HomeMy WebLinkAboutJCPRAB Draft Working Capital Plan05102021Jefferson County Parks and Recreation Capital Projects
Last updated:
Location
East Beach
Irondale Beach Park
North Beach
HJ Carroll Park
Chimacum Park
Oak Bay Campground
HJ Carroll Park
Chimacum Park
Chimacum Park
Gibbs Lake
North Beach
North Beach
HJ Carroll Park
Chimacum Park
Lake Leland
Indian Island Park
Quilcene Campground
Courthouse Park
Irondale Community Park
Memorial Field
North Beach
Quilcene Campground
Lake Leland
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
Irondale Beach Park
Memorial Field
Memorial FIeld
Lake Leland
PT Rec Center
Memorial Field
HJ Carroll Park
Oak Bay Campground
HJ Carroll Park
Gibbs Lake
Oak Bay Campground
Quilcene Campground
HJ Carroll Park
Indian Island Park
HJ Carroll Park
North Beach
Trailhead Park
HJ Carroll Park
North Beach
Indian Island Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Trailhead Park
HJ Carroll Park
HJ Carroll Park
All
Irondale Community Park
Memorial Field
Oak Bay Campground
Oak Bay Campground
Oak Bay Campground
PT Rec Center
Lake Leland
Quilcene Campground
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
Indian Island Park
Quilcene Campground
HJ Carroll Park
Indian Island Park
Irondale Beach Park
Irondale Beach Park
Irondale Community Park
Oak Bay Campground
Indian Island Park
Courthouse Park
Chimacum Park
Trailhead Park
Indian Island Park
Memorial Field
Lake Leland
Indian Island Park
HJ Carroll Park
HJ Carroll Park
Trailhead Park
2021 PROS Projects
16 Gibbs Lake
16 Gibbs Lake
17 Chimacum Park
17 Chimacum Park
17 Indian Island P
17 Indian Island P
17 Indian Island P
17 Indian Island P
17 Indian Island P
17 Indian Island L
17 Indian Island L
17 East Beach
17 East Beach
17 East Beach
17 East Beach
17 Upper Oak Bay
17 Upper Oak Bay
17 Upper Oak Bay
17 Upper Oak Bay
17 Upper Oak Bay
17 Lower Oak Bay
17 Lower Oak Bay
17 Lower Oak Bay
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake
17 Gibbs Lake/Beausite
17 Gibbs Lake/Beausite
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
17 Quilcene Camp Grnd
18 Quilcene Com Park
18 Quilcene Com Park
18 Quilcene Com Park
18 Quilcene Com Park
18 Quilcene Com Park
18 Memorial Field
18 Memorial Field
18 North Beach
18 North Beach
18 North Beach
18 North Beach
18 HJ Carroll
18 HJ Carroll
18 HJ Carroll
18 HJ Carroll
18 HJ Carroll
18 Gibbs Lake
18 Gibbs Lake
19 Chimacum Park
19 Chimacum Park
19 Chimacum Park
19 Cape George TH Park
19 Cape George TH Park
19 Irondale Beach Park
19 Irondale Beach Park
19 Irondale Beach Park
21 Irondale Beach Pk
21 Irondale Beach Pk
21 Irondale Beach Pk
21 Irondale Beach Pk
21 Irondale Beach Pk
21 Irondale Beach Pk
21 Indian Island P
21 Indian Island P
21 Indian Island P
21 Indian Island P
21 Indian Island P
21 Indian Island I
21 East Beach
21 East Beach
21 East Beach
21 Gibbs Lake
Staff Priority
2/23/2016
Item
Paint shelter to prevent deterioration
Loop Path
BBQ grills
Install new Bouldering Area
Entire Park
Repair kiosk at Lower Oak Bay Campground, update to include description of nearby attractions/activities and directions to IIP trails
BMX Track
Shelter
Shelter
Silent Alder Trail Construction
Shelter
Shelter repair
Existing Playground
Remove danger trees
Dock
Repair Shelter
Courts
Repair or replace the tennis court surface and paint
Fix and improve kiosk
Stadium
Restroom
Vegetation between courts and Community Ctr
Build Bank Fishing Trail
Improve floor in Salmon Shelter
Repair, Chip Seal and Paint Parking Lot
Restroom Building
New Playground
Paths
Dugouts
New Bleachers
Improve signage on highway
Playground
Athletic Field
Sand playing fields
Lower Toilet
Delineators
Delineators
Replace posts at Upper CG
Campground Utilities
Athletic Field
Provide ADA access at trailheads
Improve ADA access
Water tap
Single Track Improvements
Plantings on berms
Erosion in parking lot
Portage Parking Lot
Interpretive signage
Native vegetation
Hardscaping/Landscaping
Forest
Park Specific Signage
Perimeter Path
Comprehensive Signage and Branding
Courts and Playground
Back Fence
Furniture
Electric
Water
Gymnasium
Fishing dock & Day Use Toilet
Playground
Remove alders by playground
Improve vegetation on slope between fields and boundary trail
Remove invasives along perimeter trail and in vacant area near BMX track and BB court
Develop unimproved Loop Trail in Portage upland forest area to add interest
New campsites
Courts
Lagoon Parking Lot
Picnic Shelter
Toilet
B-Ball Court
Landscape at Upper Oak Bay campground
Install information kiosk at Portage Shelter trailhead
Tennis Court
Campground/Park
