Agenda Date: August 24, 2020
Subject: Rural Arterial Program (RAP) Final Prospectus for Center Road MP 10.34 to MP14.58 2R
Statement of Issue:
The Rural Arterial Program (RAP) is a competitive statewide grant program managed by the County
Road Administration Board (CRAB). To be included in the RAP Priority Array, grant criteria must be
submitted to CRAB via the on-line database and the grant request approved before September 1 by the
Board of Commissioners.
Analysis/Strategic Goals/Pro's Et Con's:
The Center Road 2R (Resurface and Restore) MP 10.34 to MP 14.58 preservation project, from Little
Quilcene River north by approximately four miles, has considerable cracking, rutting and drainage
issues. This project on a major collector proposes to improve poor pavement surface conditions and
thereby preserve the road infrastructure.
Fiscal Impact/Cost Benefit Analysis:
Jefferson County relies on RAP as a State source of funds for every fiscal biennium. This project has
been given a substantial pavement deterioration score based on CRAB staff inspection. RAP funds will
need to be matched by County Road funds. CRAB administers the competitive process by geographic
regions in which the local agency can apply local significance points. Preliminary budget estimates
indicate the total cost of the project is $1,889,872. If selected in the 2021-2023 biennium for award,
RAP will fund up to $1,700,700. This RAP project is listed in the adopted 6-year Transportation
Improvement Program (TIP).
Recommendation:
Authorize the Chair of the Board of Commissioners to sign the RAP Final Prospectus signature sheet for
the Center Road MP 10.34 to MP 14.58 2R project.
Department Contact: Wendy Clark-Getzin, PE, Transportation Planner, 360-385-9162
Revie - • B, :
Philip Morley, Co Ad inistr Date
STATE OF WASHINGTON - COUNTY ROAD ADMINISTRATION BOARD
RURAL ARTERIAL PROGRAM
FINAL PROSPECTUS
Biennium: 2021 - 2023
Region: NW County: Jefferson
IDENTIFICATION
State Legislative District: 24 Six -Year T.I.P. Priority No: 16 Total Points: 92.00
Road Number(s) Road Name(s)I FFC(s) TRC(s) I BMP(s) LE MP(s)
93150 Center Road 07 T3 1 10.340 14.580
PROJECT TYPE
Project Type: 2R - Resurface and Restore
DESCRIPTION OF PROPOSED IMPROVEMENTS - Attach Rating Worksheets
Roadway Structural Section, or Bridge Condition:
No changes to roadbed structure.
Horizontal Alignment:
No improvements to horizontal alignment. No changes to design or posted speeds. No changes to
clear zones.
Vertical Alignment:
No improvements to vertical alignment.
Width:
No changes to 11-foot travel lanes and 8-foot shoulders.
Other: Clear Zone, Slopes, Guardrail, Illumination, signals etc.:
No safety improvements.
ESTIMATED FUNDING AND TIMING
Phase Est Total Cost
Estimated Year
RATA Amount Start End
Design/Prelim. Engr.
$59,886
$53,800
Jul-21
Jun-22
Right of Way
$0
Construction
$1,829,986
$1,646,900
Jul-23
Sep-23
TOTAL
$1,889,872
$1,700,700
Schedule of CRAB reimbursements for
Construction will be or dependent on Project
SPECIAL CONSIDERATIONS THAT MAY AFFECT PROJECT SCHEDULE:
❑ Wetlands ❑ NMFS ❑ R.O.W. ❑ Shorelines ❑ USFWS ❑ BIA ❑ HPA ❑ RR ❑ USACE
❑WDFW ❑Cultrual (Hist.Arch. Paleo.) ❑Tied (Other agency work) ❑Other
LOCAL PROJECT APPROVAL r
RAP Project Prospectus prepared under the supervision of:
ure - County E i esr / Date
RAP Project Prospectus submitted to CRAB with the approval of:
Signature of Chair of the Board of County
Commissioners or County Executive / Date
Page 1 of 1