Loading...
HomeMy WebLinkAboutNotice of SMP 30 day Comment Period and Public Hearing 2021 Jefferson County Notice of Shoreline Master Program Periodic Review Public Comment Period, Public Hearing and SEPA Determination Jefferson County and Department of Ecology Shoreline Master Program Periodic Review Public Comment Period and Public Hearing. Jefferson County and Washington Department of Ecology are accepting comments on a periodic review of the County’s shoreline master program (SMP) under RCW 90.58.080(4). The County has prepared draft SMP amendments to keep the SMP current with changes in state law, changes in other County plans and regulations, and other changed local circumstances. Public comments will be accepted from May 17, 2021 to June 16, 2021 at 5 p.m. A joint local-state virtual on- line Planning Commission public hearing with public testimony taken is set for June 16, 2021at 5:30 pm here: https://zoom.us/j/91943638848, Or One tap mobile : US: +12532158782,,91943638848# or +13462487799,,91943638848#, Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1 253 215 8782 or +1 346 248 7799 or +1 669 900 6833 or +1 301 715 8592 or +1 312 626 6799 or +1 929 205 6099, Webinar ID: 919 4363 8848, International numbers available: https://zoom.us/u/aemQTynuFu Review of Documents and Public Comments Send comments to Jefferson County staff member David Wayne Johnson at djohnson@co.jefferson.wa.us, Jefferson County Community Development Department, 621 Sheridan St, Port Townsend, WA 98368. Comments sent to Jefferson County will be forwarded to the Department of Ecology. Proposed amendments to the Jefferson County SMP, Staff Report and SEPA Checklist are available for review at https://www.co.jefferson.wa.us/1481/Shoreline-Master-Program-Periodic-Review, the Jefferson County Community Development Department at 621 Sheridan St, Port Townsend, WA 98368, and by contacting David Wayne Johnson at djohnson@co.jefferson.wa.us (360) 379-4465. Comments received before the comment period ends will be provided to the Planning Commission and/or read into the record at the public hearing. SEPA Determination of Non-Significance Lead agency and applicant: Jefferson County, Washington Agency Contact: David Wayne Johnson, djohnson@co.jefferson.wa.us, Jefferson County Community Development Department, 621 Sheridan St, Port Townsend, WA 98368 Proposal: Under RCW 90.58.080(4), Jefferson County has prepared draft Shoreline Master Program (SMP) amendments to keep the SMP current with changes in state law, changes in other County plans and regulations, and other changed local circumstances. The draft SMP proposes to incorporate critical areas regulations adopted in 2020. Jefferson County has determined that this proposal will not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). We have reviewed the Environmental Checklist available at: https://www.co.jefferson.wa.us/1481/Shoreline-Master-Program-Periodic-Review. This determination is based on the following findings and conclusions: The proposed SMP amendments are meant to increase consistency with state laws and reflect local circumstances, while retaining no -net-loss of shoreline ecological function. The analysis of the proposal does not reveal any adverse environmental impacts requiring mitigation above and beyond existing or amended code provisions. However, at the time of a site-specific development proposal within shoreline jurisdiction, mitigation may be necessary and may be imposed. This DNS is issued under WAC 197-11-340(2) and the written comment period will end on June 16, 2021 at 5 pm, with public testimony taken at the Planning Commission Public Hearing. SEPA Responsible Official: Austin Watkins, SEPA Responsible Official