Bike Skills Area
Improve trail signage and install interpretive/historical interest signs
Maint Shed
Campground Utilities
Redesign and reconfigure Portage shelter area to improve parking and safety
Retaining walls for playground
Third Field
Release thin for fire safety
Remove noxious weeds
Grade shoreline to gradual
Shelter replace roof
Grade Parking Lot
Replace shelter
Prune plant trees
Remove/replace boundary logs
Build new vault toilet
Install new BBQ pits
Interpretive signs
Prune plant trees
Interpretive signs
Install PUD Tap water paid for
Grade Parking Lot
Remove invasive plants
Park specific signage
Install septic system
Campsite surfaces improve to standard
Install RV Dump
Improve trails access
Park specific signage
Repair paint toilet
Remove boat ramp
Caretaker house repair electrical
Install delineators
Challenge course maintain
Remove derelict buildings
Create additional trails
New Trail Network layout drainage
Implement Forest Mgt Plan
Bld access multi purpose trail
Park specific signage
Bld install kiosk
Shelter repair roof ck for beetles
Courts resurface
Repair fence around courts
New backstops
Wood chip playground
Install septic system
Install RV Dump
Install water and power
Set up site for Camp Host
Trim trees and brush
Repair replace safety lights
Pressure wash courts
Remove horse shoe pits
Add picnic tables
Add disc golf demo area
Add electric hookups at csites
LED Light project in progress
Grandstand roof replaced
Improve parking
Replace rot post on shelter
Paint shelter
Install new roof panel on shelter
Replace playgnd spring toys/ADA compliance
Restore picnic tables
repair/replce water fountain
repair rotting bench by sandbox
Paint basketball courts
Correct drainage issues 2 Pklot
Clear brush around picnic area
Park specific signage
Return toilet to working order
look at adj count landfor trails
Implement Forest Mgt Plan
Interpretive signs
Install signage on Irondale Rd
Remove noxious weeds
Remove graffiti
More picnic tables
Continue trail upgrades
Replace gate with post
Remove dead trees
Monitor moored boats
Creek is now clean
Move entrance for safety
Move/replace shelter
Clear trees around Garry Oaks
Add picnic tables
Add interpretive sign(s)
Clean signs
Remove English Ivy from trees
Repair/replace fire grate
Backfille concrete bulkhead
Increase parking at Gibbs Lk
In Progress
Notes
Path exists, needs improvement
Grates are burned out and full of ashes
Planned donation, seems to have gone dormant
Quick Fix Up for Safety and Community
Planned donation, Dormant, group seems to have disbanded
Roof should be cleaned, trees and brush cut right away
Some logs are rotten and carpenter ant infested
Mainly QTA and BCH
Not Urgent - This Shelter is relatively strong
Maybe 4 years left on old roof
Hold - New playground is in the works
Site has been assessed
Scheduled for 2019 by WDFW
New courts are not being maintained
Very bad condition
Planned for 2019
Roof Repair or replace to save the building, Building is still degrading. Need to decide what to do with this building
Part of WDFW Project
Good project, try in 2019
2019
2019
Donation in progress
Volunteers and RCO Project
Replacement planned in 2019.
2019
URGENT
Staff and Roads. Use salt dog
Staff and Roads. Use salt dog
Staff
Staff
Reconfigure for ease of maintenance
Revenue enhancer
Staff, 75% progress, constant project
Currently turned off
RCO, Volunteers, Partners
DNR, Volunteers, possible RCO Combine with trail
Volunteers and RCO Project
Partners?
80% complete
Staff
Critical to our future, seek hard dollars
Pressure Wash
Study options. Should be a priority
Seek Hard Dollars. 2 sites refurbished in 2018 - ongoing project
Seek Hard Dollars. Project design is complete, will try LTAC again for 2020
Seek Hard Dollars
F&W project. Planned for 2019
2019
ONGOING
Resurface
Because of its location, potential partners, potential for grant funding
Because of its location, potential partners, potential for grant funding
Seek Hard Dollars
Great fundraiser
Possible dog park, bike skills course, walking/running trail
Partners?
Current retainers are creosoted RR ties.
RCO? Fields are expensive to maintain
Done in2018
Done in2018
Partners Responsible
Total
Scope
Paint as needed, inspect for and repair small items
Improve park loop path
Remove or replace
Clean, Trees, Hardscape, Repair RR
Rebuild and or reconfigure
Clean roof
Replace rotten logs
MTB Park in Silent Alder Area
Replace entire structure
Replace Roof, Post
Replace older elements
Replace
Replace posts, anchor to concrete piers
Clean / pressure wash courts
Major restoration is needed at this time
