HomeMy WebLinkAboutFinal PlansCenexc.e. r-i (EXISTING)
— — — RIM=99.43 STATE H I G�-� WA y 19 (RHODY DRIVE)
LE.(N)=9788 (6" PC)
ANG WHEEL STOPS i0 BE REMOVED A1VCT'— — — —
EDGE OF DRIVE
STEEL CORNER
POST
4' WIRE FENCE
LIMITS OF PAWING ON WEST
SIDE TO END EVEN WTH
NORTH EDGE OF BUILDING
LINED GRA VEL TRENCH DRAIN TO -
BIORE7WION CELL IJ ALONG EDGE
OF ASPHAL TIGRA VEL DRI VEWA Y
(SEE DETAIL RIGHT)
DRAINS TO '
CHIMA CUM CREEK
ALL WORK ENCOMPASSED ON THESE PLANS
SHALL CONFORM TO THE WASHINGTON STA TE
DEPARTMENT OF STANDARD PLANS AND
SPECIFICA 77ONS
RE -USED. THIS AREA
TO BE CONI�RTFD INTO
PROPANE TANK USED
-
LANDSCAPE _7 �t°
As AU SIGN
-
STEEL CORNER
POST
>
—FUEL SIGN
TELEPHONE
--'•'�._e _ a a D' . n -= e • s _
_t�a - _ _ a - e a
•
a a D e . - _ _ ."a - .
_
r---
D -- a _ 4 D-P _ D D_ -, a.�-- -� --
_
.,:: 1 . -�-�.' _� ., .,-..:- ,A>- .„_.� >',:_ „ , ,�.:
L
\ .-
a` e a
- e D - ': b'-7777777
a
s
a e
s Y D e
♦ Pa .
A AT^C�
7777
„
;..
OHP
OHP
SAN
-
.77
tX1S41NU YKUYArvt 14iNA nu alwv
70 BE REMOVED AN01 REPLACED
WIIN NEW 5' X 12' MONUMENT SIGN
(THIS WILL REQUIRE � SEPARATE
BUILDING PERMIT AN MEET
DEVELOPMENT STANDARDS OF JCC
18.30)
CONCRETE PAD,
CHAIN LINK
FENCE W TH
PROPANE TANK
Q_
a
577-SA OIL WATER SEPARATOR
800 Gallon Capacity
Top SeOon x
No. 577-SAT - -
3.300 ftm
-`� �2r
;
BARBED AND HOT
WIRE FENCE fltstte€ Pik
�
3
W4h Somgimg Tee
By Others
let z Pipe let
VAth
rY--`
By Others
i
s_0_
Base
;
No. 577-SA-8
7,595 ths.
,
i
,r
�
y
STPUC IRWL 10'-FS_
#. Caeartte: 28 D y r_ rWe=s Strcnyth fa= 7000 Ps
2 Reber: AS 0 A-615 Grp 60
3. Va h: ASTU A-15S Ge dE 55
4, pesrgr: A f-31"-ffa
'Xtnrxsn SRuc -a3 Oesicy:
ASAA C^89iJ
-4 For Undasgam0 Prtsast Careseic
1zesatar Strue__"
W`nt and
".. Lands ftS-2£5 Trud. 7P,ree3 w/ '. imFct ?sr A4s4Tt1
FOR WSTOU APPUCKRONs
TK FO._ S WFORVATON is %FE :
G,-NE£�#i. NiSTES-
TaP 01 Ser>+'-ra4 Ele- inn:
F- A: $aif,es ctnd Weis Ta Re Stee
2. Contmcta; to
Met P5ot sae-
wet Pipe i3Eacturo=
SUFWY and {lhstoP AV P P tz SamP:Mc Fees
Outlet Poe Sim
Grajt H,, AR Ptets
FD3 Wft� Ctean wot.r Prior T. Start -Up, Of Syst_
01tiet Ppe Ef.v bca:
Wrvy AS BkxaKt s: Sizrs_ ar..d Le of ans
FOR 09AM.S,SEE REVERSE >>
(terns Shown Are Subject To Chactge Wdtmd N4otdce
issue Date; ALVist 2012
1
a -1995-2012 Cl cast a Pzecast, irtc-
PROWDE RATS EDGE ASPHALT
ALONG EAST MARGIN AND SOUTH
MARGIN OF NEW PA VEMENT
EX 6' CH N II SEE DETAIL RIGHT)
1 I
� s
e..
