Loading...
HomeMy WebLinkAbout032221_ca01Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, Public Works Director/County Engineer Agenda Date: March 22, 2021 Subject: Open Right -of -Way Request - McKinley St. Statement of Issue: Public Works has received an application to open a portion of platted McKinley St. right-of-way for approximately 420 feet for access to the Applicant's parcel. Analysis/Strategic Goals/Pro's Et Con's: The proposed area of right-of-way to be opened is located within the Plat of Irondale Acre Tracts. This road is not proposed to be a County Road, therefore the County will not be responsible for maintenance should this request be approved. Per RCW 36.80.030, the supervision of right of way, including the development of road standards is under the review of the County Engineer, acting under the supervision and authority of the Board of County Commissioners. The County Engineer has prepared standards for opening County right-of-way at this location as outlined in the attached report. Fiscal Impact/Cost Benefit Analysis: There will be no cost to the County for maintenance or construction should this right- of-way be opened. Recommendation: Jefferson County Public Works recommends approval of this application to open a portion of platted McKinley St. for approximately 420 feet, as outlined on the attached Engineer's Report. The Board is asked to sign the Resolution and return to Public Works. Department Contact: Terry Duff 360-385-9159 Reviewed By: Philip Morley, County Administrator Date STATE OF WASHINGTON COUNTY OF JEFFERSON In the Matter of a Resolution ) to Construct Roads and Utilities on a ) Resolution No. Portion of Public Right of Way Known as McKinley St. WHEREAS, an application to construct roads and utilities on public right-of-way has been submitted by Martin Kithcart for the purpose of providing access to parcels #962700047 & 962700048, and WHEREAS, said development will require opening approximately 420 feet of platted McKinley St., and WHEREAS, the Revised Code of Washington (RCW) 36.75 and 36.80 places the supervision of right of way, including the development of road standards, under purview of the County Engineer, acting under the supervision and authority of the Board of County Commissioners, and WHEREAS, the applicant has proposed to construct roads to a standard less than what would be required for public roads, and WHEREAS, the County Engineer has examined the right of way and the existing road system and the potential for future development and recommends that this request be approved provided the standards described in the County Engineer's report dated February 25, 2021 are followed, and WHEREAS, the applicant will be responsible for the maintenance of this section of roadway and it is understood that the County will not be responsible for maintenance of this section of roadway and that it will not be added to the official County Road log until such time as the road is improved to public road standards and added to the County Road Log through Board action, and WHEREAS, in lieu of requiring the road to be constructed to full public road standards at this time, the applicant will be required to sign a no protest agreement waiving rights, except as to the method of assessment, to protest formation of a pro-rata cost sharing arrangement such as a Road Improvement District (RID) should it become necessary in the future to upgrade this road, whether proposed by petition or a resolution of the Board of County Commissioners, NOW, THEREFORE BE IT RESOLVED, that applicant shall be granted permission to open the following right of way: Platted McKinley St. from its intersection with Washington Ln. at mile post 0.13 right. running north approximately 420 feet. BE IT FURTHER RESOLVED, that roads shall be constructed in general conformance with the standards recommended in the County Engineer's report dated February 25, 2021. BE IT FINALLY RESOLVED, that prior to performing construction the applicant shall receive any and all necessary permits including a permit from the Department of Public Works specifying any conditions that will be required by the County Engineer to insure that said standards are met and that the applicant shall pay any inspection costs incurred by the Public Works Department to insure that these standards are met. ADOPTED this day of 2021. JEFFERSON COUNTY BOARD OF COMMISSIONERS Kate Dean, Chair Heidi Eisenhour, Member Greg Brotherton, Member ATTEST: Carolyn Galloway Deputy Clerk of the Board Jefferson County Public Works Department County Engineer's Report Open Right -of -Way Portion of Platted McKinley St., Irondale Acre Tracts This Report is in response to an Open Right -of -Way Permit application (Exhibit A) submitted by Marty Kithcart. The intent of the County Engineer's Report is to evaluate and provide preliminary design parameters/criteria to facilitate the appropriate design of the project. After agency approval of all documents required by this report the applicant shall be issued a permit by the Public Works Department. PROJECT DESCRIPTION Plat name: Plat of Irondale Acre Tracts Road / Street Name: Platted McKinley St. Adjacent to: Assessor Parcel #962700047 & 962700048 Distance: Approximately 420 feet Sections 12, Township 29 North, Range 1 W The road is not proposed to be a County Road (Exhibit B = Site Plan). EXISTING CONDITONS This Permit would officially open a segment of platted McKinley St. right-of-way (subject ROW) to provide access to the Applicant's parcel #962700048 and the neighbor's adjoining parcel #962700047. The access to this segment of McKinley