STORMWATER CALCUI-ATION WORKSHEET
JUN 05 20tg
Scan the QR
access
PARcEL #enorecr/,APPLICANT NAME:
DETERMINING STORMWATER MANAGEMENT REQUTREMENTS: This stormwater calculation worksheet should be completed first to
classify the proposal as "small,""medium," or "large." The size determines whether a stormwater site plan is required in
conjunction with a stand-alone stormwater management permit application, building permlt application, or other land use approval
application that involves sto rmwater review. The basic information will also be helpful for completing a Stormwater Site plan, if
requi red.
ddivity is any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and
and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, filling,
compaction associated with stabilization of structures and road construction.
Notive vegetqtion is vegetation comprised of plant species, other than noxious weeds, that are indigenous to the coastal region of
the Pacific Northwest and which reasonably could have been expected to naturally occur on the site. Exa mples include species such
as Douglas fir, western hemlock, western red cedar, alder, big-leaf maple, and vine maple; shrubs such as willow, elderberry,
salmonberry, and salal; herbaceous plants such as sword fern, foam flowe r, and fireweed
Lond-disturbing
non-vegetative)
excavation, and
a0 re
lmperuious surface is a hard surface that either prevents or retards the entry of water into the soil mantle as under natural
conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or at an
increased rate of flow from the flow present under natural conditions priorto development. Common impervious surfaces include,
but are not limited to roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads,
packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater.
stormator c€lc wffksh8et oR ode - REv 2t1no19 p4a 1 or 2
Loab,",""^ffiarefeet.Multiplytheacreagebythisfigure.
in square r""tlRQ *165. 6 "qrt
'*'-Size of parcel '
Size of parcel i
LAND DISTURBING ACTIVITY. CONVERSION OF NATIVE VEGETATION. AND VOLUME OF CUT/FILL
Cut Fill_ (cu/yd)
6id sq/ft
sq/ft
16
A,fr\
Construction site for structures
Well, utilities, etc.
Driveway, parking, roads, etc.
Other compacted surface, etc.
Lawn, landscaping, etc.
lndicate Total Volumes of Proposed:
(lncludes BMP T5.'13 FillVolume)
sq/ft
sq/ft
sq/ft
sq/ft
Calculate the total area to be cleared, graded, fllled,
excavated, and/or compacted for proposed development
project. lnclude in this calculation the area to be cleared for:
Answer the following two questions related to
conversion of native vegetation:
Does the proJect convert Y, acres or more of
native vegetation to lawn or landscaped areas?
Circle: Yes
Does the project convert 2 Vz acres or more of
native vegetation to pasture?
Circle: Yes
Temporary construction area
Total Land Disturbance
Drainfield, septic tank, etc. _ sq/ft
Qnt- \\r-o\?
STORMWATER CALCULATIONS . IMPERVIOUS SURFACE
Structures (all roof area)
-
_.+__--,*-";*_,
Total Exisffng
TOTAL NEW + TOTAL EXISTING'*This amount will be used to check total lol coverage.
e
EXISTING-Fyzcnlxr.:S
o
sq/ft
,sq/ft
Other
SidewalksSidewalks
Driveway, parking, roads, etc sq/ft
Total New 9re
Patios _sq/ftPatios
-sq/ft
.sq/ft
sq/ft
Solid Decks
(without infiltration below)
NEW
Structures(allroofarea) E/( "qft
Driveway, parking, roads, etc _sq/ft
Other _sq/ft
Solid Decks
(without infi ltration below)
o
Divide the total existinq
impervious surface above by the.
size of the parcel and convert to
a percentage. A,Oq(1 v,
o
DEVELOPMENT v. REDEVELOPMENT
Does the site have > 35o/o or more
existinq im oervious surface?->no.)
F
The proposal is considered redevelopment and
Answer questions in Figure 2.4.2.
- Proponents of "smal!" projects must comply only with Minimum Requirement #2-Construction Stormwater Pollution Prevention.
Please submit the Small Project Certification. The proponent is responsible for employing the 12 Elements to control erosion and
prevent sediment and other pollutants from leaving the site during the construction phase of the project. Pick up the Construction
Stormwater Pollution Prevention (SWPPP) Best Management Plactices (BMPs) Fact Sheet.
- Proponents of "medium" projects-those that must meet only Minimum Requirements #1 through #5 must submit Worksheet 41
and 81, a stormwater site plan and a construction stormwater pollution prevention site plan (See Worksheet A2 and 82 for
guidance).
- "Lalge" projects-those that must meet all 9 Minimum Requirements- must submit Worksheet A1 and 81, a stormwater site plan
and a construction stormwater pollution prevention site plan (See Worksheet A2 and 82 for guidance). Large projects also may
require engineering. See Worksheet L to determine additional large project requirements.
APPTICANT SlGNATURE
\
The proposal is considered new development.