Clean, repair and paint kiosk, install appropriate signs
Spalling Repair
Remove overgrown vegetation, partner with CC to improve appearance of building and plantings
Remove pea gravel, replace with compacted crushed basalt
Patch, chip seal, strip
Paint interiors
Accessible
Improve park paths
In - House repairs
Portable, so field can be converted seasonally, safely
Install new signs on highway to improve access to park and campground
Replace Fence
Annual treatments
Annual treatments
Repair siding and Paint inside
Replace park boundary markers as required
Replace park boundary markers as needed
Water and Power
Repair irrigation
Install compacted crushed rock walkway surface between parking and selected areas at fields and shelters
Convert to auto-off spigot for filling water bottles
Hikers, Bikers and Horses
Remove dead/dying vegetation, replace with drought tolerant species
Resolve erosion problem in corner of parking lot by redirecting street runoff to disperse in vacant area or install rain garden
Grade & Partition
Signage, displays, trails
50% Complete
Drainage, walls, dirt
Release thin for park values and Safety
Comprehensive update
Gravel and grade
New Logo, Sign Replacement and Park/Facility "Branding"
Remove - use plants
Tables, grills, fire rings, surfaces, plants
Safety, capacity, location
Safety and capacity
Repair or Replace
Replace
Replace
Add new campsites in vacant area, improve definition of existing sites
Resuface
Restore, modify access
Tables/Shelter/Grills
Vault toilet
Resurface
Bollards, Signs, entrance area, brush, surface sites
Resurface and Repair Fence
Restore, repurpose, or decommission the entire park
Mountain Bikers
Paint, insulate, heater
Water and power
Install
Done
16.6
Estimated Spending ($K)
2015
4
0.5
0.1
0
4
8
1
Donation Pledged
124.9
2016
12
4
26
3
4
2.5
12
2
4
1.4
24
2
14
14
22
8
92
2017
3.5
4
50
2
20
2.5
4
4
2
0
2
8
148.5
2018
4
4
4
4
20
2.5
12
4
10
3
75
2
4
0
2
30
24
2019
4
4
4
2
10
2
20
2020
5
10
5
10
24
84
2025
75
5
4
40
45
25
8
100
155
2045
2035
45
2000
250
3272.05
Columns E - L (hidden) contain spending plan
Initial Cost Estimate,
$K
4
0
0
0
8.5
12
20
45
0.5
4
2.3
26
75
1
50
0
0
0
3
0
4
7
0
2.25
2
4
0.1
40
7.5
0
0
0
4
24
2
4
24
10
4.4
24
0
75
26
24
23
2000
1
40
0
0
0
0
45
250
0
10
24
5.5
0
30
25
16
0
8
100
0
155
Prioritize?,
Y/N
Y
N
Y
N
Y
Y
N
Y
Y
Y
N
N
N
Y
N
Y
N
Y
N
Y
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
0
Estimated Annual O&M Expense
Grant potential,
Y/N
Y
Y
N
Y
Y
Y
Y
Y
Easy project that can be done quickly with volunteer labor and donations or is already funded
On "Check it off list",
Y/N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Created / Start Date
Weight Factor
Status
Hold
Hold
In Progress
Hold
Hold
In Progress
In Progress
Planned for 2019
In Progress
In Progress
Annual since 2016
Annual since 2016
Design is ready
Ongoing
In Progress
In Progress
In Progress
In Progress
Many new parts, currently stable for 10 years
In Progress
2021
LTAC - 2 new ADA sites in 2018, ongoing work
Partially done
Weight factors can be adjusted as needed. Scores will automatically recalculate
Benefit
0.4
1=Nice to have
3=Needed to prevent minor deterioration
9=Mandatory or required to prevent significant deterioration
Saves what we have
9
3
9
1
9
3
9
9
1
9
9
3
9
9
9
9
3
3
9
9
3
9
1
9
9
1
3
3
1
1
9
9
9
3
9
9
9
1
3
1
1
1
1
9
9
3
1
3
3
3
1
1
3
3
9
3
1
1
9
3
3
1
1
1
1
1
3
9
1
1
3
1
1
3
3
1
1
1
1
1
1
1
0.2
1=Minimal impact
3=Moderate impact on utilization or accessibility
9=Mandatory(ADA), significant impact on utilization or accessibility or satisfies a major unmet need
Improves what we have
1
9
1
9
3
3
9
1
9
3
3
3
1
1
3
1
1
1
1
1
3
3
9
1
1
9
3
1
9
3
3
3
3
1
1
1
1
9
1
9
9
3
3
1
1
3
9
3
3
3
3
3
3
3
1
3
3
3
1
1
3
3
3
3
3
9
1
3
3
3
1
3
3
3
3
3
1
1
3
3
1
3
0.2
1=Primarly Local Use, limited flexibility
3=Regional attraction, multiple uses
9=Draws out of area users, multiple uses, significant improvement of demographic or geographic equity
Level and Equity of use
1
9
1
9
1
3
3
1
3
9
3
1
1
3
3
1
1
1
3
1
1
1
1
1
1
3
3
1
3
3
1
1
1
3
1
1
1
9
1
1
3
1
3
1
1
1
3
3
3
1
3
3
3
1
3
3
3
3
1
1
1
1
1
1
1
3
3
1
3
3
1
3
1
1
3
3
1
1
3
1
1
3
0.1
1=Minimal impact
3=Modest impact on local economy
9=Significant economic benefits to local or regional economy
Economic Benefit
1
1
1
3
1
1
1
1
3
3
1
1
1
3
1
1
1
1
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
3
1
1
1
3
1
1
1
0.1
1=Minimal impact
3=Moderate impact to 1 category
9=Significant impact to 1 categotry or moderate impact to 2 or more
Health and Safety
(People, Community, Environment)