St. is off Washington Ln. at mile post 0.13 right. Washington Ln. has a 14 foot wide chip sealed surface with 2 foot shoulders and ditches. The McKinley St. ROW extends approximately 300 feet beyond the northerly boundary of parcel #962700047 to a point where it intersects with Oak Bay Rd. The potential for this segment of right-of-way to be opened is not likely based on the existing access to parcel #962700046 and the overall safety of parcels' access to be from existing roads with local access designation, and, as such, the subject ROW is unlikely to become a through road. DESIGN STANDARDS Roads shall be constructed to the County's adopted County Road design standards: • American Association of State Highway and Transportation Officials (AASHTO) Policy on Geometric Design of Highways and Streets (most current version), • Washington Department of Transportation (WSDOT) Design Manual and Standard Specifications for Road, Bridge and Municipal Construction, • Jefferson County Unified Development Code JCC 18.30.060 Grading, JCC 18.30.070 Stormwater, and JCC 18.30.080 Roads. Page 1 of 7 Based on proposed use, potentially serving less than 4 residences, and no potential for through traffic, the typical section required will be for a "Rural Access Road" with a minimum 14 foot wide traveled way and 20 foot unobstructed width. See Exhibit C. RIGHT-OF-WAY Platted right-of-way width: Sixty feet is the AASHTO recommended ROW width in rural county areas. The current ROW width as platted is 60 feet. Right-of-way centerline location Roadways shall be constructed on the right-of-way centerline unless this is not feasible due to topography, environmental conditions (e.g., wetlands, water bodies, unstable slopes), or transitions to existing roads. Prior to construction, the right-of-way centerline shall be staked by a licensed professional land surveyor or located in the field based on existing monuments or property corners set by a licensed professional land surveyor. DESIGN SPEED Speed limit may be less than 25 This is a privately maintained dead-end road on public right-of-way, and no posted speed limit is required. DESIGN TRAFFIC VOLUME There are no existing residents on adjoining parcels that could use the subject ROW. There is a church on an adjoining parcel which presently accesses off Oak Bay Rd. The projected Average Daily Traffic (ADT) per residence is less than 10 trips per day. SIGHT DISTANCE Adequate sight distance must be met based on the criteria within the WSDOT design manual, Chapter 1340 and/or the AASHTO design manual. The Applicant's Engineer shall analyze the sight distance at the intersection of platted McKinley St. and Washington Ln. to verify and/or correct any restrictions at the proposed approach. ROADWAY CONSTRUCTION PLANS The proponent shall construct the roadway to the minimum standards depicted on the Typical Section shown in Exhibit C. The proponent shall submit road construction plans prepared by a licensed civil engineer to the Public Works Department for review prior to commencing construction. Road Construction Plan general requirements Road plans shall meet the following general requirements: Page 2 of 7 • Be prepared by a licensed Washington state civil engineer; • Include a plan view and a profile view; • A scale of 1 inch = 50 feet or less; • Depict the typical section; • Depict project limits; • Depict right-of-way centerline; • The design shall accommodate both existing and future lot access and utility service. Plan View The plan view shall at a minimum depict: • Horizontal alignment of the proposed centerline at 50 feet stations; • Horizontal curve data; • Cut and/or fill slopes; • Intersection design; • Drainage facilities: Existing and proposed, including culvert size, length, and material; centerline station and elevation; slope, and skew angle; • Stormwater management facilities; • Utilities: Existing and proposed, both above and below ground; and • Any existing or proposed features that would be affected by the proposed road construction, whether in or outside of the right-of-way. Profile View The profile view shall at a minimum depict: • Existing elevations and proposed finished grades at 50 feet stations; • Vertical curve data; and • Drainage facilities. MINIMUM STRUCTURAL SECTION Privately -maintained roads: The typical minimum cross-section consists of 6 inches compacted gravel base and 2 inches compacted crushed surfacing. A thicker structural section may be required by Public Works based on roadway function or site soils. An alternative structural section may be proposed based on analysis by a licensed civil engineer. All materials used in the construction of the structural section shall meet the requirements of the WSDOT Standard Specifications for Road, Bridge and Municipal Construction. SURFACING Privately -maintained roads: An improved roadway surface (asphalt or bituminous surface treatment) is not required. Page 3 of 7 MATERIALS TESTING Privately -maintained roads: The applicant shall be responsible for ensuring that materials and construction methods conform to WSDOT Standard Specifications. At its discretion, the Public Works Department may direct replacement of materials that clearly do not meet specifications or require testing of materials that appear not to meet specifications. CROSS SLOPES Local Service Roads and Rural Access Roads shall either be crowned at the centerline with -2% cross slopes or have a continuous -2% cross slope from shoulder to shoulder. Stormwater design must be taken into consideration when determining appropriate cross slope. d•L1!Zc1:f11 Privately -maintained