SPRINKLER PLAN REVIEW—NFPA 13 SYSTEM
Date Received: 02 i's.a.eea/ 20,3 Plan Checker: 7 -0-74-J . . /tvAvt.o
File Index Number: .6L0 /5 - OdSB Date Checked: D4/ ..-1,41.42 ea .20' -
Approved: Approved With Revisions: Revision Required:
Project Location: 9 Z0 Bee iy/LL g-0.91-0 Business: fie&TO,.v"6 cAbAt &C9*/ $,A(r
cd/-:uat9yv ,C,k Zp6 - 2.71. Sal
Contractor: &X L P. Isla Contractor Phone Number: 200 • 95.3• /GO S�
Hazard Classification:020. G,2vvP / Density/Area of Protection:
Allowable Coverage High Piled In-
Per Sprinkler Head: Storage: Rack:
a 2
Z 3 O I. DESIGN CRITERIA
Hazard classification(s)[Refer to page 4] shall be on the plans.
I Density and area of sprinkler operation shall be on the plans.
II Allowable area/coverage per sprinkler head shall be on the plans.
Dry System Designs:
L ✓I Dry pipe valve(s)—including MFG and listing.
Compressor size—Including MFG listing
Anti-Freeze Designs:
Amount and manufacturer of solution to be indicated on plans.
Check valve to prevent contamination.
1/1 Filler cup location.
Density For High-Piled Storage:
✓_ I I Commodity classification shall be on the plans.
Rack or pallet storage.
QIn-rack sprinklers required.
Hose stations provided.
Smoke vent ration shown on the plans.
dav Draft curtains—Square feet shown on the plans.
, i;
\l/achino/nn Ca.1...Pend Ci.n Prnron.i..n Rnronu Cne:n4ln.!`hnn4l:e.Pann 1 of
.
en
w c 2 44
z 3 O H. WATER SUPPLY INFORMATION
t� Minimum supply provided.
p1 Connection to water supply.
FDC and/or PIV location(s)are acceptable(within 50' of a public fire hydrant)
t/ P1V sectional location(s)are a maximum of 5 devices.
Hydrant Test Information On Plans:
I I [-p1'
Location and elevation of static and residual pressure.
L I Flow location from property to be protected.
1I Static pressure indicated on the plans.
GPM indicated on the plans.
I I [P1 Date and Time of testing is indicated on the plans.
Test conducted by/who supplied supply information indicated on plans.
This project requires super hydrants(6x2-2 '/2"x1-4").
New on-site pipe diameter(s)and piping materials per NFPA 24.
System use limited to 90%of available water supply.
a nq
a
c
Z , 3 p III. WATER SUPPLY UNDERGROUND DESIGN
V Pipe material type and MFG indicated/provided.
Valves data include model number and listing. 1V 5Y eT -a 'O8L/E egg-14ud s
I I Tel Hydrant location(s)and/or pipe size and depth of bury indicated.
• I Thrust blocking.
Vr Supply NFPA notes on plan.
dJoining method used.
Q' 2
ce a a
o x
Z a 3 d IV. OVERHEAD SYSTEM COMPONENTS
Piokw:
Material and size—including wall thickness.
I I Hangers—including the listing and proper location.
I I I ✓I Earthquake bracing—including materials,size,and proper location.
Drainage:
Main drain.
✓I Inspectors test outlet(MRA).
+/ Auxiliary drains in basements and pitched ceilings.
Washington State Patrol Fire Protection Bureau Sprinkler Checklist Page 2 of 5
°a' so
a cr 0 aC
z 3 O IV. OVERHEAD SYSTEM COMPONENTS(continued)
Sprinklers:
Manufacturer specification sheet,model,and listing.
Number of sprinklers.
rk Temperature rating.
Proper spacing on each branch line.
Alarms provided. 10 arg, $
Alarms monitored by a central station.
Construction Plans,etc.:
Complete construction details(full height and cross section)
vt Room dimensions and label rooms use/purpose.
�✓ Building elevation.
Roof design(smooth ceiling,beams,girders,bar joists).
Hydraulic Calculations:
Summary sheet of Hazard Classification(s)/Density(Refer to page 4). x4
FPI Detailed work sheets. K
Graph sheet. X 4
ffr Abbreviations and symbols.
Peaking of grid systems. fuor1:6eicti
Most remote area(MRA). A
Hydraulic reference points. 4
Additions And/Or Remodels:
Details of existing sprinkler system.
Calculations for additions to system.
c+
z rx 3 d V. MAXIMUM SPACING FOR PIPE SUPPORTS
✓ Threaded lightweight steel of less than 3"diameter at no more than 12 feet.
Steel pipe of less than 1 %Y"diameter at no more than 12 feet.
Steel pipe more than 1 4"diameter at no more than 15 feet. I�
rEf 1 Copper tube of 1"to I"at no more than 8 feet. 0
✓1 Copper tube of 1 'R'to 1 'h"at no more than 10 feet. 0
0
u
Washington State Patrol Fire Protection Bureau Sprinkler Checklist Page 3 of 5
x
z a 3 O VI. MAXIMUM SPACING FOR SWAY BRACING
I I r✓ Seismic bracing calculation sheet.
TVI Assigned load calculations shall be indicated on plans.
Longitudinal: 80' maximum for feed and cross mains.
t Lateral:
I I I R 1 40' maximum for feed and cross-mains. '2 ' fr'
-F=1--1' Within 24"of every other with flex coupling on the mains. / ' V£J21 fir'
T12-t9(SC 10'0,4 ►/-
If primary structural members exceed 40',then spaced up to 50'.