EX. CLEAN -OUTS
(TYP.)
50'
'EN770N
CELL J3
Q
V
O
J
Q
W
}VIDE GAP AT CORNER
ASPHAL T TO DRAIN TO
GRA VEL TRENCH TO BE 50'
FROM EAST PROPERTY LINE
—LINED GRA VEL TRENCH
DRAIN TO
BIORE7EN7701V CELL fff.3
ALONG EDGE OF
GRAVEL PARKING AREA
0 (Ndkmstle Precast'
l)Wiivedng Reliability
'"M
No. 3Q ' C,;W-izzd
t#-tc+nand Hate Cavtr
7•_C' -
- •.? �- Nt _ t012P Gol�ized
Oics Note Cczvcr
2'-3" °r--•--�-- 2---3` -
; s»-rnon4
L
i
t
A
A„
,
3 4" €S.Nic.. Litt Ms-t f
PLAN VIEW
�'_ Stria scot
F_ Baffle and W# it Rotes
4 P.tait$ t'•z TCF
f CCPs
Typkd
1 1 j2, C tuft #Ede
f 3P PRE
NUT PTE
mh SemPtm9 Tee
F Each Sde. 2 SfdE
C4 trncty To Pfug (Ckwt)
VWth 9 Tet
[ By 01he's
By obhs s s
After ;sstoUabon
j
12' or 1T t#eiots
A. R.,qUired
z_ i
t-
£ki Rtiauxs
@ 4 r-
s
5at�
o 0
}-.•+--.F;vSs rimstr
� � #
gig
sattse
m
f-Gr,iBudge
a
<
Rgtc -_• wex
-
SECTION AA
2 i 1� 8-25-15 IREV. PER JEFFERSON CO. P. W REVIEW SVAE
SITE
PA VED/GRA VEL AREA jRE�lCH
m r-RA VE
?" HMA CL %2"
2" CSTC
GRA VEL BASE
ASPHALT THICKENED EDGE DETAIL
NTS
2" HMA a. !12" PAVEMENT
° 4 d A. C - . d �L
•p- - •a d B. -B
. - - •d,• . - - Q .6 -
4
a
-
1- 2" CRUSHED SURFACING TOP COURSE
6" CLASS B GRAVEL BASE (COMPACTED DEPTH)
(COMPACTED DEPTH)
TYPICAL PAVEMENT SECTION
SITE WAVING and PARKING PLAN
CENEX PARKING and
DAWNA,E IMPR 0 VEMEI \ TS
� CONTACT
CENEX
9315 RNODY DRIVE
CHIMICUM, WA 98325
PD. Box 120. 11309 Clear Creek Road N.W.
Silverdale, Washlrigtm W-'Z3
Silverdale 692-5525•Seattle (206) 682-5514
Fax t3(o0) (&W-0546
E1_i1NEER1NCs • SUFZVEi'11-s
S87'44'02E 300a 00'
1 18-17-15 PER JEFFERSON CO. REVIEW SV/ME
N0. DATE DESCRIPTION I BY
:slot DfeAMN
SPV I JH/Si
CHEGiGEU DATE SCALE JOB NO, SHEET
MWE 6-4-15 1 "=20' 6fi37.00 1 OF 3
CB i 1 (EXISTING) STORM PIPING TO MEET WSDOT SiD.
_ RlM-9943 LE(N)=97.88 (6" PVC) STATE HIGHWAY 19 (RHODy nunrr, SPECIFICATIONS FOR SCHEDULE A"
- - _
EDGE OF DRIVE
STEEL CC
POST
BUBBLE -UP
C.B. j1 (Type 1)
RIM=9825
LE=96.50
W/STD. FRAME do GRA TE
4' WIRE FENCE
APPROXlMA7ELY 0.93 ACRES TO
BE DISTURBED.