roads: • Road grades shall not exceed 12% or require review without prior approval by the appropriate Fire District. Roads grades exceeding 12% may require an improved roadway surface, either hot mix asphalt (HMA) or bituminous surface treatment (BST). • Road grades shall not exceed 15%. INTERSECTION DESIGN • All intersections shall be designed so that the centerlines intersect as close to 90 degrees as practicable and in all cases between 75 and 105 degrees. • The road plans shall show the radii of the edge of the surfacing at intersections. • The road plans shall show any features that are pertinent to the design of the intersection. • Intersection design shall provide for adequate drainage. • The design and construction must assure that minimum sight distance requirements are met. EMERGENCY TURNAROUNDS Turnaround area(s) are required and shall conform to the Public Works Department's adopted design standards. See Exhibit C. HORIZONTAL CLEARANCE TO OBSTRUCTIONS For roads with a posted speed limit of 25 MPH or less, a 10 feet wide clear zone shall be maintained between the edge of traveled way and any obstructions. UTILITIES Utility installations shall meet the requirements of the Jefferson County Code, Chapter 13.56 Utilities. Any utilities installed within the right-of-way require review and approval for installation and location within the right-of-way as determined through the utility permit process. Page 4 of 7 STREET LIGHTING No street lighting is required. If the Applicant desires to install a street light, all costs associated with the installation and maintenance are the responsibility of the Applicant and shall be coordinated with the Jefferson County PUD#1. ROAD APPROACHES Road plans shall depict proposed road approaches (Exhibit D) to the private residences to be served. Approaches shall be an integral part of the roadway and constructed at locations acceptable to the parcel owner(s). DRAINAGE, EROSION CONTROL, AND STORMWATER MANAGEMENT The Jefferson County Unified Development Code, Section 18.30.070 Stormwater Management Standards adopts the standards of the Washington Department of Ecology Stormwater Management Manual for Western Washington (most current version). A Stormwater Management Permit is required for projects that exceed 2,000 square feet of impervious surface or 7,000 square feet of land -disturbing activity. See Exhibit E for comments from the Department of Community Development. The proponent shall contact the Jefferson County Department of Community Development to discuss permit requirements and application procedures: Jefferson County Department of Community Development 612 Sheridan Street Port Townsend, WA 98368 (360) 379 - 4450 MAINTENANCE AND NO PROTEST AGREEMENT A Road & Stormwater Facility Maintenance and No Protest Agreement is required for this facility on a public right-of-way. Any privately maintained road and stormwater facility on public right-of-way shall be maintained at the owners' expense and as outlined in the Road & Stormwater Facility Maintenance and No Protest Agreement. A No Protest Agreement is required for any privately maintained road on public right-of-way. The applicant has applied for a permit to construct a privately -maintained gravel roadway on public right-of-way. The County Engineer has recommended that this request be approved. It is recognized that this private road does not meet current County road standards for a public roadway which would require a wider roadway with an asphalt paved or bituminous surface. In consideration of the County agreeing to waive the requirements to construct to full public road standards, the Grantor for each parcel listed under this open right-of-way application must also enter into an agreement with the County not to protest the formation of a Road Improvement District (RID) or other pro rata cost sharing mechanism to improve the roadway in the future should improvements become necessary whether proposed by petition or by resolution of the Board of County Commissioners or by Page 5 of 7 both petition and resolution. The Grantor(s) further agree to join in any proposed petition for such road improvements. See Exhibit F for this Agreement. ROADWAY CONSTRUCTION DOCUMENTATION, CERTIFICATION, AND MONUMENTATION Construction Documentation The applicant shall provide the Public Works Department with complete road plans in electronic format to scale on 11x17 inch paper. Following completion of roadway construction, the proponent shall submit to Public Works complete "As -Built" or "As Constructed" record drawings. The drawings shall reflect any changes made to the original design. The proponent or designee shall keep detailed records of the as constructed locations of all surface and subsurface facilities to be included on the record As -Built or As -Constructed drawings. Construction Certification Certain items will need to be inspected during construction of these roadways. These requirements will be identified once complete plans have been submitted to Public Works for review. Following completion of roadway construction the proponent shall submit to Public Works a letter, affixed with the professional stamp of the Engineer of Record, certifying that the roadway and stormwater management facilities have been constructed in accordance with the design plans and specifications and all applicable federal, state and local agency requirements. PERMIT This report is not a Permit. After the review and approval of all documents, plans, and/or reports required by this report, and within three (3) years from the date of Board of County Commissioners