1
3
3
1
3
1
3
3
3
3
3
9
9
9
3
3
1
1
3
1
3
3
9
1
1
3
3
3
3
1
9
1
1
1
3
3
3
1
3
3
3
3
3
3
3
9
1
3
3
3
1
3
1
1
3
1
9
9
9
3
3
1
1
1
1
1
1
9
1
1
1
1
1
3
3
3
1
1
1
3
9
1
Total Benefit Score
4.2
5.2
4.4
4.4
4.8
2.6
6.4
4.4
3.4
6.6
5.2
3
5
5.6
5.2
4.4
1.8
1.8
5
4.2
2.4
4.8
3.4
4.2
4.2
3.2
2.8
2
3.2
1.8
5.4
4.6
4.6
2.2
4.4
4.4
4.4
5
2
2.8
3.2
1.6
2
4.4
4.4
3
3
2.8
2.8
2.4
1.8
2
2.6
2.2
4.8
2.6
2.6
2.6
5
2
2.4
1.4
1.4
1.4
1.4
3.2
2.2
5.4
1.8
1.8
1.8
1.8
1.4
2.4
3
2
1
1
2
1.6
1.8
1.8
0
Effort
0.5
1=<$500
3=$500 - $15,000
9=>$15000
Overall Net Project Cost
(factor in grant potential)
1
1
1
1
1
1
1
1
1
3
3
1
3
3
3
3
1
1
3
3
1
3
3
3
1
1
1
1
3
1
3
3
3
1
3
3
3
3
1
3
3
1
1
3
3
3
3
3
3
3
1
1
3
3
9
3
3
3
9
3
3
1
1
1
1
3
3
9
3
3
3
3
3
3
3
3
3
1
9
9
9
9
0.2
1=Less than 30 days, no acceptance or permit obstacles
3=Less than 12 months, minor permit or acceptance obstacles
9=Greater than 12 months, significant challenges likely
Complexity and timeline
1
3
1
3
1
1
3
3
1
3
1
1
1
3
3
1
1
1
3
1
1
3
1
1
1
3
3
1
1
1
3
1
1
3
1
1
1
9
3
1
3
1
3
3
3
3
3
3
3
1
3
3
3
1
3
3
3
3
3
1
3
3
3
3
3
3
3
9
3
3
3
3
1
3
9
9
1
3
3
3
1
3
0.2
1=No staff req'd, volunteer labor secured
3=Minimal staff req'd, volunteer labor likely
9=Significant staff, volunteer labor unknown
Human resource needs
1
1
3
1
3
1
3
3
3
3
3
3
3
3
3
3
1
1
3
3
3
3
1
3
9
3
3
3
3
3
9
9
9
3
9
9
9
3
3
3
3
3
3
9
9
3
3
3
3
3
3
3
3
3
1
3
3
3
3
3
3
3
3
3
3
9
3
9
3
3
3
3
3
9
9
3
3
9
3
3
9
9
0.1
1=O&M can be done with volunteer labor and donations
3=O&M less than $500/yr
9=O&M>$500/yr, chronic problem
Sustainability
1
1
1
1
3
1
9
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1
3
1
3
1
1
1
1
3
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
3
3
3
3
1
3
1
1
1
1
3
3
1
1
3
3
3
1
3
9
3
1
3
9
1
1
9
Staff Priority
Total Effort Score
1
1.4
1.4
1.4
1.6
1
2.6
1.8
1.4
2.8
2.4
1.4
2.4
3
2.8
2.4
1
1
2.8
2.4
1.4
2.8
2
2.6
2.6
2
1.8
1.4
2.4
1.4
4.2
3.6
3.6
1.8
3.6
3.6
3.6
4.2
1.7
2.4
2.8
1.4
1.8
4
4
2.8
2.8
2.8
2.8
2.4
1.8
2
2.8
2.4
5.4
3
3
3
6
2.4
3
1.8
1.8
1.8
1.8
4.2
3
8.2
2.8
3
3
3
2.4
4.2
6
4.2
2.4
3.2
6.6
5.8
6.6
7.8
0
In Progress
BE Ratio
4.2
3.71428571428571
3.14285714285714
3.14285714285714
3
2.6
2.46153846153846
2.44444444444444
2.42857142857143
2.35714285714286
2.16666666666667
2.14285714285714
2.08333333333333
1.86666666666667
1.85714285714286
1.83333333333333
1.8
1.8
1.78571428571429
1.75
1.71428571428571
1.71428571428571
1.7
1.61538461538462
1.61538461538461
1.6
1.55555555555556
1.42857142857143
1.33333333333333
1.28571428571429
1.28571428571429
1.27777777777778
1.27777777777778
1.22222222222222
1.22222222222222
1.22222222222222
1.22222222222222
1.19047619047619
1.17647058823529
1.16666666666667
1.14285714285714
1.14285714285714
1.11111111111111
1.1
1.1
1.07142857142857
1.07142857142857
1
1
1
1
1
0.928571428571429
0.916666666666667
0.888888888888889
0.866666666666667
0.866666666666667
0.866666666666667
0.833333333333333
0.833333333333333
0.8
0.777777777777778
0.777777777777778
0.777777777777778
0.777777777777778
0.761904761904762
0.733333333333333
0.658536585365854
0.642857142857143
0.6
0.6
0.6
0.583333333333333
0.571428571428572
0.5
0.476190476190476
0.416666666666667
0.3125
0.303030303030303
0.275862068965517
0.272727272727273
0.230769230769231
0
Partners Responsible
Comments
Possible community work day, Rotary or High School project
Ideal Community Project - facilitate
Possible community work day, Rotary or High School project
If new playground is built, then think over the existing one
Pursue with F&W
Volunteer (Greg Graves)
Greg Graves - spring 2017
Pursued by Backcountry Horsemen
Received two grants and project will be complete in 2016
No volunteer group at this time
Done
Timing/Urgency
12 months
2 - 4 years
12 months
2 - 4 years
12 months
12 months
12 months
12 months
2 - 4 years
>4 years
2 - 4 years
2 - 4 years
12 months
12 months
2 - 4 years
12 months
12 months
12 months
12 months
12 months
2 - 4 years
>4 years
2 - 4 years
12 months
12 months
2 - 4 years
12 months
12 months
12 months
2 - 4 years
12 months
12 months
12 months
12 months
12 months
12 months
2 - 4 years
>4 years
12 months
2 - 4 years
2 - 4 years
2 - 4 years
>4 years
12 months
2 - 4 years
2 - 4 years
2 - 4 years
12 months
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
>4 years
>4 years
>4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
>4 years
2 - 4 years
2 - 4 years
>4 years
2 - 4 years
>4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
2 - 4 years
>4 years
2 - 4 years
12 months
>4 years
>4 years
2 - 4 years
>4 years
2 - 4 years
Donation Pledged
Improvement or Repair?
