HomeMy WebLinkAboutBLD2021-00042 - 10 COMMUNICATIONSAccess Connection Permit
Managed Access Highways Only
Not for use within an Incorporated City or Town
Name and Address of Applicant Permit Number
ACP-
State Route Mile Post
Left Right
Region County
Property Address (If different from above) Joint Use Connection: Yes No
Primary Tax Parcel Number
Email
Telephone
Additional Tax Parcel Numbers (if applicable)
Project Name (If Applicable) Lot # Gov. Lot #
Average Weekday Vehicle Trip Ends (AWDVTE) not to exceed: Approach width not to exceed feet wide
Public Land Survey System (PLSS) 1/4 of the 1/4 of Section Township N,Range E W
Permit Category
1 - Minimum Connection
2 - Minor Connection
3 - Major Connection
4 - Temporary Connection
Permit Type
Conforming Permit
Non-Conforming Permit
Variance Permit
&XUUHQW0DQDJHG$FFHVV+LJKZD\&ODVVL¿FDWLRQ
Class 1 - 1320’ Minimum Approach Spacing
Class 2 - 660’ Minimum Approach Spacing
Class 3 - 330’ Minimum Approach Spacing
Class 4 - 250’ Minimum Approach Spacing
Class 5 - 125’ Minimum Approach Spacing
This Access Connection Permit serves:
The Applicant hereinafter will be referred to as the “Permit Holder,” and the Washington State Department of Transportation
hereinafter will be referred to as “WSDOT.” WSDOT will allow the Permit Holder to construct, upgrade, use, and/or
maintain this access connection provided the Permit Holder accepts all the terms, provisions, and exhibits attached
hereto and by this reference made a part of this permit. This permit is assigned to the parcel(s) served by the access
connection, and shall remain with the parcel(s) served by this permit regardless of any change in ownership of the parcel(s).
Exhibit A: Special Provisions for Access Connections
Exhibit B: Right of Way Sheet or Vicinity Map
This permit shall be void unless the work authorized by the permit is started within 90 days of issuance and completed
within 120 days of issuance, unless otherwise agreed to in writing by WSDOT or if an extended completion date is listed
here by WSDOT: No construction work is allowed without a pre-construction conference with WSDOT.
By signing below the Permit Holder accepts the terms, provisions, and exhibits attached to and made a part of this permit.
PERMIT HOLDER
Print Name
Print Title
Signature Date
WSDOT
Print Name
Print Title
Signature
.
Date
DOT Form 224-005
Revised 04/2020
Page 1
re
60687John/Christie LaPlume
2811 Evelyn Ct
Vienna, VA 22180 20 4.8
Olympic Clallam
901054007
No established address
laplumece@gmail.com
703-966-8884
100 30
sw SE 5 29 1
Single Family Residence
Exhibit C – Traffic Control Plan(s)
Exhibit D – Driveway Design Template(s)
9/1/2021
John/Christie LaPlume Nate Bergeman
Owner M&O Asst. Supt.
4/8/2021
General Provisions
1. INDEMNIFICATION
The Permit Holder, its heirs, successors and assigns, agrees to indemnify, defend, and hold harmless the State of
:DVKLQJWRQDQGLWVRႈFHUVHPSOR\HHVDQGDJHQWVIURPDOOFODLPVGHPDQGVGDPDJHVERWKWRSHUVRQVDQGRU
SURSHUW\H[SHQVHVUHJXODWRU\¿QHVDQGRUVXLWVWKDWDULVHRXWRIRUDUHLQFLGHQWWRDQ\DFWVRURPLVVLRQVE\WKH
Permit Holder, its agents, contractors, tenants, invitees, licensees, and/or employees, in the use of the state highway
right-of-way as authorized by the terms of this Permit, and/or (2) are caused by the breach of any of the conditions of this
Permit by the Permit Holder, its agents, contractors, tenants, invitees, licensees, and/or employees. The Permit Holder, its
heirs successors and assigns, shall not be required to indemnify, defend, or hold harmless the State of Washington and
LWVRႈFHUVHPSOR\HHVDQGRUDJHQWVLIWKHFODLPVXLWRUDFWLRQIRUGDPDJHVERWKWRSHUVRQVDQGRUSURSHUW\LVFDXVHG
E\WKHVROHDFWVRURPLVVLRQVRIWKH6WDWHRI:DVKLQJWRQLWVRႈFHUVHPSOR\HHVDQGRUDJHQWVSURYLGHGWKDWLIVXFK
FODLPVVXLWVRUDFWLRQVUHVXOWIURPWKHFRQFXUUHQWQHJOLJHQFHRIDWKH6WDWHRI:DVKLQJWRQLWVRႈFHUVHPSOR\HHVDQG
or agents and (b) the Permit Holder, its agents, contractors, tenants, invitees, licensees, and/or employees, or involves
those actions covered by RCW 4.24.115, the indemnity provisions provided herein shall be valid and enforceable only
to the extent of the acts or omissions of the Permit Holder, its agents, contractors, tenants, invitees, licensees, and/or
employees.
The Permit Holder agrees that its obligations under this section extend to any claim, demand and/or cause of action
brought by, or on behalf of, any of its employees or agents while performing construction, operation and/or maintenance
work authorized by this permit. For this purpose, THE PERMIT HOLDER BY MUTUAL NEGOTIATION HEREBY
WAIVES WITH RESPECT TO THE STATE OF WASHINGTON ONLY, ANY IMMUNITY THAT WOULD OTHERWISE BE
AVAILABLE TO IT AGAINST SUCH CLAIMS UNDER THE INDUSTRIAL INSURANCE PROVISIONS OF CHAPTER
51.12 RCW.
The Permit Holder further agrees that the proper performance, safe conduct, and adequate policing and supervision
RIWKHZRUNDXWKRUL]HGE\WKLVSHUPLWVKDOOQRWEHOHVVHQHGRURWKHUZLVHDႇHFWHGE\:6'27¶VDSSURYDORIWKHSODQV
VSHFL¿FDWLRQVRUZRUNDXWKRUL]HGE\WKLVSHUPLWRUE\WKHSUHVHQFHDWWKHZRUNVLWHRI:6'27UHSUHVHQWDWLYHVRUE\
compliance by the Permit Holder with any requests or recommendations made by such representatives.
7KLVLQGHPQL¿FDWLRQDQGZDLYHUVKDOOVXUYLYHWKHWHUPLQDWLRQRIWKLV3HUPLW
2. REQUIRED PROPERTY RIGHTS
If the parcel(s) served by this permit does not abut the state highway, the Permit Holder must provide legally recorded
easements or other property rights that grant a continuous right of access between this parcel(s) and the state highway
right-of-way as required by WAC 468-51-030(2). The Permit Holder shall provide copies of these documents to WSDOT
before beginning any work authorized under this permit.
3. PERMIT TYPES
There are three types of Access Connection Permits – Conforming, Non-Conforming, and Variance Access Connection
Permits. A brief description of each of these three types of permits is as follows:
• Conforming Access Connection Permits (WAC 468-51-020(4)) meet current WSDOT location, spacing, and
design criteria standards at the time of the permit application submittal.
