HomeMy WebLinkAboutECY Administrative Order 13100Vn
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 • Olympia, Washington 98504J]]5 • (360) 407-6300
January 6,2016
Administrative Order m13100
Docket
Gybe Ho Road 2711 (or 502) Gybe Ho Road,
Timothy L Wilkins Timor li Nordland. WA 98358; Jefferson
10953 Madison Ave
County Parcel 4921092007
Bainbridge Island, WA 98110 li
Re: Administrative Order
Dear Mr. Wilkins:
Enclosed is Agreed Order number 13100 between the Department of Ecology and Timothy L. Wilkins to
achieve compliance with state water quality standards. All correspondence relating to this document
should be directed to Rick Mraz at the Department of Ecology, Southwest Regional Office, PO Box
47775 Olympia, WA 98504-7775 or rmraz461Cecv.wa.gov.
If you have questions, please contact Rick Mraz at (360) 407-6221 or rmraz461.aecy.wa.eov.
Sincerely.
P Lund, Unit Supervisor
Shorelands and Environmental Assistance Program
Southwest Regional Office
Enclosures: Administrative Order Docket g13100
By certified mail: 7014 0150 0000 9188 5421
cc: Kerry Carroll, Ecology
Paula Ehlers, Ecology
Jerald Gregory, Army Corps of Engineers
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
IN THE MATTER OF AN ) ADMINISTRATIVE ORDER
ADMINISTRATIVE ORDER ) DOCKET 413100
AGAINST )
Timothy L. Wilkins )
To: Timothy L Wilkins
10953 Madison Ave
Bainbridge Island, WA 98110
Locat� ion 2711 (or 502) Gybe Ho Road, Nordland, WA 98358; Jefferson County ',,
parcel # 921092007.
Description Land clearing and fill activhies not authorized by the Department of
Ecology in jurisdictional wetlands.
This is an Agreed Order between the Department of Ecology (Department) and the Timothy L. Wilkins to
achieve compliance with Chapter 90.48 Revised Code of Washington (RCW) and Chapter 173-201A
Washington Administrative Code (WAC) by miring certain actions which are described below for the
discharge of polluting matters into waters of the state at the subject property.
RECOGNITION OF THE DEPARTMENTS JURISDICTION
This Agreed Order is issued pursuant to the authority vested in the Department by the Federal Water
Pollution Control Act (FWPCA), 33 USC sec 1311, et sea. and by Chapter 90.48 RCW.
RCW 90.48.030 provides that the Department shall have thejurisdiction to control and prevent the
pollution of streams, lakes, rivers, ponds, inland waters, salt waters, water courses, and other surface and
underground waters of the state of Washington.
Timothy L. Wilkins agrees to undertake all actions required of it by the terms and conditions of this
Agreed Order and not to contest the Department's jurisdiction and authority to administer this Agreed
Order.
STIPULATED FACTS
RCW 90.48.120(2) authorizes the Department to issue administrative orders requiring compliance
whenever it determines that a person has violated or created a substantial potential to violate any
provision of Chapter 90.48 RCW. The Departments determination that a violation has occurred is based
on the following facts:
Ecology staff conducted a site visit with you and your consultant on July 28, 2015, at which time Ecology
identified areas of cleared, graded, excavated and filled wetlands. On -site wetlands have been subject to
mechanized land clearing and the deposition of fill. Based upon a draft wetland restoration report,
prepared by Ecological Land Services and dated December 2015, approximately 0.2 acre of wetland has
been altered. Activities in wetlands were not authorized by the Department of Ecology through any
required permit process.
SCOPE OF WORK AND SCHEDULE - - - ..,'
For these reasons, and in accordance with RCW 90.48.120(2) IT IS AGREED, that Timothy L. Wilkins
shall take the following actions and not contest the Department's jurisdiction and authority to administer
this Agreed Order. These actions are necessary to satisfy the requirements of Chapter 173-201A WAC.
Timothy L. Wilkins has participated in defining these actions and the schedule by which they shall be
completed.
Imolementation
I. Timothy L. Wilkins shall restore impacts to wetlands as described in the Wetland Restoration
Plan, prepared by Ecological Land Services (ELS) and dated December 2015, except as modified
in this Agreed Order or revised and approved by the Department.
2. Timothy L. Wilkins shall begin the restoration project within two (2) months of the date of this
Agreed Order. If restoration does not begin within two (2) months, the Department may require
additional compensation to account for additional temporal loss.