Repair
Improvement
Repair
Improvement
Improvement
Repair
Improvement
Repair
Improvement
Repair
Repair
Improvement
Repair
Repair
Improvement
Repair
Repair
Repair
Repair
Repair
Repair
Improvement
Improvement
Repair
Repair
Improvement
Improvement
Repair
Improvement
Improvement
Repair
Repair
Repair
Repair
Repair
Repair
Repair
Improvement
Repair
Improvement
Improvement
Improvement
Improvement
Repair
Repair
Improvement
Improvement
Improvement
Improvement
Improvement
Improvement
Repair
Improvement
Repair
Improvement
Improvement
Improvement
Improvement
Improvement
Repair
Improvement
Improvement
Improvement
Repair
Improvement
Improvement
Repair
Improvement
Improvement
Improvement
Repair
Improvement
Improvement
Repair
Improvement
Improvement
Improvement
Repair
Improvement
Improvement
Improvement
Improvement
Improvement
Completion Date
Location
HJ Carroll Park
North Beach
North Beach
Quilcene Campground
Irondale Community Park
Gibbs Lake
Memorial Field
Lake Leland
Gibbs Lake
HJ Carroll Park
Oak Bay Campground
Gibbs Lake
PT Rec Center
Quilcene Campground
HJ Carroll Park
Gibbs Lake
Gibbs Lake
Irondale Community Park
Gibbs Lake
HJ Carroll Park
Hicks Park
Irondale Community Park
Irondale Community Park
Irondale Beach Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
Lake Leland
Quilcene Campground
HJ Carroll Park
Gibbs Lake
Memorial Field
HJ Carroll Park
Chimacum Park
Indian Island Park
Indian Island Park
Memorial Field
Hicks Park
Indian Island Park
Lake Leland
All Campgrounds
Irondale Beach Park
Quilcene Campground
17 Chimacum
Gibbs Lake
17 Quilcene Camp Grnd
Item
Hazard Tree Removal
New Sign
Park Partitions and Parking Lot Improvements
Shelter
Toilet
Park Specific Signage
Entire perimeter fence
Restore Grounds in Campground
Derelict Buildings
Picnic tables and benches near playground
Fence at Upper Oak Bay campground
Caretakers House
Games Room/Rest Room
Safety Light
Replace parking lot sign
Gravel S. Parking Lot
Gravel the road to beach
Playground
Generator Building
Check and replace rotten posts in Salmon Shelter
Parking Lot
Pumphouse
Backstop
Entrance Sign
Replace 2 soccer goals
Install Bike Rack near restroom
Install new bollards at salmon shelter
Athletic Field
Install business info kiosk
Install business info kiosk
Courts
Caretakers House
Field Lighting
Replace signs on "Salmon Trail"
Toilets
Shelter Fix Up, gravel, small repairs, stablize with braces
Toilet
Concession
Toilet
Improve line of sight at Portage Shelter entrance to reduce risk of accidents
Package of improvements
Accessible Campsites,
Remove dangerous picnic table and replace
Courts
Remove replace vault toilet
Forest
Park specific signage
Notes
Replace Sign, the old one fell down
Done, grading annual by city
URGENT Roof Leaking, caving in
Volunteer or staff
Volunteers to install
Researching scope and budget
Check for safety
Farmers Market reliance on RR
Contractor
Replace Slides
Caretaker
Roads Crew
Volunteers needed
Fencing contractor
Similar to North Beach
Improve drainage
Renovate
Study options
Volunteers needed
Roads Crew and contractor
Volunteers needed
Irene in 2015
Volunteers planning for Easter Weekend
See Detail Sheet
1 site/each
Project underway
Completed
Dog Hair forest in places
Done in2018
Scope
Build frame and install
Maintain bollards, replace rotten logs, Grade and Parking Stops
Replace Roof, Treat Beetles
Paint, repair door
Comprehensive update
Replace or repair
Remove
Repair or replace tables and benches
Fix existing fence
Modest repairs if needed
Paint, floor, RR Dividers, repairs
Repair light
Replace
Remove
Grade
Paint and repair
Repair
Purchase and install new sign
Already purchased rack
Purchase and install prefab kiosk
Purchase and install prefab kiosk
Repair tire damage, Pressure wash
Replace
Repair to preserve
Remove old grill, replace new grill, surface with rock, new picnic tables
Repair and paint
Repair Siding and paint
Door, roof, repair and paint
Clear line of sight from entrance to bridge and from entrance to uphill curve east of drive
One new wood, one concrete
Resurface and paint
Release thin for park values
Initial Cost Estimate,
$K
12
0.3
0.5
2
1.4
2
2
2
3
On "Check it off list",
Y/N
0.5
12
4
0.5
Status
0.52
4
1.875
2
1.5
0.275
0.5
0.5
0.4
10
0.15
0.75
400
30
Saves what we have
6
27
50
Improves what we have
25
Level and Equity of use
Economic Benefit
4
45
Health and Safety
(People, Community, Environment)
20
Total Benefit Score
0.52
0
4
12
0.5
4
0
0
27
1.875
2
12
1.8
0.275
0.5
0.5
4
4
0.4
0.5
0.5
2
0
10
0.15
0.75
0
1.5
1.5
46.4
50
425
0
2
0
2
22
3
0
30
0
Overall Net Project Cost
(factor in grant potential)
Y
Y
N
Y
N
N
Y
N
N
Y
N
N
N
N
N
Y
Y
N
N
N
N
N
Y
Y
Complexity and timeline
Human resource needs
Y
Sustainability
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Total Effort Score
10/1/2015
BE Ratio
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
DONE
Done
DONE
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
DONE
Done
DONE
Done
Done
DONE
Done
Done
Done
Done
Done
Done
DONE
DONE
DONE
Done
Done
Comments
9
9
9
9
9
1
9
3
9
9
9
9
3
1
3
3
3
9
3
3
3
3
3
1
3
1
3
3
3
3
3
3
3
1
9
3
Timing/Urgency
1
1
3
1
1
9
1
3
1
1
1
1
3
3
3
3
3
1
1
1
1
1
1
9
3
3
1
3
3
3
1
1
3
1
3
3
Improvement or Repair?
1
1
1
1
1
9
1
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
3
1
1
3
Completion Date
1
1
1
1
1
3
1
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
1
1
1
1
1
1
9
1
3
3
3
3
3
3
9
3
3
9
3
3
1
3
3
3
3
3
1
1
1
1
9
3
3
3
1
1
3
3
1
1
1
3
5
4.2
4.8
4.4
4.4
4.6
4.4
3
5
4.4
4.4
5
2.4
1.6
2.2
2.4
2.4
4.4
2
2
1.8
1.8
1.8
3
3
1.6
2
2.4
2.4
2.4
2
2
2.6
1
0
0
0
0
0
0
0
0
0
4.6
2.8
1
1
1
1
1
1
3
1
3
3
3
3
1
1
1
1
1
3
1
1
1
1
1
3
3
1
3
3
3
3
3
3
9
3
3
3
1
1
1
1
1
3
1
1
1
1
1
3
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1
3
1
1
3
3
3
1
3
3
1
1
3
3
3
3
1
3
3
3
3
3
3
1
3
3
3
3
3
3
3
3
3
3
3
3
3
3
9
9
3
9
3
3
3
3
1
1
1
1
3
1
1
1
1
1
1
1
1
1
1
3
3
3
1
1
1
1
1
1
1
1
1
3
1
1
3
3
3
1
3
1
1
1
1.4
1.4
1.6
1.8
2
1.4
2.4
2.4
2.4
2.8
1.4
1
1.4
1.6
1.6
3
1.4
1.4
1.4
1.4
1.4
2.4
2.4
1.4
2.4
3
3.6
3.6
3
4.2
6
2.4
0
0
0
0
0
0
0
0
0
3
2.8
5
4.2
3.42857142857143
3.14285714285714
2.75
2.55555555555555
2.2
2.14285714285714
2.08333333333333
1.83333333333333
1.83333333333333
1.78571428571429
1.71428571428571
1.6
1.57142857142857
1.5
1.5
1.46666666666667
1.42857142857143
1.42857142857143
1.28571428571429
1.28571428571429
1.28571428571429
1.25
1.25
1.14285714285714
0.833333333333333
0.8
0.666666666666667
0.666666666666667
0.666666666666667
0.476190476190476
0.433333333333333
0.416666666666667
0
0
0
0
0
0
0
0
0
1.53333333333333
1
Dave Conedera?
