FILE NO.:
APPLICANTS:
PROJECT PLANNER:
SUMMARY OF REQUEST:
JEFFERSON COUNTY
REPORT AND DECISION
MLA20-00074/SDP20-00008
SHORELINE VARIANCE
Steven and Cynthia Holshouser
10910-48th Street Court East
Edgewood, WA 98372
Donna Frostholm
' C E0VR
! ? ; MAR 2 9 202f !i
Shoreline variance to allow construction of a new residential home and a detached garage
within the 150 foot wide, shoreline buffer. This parcel abuts Oak Bay, is legally described
as Oak Bay Waterfront Tracts Lots 26 and 27, and is located at 170 Noah Bay Way, Port
Ludlow.
SUMMARY OF DECISION: Request granted, subject to conditions -
PUBLIC HEARING:
After reviewing the .! .fferson County Department of Community Development Staff Report
and examining available information on file with the application, the Examiner conducted a
public hearing on the request as follows:
The hearing was opened on March 9, 2021, at 2:00 p.m.
1X
Parties wishing to testify were sworn in by the Examiner.
The following exhibits were submitted and made a part of the record as follows:
SEE ATTACHED INDEX LIST
The Minutes of the Public 'nearing set forth below are not the official record and are
provided for the convenience of the parties. The official record is the recording of
the hearing that can be transcribed for purposes of appeal.
DONNA FROSTHOLM appeared, presented the Department of Community Development
Staff Report, and testified that the Shoreline Master Program requires a 150 foot wide
buffer from the ordinary high watermark. However, a previous owner built a house within
said area prior to adoption of the new code. She met with the applicants on the site in
November, 2019, and they considered an administrative buffer reduction, but it was not
possible. A previously installed septic system and drainfield interfere with potential
locations of the home. The applicants attended a preapplication meeting whereat DOE did
not disapprove of the variance request. The request is exempt from SEPA review, but
since it is a Type III application, public notice was provided. She received one comment
letter from a neighbor who had concerns about building issues that will be addressed
during the building permit stage. The County provided a notice of the public hearing on
February 22, 2021, and she has received no comments in response. The SMP
incorporates the County critical areas regulations by reference. The applicants provided a
biological and geotechnical report that showed the project meets the no net loss policy
requirement. She then reviewed the requirements for residential development, the
shoreline variance crit-.ria, and the substantial development permit criteria. The variance
request meets the criteria due to the existing condition of the site and the fact that other
homes are located with the same setback. The property was previously used for
residential development near the proposed location for the new home. The home will
extend no closer to the water than homes on adjacent properties. Staff finds that the
request meets all variance criteria, and she had no comments from DOE indicating an
issue with the variance.
STEVEN HOLSHOUSER, applicant, appeared and testified that their proposed home is
definitely not in front of neighboring homes. It will actually be behind the homes. They
have already installed a well and septic drainfield, and development will not require cutting
of any old growth trees. The applicants then reviewed proposed conditions of approval,
and after consultation with Ms. Frostholm, testified that they had no questions or concerns.
No one spoke further in this matter and the Examiner took the matter u:,nder advisement.
The hearing was concluded.
NOTE: A complete record of this hearing is available in the office of Jefferson
County Department of Community Development.
2X
FINDINGS, CONCLUSIONS, AND DECISION:
FINDINGS:
The Hearing Examiner has heard testimony, admitted documentary evidence into
the record, and taken this matter under advisement.
2. State Environmental Policy Act (SEPA) Review: Jefferson Courr►y determined the
proposal is categorically exempt from SEPA review pursuant to WAC 197-11-
800(1)(b)(i).
3. Notice of Application: The application was noticed on Thursday, December 10,
2020:
• Publich:=:d in the Peninsula Daily News on December 10, 2020;
• Posted on the property on December 10, 2020;
• Sent to agencies and tribes on December 10, 2020; and
• Sent to all property owners within 300 feet on December 9, 2020.
Notice of Public Hearing: The public hearing was noticed on February 22 2021:
■ Published in the Peninsula Daily News on February 22, 2021;
• Posted on the property on February 18, 2021; and
• Sent to all property owners within 300 feet on February 19, 2021.
4. The applicants, Cynthia and Steven Holshouser, have a possessory ownership
interest in a rectangular, 1.09 acre parcel of property located at 170 North Bay Way
in the Port Ludlow area of unincorporated Jefferson County. The parcel extends
from the ordinary high watermark of Oak Bay to the North Bay Way right-of-way.
The applicants request a shoreline variance to allow construction of a single-family
residential dwelling 70 feet from the ordinary high watermark of Oak Bay at its
closest point. The project also includes an attached garage located landward of the
home. An approved, onsite septic system to include primary and reserve drainfield
areas and an approved drinking water well presently serve the parcel.
5. The topography of the parcel slopes downward from Bay Way to Oak Bay and
includes a 25 foot high, vertical bluff adjacent to the shoreline. The parcel
previously supported a single-family residential home approximately 70 feet from
the ordinary high watermark, but the applicants do not have nonconforming use
rights.
6. The Jefferson County Shoreline Master Program (SMP) is set forth in Chapter 18.25
of the Jefferson County Code (JCC). Pursuant to Chapter 18.22 JCC the project is
subject to the Jefferson County Critical Area Regulations. For structures, the SMP
requires a 150 foot wide buffer from the ordinary high watermark. The applicants
3X
request a shoreline variance to reduce the required buffer width to 70 feet. Such
would allow construction of the new single-family dwelling in the same location as
the previous residence.