LINED GRAVEL TRENCH TO -
DRAIN TO BIORETENTION CELL 11
(SEE DETAIL SHEET 1)
DRAINS TO '
CHIMA CUM CREEK
/
ONP
8 (SW)=98.27
-
- -
-
LANDSCAPE AREA TO RECEIVE SOIL
TANK USED - -
�ASOADN
- -
- - - - - - - _ _
_ _ - AMENDMENT AND MULCH LAYER
�''
IGN
• =
- -
- _ PRIOR TO PLANTING
1
STEEL CORNER
t r D
MATCH r . MA7Cl-I _ '
m. s ♦ ...
,
- - _
- - --- _
FUEL SIGN POST
o _
r
t
♦ .
TELE hNNEG=00D
a
a
MATCH D A
r r
a r r R
D. r
r
MATCH a =A. 's
EG= 100 4
OHP
2WIDE BERM ELEV=98 64
f480 SF. BOTTOM AREA, ELEV=97.64
6" POND DEPTH
� t 6" FREEBOARD BULK PROPANE STORAGE
i
18" BIORETENTION SOIL MIX
PROPANE TANK
CAP WOODS
S87'44'020E 300 00'
t
3 f t
Y
11
FOUN� 5/8" REBAR AN
30'
OHP n
100.70
Qf EX 6' CHAtAl LINK FENC
® s 34j
1
O e
EX. CLEAN -OUTS
(TYP.)
0
0
Q
cd
z
a
OVERFLOW SPILL WA Y W/RIP-RAP TO
NA TI VE GROUND
BIORETEN RON CELL 12
2' WIDE BERM, ELEV=100.83
f200 S F BOTTOM AREA, ELEV=99.83
6" POND DEPTH
6" FREEBOARD
18" BIORETENTION SOIL MIX
BARBED AND NOT
WRE FENCE
LINED GRAVEL 1RENCH 70 DRAIN
TO BIORE7FN77061 CELL #3
(SEE DETAIL SHEET 1) /
'
Efl
-.a- --�C:
-max }} 7} �
_ --.a..
�-•-� --
$¢.5�
•, r
� cry^g a�..�
� ��
��':.'�,
, ., „
IN
t
Pug >
A
Bottom outlet - SK2-00
4' round
7.87`
153
0.34
A
Bottom o� ttet - SK2-040
c round
15.75`
216"
0.48
8
Bottom owlet -SK2-00
6" round
7.87"
344
fl 77
B
Bottom outlet - SK2-M
T round
15.75'
486-
1-08
C
End cutlet - SK2-00
4` round
7-87"
132
0.29
C
End outlet - W40
4' rotund
15.75'
202
0.45
D
End outlet - SK2-10
6' round
9.84'
320
0.71
p'
End cwW - SK2.40
S' round
15-76'
437
0,97
E
Type SK2-942D
4" round
25.33'
263
0.59
v
Type SK2-902D
4" round
31,83"
297
0,66
Type SK2-902D
4 round
23.76"
254
0.57
ti >
Type SK2-902D
T round
34_83'
658
1,47
f
Type SK2-902D
4' round
23-91`
255
0.57
Type M-902D
4' round
30.40'
290
0.65
ll
Type SK2-902D
6' round
24-68'
570
1.27
L
Type SK2 902D
4` round
2413'
256
0.57:
&i
Type SK2.902D
6' round
31.82`
658
1.47
pf
Type SK2.902ii
4' round
31.26'
294
0,66
O
Type SK2-902D
6' round
3128
651
1.45
p
Type SQ-902D
8' round
31.82'
1149
2,56
Q
Type SK2-902D
6' round
3032"
640
1.43
,R
Type SK2,OD20
V round
23AT
251
0,56
S
Type SK2-902D
4" round
29-90"
288
0.64
June 1314
BIORETEN 110N CELL J3
2' WDE BERM ELEV=9912
i-360 S F. BOTTOM AREA, ELEV=98.03
6" POND DEPTH
6" FREEBOARD
18" BIORETENTRON SOIL MIX
OVERFLOW SPILL WA Y
W/RIP-RAP TO NA TI VE GROUND
F
'We Tr� as the a;» fV,,
ra*e<_ et t-, gc rxd3`st,
End call
NOT
tr sTM bvicet - s:� •,rasa
i
y
sp
�
Q
Sck 40 az�_z
t
t
ACO DRAIN
PowerDrain - SMK ire edged charmel system witli kmg t"rW grate (ADA)
.
