Loading...
HomeMy WebLinkAboutBLD2021-00363-05- Stormwater or Approved Stormwaterstormwater calc worksheet QR code REV. 5/31/2019 page 1 of 2 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us STORMWATER CALCULATION WORKSHEET PARCEL # PROJECT/APPLICANT NAME: DETERMINING STORMWATER MANAGEMENT REQUIREMENTS: This stormwater calculation worksheet should be completed first to quired in conjunction with a stand-alone stormwater management permit application, building permit application, or other land use approval application that involves stormwater review. The basic information will also be helpful for completing a Stormwater Site Plan, if required. Land-disturbing activity is any activity that results in movement of earth, or a change in the existing soil cover (both vegetative and non-vegetative) and/or the existing soil topography. Land disturbing activities include, but are not limited to clearing, grading, filling, excavation, and compaction associated with stabilization of structures and road construction. Native vegetation is vegetation comprised of plant species, other than noxious weeds, which reasonably could have been expected to naturally occur on the site. Examples include species such as Douglas fir, western hemlock, western red cedar, alder, big-leaf maple, and vine maple; shrubs such as willow, elderberry, salmonberry, and salal; herbaceous plants such as sword fern, foam flower, and fireweed. LAND DISTURBING ACTIVITY, CONVERSION OF NATIVE VEGETATION, AND VOLUME OF CUT/FILL Calculate the total area to be cleared, graded, filled, Answer the following two questions related to excavated, and/or compacted for proposed development conversion of native vegetation: project. Include in this calculation the area to be cleared for: Does the project convert ¾ acres or more of Construction site for structures _________________ sq/ft native vegetation to lawn or landscaped areas? Drainfield, septic tank, etc. ____________________ sq/ft Circle:Yes No Well, utilities, etc. ___________________________ sq/ft Does the project convert 2 ½ acres or more of native vegetation to pasture? Driveway, parking, roads, etc. ___________________sq/ft Circle:Yes No Lawn, landscaping, etc. ______________________ sq/ft Other compacted surface, etc. _________________ sq/ft Indicate Total Volumes of Proposed: (Includes BMP T5.13 Fill Volume) Temporary construction area ______________ sq/ft Total Land Disturbance ____________________ sq/ft Cut __________ Fill __________ (cu/yd) PARCEL SIZE (I.E., SITE) Size of parcel _________ acres An acre contains 43,560 square feet. Multiply the acreage by this figure. Size of parcel in square feet _________________ sq/ft Scan the QR code to access the digital form Jun 14 2021 stormwater calc worksheet QR code REV. 5/31/2019 page 2 of 2 ~ Applicants for small Construction Stormwater Pollution Prevention. Please submit the Small Project Certification (Worksheet s). The proponent is responsible for employing the 12 Elements to control erosion and prevent sediment and other pollutants from leaving the site during the construction phase of the project. Pick up the Construction Stormwater Pollution Prevention (SWPPP) Best Management Practices (BMPs) Fact Sheet . ~ Applicants for medium those that must meet only Minimum Requirements #1 through #5 must submit Worksheet A1 and B1, a stormwater site plan and a construction stormwater pollution prevention site plan (See Reference A1A and B1A for guidance).). ~ Large those that must meet all 9 Minimum Requirements must submit Worksheet A1 and B1, a stormwater site plan and a construction stormwater pollution prevention site plan (See Reference A1A and B1A for guidance). Large projects also may require engineering. See Worksheet L to determine additional large project requirements. APPLICANT SIGNATURE By signing the Stormwater Calculation Worksheet, I as the applicant/owner attest that the information provided herein is true and correct to the best of my knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property. ________________________________________ _______________ (LANDOWNER OR AUTHORIZED REPRESENTATIVE SIGNATURE) (DATE) STORMWATER CALCULATIONS IMPERVIOUS SURFACE Impervious surface is a hard surface that either prevents or slows the entry of water into the soil as under natural conditions prior to development. A hard surface area which causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under natural conditions prior to development. Common impervious surfaces include, but are not limited to roof tops, walkways, patios, driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam or other surfaces which similarly impede the natural infiltration of stormwater. NEW EXISTING Structures (all roof area) _________________sq/ft Structures (all roof area) _________________sq/ft Sidewalks _________________sq/ft Sidewalks _________________sq/ft Patios _________________sq/ft Patios _________________sq/ft Solid Decks _________________sq/ft Solid Decks _________________sq/ft (without infiltration below) (without infiltration below) Driveway, parking, roads, etc _______________sq/ft Driveway, parking, roads, etc _______________sq/ft Other _________________sq/ft Other _________________sq/ft Total New _________________sq/ft Total Existing _________________sq/ft TOTAL NEW + TOTAL EXISTING* _________________sq/ft *This amount will be used to check total lot coverage. DEVELOPMENT v. REDEVELOPMENT Divide the total existing impervious surface above by the size of the parcel and convert to a percentage. ____________% Does the site have > 35% or more existing impervious surface? The proposal is considered new development. Answer questions in Figure 2.4.1 Flow Chart for New Development to determine project size (next page). The proposal is considered redevelopment Answer questions in Figure 2.4.2. Flow Chart for Redevelopment to determine project size (next page). yes no Jun 14 2021 - Jun 14 2021