEG 2017
Type Of Monitoring (C.0.d.1): None
Restoration Planning And Coordination Project
Conducting habitat restoration scoping and feasibility studies (B.1.b.8)
Project Identified in a Plan or Watershed Assessment(B.1.b.8.a): Acquisitions are identified in several
plans (see Acquisition Metrics)and the
outreach to landowners is a necessary
step towards accomplishing the
acquisitions linked to a road realignment
upstream of the current location.
Priority in Recovery Plan (B.1.b.8.b) (1211): None
Name and Description of Plan (2299): None
Agency Indirect Costs
Agency Indirect