approval of this report, and prior to initiating construction, the applicant shall be issued a permit by the Public Works Department. This Permit specifically outlines the arrangement between the applicant and the County for work on public right-of-way by the applicant. The Permit will specify insurance and bonding requirements, general provisions, and other requirements that are applicable for work to be performed in County right-of-way. The Permit, once issued, will be valid for one year from the date it is issued. The road right-of-way will not be considered to be opened until all conditions of the permit are met and the permit is finalized. A sample copy of a Permit is attached as Exhibit G. OTHER PERMITS Other permits and/or environmental review may be required for this project per Jefferson County Unified Development Code (UDC). Any questions concerning the necessity of other permits and/or environmental review and the processes should be directed to the Jefferson County Department of Community Development, 612 Sheridan Street, Port Townsend, WA 98368, Phone (360) 379-4450. Page 6 of 7 RECOMMENDATION: Public Works recommends that this request to open County right-of-way to the standards and requirements listed above be approved. This recommendation will be forwarded to the Jefferson County Board of County Commissioners for approval by way of Resolution (Draft Exhibit H). Once completed, inspected and all permit conditions met, the permit will be put in a 'Final' status and this road will be considered to be opened but will be privately maintained and not becomg-Rrt of tbe-�ounty road system Monte Reinders, P.E. Public Works Director / County Engineer Page 7 of 7 Date EXHIBIT A DI .—Department of Public Works 623 Sheridan St, Port Townsend, WA 98368 1 360-385-9160 I�.SIII�Fi��� OPEN RIGHT-OF-WAY PERMIT APPLICATION ce sea Permit # Receipt # Check # Date paid _ f Mile post $931.00 Fee ,Make check payable to Jefferson County. Additional fees will apply per ordinance 02-0312-12. Applicant Information Property Ow r Phnnp 9 Finail r eMai t City, State, Zip Designation of Agent (fin out only if applicable) Designated Agent Phone Ernail Mailing Address City, State, Zip Project Information Purpose for request to open right-of-way: [On mpkN Name of road/right-of-way to be opened: 'n Total length of right-of-way to be opened:—. Property parcel num:ber(s): _� d Name of plat where road is located: Attach any recorded sure ys (list volume and page numbers): Nearest cross street: Other permits associated with this request (e.g. septic, building, stormwater): Rb2b —00 Will you be installing any utilities within the right-of-way? /V0 Site Map Attach a site plan or plat map that identifies the right-of-way to be opened and the parcels you own. The map must include the cross street access point, access location to the applicant's property, and scale. Acknowledgements and Signature By signing the application form, the undersigned Applicant attests that the information provided herein is true and correct to the best of his/her knowledge and agrees to all conditions on the permit. The Applicant also certifies that this application is being made with the full knowledge and consent of all owners of the affected property. Any material falsehood or any omission of material fact made by the Applicant/Owner with respect to this application packet may result in this permit being null and void. The Applicant has read this disclaimer and signs and dates it below. Proper wner or Designated Agent Sig Date Application continued on next page, Page 1 of 2 Site Map Attach Jor draw a site plan or plat map that identifies the right-of-way to be opened and the parcels you own. The map must include the cross street access point, access location to the applicant's property, and scale. Page 2 of 2 EROSION CONTROL NOTES: LEGEND; �� - -- ... PROPERTY BOUNDARY 1. ALL EROSION CONTROL MEASURES SHALL BE CONTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE - -- - - PROPERTY SETBACK STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. - - - ROAD C:NTERLINE , •,SEPTIC SYSTEM [ ! 7 ALL DISTURBED AREAS, EXCEPT THOSE ON WHICH ACTIVE CONSTRUCTION IS TAKING PLACE, SHALL BE EITHER SEEDED AND MULCHED OR PROTECTED WITH ... BUILDING ROOF EDGE APPROPRIATE PLASTIC SHEETING WITHIN 2 DAYS OF DISTURBANCE BETWEEN OCTOBER 1 AND APRIL 30 AND WITHIN 7 DAYS BETWEEN MAY 1 AND SEPTEMBER 30. BUILDING WALL EDGE .1 WTR WTR WTR WATER SERVICE LINE TABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AND APPROVED PRIOR TO SITE GRADING AND/OR FOUNDATION EXCAVATION. — UGP -- UGP UGP — ... POWER SERVICE LINE �- — — .. EXISTIN3 DITCH LINE 4, ALL EROSION CONTROL MEASURES SHALL BE INSPECTED MONTHLY AND AFTER MAJOR STORM EVENTS, ANY DEFICIENCIES SHALL BE REPAIRED IMMEDIATELY. -' - "- - - — • PROPOSED STORM LINE EXISTIN3 STORM LINE JrFFER SON COull DC. '. ANY MUD THAT IS CARRIED OFFSITE BY VEHICLE WHEELS AND DEPOSITED ON PUBLIC ROADWAYS SHALL BE CANED UP IMMEDIATELY. _— _—` _— FLOW PATH DISTANCE ——_----- ---`-- 1 „, EXISTING ROAD L—_— __..._____--_,...J 6. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGE-ATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR P — — — — — — — — — - r — — — — FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES. _ _ j ••• PROPOSED DRIVEWAY 1 I ... 2' TRANSITION ZONE I I X.WATER METER -!���,�s Tsm ,,,10.20'SHEETFLOWAREA N)WATER SERVICI=LINE �� _ w � �� � 4 _ rr _ - - - 591-�.. �� ,..SLOPE DIRECTION 2i f 1 1 +1 1 I r r =O 15' SETBACK 1 I I LLu I I 10.20' VEGETATION I 13? I I (N) POWER UFFL R FOR I 1' SERVICE LINE SHEETFLOW ` I � � 200%tINITIAL AND RESERVE j I I 103't r i ��DRAINFIELD AREA (4,030 SQUARE FEET) UI p �..