VI Last length of feed and cross-mains.
Required on branch lines 2 %:"and larger.
May not be omitted on pipes with rods less than 6".
✓ Longitudinal and lateral at top of risers(4 way).
ro
c4
a' 2 x
Z a� O VII. DESIGN CRITERIA FOR SPECIFIC HAZARD CLASSIFICATIONS
Hazard Classification:
Light Hazard
Quantity or combustibility of contents is low. Fires have a relatively
low heat release rate.
r-vr Ordinary Hazard,Group I
Combustibility of contents is low. Quantity of combustibles is
moderate. Stockpiles are less than 8 feet in height. Fires have a
moderate heat release rate.
Ordinary Hazard,Group 2
Combustibility of contents is moderate. Quantity of combustibles is
moderate. Stockpiles are less than 12 feet in height. Fires have a
moderate heat release rate.
n Ordinary Hazard,Group 3
Quantity or combustibility is high. Fires have a high rate of heat
release. Storage is limited to 12 feet in height.
Extra Hazard,Groups ],&2
Quantity and combustibility is very high. Flammable liquids, dusts,
and/or other materials are present that result in rapidly developing
fires with high heat release rates.
Undetermined
When buildings have an undetermined use,Ordinary Hazard,Group
3 design standards are the minimum that are acceptable.
Washington State Patrol Fire Protection Bureau Sprinkler Checklist Page 4 of 5
ADDITIONAL REQUIREMENTS
J - AI�v aN F• .D. Cx.c/ pe7Earv/rvE-5 rf P e m•° G• C4P5
/JL rf,v ci i c is Z•sx Z. x 4-o ,ti<'c.ai As 404s Tk/cr f7D .
��S of yr�v�4 ,QE- S70.ez 432f4AvD LOG.t4¢f$4..El
, ���""��`a
""651)4'.4
Washington State Patrol Fire Protection Bureau Sprinkler Checklist Page 5 of 5
. f
Thomas L. Aumock
Consulting Fire Code Inspector&Plans Examiner
Jefferson County Department of Community Development
2303 Hendricks Street,Port Townsend,WA 98368
Office : (360)385-3938 Email: taumock@cablespeed.com Cell: (360) 643-0272
MEMORANDUM
To: Mary Blain,Plans Examiner,Jefferson County Dept. of Community Develo sm t
Fr: Thomas Aumock,Consulting Fire Code Inspector,and Plans Exa •
Dt: 16 March 2015
Re: BLD15-0058: Camp Parsons Dining Hall - Automatic Fire Sprinkler System, 970 Bee Mill
Road,Brinnon
This consulting fire code inspector and plans examiner is in receipt of the set of plans and specifications
for the above-referenced permit application from your office.
The above-reference proposal was reviewed by this department relative to the International Fire Code
[I.F.C.], 2012 Edition, as amended by Washington State amendments from W.A.C. Chapter 51.54, and
with N.F.P.A. 13, 2013 Edition.
Findings&Determinations:
1. The automatic fire sprinkler system is found to be designed by a licensed fire protection engineer,
and shall be installed by a licensed technician(W.A.C. 212-80).
2. The plan set denotes the 2010 version of N.F.P.A. 13 as the compliance path, however, as noted
above, this plan review is based upon the 2013 version. The sprinkler designer shall review their plans
under the 2013 requirements and submit a plan revision if necessary.
3. The "Fire Sprinkler Equipment Submittal" manufacturer's "cut sheets" [received March 12] are
found to be consistent with the requirements from N.F.P.A. 13, Section 6.1.1.2.
4. Sprinkler protection is to be provided in all closets and compartments, including those areas housing
mechanical equipment, that are not larger than 400 ft3 in size, where a single sprinkler at the highest
ceiling space is sufficient without regard to obstructions or minimum distance to the wall. This
requirement is now included in the 2013 Edition of N.F.P.A. 13 Section 8.5.5.4 and is applicable to small
spaces in all occupancies.
5. Overhangs having a depth of greater than four[4] feet are normally required to be provided sprinkler
protection under fixed obstructions per N.F.P.A. 13, Section 8.5.5.3.1. The proponent will be filling the
interior voids with insulation.
6. The Fire Department Connection has a plan call for 2.5" x 2.5" x 4" connection. This plan call is
consistent with the Fire Chief for Brinnon Fire Department. The Fire Chief will require Storz brand
locking 2.5"caps for this assembly.
CL
7. The annular space at the concrete floor where the fire service main and riser shall meet current 0
N.F.P.A. sizing requirements, normally two [2] inches nominal based upon the pipe size being greater
than 3 inches. + op
�.1
1 �,�„
8. The automatic sprinkler system shall be confidence tested with the presence of a Jefferson County
inspector, and a formal "Contractor's Material & Test Certificate" shall be filed at the completion of
testing and approval with the owner and Jefferson County.
9. A complete set of as-built drawing[s] shall be filed for record with East Jefferson Fire & Rescue,
and a final plan set[s] provided at on premises near the sprinkler riser, to be protected from moisture
damage. Any changes from the permit set filed with Jefferson County shall be recorded with the permit
file.
Any other applicable or relevant sections of said Code not covered herein shall nonetheless apply to this
proposal.
2.5 hours time was logged in consultation,plan review,report, and filing of this plan review.
It is the recommendation of this plans examiner that the permit application approval can be completed
subject to the applicable aforesaid requirements.