inal
S
� `-. a �asJ -..- `.rH-%3� 6f�'SS iiCit4rR �i'A(;�C:.R.2 fEai'w"e: 6'$� Pi'rOW%i.
Z. k-wts sti'Wfii are n-de end: for fen-aae BTIe(t depth subtract 5aan t=-0.21 frorn rnaie inert (except reutr� charmis when it wM be san1 as Bute nvertj-
a TO cakas'ate arm down depth. add 25"4rnnt (1.0, to hwert depth-
. 3. Catch basin assembly 7ndudes p*rner cor!crete top. PocverLek grate. trash &,,cket and ptasbc base.
4- Card: basin assembly mcludes polpner concrete top, Powe2ak grate, deep trash bucket, plastic rise; and Plastic base.
5. Water intake per rneter charnel :s 134.2 s?.865 80 mli
C4
4.
ACO Polymer Products,
hu.SPEC
Southeast Sates Office
Northeast Sates Office
P0. Box 2455
West Sales Office
PC Box 12067
4211 �"I-eas�-,i Road
follow us wa
--;
Chardon: Oft 44024
Casa Grande, AZ 85130
Fort hht, SC 29708
-.
Tel. t440) 285-7000
Tel: {520 421-9988
TO tree: F800i 543-4764
Electrouk Contact:MM
06 free #800) 543.4764
o-t Free: i888, 490-9552
Fax 803) 802.1063
irfo@ACODram.usPilo
Fax: f4401285-7005
Fav, f520) 421-9899
www ACGDrairt.us
June
1314
=exa'-P� a-:s
n�zrsn-e3ur '±.x.
OW LT 0r1440 R"
- - ------- -
Drainage Structures, Storm Sewers,
Division 7 Sanitaty Sewers, Water Mains, and Conduits
7-01 Drains
7-01.1 Description
This Work consists of constructing drain pipe and underdrain pipe in accordance with the
Plans, these Specifications and Standard Plans, at the locations staked.
7-01.2 Materials
Materials shall meet the requirements of the following sections:
Gravel Backfill for Drains 9-03.12(4)
Concrete Drain Pipe 9-05.1(1)
Zinc Coated (Galvanized) or Aluminum Coated (Aluminized)
Corrugated Iron or Steel Drain Pipe 9-05.1(2)
Corrugated Aluminum Alloy Drain Pipe 9-05.1(3)
Polyvinyl Chloride (PVC) Drain Pipe, Couplings and Fittings 9-05.1(5)
Corrugated Polyethylene (PE) Drain Pipe, Couplings and Fittings
(up to 10 inch) 9-05.1(6)
Corrugated Polyethylene (PE) Drain Pipe, Couplings and Fittings
(12 through 60 inch) 9-05 - 1(7)
Perforated Concrete Underdrain Pipe 9-05.2(2)
Zinc Coated (Galvanized) or Aluminum Coated (Aluminized)
Corrugated Iron or Steel Underdrain Pipe 9-05.2(4)
Perforated Corrugated Aluminum Alloy Underdrain Pipe 9-051(5)
Perforated Polyvinyl Chloride (PVC) Underdrain Pipe,
8-inch diameter maximum 9-05.2(6)
Perforated Corrugated Polyethylene (PE) Underdrain Pipe
(up to 10 inch) 9-05.2(7)
Perforated Corrugated Polyethylene (PE) Underdrain Pipe
(12 through 60 inch) 9-05.2(8)
Drain pipes may be concrete, zinc coated (galvanized) corrugated iron, aluminum coated
(aluminized) corrugated iron, zinc coated (galvanized) steel, aluminum coated (aluminized)
steel, corrugated aluminum alloy, polyvinyl chloride (PVC), or corrugated polyethylene (PE)
at the option of the Contractor unless the Plans specify the type to be used.