� UGP - - A 2' + r TRANSITION ZONE 466 po '± I I I (CRUSHED ROCK) ��� REQUIRED INSTALL DISPERSION L - �FLOW PATH I TRENCH PER DETAILAl3 .- I l II I r INSTALL APPROX.120 L.F. I' r SILT FENCE PER DETAlAl2 INSTALL CONSTRUCTION ENTRANCE PER DETAILBI2 INSTALL4"GSTP SEPTIC TANK AND PUMP CHAMBER 1 I I ( 50' f I I INSTALL DISPERSION I ' I ` TRENCH PER DETAILAf3^� PURPOSED 12' W GRAVEL DRIVEWAY 44t EX. ROADSIDE � * REQUIRED (1,576 S.F.) TO SERVE AS ACCESS T r I c CULVERT v FLOW PATH THE SITE DURING CONSTRUCTION I FUTURE SHOP I I 2,106 SF ROO I I k I I + 517't I AREA I m I Q 15-SETBACK t-u-- I I �� 2' TRANSITION ZONE (CRUSHED ROCK) -I I 1 • 10' VEGETATION BUFFER I - -- -- - O f45'' ail Id U z a iu 12 F WcD y 6 w s z 4 Q ti�o°R a� 4 � C o � v SCALE: 1"= 50' DATE: 6/24/2020 FILE: 19148 - E1 JOB NO: 19148 F R SHEET FLOW I - +r r I SHI Scal®: 1 " = 50' _______�—_____��______ "- -- _ _ 60'RsO.W. - _ --~-~___--- - ______�-�� -_-^- (N) POWER SERVICE LIN I 0 50' 100, 150'- -� _ - _ WASH IN6t- L-N,- ---______-__ OF _--_---------------------------------- I 3 EXHIBIT B 700115 - _ 2 95 07 � \ . - ® ' 2 2� ee : ■ : ■ � y y-- - -- �-- _ 962700098. - r 2 962700047 .�. 078 9.62700097 '— . dn 4 � f - G. 962700037 962700048 . � ash wgton,L�n . 9 7 2 2 \ 2 § ƒ \ , 2 NEW -, lit 700035 0 : . 9627000541 o 4� 41, 962 700107 962700071 L--Portagey _ ®® 4Jn l . _ Cj 962700073 _ , f + . p 921073018 �07 IM �ƒ EXHIBIT C N 1N3W3Sd3 NO kVM-30-iHOlH 0- 0 LLJ r. T 7 °' n � iFF' Z ti,.l�f a s '__ w z vi O W O Q i' W H is U Z a o m - :D ~ !- W ^ LLI > 00 N C.' o to � ZO O Z:) O O U E J • U H Q O of OO p Z X rL O W O -�i U O J N N O > = w o 3 U U af a W Of !: `` . m D p p + �Mo� obi o Q O w �. zmoo af aow �m_O3 U x - QZZOU N w �-- LLJ `cj' Z V a J a m U }- Z .Ii= W N J (, ~ J w �� v vai �x oQ s Jod 03:0 NZ Q~W W n LLJ zU Ow L w zo �LO ax w F MU Z LLj w Q � wW a mJQ OowSm J Z J j, w o ZE O :D wz�iZQZa =UO VI0wWDOO Wow DCL 3?wQWOwW -OJO ..� U F N W C)m lw�JXOx~Oril? J OOowwZOwo arP m �wzz LOO�N LJLL0� li 17 N (x/IZH�MQO�W}~ an• pWZWF-JmJ Z �Woaaa;�O�Otn w 2 F�Do��~W>�> LLJ m W 7 J W O W W 7 iD�F�- Q JfQn?N M WW OFW-O JZ WZ �_ as ��}� -i�Z ago~wow ry-- a CD— 2ddZ (AN(n o i4 N 1N3W3SV33 80 AW-30-1HOW N Ni 4 Li co t c� CD 0 ('') � C5f-:5, O M0U-(U VQ LnW (UzQ N W� Z v� _jO LLI ED KC:)7 o G >a0 O w ^o of Q Q-W (/) > a Z cr) Z p ry Z H 0 O w � � J 0 Q m Q N O CD ry U o Q CDQ L I -� CD w J z Q Q o Z o D o (U (U D p I- J J O Q m 1- Clf L6 U) :D =) C/) o W ly- [Y- O 2 U EXHIBIT D i o a 4 N J O O � Q .+ N CO = x x M.O. <J o F- f f } 14 o z o (a � Z D io z C3E3u Jw.wr A ZZ Q UJ VV)) > Ff w ❑❑¢ Q O +1 JUU C N SSJ o6 x Om f� Q Q z �U L, L, L, L, Li L,w C30¢ H C XO w Z� til¢- U-Lr)ginln o-Q-2 A �x w� ? `o Q~ z V) ,�.a N N Cl f�*) N O+ i-r ¢ a U �'"' W U c o � W fA t� ¢ JJ� 3 ¢O —H�l�� j0 -- + -- e E 3 ri Q' MQd 2 Qa 12 FL A� cU Z zZ¢ f'1� Q ra. ° o a L� 2xx xx xx W Q' WW � W i J S� HW xxxxxxf J � r=1M � qO W a Uo i p�In olno Ln Q W WW¢ IL W< Cl) N (1) M -q- LO Ln Q' W W f Q f w L U a- F LLI O O `per L �! W O h = U y U 3 J N f^ N W N 3 m ��, gyp• j m T c! m U d O cV p WLJ r S m Igl�j r Jj ?� p m Z Li "da. •'vim S q i 3LDQrU L, a w ca ttw¢i �`rs'r� ~ r r w¢y ❑ zo LD E pEj er¢ I•. •' PI w Z ¢❑� WQ Q J QJW0. �- - -_ d z dU > Q�U ❑o ¢ J a- 0, dr U F pw ❑ f A ,,�.. S; %� y<`' • n��L��"'i Q (n I z w r r r c) W s • O a ¢ ? x F (L`,Nj O W W H N a L3 Z t` w <m azw x W �•'' .••`{' �'L uT` {.'-`i- +•• , 4 �i❑ QOZ ❑LLO 7LZ+1 a JwW r z r';r '• a 0- H ww 3a •'• ��• .. ��... •: :•�._ Q d �fw r �y aca �a terry it _x:_:�•_{ '� i Y' r:�:: H a z a Z o ❑ W m r >pf „s ;•.�=-:.. a ��' z o ¢ m� UJ raw x < O O j�y7l , 'r: •+ �:. F-" :. f .y; +i1 r s .3 Q W i3 f ❑ ¢ fl- I� w W > q U ❑ !I [J �w X r Lal> z-iz< \- `.,.�j:'.,o--.; ,.: h••� W �. tip wU WpLij WW w Z g a 5 '••. =}:'';%"�'r �+:rstif,, ) Q A l7 z �' o J E m w O F W- S w CI o W 0 /':x Y{.; `• •.4 . > w > W Il a z w r r p ^-' W U 2 O o N N a `j w.r: t.� r:i ,N.. ❑ PI d W„Z,. Q Mzu J¢ U3 0'�''dU _..'�' V)O ❑ QCL Li >x zw❑U mz Wq ftlpaw �N - .-�:t: pH w 0LLJ dW zLJ�' zU rrj! �x0x r CL cr Cy❑ U2 ULj WM �Z J❑ fr mLaW r z¢ pQ QL.1LJ(•') QU M_, Qm W¢ Onzp ❑ 0 Z V) pN pz zo QL❑J V) WO < L, v1W dZ) -WJzxz I f:a uZ � zrE as ail L=)� ro r<z /•.. a, n� w+� �W =<xU 0Q aC]-j OW W" w�woe -Z �' `C7 �w > xr-o ❑= tea- wr >J > JW w� v u) T dO ¢� LLJCL a.V) io ¢O ��❑ dW 7Q j¢=W _j y V) V)0 dL7 W¢C1M xW ¢►.iH QU u3 UQ'F-U co � �� r w o rye zl ., N 6 Lb �6 r V) lL J EXHIBIT E Department of Public Works Jefferson County, Washington September 16, 2020 Jefferson County Department of Community Development Re: Open Right -of -Way Application Platted McKinley St. Applicant — Marty Kithcart APN: 962700048 & 962700047 623 Sheridan Street Port Townsend, WA 98368 360-385-9160 f, /0 (4,V'ZA-" teJ ',�rra 044U V�6 (t*� ' J)f'pW G n'�� Jefferson County Public Works has received an application to open the right-of-way of platted McKinley St. within the plat of Irondale Acre Tracts and is forwarding it to you for your review and comment in determining compliance with the Unified Development Code, i.e., critical areas, stormwater, SEPA, etc. The proposed new road will be approximately 600' in length with a minimum cleared area of 20' in width. Comments must be received within fourteen (14) days or by October 1, 2020. If no written response has been received by this date, your department will be presumed to have no comments. If necessary, an extension of time may be granted upon request or if there are additional questions regarding this application. Sincerely, Terry IDu,Eng. III Jefferson County Public Works tduff@co.jefferson.wa.us Encl: Map 700115 - _ 2 95 07 � \ . - ® ' 2 2� ee : ■ : ■ � y y-- - -- �-- _ 962700098. - r 2 962700047 .