• Nonconforming Access Connection Permits (WAC 468-51-100) do not meet WSDOT’s location and spacing
criteria standards at the time of the permit application submittal, but denial would leave the property without
reasonable access onto the public road system. Nonconforming Access Connection Permits may continue
only until WSDOT determines that a Conforming Access Connection can be constructed, in such case the
Nonconforming Access Connection shall be removed
• Variance Access Connection Permits (WAC 468-51-105) are a special nonconforming or additional access
connection permit issued for a location not normally permitted by WSDOT standards current at the time of
permit application. A Variance Access Connection Permit may be issued only after an engineering study
GHPRQVWUDWHVWRWKHVROHVDWLVIDFWLRQRI:6'27WKDWWKHFRQQHFWLRQZLOOQRWDGYHUVHO\DႇHFWWKHVDIHW\
PDLQWHQDQFHRURSHUDWLRQRIWKHVWDWHKLJKZD\LQDFFRUGDQFHZLWKLWVDVVLJQHGFODVVL¿FDWLRQ$9DULDQFH
Access Connection Permit may only be issued for Class 2 thru Class 5 highways and may remain unless a
QHZSHUPLWLVUHTXLUHGGXHWRFKDQJHVLQSURSHUW\VLWHXVHRUXQOHVV:6'27PRGL¿HVUHYRNHVRUFORVHVWKH
permit pursuant to WAC 468-51-120.
DOT Form 224-005
Revised 04/2020
Page 2
4. OTHER PERMITS, FRANCHISE RIGHTS, AND AGREEMENTS
This permit shall not be deemed or held to be an exclusive one and shall not prohibit WSDOT from granting other permits,
franchise rights, and/or agreements or from entering into other permits, franchise rights, and/or agreements of like or
other nature with other public or private companies or individuals for the use of the state highway right-of-way, nor shall it
SUHYHQW:6'27IURPXVLQJDQ\RILWVKLJKZD\VVWUHHWVRUSXEOLFSODFHVRUDႇHFWLWVULJKWWRIXOOVXSHUYLVLRQDQGFRQWURO
over all or any part of them, none of which is hereby surrendered.
5. PERMITS FROM OTHER AGENCIES
The Permit Holder shall be responsible for obtaining all necessary Federal, State, and Local Permits including, but not
limited to, Washington State Department of Ecology, Washington State Department of Fish and Wildlife, Washington
State Department of Natural Resources, and U.S. Army Corps of Engineers permits or other approvals required prior
to beginning any of the work authorized in this permit. The Permit Holder shall defend and hold harmless the State of
:DVKLQJWRQLWVRႈFHUVDQGHPSOR\HHVIRUDQ\¿QHVFRVWVRURWKHUDPRXQWVVKRXOGWKH3HUPLW+ROGHUIDLOWRREWDLQDOO
required permits.
6. PERMIT HOLDER’S REPRESENTATIVE
Should the Permit Holder not be present during any of the work authorized by this permit, the Permit Holder shall
designate a representative that has either the legal authority to represent the Permit Holder or the authority to make
decisions on behalf of the Permit Holder with respect to the work authorized by this permit. The Permit Holder, at its
own expense, shall adequately police and supervise all work authorized by this permit, including but not limited to its
contractor, subcontractor, agent, and others, so as not to endanger or injure any person or property. The Permit Holder or
the Permit Holder’s representative shall be present during any active construction or maintenance work authorized by this
permit. Failure to comply with this provision may result in WSDOT restricting any further work by the Permit Holder within
the state highway right-of-way until this requirement is met.
7. PRE-CONSTRUCTION CONFERENCE
7KH3HUPLW+ROGHUVKDOOQRWVWDUWDQ\FRQVWUXFWLRQRQVWDWHKLJKZD\ULJKWRIZD\ZLWKRXW¿UVWKDYLQJDSUHFRQVWUXFWLRQ
meeting which shall be attended by WSDOT, the Permit Holder or its authorized representative, and the Permit Holder’s
contractor, if applicable. Unless requested otherwise by WSDOT, the preconstruction conference shall be onsite at the
location of the work authorized by this permit.
8. WSDOT NOTIFICATION
7KH3HUPLW+ROGHUVKDOOQRWLI\:6'27DPLQLPXPRI¿YHZRUNLQJGD\VSULRUWRLQFOXGLQJEXWQRWOLPLWHGWRWKH
SUHFRQVWUXFWLRQFRQIHUHQFHWKHEHJLQQLQJRIDQ\FRQVWUXFWLRQZRUNWKHLPSOHPHQWDWLRQRIDQ\WUDႈFFRQWUROSODQWKDW
FORVHVRUUHVWULFWVDVLGHZDONSDWKZD\WUDLOKLJKZD\VKRXOGHURUWUDYHOHGODQHRIWKHVWDWHKLJKZD\VXEPLWWDORIDQHZ
RUUHYLVHGWUDႈFFRQWUROSODQDQ\H[WHQVLRQRIDOORZHGZRUNLQJKRXUVRUGD\VDQGWKH¿QDOLQVSHFWLRQXSRQFRPSOHWLRQRI
the construction.
Working days, for the purposes of notifying WSDOT of any work or other activity as authorized by this permit, are the
weekdays Monday through Friday, excluding legal holidays.
9. PERMIT DOCUMENTS ON SITE
A complete copy of this permit, protected from the elements, shall be readily available any time active construction work is
being performed as authorized by this permit. The permit shall be shown, upon request, to any state representative or law
HQIRUFHPHQWRႈFHU)DLOXUHWRFRPSO\ZLWKWKLVSURYLVLRQPD\UHVXOWLQ:6'27UHVWULFWLQJDQ\IXUWKHUZRUNE\WKH3HUPLW
Holder within the state highway right-of-way until said requirement is met.
10. TRAFFIC CONTROL PLANS
7KH3HUPLW+ROGHUVKDOOQRWLPSOHPHQWDQ\WUDႈFFRQWUROSODQV7&3RQVWDWHKLJKZD\ULJKWRIZD\ZLWKRXW:6'27¶V
prior written approval. It is the Permit Holder’s responsibility to plan, conduct, and safely perform the work authorized by
this permit. Should additional TCP’s be needed for the construction and/or maintenance of the work authorized by this
SHUPLWWKH3HUPLW+ROGHUVKDOOVXEPLWZRUNVSHFL¿FWUDႈFFRQWUROSODQVWR:6'27IRUUHYLHZDQGZULWWHQDSSURYDO
$ZLGHUDQJHRISHGHVWULDQVPLJKWEHDႇHFWHGE\WUDႈFFRQWURO]RQHVLQFOXGLQJWKH\RXQJHOGHUO\DQGSHRSOHZLWK
disabilities such as hearing, visual, or mobility. Bicyclists may also be impacted. The Permit Holder shall implement
DOOUHDVRQDEOHPHDQVRIWUDႈFFRQWUROQHFHVVDU\WRDGHTXDWHO\DFFRPPRGDWHWKHVHQHHGVLIWKH\FDQEHUHDVRQDEO\
expected to be encountered during the work authorized by this permit.