Underdrain pipe, other than AASHTO M 36 Type III Class IV, shall be perforated. They
may be concrete, biturninized fiber, zinc coated (galvanized) corrugated iron, aluminum coated
(aluminized) corrugated iron, zinc coated (galvanized) steel, aluminum coated (aluminized)
steel, corrugated aluminum alloy, polyvinyl chloride (PVC), or corrugated polyethylene (PE)
at the option of the Contractor unless the Plans specify the type to be used.
It is not necessary that all drain or underdrain pipes on any one project be of the same kind
of material; however, all contiguous pipe shall be of the same kind.
7-01.3 Construction Requirements
A trench of the dimensions shown in the Plans or as specified by the Engineer shall be
excavated to the grade and line given by the Engineer.
7-01.3(1) Drain Pipe
Drain pipe shall be laid in conformity with the line and grades as shown in the Plans.
The drain pipe shall be laid with soiltight joints unless otherwise specified. Concrete drain
pipe shall be laid with the bell or larger end upstream. PVC drain pipe shall be jointed with a
bell and spigot joint using a flexible elastomeric seal as described in Section 9-04.8. The bell
shall be laid upstream. PE drain pipe shall be jointed with snap -on, screw -on, bell and spigot,
or wraparound coupling bands as recommended by the manufacturer of the tubing.
7-01.3(2) Underdrain Pipe
When underdrain pipe is being installed as a means of intercepting ground or surface
water, the trench shall be fine -graded in the existing soil 3 inches below the grade of the pipe
as shown in the Plans. Gravel backfill shall be used under the pipe. Gravel backfill shall be
placed to the depth shown in the Plans or as designated by the Engineer. All backfill shall
be placed in 12-inch maximum layers and be thoroughly compacted w ith three passes of a
vibratory compactor for each layer. The Contractor shall use care in placing the gravel backfil
material to prevent its contamination.
Class 2 perforations shall be used unless otherwise specified. When Class I perforations
are specified the perforated pipe shall be laid with the perforations down. Upon final
,acceptance of the Work, all drain pipes shall be open, clean, and free draining. Perforated
pipe does not require a watertight joint. PVC underdrain pipe shall be jointed using either
the flexible elastomen'c seal as described in Section 9-04.8 or solvent cement as described
in Section 9-04.9, at the option of the Contractor unless otherwise specified in the Plans.
The bell shall be laid upstream. PE drainage tubing underdrain pipe shall be jointed with
snap -on, screw -on, bell and spigot, or wraparound coupling bands, as recommended by the
manufacturer of the tubing.
7-02 Culverts
7-02.1 Description
This Work consists of constructing culverts of the various types and classes in accordance
with the Plans, these Specifications, and the Standard Plans, at the locations staked.
Culverts may be used for transverse drains under the Roadway or as conduits for water
pipe or other utilities passing under the Roadway.
7-02.2 Materials
Materials shall meet the requirements of the following sections:
Plain Concrete Culvert Pipe 9-05.3(l)
Reinforced Concrete Culvert Pipe 9-05.3(2)
Beveled Concrete End Sections 9-05.3(3)
Steel Culvert Pipe and Pipe Arch 9-05.4
Steel Nestable Pipe and Pipe Arch 9-05.4(8)
Steel End Sections 9-05.4(9)
Aluminum Culvert Pipe 9-05.5
Aluminum End Sections 9-05.5(6)
Solid Wall PVC Culvert Pipe 9-05.12(l)
Profile Wall PVC Culvert Pipe 9-05.12(2)
Corrugated Polyethylene Culvert Pipe 9-05.19
Steel Rib Reinforced Polyethylene Culvert Pipe 9-05.21
High -Density Polyethylene (HDPE) Pipe 9-05.23
Polypropylene Culvert Pipe 9-05.24
Mortar 9-20.4
Where steel or aluminum are referred to in this Section in regard to a kind of culvert pipe,
pipe arch, or end sections, it shall be understood that steel is zinc coated (galvanized) or
aluminum coated (aluminized) corrugated iron or steel, and aluminum is corrugated aluminum
alloy as specified in Sections 9-05.4 and 9-05.5.
