HomeMy WebLinkAboutBLD2020-00482 - 01 PERMIT APPLICATIONJEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
UNIFIED DEVELOPMENT CODE
TYPE I LAND USE PERMIT
ROBERT L & HALLIE GLYNN
PO BOX 533
CHIMACUM, WA 98325-0533
APPLICANT:
DATE ISSUED:
DATE EXPIRES:
MLA NUMBER: BLD20-00482
PROJECT PLANNER: Amanda Hunt
PROJECT DESCRIPTION:
BLD20-00482 - NSFR
SEP20-00133
BLD20-00483 - SHOP no plumbing
SEP20-00133
PROJECT LOCATION:
Parcel Number 933500003 in Section 35, Township 29N, Range 1W, BISHOP HEIGHTS DIV II LOT 3 SUBJ/EASE,
located on 162 Bishop Hill Circle in Chimacum, WA 98325
CONDITIONS:
1.)This approval is for a New Single Family Residence (NSFR) with attached garage only. Any future permits on
this site are subject to review for consistency with applicable codes and ordinances and does not preclude
review and conditions which may be placed on future permits.
2.)The revised site plan as submitted with the New Single Family Residence with attached garage application on
November 19th, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson
County Department of Community Development. Any modifications, changes, and/or additions to the stamped,
approved site plan dated November 20th, 2020 shall be resubmitted for review and approval by Jefferson
County Department of Community Development.
3.)Jefferson County Department of Community Development reviewed the application and the county GIS
mapping system for the presence of critical areas and concluded that the property DOES NOT contain critical
areas. However, future proposals will be subject to a new critical area review and conditions may be added if
critical areas are found on the property.
4.)The project shall adhere to the Best Management Practices (BMPs) submitted by the applicant approved on
November 20th, 2020 to control stormwater, erosion and sediment during construction. BMPs shall address
permanent measures to stabilize soil exposed during construction, and in the design and operation of
stormwater and drainage control systems.
5.)The applicant is proposing to create or add 10,681 square feet of impervious surface and 28,120 square feet of
land disturbing activities. These calculations include impervious surface and land disturbing activity square
footage for the proposed Shop (BLD20-00483). JCC 18.30.060 and 18.30.070 require the project applicant
submit a stormwater plan meeting Minimum Requirements #1 through #9 of the Department of Ecology
Stormwater Management Manual for Western Washington. The stormwater plan shall address measures to
control stormwater, erosion and sediment during construction and shall address permanent measures to
stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control
systems.
6.)A Stormwater Plan has been submitted and approved by the Department of Community Development. Once
the subject permit has been issued the applicant shall fully implement the provisions of the submitted plan. No
clearing for roadways or utilities shall occur on the project site until clearing necessary for the installation of
temporary sedimentation and erosion control measures have been completed.
7.)The applicant has proposed and been approved to utilize downspout full infiltration to manage stormwater from
roof areas. The soils were evaluated by using the septic soil logs and found to have three or more feet of
permeable soils and the anticipated water table is at least 1 foot below the bottom of the proposed drywells.
The drywells will be designed per the requirements of the Stormwater Management Manual for Western
Washington BMP T5.10. Drywell will be 9 ft x 9 ft x 4 ft.
8.) AH
9.)The project is located within WRIA 17 and thus is subject to compliance with the WA State Department of
Ecology In Stream Flow Rule for that region. The parcel is located within the Chimacum sub-basin; as such,
state regulations require the following:
1.Water use shall be limited to domestic use only , and such use shall not include outdoor irrigation.
"Domestic use" means use of water associated with human health and welfare requirements, including water
used for drinking, bathing, sanitary requirements, cooking, laundering and other incidental household uses,
including potable domestic water requirements associated with commercial and industrial purposes. ( WAC
173-517-150(8))
2.INSTALLATION OF A WATER METER, MEETING DEPARTMENT OF ECOLOGY SPECIFICATIONS, IS
REQUIRED FOR ALL NEW USES THROUGHOUT THE WATERSHED. (WAC 173-517-180) BROCHURES
WITH SPECIFICATIONS ARE ENCLOSED WITH THE PERMIT.
Refer to enclosed documents for more information, see Ecology web site at
http://www.ecy.wa.gov/programs/wr/instream-flows/quilsnowbasin.html or contact Ecology at 360-407-6300.
FINDINGS:
The Administrator finds that this application complies with applicable provisions of the Unified Development
Code, all other applicable ordinances and regulations, and is consistent with the Jefferson County
Comprehensive Plan and Land Use map.
1.)
APPEALS:
Pursuant to RCW 36.70C, the applicant or any aggrieved party may appeal this final decision to Jefferson County
Superior Court within twenty-one (21) calendar days of the date of issuance of this land use decision. For more
information related to judicial appeals see JCC 18.40.340.
November 23, 2020
Date
______________________________________________
UDC Administrator
BLD20-00482
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street | Port Townsend, WA 98368
360-379-4450 | email: dcd@co.jefferson.wa.us
www.co.jefferson.wa.us/commdevelopment
Page 2 of 2
\\tidemark\data\forms\F_MLT_IssuePermit_U.rpt 11/23/2020