HomeMy WebLinkAboutGeotech Waiver 6011830131• DEPARTMENT OF COMMUNITY DEVELOPMEN FER 9 n
621 Sheridan Street, Port Townsend, WA 98368 L v ���U
Tel:360,379,4450 1 Fax:360.379.4451
tf Web: www.r.r�.fersan.w��,u��_ornrnrnfilv_e!o�eni.� 'Q Scan the CtR
O' E-mail: dcdo_co.'(ffc:rs�,i,wa.us
it;i �C I _ _.._._ ...___..
+, code'Wii r_cess
S-[I1�,PLEMI�N'1'AL A13'1- (CATION the digital File.
WAIVER FROM SPECIAL REPORTS — GEOTECHNICAL REPORT FOR
GEOLOGICALLY HAZARDOUS AREAS
MLA # PROJECT/APPLICANT NAME: f ' h�1ti11• TKu)
- owner of parcel'"
Property Owner's
Name Parcel number
located at - (�I [i I �- P� rl nnm
Property Address
hereby request a waiver from the requirement for a geotechnical report under JCC 18.22.370, in association
with the critical area review and protection standards under Jefferson County Code ('JCC') 18.22.170 for permit
application SEP- - R--00 25 L(if applicable).
Jefferson County Code 18.22.370 Waivers - JUSTIFICATION
The Unified Development Code Administrator may waive the requirement for a special report when an applicant
demonstrates the following:
(1) The proposal involved will not affect the critical area in a manner contrary to the goals, purposes and
objectives of this code. Specifically, address the following elements of the proposal: (1) a description of the
geologic setting; (2) topography; (3) soils; (4) hydrology (explain where/how rainwater Flows on the property);
and(5) evaluation of the proposal impacts upon known geologic, hazards lb tKC pe'uJILh
� ��' �� �]`�' d. 3.a wr�[e.rn rl�tia.a-� ��rl�. a�lc�,�,a,t '��"t.. u: c� �r.►�. t' 15`jo1 t
�G�,, _y�,�y 9�a,.zr, cvr.i� �.��.►
+� �'� `LV�� � G.S�11A] �S� �irr1t+'�, C) Q'fsi.r.i
r�n� ,r•-
(2) The minimum protection standards required in 18.22.170(2)(3)(4) are addressed in this proposal. Specifically,
address the following protection standards: (1) drainage and erosion control; (2) clearing and grading; and (3)
vegetation retention. llc �Qkn, _ �7 [tea a,AA_#�T�
�e.� a� �.i. maad.�.e4�,w. v�-.a� w "�.. �►�... �.�.�n.�J� r`�,,. �trp
�tie,r, C�A'� k� tkk �rYu.d �� �w. c1 w �+
*up a
Attach additional pages if necessary. Please also attach a site plan depicting the proposal including stormwater
runoff control BMP's to ensure stormwater stays on site. Refer to DCD stormwater forms and information.
Last update 1/17/2020
Fees are required in accordance with either of the following:
I. Any additional time required to review this recLuest in coniunction with an existing ermit a lication
will be billed 596-per review hour and invoiced se aratef .
2. A stand-alone review of this request without a concurrent permit application requires a minimum of 3
hours staff time. Required Fees: 5 base,. $24 scan, and S%_techr, Fee is due aE the tinoe of this
application. If additional staff time is required to process the application, it will be billed at an hourly
rate of $96.
A site visit may be required to inspect the property.
Waiver approval is valid for one year and only grants relief from specific requirements within Chapter 18.22
Critical Areas of Jefferson County Code. If the proposal substantially changes, the proponent must submit a new
waiver request and fee for DCD review.
Upon approval from the Unified Development Code Administrator the property owners will be required to
execute an Indemnity and Release & Waiver with Jefferson County.