Thermoplastic culvert pipe includes solid wall PVC culvert pipe, profile wall PVC culvert
pipe, corrugated polyethylene culvert pipe, and polypropylene culvert pipe.
It is not necessary that all culvert pipe on any one project be of the same kind of material.
However, all contiguous pipe shall be of the same size, material, thickness, class, and
treatment and shall be that required for the maximum height of cover.
Measurement for payment of the Bid items associated with the drainage installation will
be based on the diameter of the culvert pipe described by the Bid item in the Proposal.
When schedule A, B, C, or D culvert pipe is specified in the Plans, the Contractor shall
provide the specified schedule and diameter but has the option of furnishing any of the
acceptable materials shown in the Culvert Pipe Schedules Table.
The use of tongue and groove concrete pipe shall only be allowed under side road
connections. All tongue and groove pipe shall be joined with cement mortar.
001-
12, 18, 24
Plain or Cl. IV
.064H (16 Ga.)
.060" (16 Ga.)
PE, PVC, or PP
A
30,36
Class 111
.064" (16 Ga.)
.075" (14 Ga.)
PE, PVC, or PP
2' 15'
42,48
Class 111
.064" (16 Ga.)
.105' (12 Ga.)
PE, PVC, �or
12, 1772:T--
I--- V
(46
E, PVC, or PP
.9-64"
.064" (16 Ga.)
B
30,36
Class V
.075' (14 Ga.)
PE, PVC, or PP
15'- 25'
42,48
Class V
.064" (16 Ga.)
.1050 (12 Ga.)
PE, PVC, or PP
12,18,24
None
.064" (16 Ga.)
.060" (16 Ga.)
None
C
30,36
None
.064" (16 Ga.)
.075" (14 Ga.)
None
25'- 40'
42,48
None
.064" (16 Ga.)
.105' (12 Ga.)
None
12,18
None
.064" (16 Ga.)
.060" (16 Ga.)
None
D
24
None
.064" (16 Ga.)
.075" (14 Ga.)
None
40'- 60'
30,36
None
.064" (16 Ga.)
.105" (12 Ga.)
None
42,48
None
.079' (14 Ga.)
.135" (10 Ga.)
None
'corrugated polyethylene pipe.
2Polyvinyl chloride pipe. Solid wall or profile wall for diameters through 27 inches Profile wall for diameters larger than 27 inches.
3Polypropylene pipe,
Standard Notes
Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of
permanent road or drainage design (e.g. size and location of roads, pipes, restrictors, channels,
retention facilities, utilities, etc.).
The implementation of these ESC plans and the construction, maintenance, replacement, and
upgrading of these ESC facilities is the responsibility of the applicant/contractor until all
construction is completed and approved and vegetation/landscaping is established.
The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior
to construction. During the construction period, no disturbance beyond the flagged clearing
limits shall be permitted. The flagging shall be maintained by the applicant/contractor for the
duration of construction.
The ESC facilities shown on this plan must be constructed in conjunction with all clearing and
grading activities, and in such a manner as to insure that sediment and sediment laden water do
not enter the drainage system, roadways, or violate applicable water standards.
The ESC facilities shown on this plan are the minimum requirements for anticipated site
conditions. During the construction period, these ESC facilities shall be upgraded as needed for
unexpected storm events and to ensure that sediment and sediment -laden water do not leave the
site.
The ESC facilities shall be inspected daily by the applicant/contractor and maintained as
necessary to ensure their continued finictioning.
The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a
month or within the 48 hours following a major storm event.
