Loading...
HomeMy WebLinkAbout11- Consistency Review MLA20-00144Master# MLA Case# UDC CONSISTENCY REVIEW Project Planner: Applicant Info:Site Address: Parcel Number: S-T-R: Legal Description Total Acreage Land Use: Fire District:Planning Area:Flood District: Flood Map (FIRM) Panel No: School District: Zoning: Plot plan states "property line" Assessor's Map (Property lines on submitted plot plan must match the property lines as identified on the Assessor's 1/4 map) Legal Access to Property YES NO ____________________________________________________ Parcel Tags or Scanned Documents YES ESA's: Special Reports Nearby YES Designated Ag YES NO Shoreline Designation: YES NO Shoreline Slope Stability: YES Stream Type:YES FWHCA: YES Wetlands: YES Seismic: YES Landslide: YES Flood: YES Erosion: YES Aquifer Recharge Area:YES SIPZ: none At Risk High Risk Coastal ________________________________________ CMZ: none High Risk Moderate Risk Disconnected CMZ__________________________________ Stormwater site plan submitted:Yes No _________________________________________________ Forest Lands:YES NO _____________________________________________________________ Adjoining Forest Lands: _____________ Commercial/ ____________ Rural/______________Inholding_____________ Mineral Lands:YES NO __________________________________________________________ Agricultural Lands:YES NO __________________________________________________________ Archaeology: NO ________________________________________________________________ No Shooting Zone:YES NO __________________________________________________________ COMP PLAN DESIGNATION:_________________________________________________________________ COMMUNITY PLAN:___________UGA:____________UGA Trans___________ Project Description: NO NO NO NO _________________________________________________________ NO ________________________________________________________________ NO ________________________________________________________________ NO ________________________________________________________________ NO____________________________________________________________________ NO ___________________________________________________________________ NO NO___________________________________________________________________ YES Stormwater:New Impervious Surface_________________Land Disturbing Activity ________________________ Stormwater Req's:Min Req #2 Min Req #1 thru #5 Min Req #1 thru #10 Engineering ____________ Forest Lands YES NOMRL YES NONotice Provisions/Disclosure: Airport YES NO Landscaping Required: Yes No_______________________________________________________ Parking Spaces Required NO 2 Other_______________________________________________ Building Height: 35' UBC Standard __________________________________________________ Impervious Surface coverage percentage: _______________________________________________ Resource Lands & Public: 10%Rural Residential: 25%Rural Industrial: Per UDC Sec 6.7 Rural Commercial: 60%Area of Building Coverage: 60% in Rural Industrial Lands only Total Building (s) Size:____________________________________________________________ RVC: 20,000 SF CC: 5,000 SF NC: 7,500 SF GC: 10,000 SF All others: subject to septic & water constraints/None specified Setbacks: Front:_______Left Side:__________Right Side: __________ Rear:_______________ Shoreline Setback:_______________________________________________________________ LSHA Setback:_________________________________________________________________ Road Classification:_______________________________________________________________ Road Approach:EXISTING SEPA Required:YES NOT REQ'D RAP__________________________________________ EXEMPT _________________________________________________ Flood Certificate: _________________________________________________________________ Existing Case(s) & Condition(s):________________________________________________________ Violations: Yes No _______________________________________________________________ Recorded Date of Subdivision:_______________AFN____________________________Over 5yrs=UDC Plat Conditions:______________________________________<5yrs=Plat Conditions on plat or Old Ordinance NO _____________Lots/Require Declaration of Restrictive Covenant YES UG NO, submitted: YES NO, submitted: No Protest Agreement YES Site Visit Required YES NO _____________________________________________________ Require Final Zoning Approval YES NO _______________________________________________ADMIN: Setbacks entered in Permit Plan case New Parcel Tags entered in Permit Plan N/A YES ________________________________ N/A YES ____________________________________ Special Reports Scanned N/A YES _________________________________________________ Notes: MLA DEVELOPMENT REVIEW TIME SHEET Date Time Comments