HomeMy WebLinkAboutCAM2020-00323
Amanda Hunt, Assistant Planner
11/10/2020
CAM20-00323; Tiny Home
Event Name: Can I build a tiny home?
Event Details: Inquiry into the viability of building a tiny home on parcel
Event Date: 11/10/2020 4:00 PM to 4:30 PM
First Name: Scott
Last Name: MacDonald
Email Address: scott@foundwear.com
Phone Number: 509 250 1066
Parcel # or Address: 802013003
Contact Preference: Phone Call (staff will call phone # listed above)
Question: Can I build a tiny home on this parcel? What is the path toward doing that? There was
a SPAD done in 2006 and is expired. What would the conditions be for approval due to the
critical area designation?
Link to Jefferson County Code: https://www.codepublishing.com/WA/JeffersonCounty/
General Building and Septic
Zoning and Allowed Uses: The zoning for the parcel is Rural Residential 1:20. The total acreage
for the parcel is 18.40 Acres. The applicant is allowed to build 1 Single Family Residence and 1
Additional Dwelling Unit (ADU, 1,250 sq/ft) on the property. The Tiny Home would be treated as
an ADU.
Standard Building Setbacks: 20 ft from the front of the structure to the property line and 5 ft
from the rear and sides of the structure.
SPAAD: SPAAD’s used to be implemented to get pre-approval to develop before applying for a
building permit. SPAAD’s are no longer included Jefferson County Code (JCC 18.40). Applicants
can still use SPAAD for previous zoning cases. Applicants can no longer get a SPAAD.
Septic: Tiny homes used as a permanent dwelling, regardless of whether it’s on a foundation or
trailer, in Jefferson County cannot be self-contained. They will need to be connected to a
permanent septic or sewer hook-up and have a permanent water source similar to park model
homes. Please contact Jefferson County Environmental Health to answer further questions
(Linda Atkins LAtkins@co.jefferson.wa.us).
Amanda Hunt, Assistant Planner
11/10/2020
Permits/Applications:
Tiny Homes Brochure (see attached PDF for application details):
Building Permit Application
Septic Permit Application
Supplemental Residential Application
See the “Application” section in the Tiny Homes Brochure for other application requirements
Critical Areas
Flood plain. The entire parcel is in the “A” Flood Zone. Any building in the flood plain will require
the elevation of the floor to be 12” (1 ft) above the flood elevation. This will require a surveyor
to obtain a Flood Elevation Certificate. If a septic system is in the flood plain, we would require a
flood proofed system and or provide pretreatment before disposing into the flood plain.
Community Development would also require a habitat assessment (see “Stream” below) that
meets all the requirements of JCC 18.22.940 if any portion of the proposed building occurs
within the floodplain (18.22.430)(3)(a)).
Stream. There is one fish bearing stream (Type “F”) that runs through the middle of the parcel.
There are also two non-fish bearing streams (Type “N”) that join into the fish bearing stream.
The applicant may want to request that a Staff Member conduct a site visit to confirm the
streams present. Development within 150’ from the Type “F” Stream or 50’ from the Type “N”
stream may not be possible in some areas on the property and for sure not desirable. Any
construction, BLD or Septic, that is less than 150’ or 50’ to the streams will require a habitat
management plan put together by a qualified professional (JCC 18.22.650(4)(b)). A biologist
would be able to address both flood and stream requirements in one form. Due to numerous
critical areas on the parcel, the applicant would also need to apply for a buffer reduction to allow
enough space for building. The applicant would need to demonstrate how their project meets
the provided criteria in JCC 18.22.640(1), in order to receive a buffer reduction approval from
the administrator.
Stream, continued. A critical area stewardship plan (CASP) would be the second option if buffer
reduction/averaging is not approved by the administrator (18.22.660 (1)).The administrator
may approve CASPs for critical area buffer reductions greater than 25 percent; provided, the
project does not require a reasonable economic use variance (JCC 18.22.965(2)). The CASP
permit is a conditional approval and no other permits (such as building, shoreline, septic) shall be
approved until the applicant has recorded the notice to title and posted the performance bond
(approx. several thousand-dollar bond). The performance bond is to be refunded to the
applicant at the end of the specified monitoring period or when all performance standards are
met, whichever is greater (JCC 18.22.965(5)(b)).
Amanda Hunt, Assistant Planner
11/10/2020
Wetlands. Wetland Requirements & Process
The first step for the applicant to address the wetlands on the property is to hire a qualified
wetland biologist to prepare a Wetland Delineation Report. The report will determine which of
the actions listed below the applicant should take. The County will then review the biologist’s
recommendations and determine the requirements of the applicant.
Wetland Delineation Report: A wetland delineation report, prepared by a qualified wetland
biologist, will identify the wetland category and associated wetland protection buffers (JCC
18.22.960 (3)). See JCC Table 18.22.730(1)(a). Standard Wetland Buffer Widths to review
wetland categories and buffers. The wetland delineation report will advise the applicant on what
approach they should take to address the wetland on their property (e.g. mitigation plan, buffer
reduction/averaging, CASP).
Please Note: The wetland category and associated buffers should be included on the site plan,
submitted with the building permit.
Optional: When the applicant receives the wetland delineation report, the applicant may choose
to schedule another CAM to receive further guidance from the County.
Buffer Reduction/Averaging: Due to the parcel size, the applicant may need to apply for a buffer
reduction or averaging to allow enough space for building. The applicant would need to submit a
wetland evaluation/report prepared by a wetland biologist that demonstrates a buffer
reduction/averaging does not adversely affect the existing functions and values of the wetland.
The applicant would need to demonstrate how their project meets (JCC 18.22.730(9)). The
administrator shall have the authority to determine whether the proposed project and
mitigation plan would allow the prescribed buffer widths to be reduced or averaged, as listed in
the Table 18.22.730(1)(a).
If a proposed activity is unavoidable and occurs within a wetland or the inner 75 percent of a
wetland buffer, the wetland reports shall accompany either a financially bonded critical area
stewardship plan or critical area variance application in JCC 18.22.250 or reasonable economic
use exception in JCC 18.22.260 (JCC 18.22.960(1)).
CASP:See “Streams,continued” above.
Mitigation: As a condition of the permit which results in the unavoidable loss or degradation of
regulated wetlands, compensatory mitigation shall be required to offset impacts (JCC
18.22.740(2)). Compensatory mitigation includes restoration, creation, and/or enhancement
activities. The applicant will consult with a wetland biologist to develop the mitigation plan that
fulfills the County’s compensatory mitigation requirements.