At no time shall more than one foot of sediment be allowed to accumulate within a trapped catch
basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning
operation shall not flush sediment laden water into the downstream system.
Stabilized construction entrances shall be installed at the beginning of construction and
maintained for the duration of the project. Additional measures may be required to insure that all
paved areas are kept clean for the duration of the project.
SOIL AMFJVDMENT GLWEUMS
Scarification. Scarify or till subgrade to 8 inches depth (or to depth needed to achieve a total depth of 12 inches of
uncompacted soil after calculated amount of amendment is added). Entire surface should be disturbed by scarification. Do not
scarify within drip line of existing trees to be retained. Amend soil to meet required organic content.
A. Planting Beds
I PRE -APPROVED RATE: Place 3 inches of
composted material and rototill into 5 inches of
soil (a total amended depth of about 9.5 inches,
for a settled depth of 8 inches).
2. CALCULATED RATE: Place calculated amount
of composted material or approved organic
material and rototill into depth of soil needed to
achieve 8 inches of settled soil at 10% organic
content.
Rake beds to smooth and remove surface rocks larger than
2 inches diameter.
Mulch planting beds with 2 inches of organic mulch.
1
21 W BENC01 1- 71
ELEV=98. 64
B. Turf Areas
I PRE -APPROVED RATE: Place 1.75 inches of
composted material and rototill into 6.25 inches
of soil (a total amended depth of about 9.5 inches,
for a settled depth of 8 inches).
2. CALCULATED RATE: Place calculated amount
of composted material or approved organic
material and rototill into depth of soil needed to
achieve 8 inches of settled soil at 5% organic
content.
Water or roll to compact to 85% of maximum dry density.
Rake to level, and remove surface woody debris and rocks
larger than I inch diameter.
_Z6 ��"P POND D E�P TH
LfUNUM tLt_V=Y1.b4
DEPTH DIORE- TE-N TION
18" DEPTHD I
SOIL SIX
SCALE
BioREmNnoN ca ,L #i H. 1 10
SEMON V. 1
B06BLE-UP
C.B. /1
R
(Type 1)
'M= 98.25
WIS72).
FRAME
GRA 7F
67 L.F N 8" STU
@ S=2.407,
1+25 Of 1-5 0+25
1+42 1+00 0+50 SCALE
Drainage Design Pmfil e H.• 1`--20'
V_ 1'_10'
PLANTINGS
MULCH LAYE
18" DEPTI
SOIL MIX I
NATIVE SOIL
2" W BEN(I"171
EL E V= 100. 81
76 11 POND DEPTH
- -= - _0 I& Q 7
18" DEP T/H 810RETENTION
SOIL MIX
120
EX C.B. (Type 1)
110 RIM=99.43
I.E(N)=9788 (6- PVC)
/. E (S)=98 44 (6 - PVC)
8" (SW)=9827 NEW
100
im
MEE577
FA
NOR koi-41-001A 1,•
Examples of plants appropriate for different
soil moisture zones
SCALE
H. 1"-_ 10'
17 1
V- 1 =2
NOT TO SCALE
COASTAL STRAWBERRY
PACIFIC COAST IRIS
MOCK -ORANGE
:)WBERRY
EDGE
ROSE
SEC770N V_ 1 "-_21
Bioretention Soil Mix
Bioretention Soil Mix is mixed off -site and delivered ready for installation.
Design infiltration rate: 1 inch/hour.
Soil Mix.
65% to 70% gravelly sand and 30% to 35% compost (see specification below).
Gravelly sand gradation per ASTM D 422.
Sieve Size Percent Passing
US No. 4 100
US No. 6 88-100
US No. 8 79-97
US No. 50 11-35
US No. 200 5-15
0 Maximum clay content should be less than 5%.
0 Soil mixture should be uniform, free of stones, stumps, roots or other similar objects
larger than 2 inches.
0 On -site soil mixing or placement not allowed if soil is saturated or subjected to water
within 48 hours.
0 Cover and store soil accordingly to prevent wetting or saturation.
Test soil for fertility and micronutrients and, if necessary, amend mixture to create
optimum conditions for plant establishment and early growth at rates recommended by
an independent laboratory soil test.