Answer questions in Figure 2.4.1
Refer to the applicable Flow Chart to determine the
Minimum Requirements.
srG
By signing the Stormwater Calculation Worksheet, I as the applicant/owner attest that the information provided herein is true and correct to
the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected
R OR AUTHORIZED RE}
K)R AFF'CE USE ONLY
stomtar €lc rcrksheet QR @de - REV Z1DO19 p8p,e2 ol2
--L-i-sq/ft
\rQLtO sqfft
o o
ocD
iorr Fact Sheet
Volume I - Minimum Technical Reguirements - August 2012
2-t0
StartHere
Yec
No
No
Tes No
This is a "large" project.
Large projects refer to
Worksheet L for submittal
requirements. At a
minimum, all large Project
must submit Worksheet
Al, ,{2, Bl, and 82 or
equivalent.
Yec
This is a "medium"
project. Submit
Worksheet Al, A2,
Bl and 82 or
equivalent.
No
Con.rplete "Small ect lt
Frgure 2.4,1 -Ftow chart ror Determrnlng noquril;il;ildi[i'ii']l]'6dffitbiiiSii,PoilLrtion
See Redevelopment
Minimum
Requirements and
Flow Chart
(Figure 3.3)
Does the sito have
35o/o or more of
existing impervious
coverage?
Does the project convert
'/t ADteS Or mOre Of
vegetation to lawn or
landscaped areas, or
convert 2.5 acrrs or more
of nativc vcgetationto
pasture?
Does the project
result in 5,000
squsre feet, or
greater, of newplus
replaccd hard
surface area?
No
Yer
Does the projeot
rcsult in 2,000 square
foct, or greater, of
ncwplus rcplaced
hard surhco area?All Minimum
Requirements apply
to thencwand
rcplaccd hard surfaces
and converted
vegctation areas.
Does the project have
land disturbing
activities of 7,000
square feet or greater?
Minimum Requirements
#1 through #5 apply to
thc new and replaced
hard surfaces and the
land disturbcd.
Minimun
Requirernent #2
applies.
/fiaeryr
o O
Yer No
NcxtQscrtton
Ycr
NGrt
Qucrtloa
Ycr
No
No
Flgure 2.4.2- Flow Ghart for Determln lng Requlrements for Redevelopment
I
No
No
a pro t.to
submittal requirements. At a minirnum, all large Project must submit
worksrrT,lAri#'fr];fii^Bh}I,$*yfr;;:;i,"ments-Ausustz0r2
2-I I
Does the project rcsult in 2,000 squarc fcet, or more, ofncw plus replaced hard surfacc arca? OR
Does the land disturbing activity total 7,000 square feet or greater?
Minimum Requircmenb #2 applier.Minimum Requirements #l through #5 apply to
the ncw and rcplaced hard surfaces and the land
disturbed.
Does tho project add 5,000 squarc feet or more ofnow hard surfaces?
OR
Canvcrl'A acres or morc of vogetation to lawn or landscaped arcas?
OR
Convort 2.5 acres or morc of nativo vogetation to pastrre?
Is this a road
rclated project?
All Minimum Requircments apply to thc
ncw lurd rurfrcee and tre convcrted
wgctation arcas.
Docs thc project add 5,000 squarc fect or moro ofncw hard surfrpas?
Do now hard gurfaces add SV/o or
moroto tho cxisting hud surfscGs
within thc projcct limiB?
Is drc toal ofnew plus rcplaced hard surfaccs
5,000 squarc fcet or morc, AND does thc valuc
of thc proposed improvernents - including
iatcrior improvcmcntr - cxceed 50% of the
asscsscd valuo (or replaccnrcnt value) ofthe
oristing site improvcmcnts?
No additional
rcquiremenB
Tcr
Ycr
Yer
No additional
requirem€otB
All Minimum Rcquhonpnts apply to thc now and
rcplaccd hard rurfaccs and coovcrtod vrgotation arcas.
o t
Worksheet S
Small Project Certifi cation
Yes
Yes
no
no
no
This certification may only be used if you answer yes to all of the questions below (circle yes or no)
Permanent and temporary drainage on site is designed to divert Stormwater away from my onsite septic
system or any neighboring onsite septic system.
lf located in a SIPZ zone, I am able to infiltrate stormwater onsite using a drywell or other method (full
dispersion, downspout dispersion).
My project will not discharge stormwater runoff into a critical area (including but not limited to: geohazard
area or its 3O-foot buffer, wetland or Fish and Wildlife Habitat Conservation Area)
no My proposal is a small project, which means it will create less than 2,000 square feet of new, replaced, or new
plus replaced impervious surface area, and has less than 7,000 square feet of land disturbing activities as
defined on the Stormwater Calculation Worksheet.
I understand that my project must comply with Minimum Requirement #2 in the Department of Ecology Stormwater Management
Manual as amended. I have read the Construction Stormwater Pollution Prevention Fact Sheet and will implement BMP's as
applicable to my project.
trl
w
Applicant Signature
I as the applicant/owner attest that the information provided herein is true and correct to the best
olslrqe
By signing the small project
of my
(uroowrrn oR AUTHoRTZED nepnrse nmrffisre Mrune ) 7\(orref
IFIRn*Fwrme
05 20i9 J
:*}UI{IYDCI