HomeMy WebLinkAbout2020-2021 Maintenance Project List2020-2021 Maintenance and Small Capital Project List Now 2021 2022 2022+
Priority
General
Clean all park entrance signs X
Clean toilet roofs X
Clean and repair kiosk roofs Leland Done 10/20 X
Beausite/Gibbs
Beausite Road Parking areas and signage solution Postponed no new signs needed
Gibbs Forestry Done
Gibbs Lake road parking/no parking on road signage
Gibbs Lake park entrance sign Near the entrance to the ropes course X
Gibbs Lake trail construction/signage Done
Caretakers residence/buildings Need to visit the site X
Bathhouse derelict building
Old farm house removal In process
No-Hunting signs in the ORM areas
Boundary Line delineators as needed
Lake Leland
Lake Leland day use Park entrance/name sign Not needed
Lake Leland – after project signage/rules – (RC planes and drones)Done
Install new information in the newer kiosk Maybe shift old kiosk there
Chimacum Park
Remove shelter X
Forestry Done
Remove/fill in the vault toilets??Done
East Beach
Park toilet building removal/vault fill in Done
Shelter ADA access Not feasible
Shelter paint walls X
Shelter roof clean (remove lichens)Need estimate X
Shelter, repair foundation wall Need estimate
Memorial Field
Athletic field restoration work total of $24,500 for HJ and Mem Fld X
Entry (front) landscape fix ups, paint cannon bases Done 10/20
Pressure wash grandstand roof/clean gutters (in process)Done 10/20
Pressure wash maintenance shed/clean gutters (in process)Done
Pressure wash the entire grandstand (seating, entrance walls, exterior walls)Option for this spring/summer
Mem Fld sand storage area Need design and estimate
Touch up paint the canopy frame for rust X
Paint hinges of front entrance walk through gate X
Fence and gates on Quincy St
Repair bottom of siding and corners of concession stand
Repair siding and paint the maintenance shed
Repair walk in door of maintenance shed
Improve lighting in the maintenance shed
Install working wall heater in the maintenance shed
Improve lighting in the locker rooms
Inspect & repair concrete spalling in front of the grandstand
Paint grandstand railings for rust protection
Install doors on restrooms
Put security lights on the concession and the maintenance shed X
ADA Access restrooms and entrance
Fix stairs off Monroe St Done 12/1
Courthouse Park
Resurface courts/replace net $25k Budgeted in 2021 X
Replace bench (Molly bringing one from HJ)Done
Replace missing basketball backstop Matt emailed Alex X
Updated Feb 11, 2021
Inspect and resolve the b-ball goal post issue
Trailhead Park
Trailhead Park Forestry Underway
Quilcene
Pressure wash Quilcene courts Matt to hire a contractor X
Clean shelter roof Matt to hire a contractor X
Remove extra Kiosk Remove this kiosk
HJ Carroll
Athletic field restoration work Budgeted in 2021 $24,500 combined X
Parking stops and ADA signs In progress X
Repair dragon - eyes and foot, replace dragon sign Sarah Johani, working on scope X
Salmon shelter access, replace round rock with crushed rock
Picnic Grove - replace wood on tables and bench with wood from Chim park Matt to check on wood/plastic, Molly to do work
Picnic Grove - maintain landscape and plant trees/shrubs, irrigate
Pressure Wash Rotary roof and entire structure
Rotary - remove all staples and extraneous nails
Rotary Molly will wash and seal railings X
Rotary - consider solid body stain on the entire structure
Rotary - repair missing stone on the N. bbq grill
Rotary pavilion access ADA
RR building - paint all doors 2 done
RR - have roof checked, screws are backing out Matt called Hope Roofing X
RR - pressure wash the building
B-Ball - pressure wash, Contractor X
B-Ball - it will be due for painting/surfacing/repairs soon
B-Ball - outlet covers gone, replace
B - Ball - paint goals for rust protection Contractor X
Noxious weeds - remove
Perimeter trail - gravel and grade to widen it - create more space for dogs and Covid safety
Park Info Kiosk (original one - 3 sided with roof) remove and replace signs
Old emergency telephone post - remove or repurpose somehow
Disc Golf kiosk - put new information, update
Landscaping in general - seek solution to much maintenance
Caretakers area - tree work Done 10/20
Maint Shed - does it need anything? Looks ok to me Look at heat/other improvements soon
Athletic field irrigation - assess and estimate repairs needed Plan for replacement - medium term
Steep trail to creek - rebuild/replace rotting retaining wall
Steep trail to creek - restore vegetation that has been trampled
North Beach (these projects can be done during the outfall project)
NB Park restroom removal
Remove old bbqs
Build new shelter
Reconfigure parking
Indian Island Call Greg about mowing
Clean all signs X
Replace shelter postponed
Paint or remove entrance gate on Lagoon Beach access road Done
Paint Lagoon Beach Kiosk and clean kiosk roof Remove this Kiosk X
Brush and surface the Portage Beach South Access point (close to bridge)
Repair trail/steps leading to new canal at Lagoon Beach South access NOSC?? WCC Crew? Volunteers?X
Lagoon Beach Parking lot bulkhead - low cost restoration
Gravel and grade Lagoon beach road, cut back brush on corner
Hicks Park
Remove or replace the older wooden picnic table
Work on some noxious weeds
Surface with gravel over by the concrete picnic table
Remove or replace the older day use only sign on wall near toilet
Postpone due to outfall project, ask
Steve for an update
Irondale Beach Park
Brush mow the area along the base of the bluff
Danger tree removal Getting scope X
Knot weed NOSC
Irondale Community Park
Safety - 'depressions' (holes) in athletic field around some irrigation heads Irrigation needs replacement X
ADA Path to playground
Lower Oak Bay Campground
Toilet - next 2 years paint inside and re-roof
Kiosk - remove the plexiglass and paint the plywood X
Upper Oak Bay
Picnic tables - pressure wash them and look into some replacements
ADA sites - sign them and put them on the map X
ADA sites - come up with a rule - not using until certain time of day Check DNR, post signs
Design, scope and estimate a new camp-host site X
Brush and weeds - continue to push back and improve Done 11/20
Gravel - continue gravelling program for sites as needed X
Campground signs, design plan, make rules sign metal??Matt in charge of this