Signed
Signed
MAmy R')ZKS fF_STnr.A zy 1Pusj
Property Owner(s)
Property Owner(s)
OFFICE USE ONLY
Waiver from Special Reports Fees
Land Use Fee — Stand-alone review - $288.00
Land Use Fee — review with concurrent permit application - $96.00
Project Scanning Fee
Technology Fee — 5% of Subtotal
Total Fees*
*Additional fees may apply
Date
Date
Subtotal
(::I
TO: Linda Paralez, UDC Administrator
FROM: Shannen Cartmel, Associate Planner
DATE: 02/21 /2020
RE: 450 Pulali Point Road, Brinnon Geotech Waiver Request — Approval
Recommendation
Mr. Parks applied for a geotech waiver during the course of a septic permit application. Mr.
Parks has an existing single-family residence on this site that will be served by this new septic
system. Mr. Parks' property is mapped as an intermediate shoreline slope and seismic hazard. I
have reviewed Mr. Parks' waiver request, available map and data, and completed the attached
geohazard checklist. Mr. Parks will implement applicable best management practices during
installation. The septic will be sited on an area that has approximately a 9% slope. Based on our
available data, Mr. Parks' site, proposed development, and analysis from the geohazard checklist
I find that the standards for a geotechnical report waiver, under Jefferson County Code
18.22.370, have been satisfied.
Approved
Denied
, A'SW ).M �
Linda Paralez /Ubt Admini
Attachments:
Supplemental application waiver from special reports — geotech
Maps
Geohazard Checklist
Site Plan
Geohazard Checklist
(for internal DCD use only)
1. Which of the following are mapped on -site?
Land Slide Hazard: Slight_ Moderate High
Erosion:
Seismic:
Shoreline Slope Stability: Unstable Landslide
Two or more? Yes K No (yes = 1 point)
Recent Landslide Old Slide
Modified I� �X k"AC
2. Existing Development? Yes X No _ Evidence of geohazard? Yes_ No (yes/yes = 1
point)
3. Is the slope greater than 15 %? (rise/run = %) Yes No (yes = 1 point)
4. Will the development be less than 35 feet from the top or toe of slope? Yes L No (yes
=1 point)
S. Does the site have a less stable slope form? Yes No (yes =1 point)
Divergent (most stable) Planar (more stable) Convergent (less stable)
r
6. Is there any information regarding stability of the soil e.g. septic soil logs, NRSC soil survey etc.
Yes No ( 1 is least stable, 7 is most stable) (1, 2 or 3 = 1 point)
7. What type of vegetation on -site? 1
Heavily Vegetated with Native (most stable) Not well vegetated (less stable) { Recent
Timber Harvest (least stable) (least stable =1 point)
8. Site Visit recommended on moderate or greater risk areas to look for indicators (see list) —Any
indicators? Yes _ No (yes = 1 point for each indicator)
I
9. Were there any other Geotechs done on adjacent properties? Yes No If yes, did the
Geotech indicate a geohazard or unstable slope? Yes Notes (yes = 1 point)
Total points =
- V�q
f5 N
W
U C
7
O z
U
z ❑
>❑ w
O
>_ N
T �
C
7 C
O
U Q
C ❑
o � is
U) U
N O
N 6 y
-'
0
N
O
N
N
N
N
m
O
4-0
c
U
c
0
L
a)
3
C C
O _ o
O C y
o N N
_ N
f0`o
0
UE
) E�C�o
co
-m
mmoo a�
o�3 E oL)
cn ZZ m
w Q co a) c 0 0 a
m= maw b>
'-m T M-o m E m
RELEASE AND WAIVER
Applicant: Robert M Parks Trustee
Mary E Parks Testamentary Trust
4501 153`d Ave SE
Bellevue, WA 98006-2551
Property: Assessor's property tax parcel no.: 601183013
Legal description: S 18 T26 R1 W TAX 1 REVISED (S 1/2)
Address: 450 Pulali Point Road, Brinnon, WA 98320
RD SO OVE
MAR - 4 2020 U
Please read this form carefully and be aware that, in applying for and receiving a permit
for development, you are knowingly and willfully seeking a waiver from the requirement of a
professional geotechnical report describing your Property, proposed development, and potential
risk of earth movement. Your Property contains a mapped Geologically Hazardous Area, a
Critical Area as defined by Chapter 18.22 of the Jefferson County Code. Mapped Geologically
Hazardous Areas may contain site features, such as soil, hydrology, or topography features that
increase the risk of earth movement, which may present a risk to life and property. In accordance
with permitting the construction of the items described and listed below within an
Environmentally Sensitive Area, Applicant(s) acknowledge and agree as follows:
1. Applicant(s) desire to construct a new septic system. The Property is located within a
Geologically Hazardous Area with an intermediate shoreline slope and seismic hazard.