Modifications to the Weiland Restoration Plan
3. Required plant survival for monitoring year 2 is reduced to 90% and monitoring year 3 percent
survival is reduced to 80%. If 80% is achieved in year 3, no further monitoring for survival is
required.
4. An as -built report, prepared by a qualified wetland professional, shall be provided to the
Department within 30 days of completion of the restoration plantings.
5. The as -built report shall contain the following:
A. A report that identifies the date on which construction at the compensatory mitigation site was
completed and if there were any changes from the plan approved by the Department.
B. Drawings showing actual locations and quantities of plantings within the restoration area.
C. A list of any follow-up actions, if needed, with a schedule.
D. Plan sheets/drawings showing the as -built conditions.
E. Photos to document baseline conditions.
6. Alder and red cedar plantings in the restored wetland are to be doubled (50-60 plants of each
species).
monitoring and Maintenance
7. Timothy L. Wilkins, or his agent, shall monitor the restoration site for a minimum of five (5)
years. Timothy L. Wilkins, or his agent, shall use the monitoring methods described on pages 7-8
of the Restoration Plan, or as revised and approved by the Department.
S. Timothy L. Wilkins shall submit monitoring reports as detailed on pages 7-8 ofthe Restoration
Plain.
9. Timothy L. Wilkins shall consult with the Department if unidentified contingency measures are
necessary.
I0. Timothy L. Wilkins shall provide access to the site upon request by Fcology personnel for site
inspections, monitoring, necessary data collection, and/or to ensure that conditions of this Agreed
Order are being met.
PROHIBITION OF NEW WORK WITHIN WATERS OF THE STATE, -'-
Timothy L. Wilkins is prohibited from undertaking regulated activities (i.a, mechanized clearing, filling,
excavating, draining, or any discharge of pollutants) within waters of the state or their restored buffers on
the subject property, except for approved restoration work, until the actions defined in the "Scope of
Work and Schedule' Section of this Agreed Order are completed and the Department has issued a written
Order of Satisfaction.
Timothy L. Wilkins agrees to implement this prohibition.
Timothy L. Wilkins acknowledges that the restoration plan prepared by ELS applies to restoration work
only, and that any future site development may require permitting from Jefferson County Department of
Community Development, Driveway spoils shall not be placed in wetland buffers without requisite
permitting. Additional mitigation for new work in wetland buffers may be required pursuant to that
permitting.
--
Timothy 1.. Wilkins shall provide regular progress reports to the Department on his efforts to comply with
the requirements of this Agreed Order. Progress reports shall be conducted and submitted consistent with
the monitoring plan on pages 7-8 of the Restoration Plan
Timothy L. Wilkins shall promptly notify the Department of any occurrence which may result in non-
compliance with the requirements of this Agreed Order. Such notification shall state the nature of the
potential non-compliance, the reason(s) therefore and the actions taken by Timothy L. Wilkins to address
die potential non-compliance.
AMENDMENTS-TO.THE AGREED�SCOPE OFWORK ANDSCFiEOULE -:: .,_ -._;
Amendments to the agreed scope of work and schedule may be requested for good cause. Extension of
deadlines imposed by this Agreed Order shall be granted only when requests for extensions are submitted
in writing within 30 days of Timothy L. Wilkins becoming aware of a circumstance which may result in
non-compliance with the Restoration Plan.
To be effective, all proposed amendments must he agreed to and signed by the persons with signature
authority for. each Party and attached to this Agreed Order.
TERMINATION Of•TkFE AGREEgQRDER __ T ==-
The Department shall issue an Order of Satisfaction upon finding that the restoration at the subject
Property has been completed. Upon issuance, the requirements of this Agreed Order shall be deemed to
be fulfilled and shall have no further effect on Timothy T.. Wilkins.
FAILURE TO COMPLY - _ --
Failure to comply with this Agreed Order may result in the issuance of civil penalties of up to $10,000 per
day or other actions, whether administrative orjudicial, to enforce the terms of this Agreed Order.
C0019f ibFORMATION _ :... ----- ---
Please direct all questions about this Order to:
Rick,Mraz
Department of Ecology
Southwest Regional Office
PO Box 47775
Olympia, WA 98504-7775
(360)407-6221
rmra7.4610.ecvt a ecv
SIGNATURE
Perry 3 L dTUnit Supervisor
Shoprblinds and Environmental .Assistance Program
Southwest Regional Office
Timothy L. Wilkins
Date
'y�ste