HomeMy WebLinkAboutBLD2020-00427-09A - Geotech field report4/5/2021 JOB# BUILDING PERMIT NO.BLD20-00427 Looking NE at the Foundation Excavation Page 1 of 1 CLIENT: CONTACTS: Katharine Weissmann Field Report No. 1 DATE:2021-0002 PROJECT NAME: b2 structural engineers Glen G. Wade, P.G., L.E.G.Rain Shadow Woodworks Coker Designs, LLC INSPECTOR: LOCATION: Weissmann Residence 650 Beckett Pt Rd, Port Townsend, WA I visted the site as requested by Kellie Merritt of Rain Shadow Woodworks to meet with her, Kevin Coker,  Basri Basri, Seb Eggert, and the concrete contractor about potential design changes, and to observe the  conditions of the foundation excavation.   Due to frost depth, height restriction, and site grades, the proposed building footprint was excavated  to a  depth of up to 3±ft adjacent to the rockery along the northeast property line.  The near‐vertical cut did not  show signs of movement.  The rockery and slope above did not show signs of obvious recent movement.  I  suggested the possibility of survey monitoring of the slope periodically throughout construction to verify  no slope movement associated with construction.   Excavated materials appeared to include sod, topsoil, and fine‐grained soil to a depth of roughly 1.5‐2±feet  below the existing ground surface.  Below such depth, medium dense to dense sand and gravel was  exposed, including the majority of the bottom of the excavation.  Near the west corner of the excavation,  where the bottom of the excavation was about 1.5 feet or less, some fine‐grained material and grass roots  remained exposed.  Based on the deeper than expected foundation depth, particularly along the northeast  side at the toe of the rockery, all agreed to change the current design to a wider footing and taller stem  wall. We will return to the site as requested for pipe pile installation observation, slope observation, verification  of foundation soil bearing, and subsurface drainage installation. North Shore Geo, PLLC 317 Sutter Rd Port Angeles, WA 98362 glenwade@gmail.com (206) 755-4404 4/9/2021 JOB# BUILDING PERMIT NO.BLD20-00427 Pile Plan Page 1 of 1 CLIENT: CONTACTS: Katharine Weissmann Field Report No. 2 DATE:2021-0002 PROJECT NAME: b2 structural engineers Glen G. Wade, P.G., L.E.G.Rain Shadow Woodworks Coker Designs, LLC INSPECTOR: LOCATION: Weissmann Residence 650 Beckett Pt Rd, Port Townsend, WA I visted the site as requested by Kellie Merritt of Rain Shadow Woodworks to observe pipe pile installation  by Basri Basri and to observe the conditions of the foundation excavation.   All 22 steel galvanized 2‐inch schedule 80 pipe piles were installed today with 140‐lb pneumatic rhino  hammers and met the refusal criteria of 3 cycles of less than 1‐inch penetration for 60 seconds of  continuous driving.  Please see the pile plan below with corresponding pile numbers and depths. I observed no apparent changes in the excavation slope, rockery slope, adjacent property above the  rockery, or the bluff slope to the northwest.  The contractor previously covered the excavation slope below  the rockery with plastic sheeting to prevent the soils from drying and potentially raveling into the  excavation.  The contractor set up 9 survey points on the rockery face, measuring the optical distance  before and after pile driving, and found no changes in the points outside of the likely margin for error  (largest change was 1/8"). I will return to the site as requested for slope observation, verification of foundation soil bearing, and  subsurface drainage installation. North Shore Geo, PLLC 317 Sutter Rd Port Angeles, WA 98362 glenwade@gmail.com (206) 755-4404