Applicant(s) agree that they are fully aware of the risks inherent in development in a
Geologically Hazardous Area, an intermediate shoreline slope and a seismic hazard.
2. Applicant(s), as their own free and voluntary act, accept, and assume all risks of loss or
damage arising out of the conditions described herein and further agree to relieve
Jefferson County, its agencies, divisions, officers, agents, and employees of any
liability, damages, claims, or other expenses arising as a result of or allegedly as the
result of the approval of the development and the approval of the Applicant(s)' proposed
development.
3. Applicant(s) agrees to and shall hold harmless and indemnify the Jefferson County, its
agencies, divisions, officers, agents, and employees from and against any and all
liability, loss, claims, suits, damages, costs, expenses (including attorney's fees) that
may arise at any time, occur or be generated as a result of any reduction in the fair
Page 1 of 3
market value of the Applicant(s)' Property and/or any damage to personal property or
personal injury by reason of the conditions existing now or any time hereafter on or
around the Appficant(s)' Property or due to any design, development, or construction
—pursuau nd"the building permit, stormwater management system approval, septic permit,
t
or-any-athefdevelopment permits issues thereunder by the Jefferson County, its
agencies, divisions, employees, agents, officers, or representatives pursuant to any then
applicable state statute, administrative code, regulation, or Jefferson County ordinance.
4. If any term of this Waiver is to any extent invalid, illegal, or incapable of being
enforced, such term shall be excluded to the extent of such invalidity, illegality, or
unenforceability; all other terms shall remain in full force and effect.
5. All associated permits must be obtained or development must be substantially started
within one-year from the effective date of this Waiver. If this condition is not met, the
Waiver shall be void.
6. Development and associated permits must substantially comply with the Exhibit "A"
Site or Development Plan.
7. This Waiver is not a permit of :any type
I r1w. a 72't r4aw
iem
. IT:
qt 20 2,
Date
Page 2 of 3
Exhibit "A"
Site or Development Plan
See attached submitted site plan
Page 3 of 3
IL
19 NO Build
A�
=
Soil Log
----
BtpMng Envelope
-----
Setback
Existing Septic
Component
+
Tree
(A)
Clean Out
(B)
Septic Tank
(Ci
Filter Sock
(D)
PurW Tank
(E)
D-Box
Nathan Cleaver Septic Design, Inc.
Phone: (360) 598-6546, Fax: 360-598-6548
262 NW Thompson Road, Poulsbo, WA 98370
E-mail: nathan@nathancleaver.com
CUSTOMER: Mary E. Parks
TAX ID #: 601183013
LOCATION: 540 Pulali Point Rd.
Brinnon, WA 98320
DRAWN BY: ALR
DESIGN BY: NATHAN N. CLEAVER
DATE: September 5, 2019
Y
h' 2020
E.1f WIgON MFF1SpN CQ JA1
�RL PU&IC HEALTH
PROPERTY LINES BASED ON COUNTY RECORDS:
#509849: April 3, 2006 ; Vol. 30 Pg. 65
CONTOUR LINES SOURCED FROM:
Jefferson County Central Services GIS Mapping
7!Y
SCALE: 1 "=40'
THIS IS NOT A SURVEY
NOTES:
1. ALL WATER LINES TO MAINTAIN >10' SETBACK TO ALL SEPTIC COMPONENTS.
2. THE TANK LOCATION CAN BE CHANGED / ALTERED AS LONG AS ALL OF THE
APPLICABLE SETBACKS ARE MAINTAINED. *BE SURE TO CHECK WITH THE
DESIGNER FOR APPROVAL PRIOR TO ANY & ALL CHANGES TO ENSURE
PROPER OPERATION & FUNCTIONALITY IS RETAINED.
0
0
0
N
N