Request GF Budget Extension
Facilitate the Project with Friends
Check electric, heat, water, roof, septic, fireplace
Apply to RCO in 2016
An annual PM, was done in 2016
Total of four goals are there, two need replacement
Work on Scope, Look into RCO YAF, Match from Schools, Donations, Volunteers
Being done by IIP volunteers Dennis Burk and Greg Graves
12 months
12 months
2 - 4 years
12 months
12 months
2 - 4 years
12 months
12 months
2 - 4 years
12 months
12 months
12 months
12 months
12 months
12 months
12 months
12 months
2 - 4 years
12 months
12 months
12 months
12 months
12 months
12 months
12 months
2 - 4 years
12 months
12 months
2 - 4 years
>4 years
12 months
2 - 4 years
12 months
2 - 4 years
12 months
>4 years
Repair
Repair
Improvement
Repair
Repair
Improvement
Repair
Repair
Improvement
Repair
Repair
Repair
Repair
Improvement
Repair
Improvement
Improvement
Repair
Improvement
Repair
Improvement
Repair
Repair
Improvement
Repair
Improvement
Improvement
Improvement
Improvement
Improvement
Repair
Improvement
Improvement
Repair
Repair
Repair
Repair
Repair
Repair
Repair
Improvement
Improvement
Repair
Repair
Improvement
7/1/2015
6/1/2015
Location
Equestrian Park
Equestrian Park
Equestrian Park
Quilcene Campground
Equestrian Park
Oak Bay Campground
Gibbs Lake
Indian Island Park
17 Indian Island P
17 Indian Island P
17 Indian Island L
17 East Beach
17 Upper Oak Bay
17 Upper Oak Bay
17 Upper Oak Bay
17 Upper Oak Bay
17 Gibbs Lake
18 Quilcene Com Park
18 Memorial Field
18 Memorial Field
18 North Beach
18 HJ Carroll
18 North Beach
18 HJ Carroll
19 Chimacum Park
21 Irondale Beach Pk
21 Irondale Beach Pk
Item
Fencing and Trails
Event Ring and Toilet
Trails
RV Dump
Race Course
RV Dump
Enlarge Parking Lots
Improve connection between Lagoon and Isthmus trails
Interpretive signs
Grade Parking Lot
Parking restore modify access
Shelter needs paint job
Electtric upgrade safety capacity
Water extend to each site
Landscape surfaces plants
Furniture clean and repair
Parking accommodate more vehicles
Add 5 to 8 new campsites
Replace perimter fence
Install portable bleachers
Remove broken fire grates
Resurface/chip seal parking lot
Replace water tap on fountain
Park specific signage
Dup shelter needs new roof
Manage invasive weeds DNR?
Interpretive signs
Notes
JEA
JEA
JEA
Revenue enhancer, REMOVE- too expensive to maintain
JEA
Seek Hard Dollars
Horse Trailer and car parking
Scope
Install N. Perimeter + Trails
Install
Improve existing
Install
Install
Install
Initial Cost Estimate,
$K
On "Check it off list",
Y/N
0
Status
0
35
0
Saves what we have
0
Improves what we have
Level and Equity of use
Economic Benefit
Health and Safety
(People, Community, Environment)
Total Benefit Score
0
0
0
35
0
0
0
0
Overall Net Project Cost
(factor in grant potential)
Y
Y
N
Y
Y
Y
Complexity and timeline
Human resource needs
Sustainability
Total Effort Score
BE Ratio
Consulting with JEA is in progress
Cancelled
Cancelled
Hold, not needed
Not feasible
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
dup
Comments
1
1
1
1
1
1
1
1
Timing/Urgency
9
9
9
9
3
9
3
3
Improvement or Repair?
9
3
3
3
3
3
3
1
Completion Date
3
3
3
3
1
1
1
1
3
1
1
1
1
3
1
3
4.6
3.2
3.2
3.2
1.8
3.2
1.8
1.6
1
3
3
3
3
9
9
9
9
3
3
3
3
9
3
9
1
3
3
3
3
3
3
3
1
1
1
3
1
3
1
1
2.6
2.8
2.8
3
2.8
7.2
5.8
7
1.76923076923077
1.14285714285714
1.14285714285714
1.06666666666667
0.642857142857143
0.444444444444444
0.310344827586207
0.228571428571429
This ranking assumes the JEA is completing the project.
Postpone until more information
Postpone until more information
>4 years
>4 years
>4 years
>4 years
>4 years
>4 years
2 - 4 years
>4 years
Improvement
Improvement
Improvement
Improvement
Improvement
Improvement
Improvement
Improvement
Goals and Objectives from updated PROS Plan
Administrative Goal #1 SUSTAINABLE RESOURCES AND COORDINATED MANAGEMENT: Create effective and efficient methods of acquiring, developing, operating and maintaining facilities and programs
that accurately distribute costs and benefits to public and private interests.
Facilities and Program Goal #1: COUNTY-WIDE PROGRAMS AND SERVICES: Develop focused recreation programs that utilize and support existing facilities, provide the greatest benefit and
generate the highest level of self-sustaining fee revenue.