$OOWUDႈFFRQWUROSODQVVKDOOEHLQFRPSOLDQFHZLWKWKHFXUUHQWHGLWLRQVRIWKH:DVKLQJWRQ6WDWH'HSDUWPHQWRI
7UDQVSRUWDWLRQ:6'27:RUN=RQH7UDႈF&RQWURO*XLGHOLQHVDQG)HGHUDO+LJKZD\$GPLQLVWUDWLRQDSSURYHG0DQXDORQ
DOT Form 224-005
Revised 04/2020
Page 3
8QLIRUP7UDႈF&RQWURO'HYLFHV087&'IRU6WUHHWVDQG+LJKZD\V
7KH:6'27:RUN=RQH7UDႈF&RQWURO*XLGHOLQHV0PD\EHDFFHVVHGDW
http://www.wsdot.wa.gov/Publications/Manuals/M54-44.htm
7KH087&'LQFOXGLQJPRGL¿FDWLRQVIRU:DVKLQJWRQ6WDWHPD\EHDFFHVVHGDW
KWWSZZZZVGRWZDJRY2SHUDWLRQV7UDႈFPXWFGKWP
11. CHANGES TO TRAFFIC CONTROL PLANS
:6'27UHVHUYHVWKHULJKWWRLPPHGLDWHO\PRGLI\VXVSHQGRUUHYRNHDQ\WUDႈFFRQWUROSODQRUZRUNDXWKRUL]HGXQGHU
this permit, including but not limited to lane closures and shoulder closures due to unexpected conditions or other
circumstances which WSDOT determines is in the best interests of the state and/or safety of the traveling public. All costs
DVVRFLDWHGZLWKDPRGL¿FDWLRQVXVSHQVLRQRUUHYRFDWLRQVKDOOEHERUQHVROHO\E\WKH3HUPLW+ROGHU:6'27VKDOOLQQR
way be held liable for any delays, costs, or other damages to the Permit Holder by reason of any such WSDOT action.
12. TRACKING OF MATERIAL
The Permit Holder shall maintain the surface of the access connection to prevent the tracking of material onto any portion
of the state highway, including the traveled lanes and shoulders of the highway. Any tracking of material onto the highway,
such as mud or debris, shall be immediately cleaned up by the Permit Holder in accordance with RCW 46.61.655. Should
the Permit Holder fail to immediately correct or clean up material tracked onto the state highway after receiving written
notice from WSDOT, WSDOT reserves the right to perform the necessary work to preserve the state highway right-of-way
or for the protection of the traveling public or pedestrians. If WSDOT performs the work as provided herein, the Permit
Holder agrees to make payment to WSDOT within thirty (30) calendar days of the date of WSDOT’s detailed invoice. If
WSDOT chooses not to perform the work, WSDOT may initiate an action to revoke this permit as provided as provided by
WAC 468-51.120.
13. EROSION AND SEDIMENTATION CONTROL
7KH3HUPLW+ROGHUVKDOOFRPSO\ZLWKWKH:DVKLQJWRQ6WDWH'HSDUWPHQWRI7UDQVSRUWDWLRQ+LJKZD\5XQRႇ0DQXDO+50
and implement Best Management Practices (BMP’s) to reduce erosion, trap sediment, and ensure that sediment-laden
water does not leave the work site. The HRM establishes minimum requirements and provides uniform technical guidance
for avoiding, minimizing, and/or mitigating potential water resource impacts. All water discharges to or from the state
highway right-of-way due to the work activities authorized by this permit shall conform to all applicable federal, state, and
local water quality regulations.
7KH:DVKLQJWRQ6WDWH'HSDUWPHQWRI7UDQVSRUWDWLRQ+LJKZD\5XQRႇ0DQXDO0PD\EHDFFHVVHGDWhttp://www.
wsdot.wa.gov/Publications/Manuals/M31-16.htm
14. CULTURAL RESOURCES
If any archaeological or historical resources are revealed due to the work authorized under this permit, the Permit Holder
shall immediately stop work and notify WSDOT’s representative and retain a United States Government Secretary of
WKH,QWHULRU¶VTXDOL¿HGDUFKDHRORJLVW6DLGDUFKDHRORJLVWVKDOOHYDOXDWHWKHVLWHDQGPDNHUHFRPPHQGDWLRQVWR:6'27
regarding the continuation of the work.
15. UTILITY IMPACTS
All manholes, valve covers, catch basins, utility boxes, or other similar utility appurtenances impacted by the work
authorized in this permit that do not require a separate WSDOT Utility Permit or Utility Franchise shall be constructed,
PRGL¿HGRUUHSDLUHGWRPDWFKWKHKLJKZD\VKRXOGHUVORSHDQGLIRXWVLGHWKHKLJKZD\VKRXOGHUVKDOOPDWFKWKHDGMDFHQW
WHUUDLQDVUHTXLUHGE\:6'27$Q\:6'27LQVSHFWLRQRUFRQFXUUHQFHRIWKLVZRUNVKDOOEHIRUWKHVROHEHQH¿WRI:6'27
and not for the Permit Holder or any third party. The Permit Holder shall make a timely application for any WSDOT-issued
Utility Permit, Utility Franchise, or an amendment to an existing utility permit or franchise. Failure to obtain any required
Utility Permit, Utility Franchise, or an amendment to an existing utility permit or franchise in a timely manner may result
in WSDOT delaying the work authorize by this permit until such time that the require documents are obtained. The
Permit Holder agrees on behalf of itself, its successors, assigns, tenants, invitees, licensees, contractors, agents and/or
employees, that WSDOT shall in no way be held liable for any delays, costs, or other damages to the Permit Holder or its
successors, assigns, contractors, tenants, invitees, licensees, employees and/or agents by reason of any action taken by
WSDOT pursuant to this section.
Additional guidance in accommodating utilities within state highway right-of-way may be found in the current editions
of the Washington State Department of Transportation Utilities Accommodations Manual M22-86 and WSDOT Utilities
Manual M22-87.
DOT Form 224-005
Revised 04/2020
Page 4
The WSDOT Utilities Accommodations Manual, M22-86, may be accessed at: http://www.wsdot.wa.govPublications/
Manuals/M22-86.htm.
The WSDOT Utilities Manual, M22-87, may be accessed at: http://www.wsdot.wa.gov/Publications/Manuals/M22-87.htm
16. SURVEY MONUMENTS
7KH3HUPLW+ROGHUVKDOOQRWGLVWXUEUHPRYHRUGHVWUR\DQ\H[LVWLQJVXUYH\0RQXPHQWEHIRUH¿UVWREWDLQLQJD:DVKLQJWRQ
State Department of Natural Resources (DNR) permit. The Permit Holder further agrees that all WSDOT control and
DOLJQPHQWPRQXPHQWVPD\QRWEHGLVWXUEHGUHPRYHGRUGHVWUR\HGXQOHVVVSHFL¿FDOO\DXWKRUL]HGE\WKLVSHUPLWRU
pursuant to WSDOT’s prior written approval. Any reset survey Monument shall be set by or under the direct supervision of
a Professional Land Surveyor who has an active professional license with the State of Washington.
