HomeMy WebLinkAboutSEP2018-00137 - 02 PERMITJEFFERSON COUNTY PUBLIC HEALTH
615 Sheridan St
Port Townsend, WA 98368
www jeffersoncountypublichealth org
Phone 360-385-9444 Fax 360-379-4487
n .rl)-ll 1i#;<_./" Uwthltublic l-bollh
PERMIT #:
SITE ADDRESS:
APPLICANT
ON.SITE SEWAGE DISPOSAL PERMIT
SEpl g_00137 Dare Received: 07t31t11
40 W SWANE' ST Date tssued: 10126119
, WA Date Expires: 10126121
SAMUEL BAIN
60 W SWANEY ST
PORT HADLOCK WA 98339-9630
PHONE:
LEGAL DESCRIPTION: IRONDALE #2 BLK 49 LOTS 5 & 44
PARCEL#:961 80491 I Section: 34 Township: 30N Ranqe: 1W
DESIGNER SUZANNE L MARTIN
PO BOX 125
CHIMACUM WA 98325
PHONE: 360-990-3304
SYSTEM DESCRIPTION:
No. of Gallons per Day: 480
Drainfield-
Length: 267 feet
CONVENTIONAL TRENCH
Type of work:
ptic Tank------
Width: 3 feet Depth: 12 inches Size: 2,000 gallons
DISCLAIMER- This approvat is for an on-site sewage system that meets the state and county standards in effect on the
date of application. This approval for an on-site sewage system DOES NOT assure you of any other County approvals. For
example, it DOES NOT GUARANTEE that you will later obtain permission to buitd a permanent residence or other structure
on this parcel. Any future application will be separately judged by the rules and laws in effect at that time. All construction
and development activities must comply with all permit conditions, state and local codes, and Recommended Standards and
Guidance documents in effect when the permit is issued.
The property owner is responsible for the accurate location of all property lines. Any removal of or major disturbance of soil in the
primary or reserve drainfield area may create site conditions that are unacceptable for the installation of a sewage disposal system.
Any change in drainfield or tank location may invalidate this permit unless prior approval is obtained from the Jefferson County
Environmental Health Division. lf during excavation or development of the site an area of potential archeological significance is
uncovered, all activity in the immediate area shall be halted, and the UDC Administrator shall be notified at once.
NEW
PETMit issued to CONSTRUCT, ALTER, REPAIR OR MODIFYAN INDIVTDUAL SEWAGE DISPOSAL
SYSTEM IN JEFFERSON COUNTY, WASHINGTON
This permit is issued for a period of three years (unless otherwise stated above) in accordance with
Jefferson County Rules and Regulations for On-Site Sewage codified in JCC 8.15 as amended.
This permit may not be renewed
County Environmental Health Specialist
This permit with conditaons must be onsite during all phases of construction
HEALTH DEPARTMENT MUST BE CONTACTED FOR FINAL INSPECTION.
J
SPECIAL CONDITIONS APPLY. SEE REVERSE & ADDITIONAL PAGES
CONDITIONS OF APPROVAL - PERMIT NO.: SEP18-00137
1.) H - The existing water line must be decommissioned and re-routed as designed.
2.) Approval/issuance of a sewage disposal permit or installation of a septic system does not
guarantee the approval of other development or a building permit on this site. Future buildings that
require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets
the current standards and codes in effect at the time of the building application.
3.) H - Existing tank shall be properly abandoned. lt shall be pumped and filled with clean fill.
Documentation to be provided to Health Dept. prior to final.
4.) Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a
secured lid, adequately sized to allow visible inspection of the liquid level in the box.
5.) H - AS pER WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE
SYSTEMS REQUIRE THATA RESTRICTIVE COVENANT REGARDING THE MONITORING OF
THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY
OWNER SHALLASSURE THAT MONITOR]NG IS PROVIDED BYAN APPROVED ENTITYAT
THE FREQUENCY DEFINED PER STATE WAC 246-272AAND JEFFERSON COUNTY CODE
8.1 5 AS ADOPTED OR AMENDED.
6.)
7.)
8.)
e.)
10.)
11 .)
12.)
13.)
14.)
1s)
A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED
PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL PERMIT
Designer must be contacted prior to start of construction and for inspections during installation.
DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS.
Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health
ONE WORKING DAY prior to start.
H - An asbuilt drawing and certification of completion by the Designer is required prior to final
approval.
Before final approval is given, the designer shall provide an operations and maintenance manual to
the property owner and the Health Department. The manual must instruct the owner of the on site
sewage system on the ways to properly operate and maintain all components of the system.
10' separation required between a Water line and all portions of the onsite sewage system; effluent
transport line, tanks, treatment and disposal components.
Approval of this sewage disposal permit does not preclude the permit holder from complying with
the Unified Development Code for other/future development on the site.
H - This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots to
meet the minimum land area required under WAC 246-272AOnsite Sewage Code. COVENANT
recorded under AFN 61 8246
This approval is valid only with a connection to an approved public water supply.
All construction and development activities must comply with all permit conditions, Washington
State and Jefferson County Codes and Recommended Standards and Guidance documents in
effect when the permit is issued.
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion
and sediment during construction. BMPs shall address permanent measures to stabilize soil
exposed during construction, and in the design and operation of stormwater and drainage control
systems.
Page 2 of 3sEP18-00137
\\tidemark\data\forms\F_SEP_Permitmod. rpt 10t26t2018
16.) The application was reviewed by the Jefferson County staff for the potential presence of Critical
Areas under the provisions of the Unified Development Code (UDC). After a Geographic
lnformation Systems mapping review the following CriticalAreas were confirmed to be present on
the subject property: Landslide Hazard Area. A Geotechnical Report was prepared and submitted
by Stratum Group dated October 8,2018 which concluded the area was not a landslide or erosion
hazard, but did recommend that all development be setback 20 feet from the top edge of the bluff
slope.
17 ) Per the Geotech Report, all development must be setback at least 20 feet from the top edge of the
bluff slope
sEP18-00137
\\tidemark\data\forms\F_SEP_Permitmod. rpt
Page 3 of 3
10t2612018