�. 078 9.62700097 '— . dn 4 � f - G. 962700037 962700048 . � ash wgton,L�n . 9 7 2 2 \ 2 § ƒ \ , 2 NEW -, lit 700035 0 : . 9627000541 o 4� 41, 962 700107 962700071 L--Portagey _ ®® 4Jn l . _ Cj 962700073 _ , f + . p 921073018 �07 IM �ƒ *:4:11:1kag When recorded please return to: Jefferson County Public Works 623 Sheridan St. Port Townsend, WA 98368 No Protest Agreement Platted, Public Right of Way Grantor(s): Marty Kithcart Grantee: County of JEFFERSON, a Washington municipal corporation Reference: Open Right -of -Way Permit No. RAP20-00052 Assessor's Tax Parcel Number: 962700048 WHEREAS, the Grantor is owner of the parcel listed by owner and parcel identification number above and said parcel is located adjacent to and adjoining a public, platted right of way; and WHEREAS, approved access is a condition of development or redevelopment within platted, public rights of way; and WHEREAS, any agreement to establish a Road Improvement District (RID) to the public, platted rights of way adjacent to or adjoining the parcels listed above are subject to the terms and conditions of this No Protest Agreement NOW THEREFORE, the GRANTOR covenants and agrees that at any time a Road Improvement District (RID), including but not limited to a Local Improvement District (LID), Utility Local Improvement District (ULID), or any other pro rata sharing of costs to construct, improve the public, platted rights of way to the parcels listed above is formed and the parcels are subject to a RID or within the service area of a RID, then the owners and successors in interest as their interests as they may appear of the parcels hereby waive their right of protest to said RID except as to the method of assessment and GRANTOR and GRANTEE acknowledge and confirm that the terms and conditions of this Restrictive Covenant "touch upon the land" and shall "run RID No Protest Agreement Page I of 2 with the land" or any part thereof described in this agreement for perpetuity. DATED this day of 12021. STATE OF WASHINGTON) ss. COUNTY of JEFFERSON ) PROPERTY OWNER: Marty Kithcart On this day personally appeared before me , to me known to the individual(s) described in and who executed the within and foregoing instrument, and acknowledged that signed the same as free and voluntary act and deed, for the use and purposes therein mentioned. Given under my hand and official seal this day of 12021. NOTARY PUBLIC in and for the State of Washington residing at My commission expires: RID No Protest Agreement Page 2 of 2 When recorded please return to: Jefferson County Public Works 623 Sheridan St. Port Townsend, WA 98368 No Protest Agreement Platted, Public Right of Way Grantor(s): Paul Shirts Grantee: County of JEFFERSON, a Washington municipal corporation Reference: Open Right -of -Way Permit No. RAP20-00052 Assessor's Tax Parcel Number: 962700047 WHEREAS, the Grantor is owner of the parcel listed by owner and parcel identification number above and said parcel is located adjacent to and adjoining a public, platted right of way; and WHEREAS, approved access is a condition of development or redevelopment within platted, public rights of way; and WHEREAS, any agreement to establish a Road Improvement District (RID) to the public, platted rights of way adjacent to or adjoining the parcels listed above are subject to the terms and conditions of this No Protest Agreement NOW THEREFORE, the GRANTOR covenants and agrees that at any time a Road Improvement District (RID), including but not limited to a Local Improvement District (LID), Utility Local Improvement District (ULID), or any other pro rata sharing of costs to construct, improve the public, platted rights of way to the parcels listed above is formed and the parcels are subject to a RID or within the service area of a RID, then the owners and successors in interest as their interests as they may appear of the parcels hereby waive their right of protest to said RID except as to the method of assessment and GRANTOR and GRANTEE acknowledge and confirm that the terms and conditions of this Restrictive Covenant "touch upon the land" and shall "run RID No Protest Agreement Page I of 2 with the land" or any part thereof described in this agreement for perpetuity. DATED this day of 12021. STATE OF WASHINGTON) ss. COUNTY of JEFFERSON ) PROPERTY OWNER: Paul Shirts On this day personally appeared before me , to me known to the individual(s) described in and who executed the within and foregoing instrument, and acknowledged that signed the same as free and voluntary act and deed, for the use and purposes therein mentioned. Given under my hand and official seal this day of 12021. NOTARY PUBLIC in and for the State of Washington residing at My commission expires: RID No Protest Agreement Page 2 of 2 When recorded please return to: Jefferson County Department of Public Works 623 Sheridan Street Port Townsend, WA 98368 ROAD & STORMWATER FACILITY MAINTENANCE & NO PROTEST AGREEMENT This MAINTENANCE AGREEMENT is made this day of , 2021 by Marty Kithcart and Paul Shirts hereinafter GUARANTORS and Jefferson County, a municipal corporation, hereinafter GUARANTEE. 1.0 RECITALS 1.1 GUARANTORS are the owners of certain real property in the Plat of Irondale Acre Tracts, Section 12, Township 29N, Range 1 West, W.M., Jefferson County, Washington; Volume 2 of Plats, Page 145, identified as Tracts 47 & 48, Assessor's Parcel Numbers 937400047 & 962700048, and referred to in this Agreement as the PROPERTY. 