$OLVWLQJRI6XUYH\0RQXPHQWVPD\EHDFFHVVHGDW:6'27¶V*HRJUDSKLF6HUYLFHV2ႈFH:HEVLWH
http://www.wsdot.wa.gov/monument/searchBroad.aspx
17. DELAY TO WSDOT WORK
All work authorized by this permit shall be done in such a manner by the Permit Holder as will cause the least interference
with any of WSDOT’s or it’s contractor’s work on the state highway. The Permit Holder agrees on behalf of itself, its
successors, assigns, tenants, invitees, licensees, contractors, agents and employees, that WSDOT shall in no way be
held liable for any delays, costs, or other claims or damages by the Permit Holder or its successors, assigns, tenants,
invitees, licensees, contractors, agents and/or employees occasioned by WSDOT’s or its contractor’s work on the state
highway right of way.
18. MATERIALS AND WORKMANSHIP
All material and workmanship shall conform to the current edition of the Washington State Department of Transportation
6WDQGDUG6SHFL¿FDWLRQVIRU5RDG%ULGJHDQG0XQLFLSDO&RQVWUXFWLRQDQGDPHQGPHQWVWKHUHWRDQGVKDOOEHVXEMHFWWR
LQVSHFWLRQDQGFRQFXUUHQFHE\:6'27$Q\:6'27LQVSHFWLRQRUDFFHSWDQFHVKDOOEHIRUWKHVROHEHQH¿WRI:6'27
and not for the Permit Holder or any third party.
7KH:DVKLQJWRQ6WDWH'HSDUWPHQWRI7UDQVSRUWDWLRQ6WDQGDUG6SHFL¿FDWLRQVIRU5RDG%ULGJHDQG0XQLFLSDO&RQVWUXFWLRQ
(M41-10) may be accessed at: http://www.wsdot.wa.gov/Publications/Manuals/M41-10.htm
19. PERMIT MODIFICATIONS, AMENDMENTS, CHANGES AND/OR CORRECTIONS
:6'27UHVHUYHVWKHULJKWWRUHTXLUHSHUPLWPRGL¿FDWLRQVDPHQGPHQWVFKDQJHVDQGRUFRUUHFWLRQVVKRXOGWKH
DXWKRUL]HGFRQVWUXFWLRQQRWFRQIRUPZLWK:6'27¶VFXUUHQW6WDQGDUG6SHFL¿FDWLRQVIRU5RDG%ULGJHDQG0XQLFLSDO
Construction, WSDOT’s Standard Plans, WSDOT’s Design Manual, the permit Special Provisions and/or if unexpected
construction site conditions are encountered prior to or during the performance of the work authorized by this permit. The
Permit Holder is required to obtain WSDOT’s prior review and written approval for any proposed changes to the permit.
Permit Holder agrees on behalf of itself, its successors, assigns, tenants, invitees, licensees, contractors, agents and
employees, that WSDOT shall in no way be held liable for any delays, costs, or other claims or damages to the Permit
Holder or its successors, assigns, tenants, invitees, licensees, contractors, agents and/or employees, should WSDOT
UHTXLUHDQ\PRGL¿FDWLRQVDPHQGPHQWVFKDQJHVDQGRUFRUUHFWLRQVWRWKHSHUPLW
20. STORAGE OF EQUIPMENT AND MATERIALS
The Permit Holder shall not place or store any equipment and/or materials within the state highway right-of-way unless
VSHFL¿FDOO\DXWKRUL]HGE\WKLVSHUPLWRULQZULWLQJE\:6'27DQGDQ\SODFHPHQWRUVWRUDJHRIDQ\HTXLSPHQWDQGRU
materials, if allowed, shall only be during the active construction phase of the work authorized by this permit.
21. CONSTRUCTION AND MAINTENANCE WORKING DAYS – SUSPENSION OF WORK
7KH3HUPLW+ROGHUVKDOOQRWSHUIRUPZRUNRQD6DWXUGD\6XQGD\RUDOHJDOKROLGD\XQOHVVVSHFL¿HGHOVHZKHUHLQWKLV
permit or by WSDOT in writing. RCW 1.16.050 lists the following days as the observed legal holidays and their common
names:
• First day in January - New Year’s Day
• Third Monday of January - Martin Luther King Jr’ s Birthday
• Third Monday of February - President’s Day
• Last Monday of May - Memorial Day
• Fourth day of July – Fourth of July
• First Monday in September - Labor Day
DOT Form 224-005
Revised 04/2020
Page 5
• Eleventh day of November - Veterans’ Day
• Fourth Thursday in November – Thanksgiving Day and the day immediately following
• 7ZHQW\¿IWKGD\RI'HFHPEHU&KULVWPDV'D\
22. FAILURE TO COMPLETE WORK IN A TIMELY MANNER
The Permit Holder agrees to complete the work authorized by this permit within 120 days, unless an extension of time
is granted in writing by WSDOT. Should the Permit Holder fail to complete the work within the approved time limit,
WSDOT shall determine what work must be completed to restore the state highway right-of-way back to a condition
DQGFRQ¿JXUDWLRQWKDWLVVDIHIRUSXEOLFXVH6KRXOGWKH3HUPLW+ROGHUIDLOWRLPPHGLDWHO\¿QLVKWKHZRUNDXWKRUL]HGE\
WKLVSHUPLWRUWRUHVWRUHWKHVWDWHKLJKZD\ULJKWRIZD\EDFNWRDFRQGLWLRQDQGFRQ¿JXUDWLRQWKDWLVVDIHIRUSXEOLFXVH
DIWHUUHFHLYLQJZULWWHQQRWLFHRIWKHGH¿FLHQF\IURP:6'27:6'27UHVHUYHVWKHULJKWWRSHUIRUPWKHQHFHVVDU\ZRUN
to preserve the state highway for public use and for the safety of the traveling public. If WSDOT performs the work, the
Permit Holder agrees to make payment to WSDOT within thirty (30) calendar days of the date of WSDOT’s detailed
invoice. If WSDOT chooses not to perform the work, WSDOT may initiate an action to revoke this permit as provided as
provided by WAC 468-51.120, as well as recover all costs associated with restoring the state highway right-of-way.
23. FINAL INSPECTION AND SURETY RELEASE
$OOZRUNRQVWDWHKLJKZD\ULJKWRIZD\LVVXEMHFWWRRQJRLQJPRQLWRULQJDQGLQVSHFWLRQE\:6'27VROHO\IRUWKHEHQH¿W
of WSDOT and not for the Permit Holder or any third party. Upon completion of the work authorized by this permit,
LQFOXGLQJWKHUHPRYDORIDOOFRQVWUXFWLRQUHODWHGUXEELVKDQGGHEULVWKH3HUPLW+ROGHUVKDOOUHTXHVWD¿QDOLQVSHFWLRQIURP
WSDOT’s representative. Only upon WSDOT’s inspection and concurrence of the work authorized by this permit will
WSDOT release the surety, if any, that was made a condition of this permit, provided all other conditions related to the
surety have been met.