Organic content of the soil mixture should be 8% to 12%.
Excavation , Bioretention soil media installatioo,
Soil compaction can lead to facility failure; accordingly, Placement
minimizing compaction of the base and sidewalls of the On -site soil mixing or placement should not be
bioretention area is critical. Excavation should never be performed if BSM or subgrade soil is saturated. The
allowed during wet or saturated conditions (compaction bioretention soil mixture should be placed and graded
can reach depths of 2-3 feet during wet conditions and by machinery operating adjacent to the bioretention
mitigation is likely not possible). Excavation should facility. If machinery must operate in the bioretention
be performed by machinery operating adjacent to cell for soil placement, use light weight equipment with
the bioretention facility and no heavy equipment with low ground -contact pressure. If machinery operates
narrow tracks, narrow tires, or large lugged, high in the facility, the BSM infiltration rates must be field
pressure tires should be allowed on the bottom of the tested and compared to design rates and verified by
bioretention facility. If machinery must operate in the the project engineer. Failure to meet or exceed the
bioretention cell for excavation, use light weight, low design infiltration rate for the BSM will require revised
ground -contact pressure equipment and rip the base at engineering designs to verify achievement of treatment
completion to re -fracture soil to a minimum of 12 inches and flow control requirements. The soil mixture should
(Prince George's County, 2002). If machinery operates be placed in horizontal layers not to exceed 12 inches
in the facility, subgrade infiltration rates must be field per lift for the entire area of the bioretention facility.
tested and compared to design rates and verified by
the Engineer of Record. Failure to meet or exceed the Compact the BSM to a relative compaction of 85
design infiltration rate for the subgrade will require percent of modified maximum dry density (ASTM D
revised engineering designs to verify achievement of 1557). Compaction can be achieved by boot packing
treatment and flow control benefits that were estimated (simply walking over all areas of each lift) and then
in the Stormwater Site Plan. apply 0.2 inch of water per I inch of BSM depth. Water
for settling should be applied by spraying or sprinkling.
Prior to placement of the BSM the finished subgrade
should:
Be scarified to a minimum depth of 3 inches.
Have any sediment deposited from construction
runoff removed (to remove all introduced
sediment, subgrade soil should be removed to a
depth of 3-6 inches and replaced with BSM)' Be inspected by the engineer to verify required
subgrade condition.
Sidewalls of the facility beneath the surface of the BSM
can be vertical if soil stability is adequate. Exposed
sidewalls of the completed bioretention area with BSM
in place should be no steeper than 3H:1V (see Bottom
area and side slopes in section 6.1.2.2: Bioretention
components). The bottom of the facility should be flat.
Vegetation protection areas with intact native soil and
vegetation should not be cleared and excavated for
bioretention facilities.
Controlling erosion and sediment are most difficult
during clearing, grading, and construction; accordingly,
minimizing site disturbance to the greatest extent
practicable is the most effective sediment management.
During construction:
• Bioretention areas should not be used as
sediment control facilities and all drainage should
be directed away from bioretention areas after
initial rough grading. Flow can be directed away
from the facility with temporary diversion swales
or other approved protection (Prince George's
County, 2002). If introduction of construction
runoff cannot be avoided see below for
guidelines.
• Construction on bioretention facilities should not
begin until all contributing drainage areas are
stabilized according to erosion and sediment
control BMPs and to the satisfaction of the
engineer.
• If the design includes curb and gutter, the curb
cuts and inlets should be blocked until BSM and
mulch have been placed and planting completed
(when possible), and dispersion pads are in place
(see figure 6.1.27).
Every effort during design, construction sequencing,
and construction should be made to prevent sediment
from entering bioretention areas. However, bioretention
areas are often distributed throughout the project area
and can present unique challenges during construction.
See Section 5.4.1 for guidelines if no other options
exist and runoff during construction must be directed
through the bioretention areas.
Erosion and sediment control practices must be
inspected and maintained on a regular basis.
rir�rr��Y:s