1.2 In conjunction with the GUARANTORS development of the PROPERTY under Jefferson County Open Right -of -Way Application RAP20-00055, GUARANTEE has required and GUARANTORS have agreed to construct a road and stormwater facility which includes collection, conveyance, treatment, and infiltration facilities. The road and stormwater facility is described and shown on a construction drawing for GUARANTORS development of the PROPERTY that is on file with the appropriate agency, division, employee, or representative of Jefferson County. 1.3 As a condition of development approval, GUARANTORS have agreed to enter into this Maintenance Agreement ensuring that the road and stormwater facility will be constructed and maintained in accordance with the approved plans. 1.4 Any agreement to establish a Road Improvement District (RID) to the public, platted rights of adjacent to or adjoining the parcel(s) listed above are subject to the terms and conditions of this Agreement The establishment of a Road Improvement District (RID) may be formed in which the owners and successors hereby waive their right to protest said RID except as to the method of assessment. 2.0 CONSTRUCTION AND MAINTENANCE GUARANTORS agree to construct and maintain a road and stormwater facility as shown on the construction drawings described above. The road and stormwater facility shall be maintained and preserved by GUARANTORS until such time as GUARANTORS, their heirs, successors, or assigns and GUARANTEE agree that the facility should be dismantled, altered, abandoned, or removed. 3.0 NO REMOVAL No part of the road and/or stormwater facility shall be dismantled, altered, or removed except as Page 1 of 3 necessary for maintenance, repair or replacement. 4.0 NO PROTEST — IMPROVEMENT DISTRICT GUARANTORS covenants and agrees that at any time a Road Improvement District (RID), including but not limited to a Local Improvement District (LID), Utility Local Improvement District (ULID), or any other pro rata sharing of costs to construct, improve the public, platted rights of way to the parcel(s) listed above is formed and the parcel(s) are subject to a RID or within the service area of a RID, then the owners and successors in interest as their interests as they may appear of the parcels hereby waive their right of protest to said RID except as to the method of assessment 4.0 DISPUTE RESOLUTION If a dispute arises between the parties to this Agreement regarding the road and stormwater facility, GUARANTORS shall attempt to negotiate an appropriate resolution with GUARANTEE represented by the Jefferson County Engineer. If the dispute cannot be resolved at that level, GUARANTORS may file an appeal with the Jefferson County Hearing Examiner as provided for in the Jefferson County Unified Development Code. 5.0 ENFORCEMENT This Agreement may be enforced by GUARANTEE in law or equity against GUARANTORS, their heirs, successors and assigns. 6.0 SUCCESSORS AND ASSIGNS This Agreement shall run with the PROPERTY and be binding on GUARANTORS, their heirs, successors and assigns. 7.0 NOTICE GUARANTORS shall file this Agreement with the Jefferson County Auditor. DATED this day of , 2021 DATED this day of , 2021 GUARANTOR STATE OF WASHINGTON ss COUNTY OF GUARANTOR On this day personally appeared before me & to me known to be the individuals described in and who executed the foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. Page 2 of 3 GIVEN under my hand and official seal this day of Notary Public in and for the State of Washington residing at MY COMMISSION EXPIRES ACCEPTED for JEFFERSON COUNTY by: Monte Reinders, P.E. Date Jefferson County Public Works Director / County Engineer STATE OF WASHINGTON ss COUNTY OF On this day personally appeared before me to me known to be the individual described in and who executed the foregoing instrument, and acknowledged that he signed the same as his free and voluntary act and deed, for the uses and purposes therein mentioned. GIVEN under my hand and official seal this day of Notary Public in and for the State of Washington residing at A MY COMMISSION EXPIRES Page 3 of 3 EXHIBIT G 2/8/2021 �ACCELA> Conditions Associated With 2:09:38PM Case #: RAP2020-00055 Condition Status Updated Code Title Hold Status Changed By Tag Date By 0701 PERMIT ON SITE None NOT MET 2/8/2021 TLD This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work. 1000 CULVERT 12" None NOT MET 2/8/2021 TLD A minimum 12 inch diameter culvert, not to exceed feet in length, to accommodate a 10 to 16 foot wide driveway with 10-25 foot approach radius shall be installed in accordance with the approved plans dated and attached to this permit. 1007 ROW SURVEY None NOT MET 2/8/2021 TLD The right-of-way shall be located and the centerline staked by a surveyor licensed in the State of Washington. 1010 SIGHT BRUSHING None NOT MET 2/8/2021 TLD The applicant shall be responsible for maintaining all vegetation to provide for the adequate sight distance adjacent to this road approach. 1010 SIGHT BRUSHING None NOT MET 2/8/2021 TLD The applicant shall be responsible for maintaining all vegetation to provide for the adequate sight distance adjacent to this road approach. 1011 RESPONSIBLE None NOT MET 2/8/2021 TLD The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights -of -way, including the integrity of all survey monuments or boundary markers. 1021 DEVELOPMENT MITIGATIVE MEASURES None NOT MET 2/8/2021 TLD This permit is issued in conjunction with any mitigative measures assigned to this project through the development process. 