24. ON-GOING MAINTENANCE OF ACCESS CONNECTION
The Permit Holder, its successors or assigns, shall be responsible for maintaining the access connection and related
appurtenances between the state highway edge of shoulder and the state highway right-of-way line, including but
not limited to, pavement surface, culverts, catch basins, earthen embankment slopes above and below the access
FRQQHFWLRQYHJHWDWLRQJURZWKWKDWLPSDFWVWUDႈFDQGSHGHVWULDQVLJKWOLQHVDQGVLJKWGLVWDQFHWKHUHPRYDORIVQRZRU
other material that may be tracked onto the access such as mud and debris, and mail boxes.
7KH3HUPLW+ROGHUVKDOOFRUUHFWDQ\PDLQWHQDQFHGH¿FLHQF\ZLWKLQWKLUW\FRQVHFXWLYHFDOHQGDUGD\VXSRQGLVFRYHU\
RU:6'27ZULWWHQQRWLFHXQOHVV:6'27DXWKRUL]HVLQZULWLQJDGLႇHUHQWWLPHSHULRG6KRXOGWKH3HUPLW+ROGHUIDLOWR
FRUUHFWDGH¿FLHQF\DIWHUUHFHLYLQJZULWWHQQRWLFHRIWKHGH¿FLHQF\IURP:6'27:6'27UHVHUYHVWKHULJKWWRSHUIRUP
the necessary maintenance work to preserve the state highway right-of-way or for the protection of the traveling public
or pedestrians. If WSDOT performs maintenance work as provided herein, the Permit Holder agrees to make payment
to WSDOT within thirty (30) calendar days of the date of WSDOT’s detailed invoice. If WSDOT chooses not to make the
repair, WSDOT may initiate an action to revoke this permit as provided as provided by WAC 468-51.120.
25. STORMWATER AND DRAINAGE MAINTENANCE
7KH3HUPLW+ROGHUVKDOOFRQVWUXFWDQGPDLQWDLQWKHDFFHVVFRQQHFWLRQVXFKWKDWQRVWRUPZDWHUUXQRႇLVGLUHFWHGRQWRWKH
paved surface of the state highway traveled lanes and shoulders. Curbing or other drainage features may be required
LIWKHJUDGHEH\RQGWKHHGJHRIVKRXOGHULVÀDWRUVORSHVWRZDUGWKHVWDWHKLJKZD\SDYHPHQWVXFKWKDWDQ\VWRUPZDWHU
UXQRႇRQWKHDFFHVVFRQQHFWLRQZRXOGÀRZRQWRWKHWUDYHOHGODQHVDQGVKRXOGHURIWKHVWDWHKLJKZD\
The Permit Holder shall be responsible to maintain all culverts and catch basins associated with this permit and shall
SURYLGHDOOQHFHVVDU\RQJRLQJPDLQWHQDQFHWRNHHSWKRVHFXOYHUWVDQGFDWFKEDVLQVIUHHÀRZLQJDQGFOHDURIDOO
obstructions in accordance with the provisions of Section 24.
The Permit Holder shall not interfere with the conveyance and/or treatment of the existing highway stormwater drainage
system. If the work performed in any way adversely interferes with existing state highway stormwater drainage, including
the treatment and/or conveyance of stormwater, the Permit Holder shall immediately correct its drainage impacts on
the state highway at its own expense after receipt of WSDOT’s written notice. Such work as required by WSDOT shall
be inspected and concurred to by WSDOT. Any WSDOT notice, requirement, inspection and/or concurrence shall be
VROHO\IRUWKHEHQH¿WRIWKHVWDWHDQGQRWIRUWKH3HUPLW+ROGHURUDQ\RWKHUWKLUGSDUW\6KRXOGWKH3HUPLW+ROGHUIDLOWR
LPPHGLDWHO\PDLQWDLQRUFRUUHFWDQ\VWRUPZDWHUFRQYH\DQFHGUDLQDJHRUWUHDWPHQWGH¿FLHQF\DIWHUUHFHLYLQJZULWWHQ
QRWLFHRIWKHGH¿FLHQF\IURP:6'27:6'27UHVHUYHVWKHULJKWWRSHUIRUPWKHQHFHVVDU\ZRUNWRSUHVHUYHWKHVWDWH
highway right-of-way or for the protection of the traveling public or pedestrians. If WSDOT performs the work as provided
herein, the Permit Holder agrees to make payment to WSDOT within thirty (30) calendar days of the date of WSDOT’s
detailed invoice. If WSDOT chooses not to perform the work, WSDOT may initiate an action to revoke this permit as
DOT Form 224-005
Revised 04/2020
Page 6
provided as provided by WAC 468-51.120.
26. RIGHT-OF-WAY VEGETATION MAINTENANCE
7KH3HUPLW+ROGHUVKDOOQRWFXWVSUD\UHWDUGUHPRYHGHVWUR\GDPDJHGLV¿JXUHRULQDQ\ZD\PRGLI\WKHSK\VLFDO
condition of any vegetative material located within the state highway right-of-way for any reason, except for the work
VSHFL¿FDOO\GHWDLOHGVKRZQDQGDXWKRUL]HGLQWKLVSHUPLW,ILWEHFRPHVQHFHVVDU\WRLQFUHDVHWKHVLJKWOLQHVDQG
sight distance at this access connection for safety purposes, the Permit Holder shall contact WSDOT to obtain prior
ZULWWHQDSSURYDOIRUDQ\YHJHWDWLYHPDWHULDOPRGL¿FDWLRQORFDWHGRQWKHVWDWHKLJKZD\ULJKWRIZD\LQFOXGLQJREWDLQLQJ
:6'27¶VSULRUZULWWHQDXWKRUL]DWLRQIRUYHJHWDWLYHPDWHULDOPRGL¿FDWLRQWRSURYLGH3HUPLW+ROGHUSURSHUW\VLJQRUIDFLOLW\
YLVLELOLW\IURPWKHVWDWHKLJKZD\7KLVLQFOXGHVDQ\PRGL¿FDWLRQVWRWKHHDUWKHQHPEDQNPHQWRQHLWKHUVLGHRIWKHDFFHVV
connection. The unauthorized cutting of timber or damage to the vegetative material is prohibited. Criminal penalties
may apply under RCW 47.40.080. Civil penalties may apply under RCW 4.24.630. The Permit Holder agrees that it shall
perform all restoration work at its sole cost and expense to the satisfaction of WSDOT.
27. FUTURE ACCESS PERMIT MODIFICATIONS BY WSDOT AND RIGHT OF ENTRY
In WSDOT’s sole discretion as part of its highway work program, existing permitted access connections may require
PRGL¿FDWLRQUHORFDWLRQRUUHSODFHPHQWLQRUGHUWRPHHWFXUUHQW:6'27GHVLJQVWDQGDUGV:6'27VKDOOEHUHVSRQVLEOH
WRSHUIRUPVXFKPRGL¿FDWLRQVUHORFDWLRQVRUUHSODFHPHQWVDW:6'27¶VVROHFRVWDQGH[SHQVH7KH3HUPLW+ROGHU
hereby authorizes WSDOT to enter upon its lands only where necessary to modify, relocate, or replace all or a portion
RIWKHSHUPLWWHGDFFHVVFRQQHFWLRQDQGWRPDLQWDLQWUDႈFFRQWUROGHYLFHVDQGDSSXUWHQDQFHVDVVRFLDWHGZLWK:6'27¶V
work performed on or near the permitted access connection.
