Loading...
HomeMy WebLinkAbout022221_ra01Department of Public Works O Regular Agenda 10:30 am Page 1 of 2 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer Agenda Date: February 22, 2021 Subject: Bid Opening, Membrane Bioreactor Equipment for Port Hadlock Wastewater Treatment System Statement of Issue: Bid opening at 10:30 a.m. or shortly thereafter for procurement of Membrane Bioreactor Equipment - Design, Fabrication, and Installation Services for the Port Hadlock Wastewater Treatment System project. Analysis/Strategic Goals/Pro's Et Con's: The Port Hadlock Wastewater System Value Engineering Review completed in May 2019 determined that significant initial cost savings could be realized by using a small, pre -packaged membrane bioreactor (MBR) and a pressurized collection system. This will allow the sewer to start small, just servicing the Port Hadlock "Core Area", and grow slowly as demand dictates. The 2020 Supplemental State Capital Budget included an appropriation of $1,422,000 for the final design of this project. Final design work is currently underway and will deliver plans, specifications, and cost estimates for the County and property owners. A complete design will position the project favorably for construction grants including possible infrastructure stimulus funding. The design work includes several components: 1) The wastewater treatment facility, 2) the collection system in the streets/roads, 3) the private on -site connections to residences and businesses, and 4) the discharge area where wastewater is allowed to rapidly infiltrate into the ground. To complete the design work related to the wastewater treatment plant (design element #1), it is necessary to identify the MBR plant manufacturer and obtain costs for this equipment as well as more detailed information on likely operating costs. Several companies offer modular membrane bioreactor (MBR) treatment plants of various sizes and configurations that are delivered by truck ready to use at the site. These so called "package plants" are able to treat wastewater to a high standard in an affordable package that is scalable and expandable. Although funding for the acquisition and installation of this equipment has not yet been obtained, it is important to select the MBR supplier now in order to synchronize the remainder of the project design with the treatment plant equipment. Seeking and awarding a Department of Public Works O Regular Agenda 10:30 am Page 2 of 2 bid now will enable the County's sewer design consultants to work closely with the successful Bidder's team to incorporate their equipment into the overall system design. Fiscal Impact/Cost Benefit Analysis: This bid does not obligate the County to purchase the equipment. Purchase is subject to future availability of project construction funding from Local, State and Federal sources. This bid will lock in pricing for a 5-year purchasing window. Bidders are asked to include a price to work with the County's consulting engineers as part of the project design work effort currently underway. These up -front design costs will be covered by County funds through the Port Hadlock Sewer Fund. Recommendation: The Board is requested to open the bids and direct public Works to review the bids and make a recommendation for award. Department Contact: Monte Reinders x242 Reviewed By: h' ' oun y A ministrator Date