Facilities and Proram Goal #2: RECREATIONAL FACILITIES: Maintain and improve those resources currently in the system. When financially feasible and sustainable, develop a high quality,
diversified recreation system that provides for all age and interest groups.
Facilities and Program Goal #3: DESIGN AND ACCESS STANDARDS: Design and develop facilities that are accessible, safe, and easy to maintain, with life cycle features that account for
long-term costs and benefits.
Historial and Cultural Resources Goal #1: HISTORICAL RESOURCES: As is feasible and sustainable, develop a high quality, diversified park system that preserves significant historical
opportunity areas and features.
Historical and Cultural Resources Goal #2: MANMADE ENVIRONMENTS AND FEATURES: Incorporate interesting manmade environments, structures, activities and areas into the park system to preserve
these features and provide a balanced park, recreation and open space experience
Historical and Cultural Resources Goal #3: CULTURAL ARTS PROGRAMS AND RESOURCES: Provide high quality parks and facilities that can be utilized by existing organizations and schools
in the implementation and provision of cultural programs.
2017 Project Plan Draft 12/14/17
Location
Chimacum Park
Lake Leland
Leland and Quilcene
Quilcene Campground
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
PT Rec Center
Oak Bay Campground
Upper Oak Bay Campground
Upper Oak Bay Campground
Irondale Community Park
Gibbs Lake
Gibbs Lake
Gibbs Lake
HJ and Mem Fld
Quilcene Campground
Mem Fld and HJ
Install North Beach Sign
New sign for Irondale BP
All parks
PT Rec Center
Mem Fld
Quilcene Campground
Quilcene Campground
Chimacum Park
Chimacum Park
Chimacum Park
Chimacum Park
Courthouse Park
Equestrian Park
Equestrian Park
Equestrian Park
Equestrian Park
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Gibbs Lake
Hicks Park (Done)
Hicks Park
Hicks Park (Done)
HJ Carrol Park
HJ Carrol Park
HJ Carroll Park
HJ Carroll Park
HJ Carrol Park
HJ Carrol Park
HJ Carrol Park
HJ Carrol Park
HJ Carrol Park
HJ Carrol Park
HJ Carrol Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
HJ Carroll Park
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park (DONE)
Indian Island Park (DONE)
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park
Indian Island Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Beach Park
Irondale Community Park
Irondale Community Park
Irondale Community Park
Irondale Community Park
Irondale Community Park
Lake Leland (DONE)
Lake Leland
Lake Leland
Lake Leland
Lake Leland
Lake Leland
Location
Memorial Field
Memorial Field
Memorial Field
Memorial Field
Memorial Field
Memorial Field
Memorial Field
Memorial Field
North Beach
North Beach
North Beach
North Beach
North Beach
North Beach
North Beach
North Beach
Oak Bay Campground
Oak Bay Campground
Oak Bay Campground
Oak Bay Campground
Oak Bay Campground
Oak Bay Campground
PT Rec Center
PT Rec Center
Quilcene Campground
Quilcene Campground
Quilcene Campground
Quilcene Campground
Quilcene Campground
Trailhead Park
Trailhead Park
Trailhead Park
Staff Priority
Project
Forest Safety
Package of improvements
Business Info Kiosk
Package of improvements
Restroom Building
Hazard Tree Removal
Replace parking lot sign
Install Bike Rack near restroom
Check and replace rotten posts
Install new bollards at salmon shelter
Replace 2 soccer goals
Remodel roundabouts
Courts
Delineators
Playground fence
Lower Toilet
Fence
Landscape
Pumphouse
Delineators
Park Specific Signage
Caretakers House
Heavy sanding fields
Shelter
Water tank type weights for all soccer goals
Build frame and install
Similar to NB Sign
Purchase pressure washer
AED
AED
New net for tennis court
1 new backstop
Shelter
Entire Park
Campground/Park
Toilets
Tennis Court
Fencing and Trails
Event Ring and Toilet
Trails
Race Course
Mountain Bike Park
Generator Building
New Trail Network with some bicycle only trails
Forest
Derelict Buildings
Gravel S. Parking Lot
Gravel the road to beach
Enlarge Parking Lots
Caretakers House
Parking Lot
Restore Shoreline
Toilet
BMX Track
Existing Playground
New Playground
Athletic Field
Athletic Field
ADA
Park Specific Signage
Perimeter Path
Courts
Third Field
Improve floor in Salmon Shelter
Remove and replace roundabouts with low maintenance solution
Replace signs on "Salmon Trail"
Remove alders by playground
Improve vegetation on slpe between fields and boundary trail
Remove invasives along perimeter trail and in vacant area near BMX track and BB court
Install new Bouldering Area
Improve ADA access
Replace Shelter
Portage Parking Lot
Lagoon Parking Lot
Shelter Fix Up
Toilet
Improve line of sight at Portage Shelter entrance to reduce risk of accidents
Improve trail signage and install interpretive/historical interest signs
Install information kiosk at Portage Shelter trailhead
Improve connection between Lagoon and Isthmus trails
Develop unimproved Loop Trail in Portage upland forest area to add interest
Redesign and reconfigure Portage shelter area to improve parking and safety
Install Portapot at south Istmus trailhead
Provide "ADA access at trailheads
Loop Path
Paths
Interpretive signage
Hardscaping/Landscaping
Native vegetation
Picnic Shelter
Entrance Sign
Toilet
Toilet
Courts and Playground
Playground
Backstop
B-Ball Court
Restore Grounds in Campground
Dock
Build Bank Fishing Trail
Day Use Toilet
Campground Utilities
Improve signage on highway
Item
Quincy St Fence
Stadium
Dugouts
Back Fence
Field Lighting
Maint Shed
Wash St Fence
Concession
Shelter repair
Park Partitions and Parking Lot Improvements
New Sign
Shelter
Restroom
Restroom
Restroom
Boat Ramp
Furniture
Electric
Water
RV Dump
Provide kiosk at Upper Oak Bay Campround with description of nearby attractions/activities and directions to IIP trails
Repair kiosk at Lower Oak Bay Campground, update to include description of nearby attractions/activities and directions to IIP trails
Games Room/Rest Room
Gymnasium
Safety Light
Courts
Campground Utilities
RV Dump
Playground
Single Track Improvements
Forest
Bike Skills Area
In Progress
Lead
Matt
Matt
Matt
Matt
Molly
Molly
Matt
Molly
Molly
Molly
Matt
Matt
Molly/Matt
Matt
Matt
Molly
Matt
Molly & Matt
Molly
Matt
Matt
Matt
Matt
Matt
Matt
Matt
Matt
Molly
Matt
Matt
Matt
Matt
Who
Roads Maint Crew
Staff
Staff
Staff
Staff
Contractor
Matt to order, staff install
Staff
Staff
Staff
Purchase
Needs more design and costing
Staff or contractor?