6KRXOGWKH3HUPLW+ROGHUUHTXHVWWKDWIXUWKHUHQKDQFHPHQWVRUPRGL¿FDWLRQVEHDGGHGWR:6'27¶VZRUN:6'27DW
LWVVROHRSWLRQPD\DOORZWKHIXUWKHUHQKDQFHPHQWVRUPRGL¿FDWLRQVEHDGGHGWRLWVZRUNSURJUDPSURYLGHGDOOFRVWVWR
SHUIRUPWKHDGGLWLRQDOHQKDQFHPHQWVRUPRGL¿FDWLRQVLVDWWKHVROHH[SHQVHRIWKH3HUPLW+ROGHU7KH3HUPLW+ROGHU
agrees to remit the estimated costs of the work to WSDOT before WSDOT will perform the additional enhancement or
PRGL¿FDWLRQZRUN:6'27DJUHHVWRUHLPEXUVHWKH3HUPLW+ROGHUIRUPRQLHVSDLGEXWQRWXVHGIRUWKHZRUNZLWKLQWKLUW\
(30) calendar days after the work is performed. The Permit Holder agrees to reimburse WSDOT for all additional costs
should they exceed the estimated cost paid within thirty (30) calendar days after receipt of a detailed WSDOT notice.
28. FUTURE ACCESS MODIFICATIONS BY THE PERMIT HOLDER
The Permit Holder shall immediately notify WSDOT of any changes made or proposed in the use, intensity of
GHYHORSPHQWW\SHRIWUDႈFRUWUDႈFÀRZRIWKHSURSHUW\RUSURSHUWLHVVHUYHGE\WKLVDFFHVVFRQQHFWLRQSHUPLW:6'27
PD\UHTXLUHIXUWKHUWUDႈFDQDO\VHVE\WKH3HUPLW+ROGHULIWKHFKDQJHLVVLJQL¿FDQWWKDWZRXOGUHTXLUHDQHZDFFHVV
FRQQHFWLRQSHUPLWDQGRUPRGL¿FDWLRQVWRWKHDFFHVVFRQQHFWLRQ7KHFRVWRIDPRGL¿FDWLRQWRWKLVDFFHVVFRQQHFWLRQ
VKDOOEHWKHVROHUHVSRQVLELOLW\RIWKH3HUPLW+ROGHULQFOXGLQJWKHFRVWRIPRGL¿FDWLRQRIDQ\DFFHVVFRQQHFWLRQUHTXLUHG
as a result of changes to property site use in accordance with WAC 468-51-110, except as provided in Section 17 of this
permit.
29. MODIFICATION OR REVOCATION OF PERMIT OR CLOSURE OF ACCESS CONNECTION
In addition to other provisions of this permit, WSDOT may initiate an action to modify, revoke, or close this permit in
DFFRUGDQFHZLWKWKHVSHFL¿FWHUPVRI:$&DQGLQFOXGLQJLI
• 6LJQL¿FDQWFKDQJHVKDYHRFFXUUHGLQWKHXVHGHVLJQRUWUDႈFÀRZRIWKHSURSHUW\RURIWKHVWDWHKLJKZD\
requiring the relocation, alteration or closure of the access connection, or
• 7KHFRQQHFWLRQZDVQRWFRQVWUXFWHGDWWKHORFDWLRQRUWRWKHGHVLJQVSHFL¿HGLQWKHSHUPLWRU
• The permit provisions were not met, or
• The connection causes a safety, maintenance, and/or operational problem on the state highway system.
The Permit Holder may have appeal rights as provided under WAC 468-51-150. In addition, WAC 468-51-120(3)
authorizes WSDOT to take immediate remedial action, including the closure of an access connection, if there is an
immediate and serious danger to the public health, safety, and welfare, in compliance with chapter 47.32 RCW.
This permit is also subject to any and all causes of revocation as allowed by state laws, as amended.
DOT Form 224-005
Revised 04/2020
Page 7
30. ASSIGNMENT OF PERMIT
7KLVSHUPLWLVDVVLJQHGWRWKHLGHQWL¿HGSDUFHOVVHUYHGE\WKHDFFHVVFRQQHFWLRQDQGVKDOOUHPDLQDSSXUWHQDQWWRWKH
LGHQWL¿HGSDUFHOV6KRXOGWKHLGHQWL¿HGSDUFHOVEHLQKHULWHGVROGDVVLJQHGRUWUDQVIHUUHGLQDQ\ZD\WKLVSHUPLW
VKDOOUXQZLWKWKHODQGWRWKHH[WHQWWKDWWKHLGHQWL¿HGSDUFHOVUHPDLQLQFRPSOLDQFHZLWKWKHWHUPVRIWKLVSHUPLWXQOHVV
WKHSHUPLWLVUHYRNHGPRGL¿HGRUFORVHGE\:6'27DVSURYLGHGE\ODZRUWKHFXUUHQW3HUPLW+ROGHUUHTXHVWVWKH
cancellation of the permit and closure of the access.
31. HIGHWAY ADVERTISING CONTROL
No signs shall be placed on state highway right-of-way. Any advertising adjacent to the state highway shall be in
compliance with the Scenic Vistas Act of 1971, chapter 47.42 RCW and chapter 468-66 WAC.
32. APPLICABLE WAC’s AND RCW’s
,QDGGLWLRQWRWKHVSHFL¿FVWDWHODZVDQGUXOHVLGHQWL¿HGLQWKLVSHUPLWWKLVSHUPLWLVDOVRVXEMHFWWRDOODSSOLFDEOHSURYLVLRQV
of chapters 468-51 and 468-52 WAC, and chapters 47.32, 47.44, and 47.50 RCW, and amendments thereto.
33. AMERICANS WITH DISABILITIES ACT
This permit is subject to all applicable provisions of the United States Government American’s with Disabilities Act (ADA).
$Q\FXUUHQWRUIXWXUHZRUNVKDOOFRPSO\ZLWKDOODSSOLFDEOH$'$UHTXLUHPHQWVLQHႇHFWDWWKHWLPHRIWKHZRUN
DOT Form 224-005
Revised 04/2020
Page 8
DOT Form 224-713
Revised 12/2020
Page 1
Special Provisions for Access Connection Permit Managed Access Highways Only
Not for use within an Incorporated City or Town
Permit No.
Applicable provisions are denoted by ( )
1. No work provided by this permit shall be performed until the Permit Holder is authorized by the following
WSDOT representative:
2. The Permit Holder shall only perform the construction work authorized by this permit during the following
work hours:
3. The Permit Holder, unless specified otherwise in this permit, shall only implement the Traffic Control Plans
approved for this permit during the following work hours:
4. Pre-Paving Inspection
The Permit Holder shall contact WSDOT to request a pre-paving inspection prior to paving any Hot Mix Asphalt
(HMA) or Bituminous Surface Treatment (BST). No paving shall occur without first receiving WSDOT’s prior
written approval to pave. Failure to obtain this approval may result in WSDOT directing the Permit Holder to
remove, repair, and/or add more paving at the Permit Holder’s sole cost and expense.
