Loading...
HomeMy WebLinkAboutBLD2021-00294 - 01 Permit ApplicationPermit Application Page 1 of 2 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us PERMIT APPLICATION Steps in the Permit Process: -Review application checklist to ensure all information is completed prior to submitting application. -Make sure septic has been applied for and water availability has been proven. -Make an appointment to meet with the Permit Technician by calling 360-379-4450. -This is not a standalone application; it must be accompanied by a project specific supplemental application. -Fees will be collected at intake. Additional fees may apply after review and payment is required before permit is issued. For Department Use Only Building Permit # Related Application #s: MLA # Site Information Assessor Tax Parcel Number: Site Address and/or Directions to Property: Access (name of street(s)) from which access will be gained: Present use of property: Description of Work (include proposed uses): Wastewater - Sewage Disposal This property is served by Port Townsend or Port Ludlow sewer system? YES NO If not served by sewer identified above, identify type of septic system below: Type of Sewage System Serving Property: Septic Septic Permit #: Community Septic Name of System: Case #: Are other residences connected to the septic system? Additions or repairs to sewage system: Is it a complete or partial system installation: Complete Partial Has a reserve drainfield been designated? Yes No Date of Last Operations & Maintenance check: Attach last report to application Describe or attach any drainfield easements, covenants or notices on title, which may impact the property: X May 06 2021 Permit Application Page 2 of 2 The authorized agent/representative is the primary contact for all project-related questions and correspondence. The County will mail / e-mail requests and information about the application to the authorized agent/representative and will copy (cc) the owner noted below. The authorized agent/representative is responsible for communicating the information to all parties involved with the application. It is the responsibility of the authorized agent/representative and owner to ensure their mailbox accepts County email (i.e., Applicant/Property Owner Information Property Owner: Name: Address: Phone #: E-mail Address: Please contact Authorized Agent/Representative with project info. (select only one). Property Owner Signature: Date: Note: For projects with multiple owners, attach a separate sheet with each owner(s) information and signatures. Applicant: Authorized Agent/Representative (If other than owner) Name: Address: Phone #: E-mail Address: Professional: Is this an Authorized Agent/Representative for this project? NO YES Engineer Architect Surveyor Contractor Consultant Name: License # Address: Phone #: E-mail Address: Professional: Is this an Authorized Agent/Representative for this project? NO YES Engineer Architect Surveyor Contractor Consultant Name: License # Address: Phone #: E-mail Address: Professional: Is this an Authorized Agent/Representative for this project? NO YES Engineer Architect Surveyor Contractor Consultant Name: License # Address: Phone #: E-mail Address: By signing this application form, the owner/agent attests that the information provided herein, and in any attachments, is true and correct to the best of his or her knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in making any issued permit null and void. I further agree to that all activities I intend to undertake or complete associated with this permit will be performed in compliance with all applicable federal, state and county laws and regulations and I agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Applicant may visits related to this application and subsequent permit issuance. Signature: Print Name: Date: ______________ May 06 2021 May 06 2021 May 06 2021 Your jobsite for permit number 3510887P was inspected 2/3/2021 by Michael Friend. The results of inspection are listed below: Inspections: Inspection Date Inspection Result Inspection Comment 2/3/2021 Circuit,New,Concealed,<=120V,<=1 00A Approved Complete BATH HOUSE 2/3/2021 Feeder,New,Underground,240V,<=1 00A Approved Complete SUB PANEL LOWER FIELD The following corrections were written on this inspection today. The following corrections were marked completed on this inspection today. Regulation Title Correction NEC -210 .12 .(A) Dwelling Unit AFCI Requirements PLEASE INSTALL AFCI PROTECTION FOR LAUNDRY CIRCUIT.-All 120-volt, single phase, 15- and 20-ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas, or similar rooms or areas shall be protected by any of the means described in 210.12(A)(1) through (6). The AFCI shall be installed in a readily accessible location. NEC -406 .12 . Tamper-Resistant Receptacles All 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles in the areas specified in 406.12(1) through (8) shall be listed tamper resistant receptacles. (1) Dwelling units, including attached and detached garages and accessory buildings to dwelling units, and common areas of multifamily dwellings specified in 210.52 and 550.13 (2) Guest rooms and guest suites of hotels, motels, and their common areas (3) Child care facilities (4) Preschools and education facilities (5) Business offices, corridors, waiting rooms and the like in clinics, medical and dental offices and outpatient facilities (6) Subset of assembly occupancies described in 518.2 to include places of awaiting transportation, gymnasiums, skating rinks, and auditoriums (7) Dormitory units (8) Assisted living facilities NEC -250 .104 .(B) Other Metal Piping PLEASE BOND PROPANE PIPE-If installed in or attached to a building or structure, a metal piping system(s), including gas piping, that is likely to become energized shall be bonded to any of the following: (1) Equipment grounding conductor for the circuit that is likely to energize the piping system (2) The service equipment enclosure (3) Grounded conductor at the service (4) Grounding electrode conductor if of sufficient size (5) One or more grounding electrodes used if the grounding electrode conductor or bonding jumper to the May 06 2021 Regulation Title Correction grounding electrode is of sufficient size. The bonding conductor(s) or jumper(s) shall be sized in accordance with Table 250.122, and equipment grounding conductors shall be sized in accordance with Table 250.122 using the rating of the circuit that is likely to energize the piping system(s). The equipment grounding conductor for the circuit that is likely to energize the piping system(s). The points of attachment of the bonding jumper(s) shall be accessible. NEC -210 .8 .(A) Dwelling Units PLEASE PROVIDE GFCI PROTECTION FOR FAN ABOVE SHOWER.-All 125-volt through 250-volt receptacles installed in the locations specified in 210.8(A)(1) through (A)(11) and supplied by single-phase branch circuits rated 150 volts or less to ground shall have ground-fault circuit- interrupter protection for personnel. NEC -408 .36 .(D) Back-Fed Devices PLEASE PROVIDE BREAKER RETAINER FOR SUB- PANEL-Plug-in-type overcurrent protection devices or plug-in type main lug assemblies that are backfed and used to terminate field-installed ungrounded supply conductors shall be secured in place by an additional fastener that requires other than a pull to release the device from the mounting means on the panel. You can view all inspection information on this permit online at Labor and Industries, electronic permit and inspection system. Additional fees may be assessed and will not appear until they are processed by our support team. May 06 2021