Loading...
HomeMy WebLinkAboutBLD2021-00300 - 01 PERMIT APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us PERMIT APPLICATION Steps in the Permit Process: -Review application checklist to ensure all information is completed prior to submitting application. -Make sure septic has been applied for and water availability has been proven. -Make an appointment to meet with the Permit Technician by calling 360-379-4450. -This is not a standalone application; it must be accompanied by a project specific supplemental application. -Fees will be collected at intake. Additional fees may apply after review and payment is required before permit is issued. For Department Use Only Building Permit # Related Application #s: MLA # Site Information Assessor Tax Parcel Number: Site Address and/or Directions to Property: Access (name of street(s)) from which access will be gained: Present use of property: Description of Work (include proposed uses): Wastewater - Sewage Disposal This property is served by Port Townsend or Port Ludlow sewer system? YES NO If not served by sewer identified above, identify type of septic system below: Type of Sewage System Serving Property: Septic Septic Permit #: Community Septic Name of System: Case #: Are other residences connected to the septic system? Additions or repairs to sewage system: Is it a complete or partial system installation: Complete Partial Has a reserve drainfield been designated? Yes No Date of Last Operations & Maintenance check: Attach last report to application Describe or attach any drainfield easements, covenants or notices on title, which may impact the property: Permit Application Page 1 of 2 May 14 2021 May 14 2021 REVISED 1/11/2022 REVISED 1/11/2022 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street | Port Townsend, WA 98368 360-379-4450 | email: dcd@co.jefferson.wa.us www.co.jefferson.wa.us/commdevelopment  BUILDING PERMIT REVISION Date Regarding: Building Permit Number Address Parcel Number Other Case Number/s Submitted by: Phone: Submittal Explanation (what’s being revised?): Please complete the following, if applicable: Permit Type & Square Footage PERMIT TYPE: APPROVED SQ/FT: CHANGE TO SQ/FT: TOTAL SQFT: Commercial Residential Garage/Shop Accessory Uncovered Porch Covered Porch Unfinished Basement Other (Specify) Estimated Fair Market value cost of changes: No change to square footage REVISED 09/03/2021 9/03/21 184 Condon Lane 990400241 Robert Rester 253-820-8311 We are rubmitting the site plan to show that we have moved the home 20ft to the West. 2165 0 2165 533 0 533 $0.00 ✔ Estimated Fair Market value cost of changes: If the revision involves structural and/or floor plan changes, the following is required:  A narrative describing the changes and page number in set of plans where change occurs  Two copies of only the revised building plans - clearly marked by a border/bubble  Two copies of revised floor plan on no larger than 11x17  Minimum fees: Plan Check - $97.00 Land Use - $97.00 Administrative - $97.00 Environmental Health - $141.00 Environmental Health - $71.00 - Review of resubmission before Building Permit is approved Technology Fee - 5% of total fees If the revision involves changes to the site plan, the following is required:  A narrative describing the changes on the site plan- if they were requested by a department please note who requested them  Two copies of the revised site plan on no larger than 11x17 – revisions clearly marked by a border/bubble  Minimum fees: Administrative - $97.00 Land Use - $97.00 Environmental Health – will be invoiced by EH, if needed, after review Plan check fees may apply if a revision to the building plans is needed Technology Fee - 5% of total fees Fees shall be collected at the time of re-submittal. Revisions that go beyond the minimum revision time during Plan Check, Land Use review, and Environmental Health review will be charged an additional hour. Any additional fees that are accrued during the revision process must be paid prior to the approval and issuance of the revised permit. All revisions to structural components or plans that previously included structural engineering will need to have the revision wet stamped and signed by a design professional (engineer, architect etc.) licensed in WA state. Please route copy to: EH: Planning: PW: Building: Office use only Please Check with DCD for total fees REVISED 09/03/2021 $0.00