Loading...
HomeMy WebLinkAbout050321_ca03 Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Philip Morley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer V Agenda Date: May 3, 2021 Subject: Resolution to create a County Project 18020820 - Port Ludlow Culvert Lining Project Oak Bay Road (County Road No. 56990) MP 7.69 Culvert and Pioneer Drive (County Road No. 54000) MP 0.34 Culvert Drew Lane (County Road No. 50980) MP 0.149 Culvert Statement of Issue: Resolution 5-21 created a project titled the Port Ludlow Culvert Lining Project to install structural liners in two culverts in Port Ludlow. Additional culverts have been investigated as lining candidates and a third culvert has been found that requires the same type of repair. Adding the additional culvert should result in a lower cost for each culvert repair. Analysis/Strategic Goals/Pro's Et Con's: The existing culverts at Oak Bay Road MP 7.69, Pioneer Drive MP 1.34, and Drew Lane MP 0.149 are galvanized steel pipes that have significant corrosion, but are still in a condition that allows a structural liner pipe to be installed. The three culverts are under deep fills that makes excavating and replacing the pipes an expensive project requiring complete closure of the roadway or an expensive bypass. Two of the culverts have utility conflicts that complicate excavating and replacing the existing culvert. Installing a structural liner pipe inside the existing culverts, before they deteriorate to a condition where this repair is not possible, will extend the life of the culverts a minimum of 50 years at a lower cost than the excavate and replace option. Fiscal Impact/Cost Benefit Analysis: The total estimated project cost is $110,000 which will be funded from County road funds. Construction projected to occur in 2022 in the current TIP (Transportation Improvement Plan), will be advanced to 2021. Recommendation: The Board is requested to sign one original of the Resolution to Create County Project. Department Contact: Bruce Patterson, P.E. Project Manager, 385-9169 Revie ed By: 7--r) / c C-/4, / (----- i / clip Mo y ounty Administrator Date N • � U ,� 40. �ot,x�Cd cd o � r z _ o. 0 Otr) 4- O bA — O N d Ln � O ^•� � N � �' O fir" bb o O U a cd O O O cdQ) p CIS >, 3 a '3 •.. Cd O 4-4-' � + ��> �`�o=uao �El bo Azo• .� wLn W �-o > o O a O 'c� s p O j U W >l t. O O� "� `�'L" U w 2Cd o to °+' xQ HN rn. w o s•to rn �Ny C6 7� O U °°I o C cd z 0 0 O O O O cd O O O O O Q. ~ ~ � 'd Q � 69 69 E/9 69 fA rU+ � U W .. O 'd a Cd �U o 4� o ¢, a� S cri 0 :0 .� r, V) 00 U E >' U °' U � H H 3 a bn W rx co U E- cin W C cn 4 w O W ai H h H R