7. According to the Mitigation and Habitat Management Plan (MHMP) prepared by
Westech Company, a qualified expert, the parcel measures 121 feet in width and
414 feet in length and previously supported a 600 square foot residence,
greenhouse, and several small sheds in the location of the proposed residence. All
structures with the exception of one, small shed were removed from the site
subsequent to 2013. An onsite septic drainfield consisting of three glendon units
and a reserve drainfield area were recently approved, and the applicants have
applied for a permit to install a new septic tank adjacent to the proposed new
residence.
8. The shoreline is classified as a "Fish and Wildlife Habitat Conservation Area" that
requires a 150 foot wide buffer from the ordinary high water Oark ar,d a ten foot wide
building setback therefrom. The applicants propose to construct a new, single-
family residential dwelling with a footprint of approximately 1,800 square feet. The
structure will have the same setback as the previous dwelling, but the footprint will
expand to the side and rear to accommodate the larger structure. The detached,
600 square foot garage and the septic tank will also be constructed within the buffer
but farther from the -;"oreline. The home will align with homes on parcels to the
north and sc:;h and will not extend closer to the shoreline.
9. According to the MHMP, the parcel is located within the Conservancy Shoreline
designation of the SMP that includes "low density residential and recreational uses"
as permitted activities therein. Construction of the previous improvements (now
removed) required removal of trees and understory and replacement with a lawn
area that now supports both native and invasive species. Locating the structures in
previously disturbed areas will preserve the thickly forested, western, upland area of
the site. The applicants will also revegetate four portions of the site with native plant
species as set forth in the planting plan of the MHMP. According to the site plan
three planting areas are shown waterward of the single-family dwelling, and one
planting area is shown between the dwelling and the septic drainfield.
10. Staff has evaluated applicable policies for residential development as set forth in
JCC 18.25.500 on pages 4 and 5 of the Staff Report. The Examiner has reviewed
staff's analysis, agrees therewith, and incorporates said analysis herein as his own
as if set forth in full.
11. Prior to obtaining a shoreline variance the applicants must show that the request
satisfies the criteria set for 'n in JCC 18.25.580. The Examiner has reviewed all
such criteria and staff's analysis thereof as set forth on pages 5-9 of the Staff
Report, agrees therewith, and hereby incorporates said analysis herein as his own
as if set forth in full.
4X
12. Concerns were raised regarding the location of the well on the property and whether
it maintains the required distance from the septic drainfield. The Jefferson County
Environmental Health Department will ensure during its revi-w of the building permit
application that all health requirements are met to include the location and distance
of the well from the septic system.
CONCLUSIONS:
1. The Hearing Examiner has jurisdiction to consider and decide the issues presented
by this reque,;,.
2. The applicants have shown that the request for a shoreline variance satisfies all
criteria set forth in JCC 18.25.500 and therefore should be approved subject to the
following conditions:
This proposal requires final permitting approval from Washington
Department of Ecology (Ecology). Construction shall not begin until Ecology
has sent written authorization to proceed.
2. The applicants shall apply for and obtain a building permit prior to beginning
any work approved under this shoreline permit. The site plan submitted at
the time of building application shall be consistent with the approved site plan
for the shoreline permit.
3. Substantial progress towards completion of the project shall be performed
within two years of the issuance of the permit.
4. Work within the iurisdiction of the Shoreline Master Program other than as
approved for this shoreline permit shall receive separate review by DCD.
5. The applicants shall implement the mitigation proposal in the approved the
Mitigation and Habitat Management Plan (submitted June 23, 2020), except
that (1) the 12 bracken fern (Pteridium aquilinum) plants proposed for
Planting Area B shall be replaced with 12 sword fern (Polystichum munitum)
plants for a total of 24 sword fern plants being installed in Planting Area B
and (2) the performance standard for removal of non-native, invasive species
is 10 percent cover for all five monitoring years.
& A final building inspection shall not be conducted until the mitigation proposal
has been implemented and a DCD planner has reviewed the mitigation area
for compliance with the approved biological report and permit conditions.
5X
7. Any plant substitutions shall be approved by DCD prior to plant installation.
Non-r)a'ive species and landscaping varieties shall not be considered
appropriate substitutions.
8. The applicants shall adhere to all recommendations in the Geotechnica/ Site
Assessment Update report (dated May 3, 2020). The building application
shall be consistent with all recommendations.
9. The applicant shall comply with the 2019 Ecology Stormwater Management
Manual for Western Washington and shall be consistent with the stormwater
management proposed as part of the shoreline application.
10. The project shall adhere Best Management Practices (BMPs) to control
stormwater, erosion and sediment during construction. BMPs shall address
permanent measures to stabilize soil exposed during'construction, and in the
design and operation of stormwater and drainage control systems.
11. No fill or other materials may be placed in the waters or intertidal areas of
Jefferson County.
12. Annual rnonito.Ing rernorts shall be submitted to DCD by October 31 of each
monitbring year and for five years after construction is complete. The final
monitoring report shall clearly state if the performance standards have been
met. A contingency plan shall be required if the performance standards are
not met.
DECISION:
The request for a shoreline variance to allow construction of a single-family residential
dwelling and attached garage a minimum of 70 linear feet from the ordinary watermark of
Oak Bay at a site located at 170 North Bay Way, Port Ludlow, is hereby granted subject to
the conditions contained in the conclusions above.
ORDERED this 24th day of March, 2021.
S PHEN K. CAUSSE X, JR.
Hearing Examiner
6X