The pre-paving inspection is required to permit WSDOT to verify that the paving, before it is placed, will meet
WSDOT’s design requirements for the access connection. Items to be inspected include, but are not limited
to, paving limits, culvert placement, material installation, side slopes, and grading of the access connection to
Mon-Fri, 8A-4P (daily)
Connie Rae/Nate Bergeman
1707 S. C St.
Port Angeles, WA 98363
360-565-0680
Shoulder Closure - Mon-Fri, 8A-4P (daily)
Lane Closure - Mon-Fri, 8A-2P (daily)
60687
DOT Form 224-713
Revised 12/2020
Page 2
ensure that stormwater will not flow onto the existing state highway pavement after the access connection paving
is completed.
5. Paved Access Connection
The Access Connection shall be constructed with the following materials, listed from top lift to bottom lift. The
thicknesses shown are minimum requirements, as additional material may be necessary to properly construct
the access connection.
See Exhibit “ “ for design details and paving requirements
inches of Mix Asphalt (HMA)
Bituminous Surface Treatment (BST), also known as chipseal
inches Crushed Surfacing Top Course (CSTC)
inches Crushed Surfacing Base Course (CSBC)
inches of Rock Cap
Geotextile for separation or soil stabilization
6. Gravel Access Connection
The Access Connection shall be constructed with the following materials, listed from top lift to bottom lift. The
thicknesses shown are minimum requirements. WSDOT may require additional material as necessary to
properly construct the access connection.
See Exhibit “ “ for additional desgin details and gravel requirements
inches Crushed Surfacing Top Course (CSTC)
inches Crushed Surfacing Base Course (CSBC)
inches of Quarry Spalls
inches of Rock Cap
Geotextile for separation or soil stabilization
7. Culvert Installation
The access connection shall include the installation of a culvert installed in a straight line and with a grade
that matches the existing grade of the highway ditch or swale such that the existing conveyance of stormwater
will not be adversely impacted. The culvert to be installed shall be
inch minimum diameter culvert
8. Culvert Beveled End Treatments
The open ends of the culvert run shall be beveled to match the existing slopes of the ditch or swale and
access connection fill material.
9. Culvert End Treatments – Quarry Spalls
Quarry spalls shall be placed around the open ends of the culvert. The quarry spalls shall be placed below,
along the sides, and on the top of the open end of the culvert for a minimum length of two (2) feet in all
directions.
10. Gated and Locked Access
This access connection shall be gated and locked when not in active use.
11. Surety
To ensure proper compliance with all terms and conditions of this permit, a surety amount in the form of
a Bond, Assignment of Escrow, Certificate of Deposit, Irrevocable Letter of Credit, Check or Money Order
shall be provided to WSDOT in the amount listed below. If a bond is provided, it shall be written by a surety
company authorized to do business in the State of Washington.
The surety amount shall be:
The surety bond shall remain in force until all work under this permit has received final concurrence by
WSDOT, and WSDOT issues a written release of the surety bond.
D
3
3
DOT Form 224-713
Revised 12/2020
Page 3
12.Temporary Access Connection
This is a temporary access connection that shall be immediately closed and removed by the Permit Holder
when no longer needed, or by the date listed below, whichever comes first:
When the access connection is removed, the Permit Holder shall restore the state highway right-of-way to
its original condition, including reseeding if required. Failure by the Permit Holder to remove the access
connection as specified herein may result in WSDOT removing the access connection at the Permit Holder’s
expense.
13.Access Connection for Emergency Use Only
This access connection is for emergency use only and shall be gated and locked at all times to the general
public.
14.This is a Non-Conforming Access Connection Permit:
Per WAC 468-52-040 Private direct access to the state highway system shall be permitted only when the
property has no other reasonable access to the general street system or if access to the general street
system would cause traffic operational conditions or safety concerns unacceptable to the local governmental
entity. When direct access must be provided the access connection shall continue until such time that other
reasonable access to a highway with a less restrictive access control classification or acceptable access to
the general street system becomes available and is permitted.
It does not meet the minimum spacing from another adjacent driveway or public road intersection of:
125 feet 250 feet 330 feet 660 feet 1320 feet
It does not meet the minimum corner clearance standards of WAC 468-52-040(6) of
75 feet 100 feet 115 feet 125 feet 230 feet
It exceeds the number of access points for one parcel or contiguous parcels under the same ownership by
one or more additional access connections.
The existing topography, site conditions, and/or wetland or stream restrictions and buffers prevent the
access to be constructed to current standards.
Therefore, this access connection shall only continue until such time that a conforming access connection
can be constructed or another access to the local street system becomes available and is permitted. Variance
Access Connection Permits are only issued on Class 2 through 5 highways.
15. This is a Variance Access Connection Permit:
Variance Access Connection Permits (WAC 468-51-105) may be issued, at the discretion of WSDOT, for
certain connections not meeting the access classification location and spacing or that exceed the number of
connections allowed by the standards adopted for a particular highway segment.
It does not meet the minimum spacing from another adjacent driveway or public road intersection of:
125 feet 250 feet 330 feet 660 feet
It does not meet the minimum corner clearance standards of WAC 468-52-040(6) of:
75 feet 100 feet 115 feet 125 feet 230 feet
It exceeds the number of access points for one parcel or contiguous parcels under the same ownership by
one or more additional access connections.
The existing topography, site conditions, and/or wetland or stream restrictions and buffers prevent the
access to be constructed to current standards.
Therefore, this access connection shall only continue until such time that a conforming access connection can
be constructed or another access to the local street system becomes available and is permitted.
Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS,AeroGRID, IGN, and the GIS User Community, Jefferson County, WA., Pro-West &³These data are provided on an "AS-IS" basis, without warranty of any type, expressed or implied, including but not limited to any warranty as to their performance, merchantability, or fitness for any particular purpose.This map is not a substitute for accurate field surveys or for locating actual property lines and any adjacent features.
Jefferson County, WA
Date: 4/8/20211:36,112
Parcel Number 901054007 04/08/2021
Owner Mailing Address:
CHRISTIE E LAPLUME
2811 EVELYN CT
VIENNA VA
22810-7015
Site Address:
Section: 5 School District: Port Townsend (50)
Qtr Section: SE1/4 Fire District: EJFR (1)
Township: 29N Tax Status: Taxable
Range: 1W Tax Code: 0111
Planning Area: Discovery Bay (5)
Sewer: Drainage:
Bank: View 1:
View 2: Zoning 1: RR-5 - Rural Residential
Zoning 2:Zoning 3:
Sub Division:
Assessor's Land Use Code: 9100 - Vacant Land
Assessor's Land Use Code:
Property Description:
S5 T29 R1W TAX 5 TAX 15 TAX RR1
Stationary Work Zones Chapter 2
WSDOT Work Zone Traffic Control Guidelines for Maintenance OperationsՈƒƑňƑƑĸƍѳ -];ƏňƐ
m;ƏƍƎѴ
TCP 1 Typical One-Lane, Two-Way Traffic Control with Flaggers
Chapter 2 Stationary Work Zones
-];ƏňѴ WSDOT Work Zone Traffic Control Guidelines for Maintenance OperationsՈƒƑňƑƑĸƍѳ
m;ƏƍƎѴ
TCP 6 Typical Shoulder Closure – High Speed (45 mph or Higher)
Chapter 1340 Driveways
WSDOT Design Manual M 22-01.17 Page 1340-5
September 2019
Exhibit 1340-1 Driveway Design Template SU-30 and Smaller
Notes:
[1] Culvert pipe with beveled end treatment (see Chapter 1600). See Hydraulics Manual, Road
Approach and Driveway Culverts for details.
