Loading...
HomeMy WebLinkAboutJefferson County Boiler Replacement - Addendum No. 1Project No. 30120370 ADDENDUM NO. 1 Jefferson County Courthouse Boiler Replacement January 27, 2020 Jefferson County Courthouse Boiler Replacement - Addendum No. 1 Page 1 REVISIONS TO THE ISSUE FOR BID DOCUMENTS WALKTHROUGH ATTENDANCE SHEET: • Attached is the Attendance Sheet from the January 22, 2020 Walkthrough. SPECIFICATIONS: SECTION 22 05 00 – PLUMBING, GENERAL Paragraph 2.02 FLOOR DRAIN: A. Revise Funnel Floor Drain size to be 3 inches. Paragraph 2.03 HUB DRAIN: A. Revise Hub Inlet Size to be a 4 inch Hub Inlet Fitting. Paragraph 2.04 AIR ADMITTANCE VALVES: B. Revise paragraph to read as follows: “Air Admittance Valves shall be Studor Mini-Vent, 1-1/2 inch threaded connector or Studor Maxi-Vent, 3 inch thread connector, as indicated on the Drawings, or Approved Equal. SECTION 23 51 16 – FABRICATED BREECHING AND ACCESSORIES Paragraph 2.01 ACCEPTABLE MANUFACTURERS: ADD “METAL-FAB INC.” as an acceptable manufacturer. DRAWINGS: DRAWINGS G0.1, MP0.0, MP1.0, MP1.1, MP1.2 AND MPD1.1 ISSUED WITH THE FOLLOWING REVISIONS: DRAWING G1.0 TITLE SHEET • Reissued – no changes. DRAWING MP0.0 ABBREVIATIONS, LEGEND AND SCHEDULES • PLUMBING FIXTURE SCHEDULE revised to increase size of FFD FUNNEL FLOOR DRAIN and add HD HUB DRAIN. • BOILER EQUIPMENT SCHEDULE revised to add BDS-1 BLOWDOWN SEPARATOR & COOLER DRAWING MP1.0 ENLARGED GROUND FLOOR PLAN • MAKE-UP AND COOLING WATER DIAGRAM 1/MP10 added. • BLOWDOWN SEPARATOR & COOLER DIAGRAM 2/MP1.0 added. DRAWING MP1.1 ENLARGED BOILER ROOM VENT PLAN • Reissued – no changes. Project No. 30120370 ADDENDUM NO. 1 Jefferson County Courthouse Boiler Replacement January 27, 2020 Jefferson County Courthouse Boiler Replacement - Addendum No. 1 Page 2 DRAWING MP1.2 ENLARGED BOILER ROOM MECHANICAL PLAN • Added FOS Fuel Oil Supply and FOR Fuel Oil Return valves from existing exterior Fuel Oil Storage Tank at entry into Boiler Room. • Revised size of FOW & FOR piping. • Added inspection and cleaning of existing Condensate Pump Receiver and Components. • Added balancing valve on Condensate Supply Line from existing Condensate Pump. • Revised size of the Hub Drain Inlet and added callout of the Hub Drain Air Admittance Valve. • Added replacement of 2 inch condensate line at floor. • Added BDS-1 BLOWDOWN SEPARATOR & COOLER. DRAWING MPD1.1 ENLARGED BOILER ROOM DEMOLITION PLAN • Added removal of existing boiler brick housekeeping pad and associated bricks within the lower (filled) fire box. • Added salvage of removed windows and frames to be returned to the Owner. • Added removal of existing condensate piping near floor. • Added removal of existing boiler makeup water backflow preventer and boiler makeup water meter. ATTACHMENTS: • WALKTHROUGH ATTENDANCE SHEET • DRAWING G1.0 TITLE SHEET • DRAWING MP0.0 ABBREVIATIONS, LEGEND AND SCHEDULES • DRAWING MP1.0 ENLARGED GROUND FLOOR PLAN • DRAWING MP1.1 ENLARGED BOILER ROOM VENT PLAN • DRAWING MP1.2 ENLARGED BOILER ROOM MECHANICAL PLAN • DRAWING MPD1.1 ENLARGED BOILER ROOM DEMOLITION PLAN END OF ADDENDUM NO. 1