1037 SURFACE WATER None NOT MET 2/8/2021 TLD The grade of the approach shall follow the crown of the road and be such that no surface water is directed onto the new segment of McKinley St. 1039 NO PROTEST AGREEMENT None NOT MET 2/8/2021 TLD The Applicant must sign, record and return to Public Works the Road & Stormwater Facility Maintenance & No Protest Agreements. 1039 STORMWATER CERTIFICATION LTR None NOT MET 2/8/2021 TLD Following completion of roadway construction, the Applicant shall submit to Public Works a letter, affixed with the professional stamp of the Engineer of Record, certifying that the roadway and stormwater management facilities have been constructed in accordance with the design plans and specifications and all applicable federal, state and local requirements. 1039 AS BUILT None NOT MET 2/8/2021 TLD Following completion of roadway construction the Applicant shall submit to Public Works complete "As -Built" or "As -Constructed" record drawings that reflect any changes made to the approved plans. 1039 CENTERLINE None NOT MET 2/8/2021 TLD The segment of McKinley St. to be opened shall be build on the platted centerline per the Rural Access Road Standard Typical Section (See Engeineer's Report). 1045 RAP ONLY None NOT MET 2/8/2021 TLD This approval is for this Open Right -of -Way Permit and assoctiated approvals as it relates to this permit only and does not constitute approval of other activities within the right of way or on this parcel. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits. 1065 PRE -CON None NOT MET 2/8/2021 TLD Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on -site pre -construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig). 1070 FINAL INSPECTION None NOT MET 2/8/2021 TLD The Applicant must contact the Public Works Department for a final inspection upon completion of construction. 9140 P-PRIVATE ROAD APPROACH None NOT MET 2/8/2021 TLD Page 1 of 2 CaseConditions..rpt 2/8/2021 <A'CCEL/> Conditions Associated With 2:09:38PM Case #: RAP2020-00055 Condition Status UpdAted Code Title Hold Status Changed By Tag Date By The Applicant may install a private road approach to the newly extended and constructed roadway to both parcels as shown on the approved plans dated 9220 P-OPEN ROW None NOT MET 2/8/2021 TLD The Applicant has permission to open a portion of platted McKinley St. from Washington Ln., mile post 0.13 left, for a distance of approximately 300 feet, in accordance with the Jefferson County Public Works Engineer's Report and approved plans dated , 2021. The Engineer's Report specifies a road standard for a Rural Access Road which does not meet the criteria for a County road. Therefore, this section of right-of-way will not be maintained by the County. Page 2 of 2 CaseConditions-rpt EXHIBIT H STATE OF WASHINGTON COUNTY OF JEFFERSON In the Matter of a Resolution ] to Construct Roads and Utilities on a ] Resolution No. Portion of Public Right of Way Known as McKinley St. WHEREAS, an application to construct roads and utilities on public right-of-way has been submitted by Martin Kithcart for the purpose of providing access to parcels #96270004 & 962700048, and WHEREAS, said development will require opening approximately 300 feet of platted McKinley St., and WHEREAS, the Revised Code of Washington (RCW) 36.75 and 36.80 places the supervision of right of way, including the development of road standards, under purview of the County Engineer, acting under the supervision and authority of the Board of County Commissioners, and WHEREAS, the applicant has proposed to construct roads to a standard less than what would be required for public roads, and WHEREAS, the County Engineer has examined the right of way and the existing road system and the potential for future development and recommends that this request be approved provided the standards described in the County Engineer's report dated , 2021 are followed, and WHEREAS, the applicant will be responsible for the maintenance of this section of roadway and it is understood that the County will not be responsible for maintenance of this section of roadway and that it will not be added to the official County Road log until such time as the road is improved to public road standards and added to the County Road Log through Board action, and WHEREAS, in lieu of requiring the road to be constructed to full public road standards at this time, the applicant will be required to sign a no protest agreement waiving rights, except as to the method of assessment, to protest formation of a pro-rata cost sharing arrangement such as a Road Improvement District (RID) should it become necessary in the future to upgrade this road, whether proposed by petition or a resolution of the Board of County Commissioners, NOW, THEREFORE BE IT RESOLVED, that applicant shall be granted permission to open the following right of way: Platted McKinely St. from its intersection with Washington Ln. at mile post 0.13 right. running north approximately 300 feet. BE IT FURTHER RESOLVED, that roads shall be constructed in general conformance with the standards recommended in the County Engineer's report dated 2021. BE IT FINALLY RESOLVED, that prior to performing construction the applicant shall receive any and all necessary permits including a permit from the Department of Public Works specifying any conditions that will be required by the County Engineer to insure that said standards are met and that the applicant shall pay any inspection costs incurred by the Public Works Department to insure that these standards are met. ADOPTED this day of 2021. JEFFERSON COUNTY BOARD OF COMMISSIONERS Kate Dean, Chair Heidi Eisenhour, Member Greg Brotherton, Member ATTEST: Carolyn Galloway Deputy Clerk of the Board