Loading...
HomeMy WebLinkAboutBLD2020-00535 - 07 Engineering24 ' 2' 4' 4' 4' 4' 4' 2' 4'12' 8" 4X8 BEAM 15" SQ X12" CONC FOOTING SEE POST DETAIL 3" 10' 4X8 BEAM 10' 61 4" 4X8 BEAM 10' 8' 4X8 BEAM15' 61 4" 4X8 BEAM 8' 4X8 BEAM 15' 61 4" 4X8 BEAM 10' 4X8 BEAM 10' 61 4" 4X8 BEAM 12' 8" 4X8 BEAM 3'-91 4" CENTERLINE FRAME TO 23' 11" DIA. FOR HARDWARE CLEARANCE. CUT 2X6 T&G CEDAR DECKING TO 24 FOOT DIA. Ø 2 3 ' - 1 1 " SEE FRAMING DETAIL RIM JOIST SEE ELEVATION SHT 2 KN E E B R A C E B KN E E B R A C E B KN E E B R A C E C KN E E B R A C E C KNEE BRACE A UNDER KNEE BRACE A UNDER 4X8 BEAM PC 444X4 POST PB 44 12" 6" 15" SQ COMPACTED MINERAL SOIL (NO ORGANICS) 4 - #4X12" REBAR 4X8 BEAM 2X8 RIM JOIST TOENAIL AS REQUIRED HRS 12 W/ 14-10d NAILS PLATFORM FRAMING PLAN    P r e p a r e d f o r : N I C H A L A S & K R I S T Y P A P A D O P U L O S 16 7 H A Y E S S T . SE A T T L E , W A 9 8 1 0 9 24 ' P L A T F O R M F R A M I N G P L A N PA R C E L N O . 9 2 1 3 2 4 0 1 5 POST DETAIL    FRAMING DETAIL    123'367' 63' 103' 20% SLOPE 6'± 6" MIN 15% SLOPE 5'± 6" MIN 24' 10' ENTRY DECK STAIRS SEE ENTRY DECK DETAIL 4X8 4X8 4X8 2X8 2X8 2X8 2X8 4X4 POST W/ EPC 44 & PC 44 4X8 BEAM PC 44 15" SQ 18" 4X4 POST ENTRY DECK 3 8" EXTERIOR PLY DRIP EDGE MAIN PLATFORM 2x8 RIM JOIST 4X8 BEAM HUC 48 PB 44 COMPACTED MINERAL SOIL (NO ORGANICS) 4 - #4X12" REBAR 24 ' P L A T F O R M E L E V A T I O N PA R C E L N O . 9 2 1 3 2 4 0 1 5 P r e p a r e d f o r : N I C H A L A S & K R I S T Y P A P A D O P U L O S 16 7 H A Y E S S T . SE A T T L E , W A 9 8 1 0 9 PLATFORM LOCATION PLATFORM ELEVATION    OAK BAY ROAD SITE LOCATION   OPTIONAL DECK    OPTIONAL DECK DETAIL    45.00 ° 2' - 3' 4X8 BEAM 2-KBS1Z (4 LOCATIONS) 4X4 KNEE BRACE 4X4 POST 2X6 DECK 2X6 DECK 2-KBS1Z ONE LOCATION AS REQUIRED 4X8 BEAM 12"± 4X4 KNEE BRACE 2-A34 2X6 DECK 2-KBS1Z ONE LOCATION AS REQUIRED 4X8 BEAM 12"± 4X4 KNEE BRACE 2-A34 VARIES 1/2" MIN 93 4" 2X6 T&G CEDAR DECKING OR 11 8" PLYWOOD 2X8 RIM JOIST 1" 3 8" PLY DRIP EDGE ADD BLOCKING AS NEEDED STRUCTURAL NOTES: 1. Framing lumber, posts and beams shall be DF-L #1 2. Posts shall be preservative treated. 3. Galvanized nails are required with all preservative treated lumber. 4. All framing shall be fastened in accordance with 2016 IBC Table 2304.9.1. 5. Concrete shall have a minimum 28 day compressive strength of 2500 psi. 6. Reinforcing steel shall have a minimum yield strength of 40,000 psi. 7. All footings shall be placed on native undisturbed mineral soil. 8. Simpson connectors shall have ZMAX corrosion protection. 24 ' P L A T F O R M B R A C I N G PA R C E L N O . 9 2 1 3 2 4 0 1 5 P r e p a r e d f o r : N I C H A L A S & K R I S T Y P A P A D O P U L O S 16 7 H A Y E S S T . SE A T T L E , W A 9 8 1 0 9 KNEE BRACE A DETAIL    KNEE BRACE B DETAIL    KNEE BRACE C DETAIL    DRIP EDGE DETAIL