Loading...
HomeMy WebLinkAboutSEP2018-00137 - 02 PERMITJEFFERSON COUNTY PUBLIC HEALTH 615 Sheridan St Port Townsend, WA 98368 www jeffersoncountypublichealth org Phone 360-385-9444 Fax 360-379-4487 n .rl)-ll 1i#;<_./" Uwthltublic l-bollh PERMIT #: SITE ADDRESS: APPLICANT ON.SITE SEWAGE DISPOSAL PERMIT SEpl g_00137 Dare Received: 07t31t11 40 W SWANE' ST Date tssued: 10126119 , WA Date Expires: 10126121 SAMUEL BAIN 60 W SWANEY ST PORT HADLOCK WA 98339-9630 PHONE: LEGAL DESCRIPTION: IRONDALE #2 BLK 49 LOTS 5 & 44 PARCEL#:961 80491 I Section: 34 Township: 30N Ranqe: 1W DESIGNER SUZANNE L MARTIN PO BOX 125 CHIMACUM WA 98325 PHONE: 360-990-3304 SYSTEM DESCRIPTION: No. of Gallons per Day: 480 Drainfield- Length: 267 feet CONVENTIONAL TRENCH Type of work: ptic Tank------ Width: 3 feet Depth: 12 inches Size: 2,000 gallons DISCLAIMER- This approvat is for an on-site sewage system that meets the state and county standards in effect on the date of application. This approval for an on-site sewage system DOES NOT assure you of any other County approvals. For example, it DOES NOT GUARANTEE that you will later obtain permission to buitd a permanent residence or other structure on this parcel. Any future application will be separately judged by the rules and laws in effect at that time. All construction and development activities must comply with all permit conditions, state and local codes, and Recommended Standards and Guidance documents in effect when the permit is issued. The property owner is responsible for the accurate location of all property lines. Any removal of or major disturbance of soil in the primary or reserve drainfield area may create site conditions that are unacceptable for the installation of a sewage disposal system. Any change in drainfield or tank location may invalidate this permit unless prior approval is obtained from the Jefferson County Environmental Health Division. lf during excavation or development of the site an area of potential archeological significance is uncovered, all activity in the immediate area shall be halted, and the UDC Administrator shall be notified at once. NEW PETMit issued to CONSTRUCT, ALTER, REPAIR OR MODIFYAN INDIVTDUAL SEWAGE DISPOSAL SYSTEM IN JEFFERSON COUNTY, WASHINGTON This permit is issued for a period of three years (unless otherwise stated above) in accordance with Jefferson County Rules and Regulations for On-Site Sewage codified in JCC 8.15 as amended. This permit may not be renewed County Environmental Health Specialist This permit with conditaons must be onsite during all phases of construction HEALTH DEPARTMENT MUST BE CONTACTED FOR FINAL INSPECTION. J SPECIAL CONDITIONS APPLY. SEE REVERSE & ADDITIONAL PAGES CONDITIONS OF APPROVAL - PERMIT NO.: SEP18-00137 1.) H - The existing water line must be decommissioned and re-routed as designed. 2.) Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application. 3.) H - Existing tank shall be properly abandoned. lt shall be pumped and filled with clean fill. Documentation to be provided to Health Dept. prior to final. 4.) Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box. 5.) H - AS pER WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THATA RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALLASSURE THAT MONITOR]NG IS PROVIDED BYAN APPROVED ENTITYAT THE FREQUENCY DEFINED PER STATE WAC 246-272AAND JEFFERSON COUNTY CODE 8.1 5 AS ADOPTED OR AMENDED. 6.) 7.) 8.) e.) 10.) 11 .) 12.) 13.) 14.) 1s) A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS. Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start. H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval. Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system. 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components. Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site. H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots to meet the minimum land area required under WAC 246-272AOnsite Sewage Code. COVENANT recorded under AFN 61 8246 This approval is valid only with a connection to an approved public water supply. All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued. The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. Page 2 of 3sEP18-00137 \\tidemark\data\forms\F_SEP_Permitmod. rpt 10t26t2018 16.) The application was reviewed by the Jefferson County staff for the potential presence of Critical Areas under the provisions of the Unified Development Code (UDC). After a Geographic lnformation Systems mapping review the following CriticalAreas were confirmed to be present on the subject property: Landslide Hazard Area. A Geotechnical Report was prepared and submitted by Stratum Group dated October 8,2018 which concluded the area was not a landslide or erosion hazard, but did recommend that all development be setback 20 feet from the top edge of the bluff slope. 17 ) Per the Geotech Report, all development must be setback at least 20 feet from the top edge of the bluff slope sEP18-00137 \\tidemark\data\forms\F_SEP_Permitmod. rpt Page 3 of 3 10t2612018