[2] When the travel lanes are bituminous, a similar surface may be used on the approaches.
[3] For mailbox location and type, see Section 1340.07 and Chapter 1600.
[4] Not to exceed ±8% maximum algebraic difference from shoulder slope.
[5] Vertical alignment not to exceed a 3¼-inch hump or a 2-inch depression in a 10-foot chord
From:Christie LaPlume
To:Carla Sebastian
Cc:John LaPlume; Wes Fetch
Date:Tuesday, June 16, 2020 1:15:07 PM
To Whom It May Concern:
I give Carla Sebastian and Estes Builders, Authorized Agent authority to apply and
administer permit activities on my behalf for parcel #901054007.
Thank you.
V/R, Christie LaPlume
2811 Evelyn Ct, Vienna, VA 22180
703-966-8884
Up Front Parcel
Review Parcel
Date Completed:
Owner Name:
Add. Name:
Mailing Address:
Site Address(es):
Parcel Number: S-T-R: --Total Acreage
Legal Description Land Use:
Flood District:Fire District:Planning Area:
Flood Map (FIRM) Panel No: School District Zoning:
[ ] Zoning ________________________________________________________________________________
[ ]Setbacks:Front:_______Left Side:__________Right Side: __________ Rear:_______________
Informed by JCC 18.30 or Title 17 for Master Planned Resorts:
Shoreline Setback:____________Critical Area Buffer__________________________________________
Building Setback: ______________________________________________________________________
Adjoining Forest Lands: Commercial/ ____________ Rural/______________Inholding_______________
[ ] Lots/Require Declaration of Restrictive Covenant YES NO, submitted: YES NO __________________
[ ] Legal Access to Property YES NO _____________________________________________________
[ ] Parcel Tags or Scanned Documents YES NO List:_________________________________________
[ ] Sepcial Reports Nearby YES NO List:____________________________________________________
[ ] Shoreline Designation: YES NO _______________________________________________________
[ ] Critical Areas
Geologically Hazardous Areas YES NO
Shoreline Slope Stability:____________Landslide____________Erosion_____Seismic___________
CMZ: none High Risk Moderate Risk Disconnected CMZ__________________________
Report Submitted________________________________________________________________________
FWHCA: YES NO Stream type: __________________________ Pond or Lake < 20 acres________
Marbled murrelet/Spotted owl_____________ marine nearshore______________
Wetlands:YES NO ___________________________________________________________________
Flood:YES NO List FIRM map:_______________________________________________________
Flood Certificate: ______________________________________________________
Aquifer Recharge Area:YES NO___________________________________________________________
SIPZ: none At Risk High Risk Coastal ________________________________________[
] Site Visit conducted YES NO _____________________________________________________
[ ]Notice Provisions/Disclosure Forest Lands:YES NO Airport YES NO MRL YES NO
Agricultural Lands: YES NO No Shooting Zone:YES NO
[ ] Archaeology:YES NO _____________________________________________________________
4
No
No
4
No
No
Intermediate Slope
Yes
Coastal
Geotechnical Report
Moderate
None
150'
No
Yes
No
267'180'
4
No
No
No
100'
214'58'
Case #: BLD2021-00042
No
901054007
901054007
Yes
Wetlands mapped but not present on site--see notes.
Geotechnical Report
4
4
NONE
4
No
10'
No No
4
No
Inadvertent discovery plan required 4
None
No
4
4
Yes
RR-5
RR-5
March 26, 2021
4
Yes
Yes
none
No
Land Use Requirements
[ ] SEPA Required:YES EXEMPT _________________________________________________
[ ] Landscaping Required: Yes No_______________________________________________________
[ ] Parking Spaces Required NO 2 Other_______________________________________________
[ ] Building Height: 35' UBC Standard __________________________________________________
[ ]Stormwater: New Impervious Surface_____________Land Disturbing Activity ________________
Min Req #1 thru #5Stormwater Req's: Min Req #2 Min Req #1 thru #9
Engineering ________________ Drainage District Review Required___________
[ ] Stormwater Pollution Prevention Plan Submitted: Yes No __________________________________
[ ] Impervious Surface coverage percentage: __________________________________________
Resource Lands & Public: 10%Rural Residential: 25%Rural Industrial: Per UDC Sec 6.7
Rural Commercial: 60%Area of Building Coverage: 60% in Rural Industrial Lands only
[ ] ADMIN: Setbacks entered in Permit Plan case N/A YES ________________________________
New Parcel Tags entered in Permit Plan N/A YES ____________________________________
Special Reports Scanned N/A YES _________________________________________________
[ ] ADU Proposed YES NO Square Footage: ______________________
[ ] Total Building (s) Size:____________________________________________________________
RVC: 20,000 SF CC: 5,000 SF NC: 7,500 SF GC: 10,000 SF All others: subject to septic & water constraints/None specified
[ ] Road Classification:_______________________________________________________________
Road Approach:EXISTING NOT REQ'D RAP__________________________________________
[ ] Require Final Zoning Approval/inspection YES NO __________________________________________
[ ] UGA No Protest Agreement YES NO, submitted: YES NO _____________
[ ] Recorded Date of Subdivision:_______________AFN____________________________Over 5yrs=UDC
Plat Conditions:_____________________________________<5yrs=Plat Conditions on plat or Old Ordinance
Reviewed By:
Additional Notes:
No
No
4
4
4
Geotechnical report prepared by Leroy Surveyors and Engineers, Inc. and findings
conclude that the building site is stable. Project is set back 100 feet from top of
intermediate hazard slope. No risk incurred by development.
Wetland on site is mapped on site, but mapped area is on a 94% slope grade and
vegetation present (madrone, fir, vine maple) does not support presence of wetland.
Further, DOE shoreline photos do not show wetland features on or near the property.
Coastal SIPZ designation does not impact proposal--single family residence is a low
intensity land use and water service is public as opposed to well.
Engineered stormwater plan submitted with MLA2020-00072, meets minimum
requirements #1 through #9 per 2019 SWMMWW.
Project approved.
N/A
N/A
State
6%
Bryan Benjamin
RAP REQ'D
4
Yes
4
No
4
No
18,428 SF
N/A
4
2
4
MLA2020-00072 for engineered stormwater
10,235 SF
4
4
4
4
N/A
No
No
Exempt4
4,433 SF
4
4
Not within subdivision
Yes
4