Staff
Contractor
Staff
Contractor
Staff, contractors, roads crew
Matt to order, staff install
Matt to order, volunteers to install
Check for safety
Staff, salt dog
Coordinate with Phil J?
Run past staff to be sure they like them
Dave Conedera?
Volunteer install
new, portable
More research
How to deploy?
Quick Fix Up for Safety and Community
Possible dog park, bike skills course, walking/running trail
Volunteers needed
Great fundraiser
JEA
JEA
JEA
JEA
Mainly QTA, with some RCO or other $
Caretaker
Quimper Trails, Volunteers needed to help them
Dog Hair forest in places
Horse Trailer and car parking
Renovate
Roads Crew
Volunteers planning for Easter Weekend
Ideal for volunteer group
Can wait
Donation in progress
Improve drainage
Staff
RCO
Staff
Resurface
RCO
Roads Crew
Roads Crew
Volunteers needed
Volunteers and RCO Project
RCO, Volunteers, Partners
Volunteers and RCO Project
DNR, Volunteers, possible RCO Combine with trail
Because of its location, potential partners, potential for grant funding
Because of its location, potential partners, potential for grant funding
Volunteer or staff
Pressure Wash
Replace Slides
Fencing contractor
Volunteer project
URGENT
Replace Day Use Toilet
Notes
Friends Project
Irene in 2015
Study options
Study options
Urgent
Irene in 2015
Maybe 4 years left on old roof
Replace Sign, the old one fell down
Not Urgent - This Shelter is relatively strong
Roof Repair or replace to save the building
Restore and open
Existing structure is impeding replenishment of beach and eel grass. Seek Partner
Seek Hard Dollars
Seek Hard Dollars
Seek Hard Dollars
Seek Hard Dollars
Farmers Market reliance on RR
Contractor
Project underway
Revenue enhancer
Revenue enhancer
Partners?
Partners?
Partners Responsible
Notes
Remove danger trees
See detail sheet
Per LTAC Grant
See detail sheet
Paint interiors
Already purchased rack
1 is done, 1 left
1 us, 1 JCSC ask
Matt and Molly to meet and discuss
Pressure wash/repair tire damage
Repair siding and Paint inside
Bollards, Signs, entrance area, brush, surface sites
Paint and repair
Trails, entrance and roads
Modest repairs if needed
work with roads maintenance to acquire the sand
Replace Roof, Treat Beetles
Clean, replace roof
Clean, Trees, Hardscape, Repair RR
Restore, repurpose, or decommission the entire park
Repair to preserve
Resurface and Repair Fence
Install N. Perimeter + Trails
Install
Improve existing
Install
MTB Park in Clear Cut Areas
Remove
Plan then Build
Release thin for park values
Remove
Grade
Remove Hard Armour
Door, roof, repair and paint
Rebuild and or reconfigure
Replace older elements
Accessible
Repair irrigation
Improve parking and paths
Comprehensive update
Gravel and grade
Resuface
Install
Remove pea gravel, replace with compacted crushed basalt
Install compacted crushed rock walkway surface between parking and selected areas at fields and shelters
Replace
Grade & Partition
Restore, modify access
Remove old grill, replace new grill, surface with rock, new picnic tables
Repair and paint
Clear line of sight from entrance to bridge and from entrance to uphill curve east of drive
Build and improve park Loop path
Improve park paths
Signage, displays, trails
Drainage, walls, dirt
50% Complete
Tables/Shelter/Grills
Vault toilet
Paint, repair door
Replace
Repair
Resurface
75% Complete,
Replace
Clean and paint
Water and power
Install new signs on highway to improve access to park and campground
Scope
Replace
Spalling Repair
In - House repairs
Remove - use plants
Replace
Paint, insulate, heater
Replace Washington St
Repair Siding and paint
Replace Roof, Post
Replace with Rocks, Grade and Parking Stops
Replace entire structure
restore to function
Replace
Remove, restore beach
Tables, grills, fire rings, surfaces, plants
Safety, capacity, location
Safety and capacity
Install
Paint, floor, RR Dividers, repairs
Repair or Replace
Resurface and paint
Water and Power
Install
Replace
Hikers, Bikers and Horses
Release thin for park values
Mountain Bikers
Done
M & O
1500
250
Parks Imp
2300
500
520
275
150
400
750
5000
750
2550
400
1875
5500
850
2000
6000
250
200
200
1500
350
750
30770
500
500
Completion Date
500
63040
CG Revenue
8000
3000
11000
Fund Balance
10000
10000
Ask
5000
2000
2000
9000
Mollys suggestion, Matt To checkit ou
Leland and Quil CG Draft Project Plan
Description
New large kiosk
New Iron Ranger
New slab
Business info Kiosk
Fire Rings
Picnic Tables
Shed
Mower
Rakes
Shovels
Loppers
Hand clippers
Push mower
String trimmer
Broom
Cleaning supplies
PPE
Notes
Prefab
Bought in 2016
Bought in 2015?
Matt to order KCDA
Matt to order KCDA
CG Fee $
4000
2500
2000
50
50
50
50
0
50
100
8850
LTAC
1500
1500
400
100