HomeMy WebLinkAbout013Michelle Farfan From: David W. Johnson <dwjohnson@co.jefferson.wa.us> Sent: Wednesday, February 10, 2010 11:44 AM To: VMorrisCS@aol.com Cc: peckassoc@comcast.net; Al Scalf; Stacie Hoskins Subject: RE: List of Priority Work Items Attachments: Proposed Actions & Alternatives— 3 w CO edits.DOC Vicki, Attached is the draft of Chapter 2, Proposed Actions and Alternatives with our edits and comments. Upon review of the Priority Work Items, and specifically the Key technical reports, we concur with the content. As far as level of detail we note that those reports that are relevant to the ordinance conditions, or require other jurisdictional approval will naturally need to be completed to a level of detail that will satisfy those conditions, achieve other jurisdictional approval and mitigate impacts to a non-significant level. All other reports or plans may be completed only to a level that achieves a level of non-significant environmental impact, and may be altered and finally completed after acceptance of the SETS and approval of the Development Agreement with a separate SEPA determination of MDNS or DNS, since a DS would not apply to those environmental impacts that have already met the non-significant level — i.e. addressed in the SEIS. I will cover this in the Scoping Memo as well, which I hope to complete in draft form early next week. I will also send along our final response to the Tech Team response to comments once I receive the Peer Review Team response. That's a lot of responses! From: VMorrisCS@aol.com [mailto:VMorrisCS@aol.com] Sent: Tuesday, February 09, 2010 3:24 PM To: David W. Johnson Subject: List of Priority Work Items David: Per our discussion this afternoon . . . Vicki Preliminary — Do Not Cite or Distribute 2. Description of the Proposed Action and Alternatives Draft Outline of Information Requirements: 2/08/10 2.1 Project Proponent The proponent of the Brinnon Master Planned Resort (MPR) is Pleasant Harbor Marina and Golf Resort, LLC. [Garth: What is this entity as it relates to the Statesman Group? Is it the Statesman Group doing business as the LLC? Are there others involved in the LLC besides Statesman?] The activities within the MPR will be known as the Pleasant Harbor Marina and Golf Resort. 2.2 Purpose and Objectives of the Proposal The Pleasant Harbor Marina and Golf Resort is a Master Planned Resort (MPR) proposal for the Brinnon Subarea in southeastern Jefferson County, Washington. The County's Comprehensive PlamBrinnen Subama Plan designates this area as apprepriate fur an MPR as provided in RCW 36.70A.360 on page 3- - and Jefferson County Code Chapter 18.15. The Brinnon Subarea Plan has identified the Pleasant Harbor/Black Point area as a potential location for a MPR since 2002. This private application will fulfill this County land use goal. The purpose of the MPR on the subject site owned by the applicant is to: Design a Master Planned Resort unique to the site that is both constructible and economically viable. Develop a Golf Resort to include an 18 -hole championship golf course, clubhouse facilities; conference center; and amenities such as a restaurant, spa and athletic facilities. d• Develop one-, two- and three-bedroom terraced lofts, villas and chalets available for short-term and long-term vacationers, or retired or semi -retired people. •S Significantly expand_ and _upgrade_ existing commercial uses _as_ associated '--with the 285 boat slip _--- Formatted: Highlight --------- ------------------- Pleasant Harbor Marina; develop a Maritime Village with water -dependent and water -related commercial uses and commercial amenities to serve residents and visitors to the Master Planned Resort. s• Concurrently construct urban -level services, i.e. water and sewer systems, for a self-sufficient development: additional wells as a source of water under a DOH approved WSP to provide potable water supply requirements; an on-site wastewater treatment and reclamation facility; a stormwater collection, treatment, and infiltration system compliant with the Washington Department of Ecology 2005 Stormwater Management Manual for Western Washington and Jefferson County standards; an on-site circulation system that meets County design standards and emergency vehicle access requirements; improved points of access to U.S. Highway 101; and coordination with community transit service. Implement design adaptations that integrate eco -technologies in a setting for resort living: sustainable structures, landscapes and lifestyles. Design buildings using Leadership in Energy and Environmental Design (LEED) and/or Built -Green rating system standards. Is this appropriate considering the SMP Version Alternative? 1 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10 Preliminary — Do Not Cite or Distribute Implement Sustainable Development Principles to the ffifflkiffitiffi eXtefit ffaGtieabie; for example: • Install geothermal (or comparably energy-efficient) heating and cooling systems. • Operate the resort water supply system in a manner that will balance (or increase) aquifer recharge and avoid saltwater intrusion. • Use Class A reclaimed water from the on-site wastewater treatment system for golf course and landscape irrigation, fire protection, and toilet/urinal flushing systems. • Install locally- or regionally -produced building materials, and materials manufactured from recycled products to the extent praetieahly.. :• Restore the site following construction using Low Impact Development/Sustainable Development principles. Implement site improvements over a period of approximately 10 years, 3 market demand. Comply with Jefferson County Comprehensive Plan policies and a—the MPR Zoning Ordinance, consistent with the intent conditions of approval of Board of County Commissionersper Ordinance No. 01-0128-08. The objectives for the specific development proposal on the site were established in the Brinnon Master Planned Resort Final Environmental Impact Statement (Jefferson County Department of Community Development, November 27, 2007). Mandatory elements of the MPR listed on page 1-17 of that document include: Total MPR Golf Resort Side Marina Village Side Total Acres: 241 acres' 220-E acres 21t acres (upland) Total Residential Units: Up to 739 units No more than 151 units Up to 890 52 staff apartments 16 permanent residences (up to 10%)Z 68 permanent residences (up to 10%)' 45 seasonal tourist use (up to 30%), 275 long-term tourist use (up to 40%) not to exceed 6 months 344 short-term tourist use (at least 50%) 90 short-term tourist use at least 60% Impervious Surface Not to exceed 20% Not to exceed 40% ' The total acreage of the MPR property is approximately 252 acres with l It acres of submerged lands under WDNR Aquatic Lands Lease within the existing marina. This area is not subject to modification as a result of the MPR proposal and therefore is not included in the upland acres indicated above. 2 The number of permanent residences can beshifted2 between the Golf Resort side and the Marina villa a side, but total permanent residences shall not exceed 84 units. — — � Formatted: Highlight 2.3 Location The proposed Master Planned Resort is located adjacent to Pleasant Harbor, south of Brinnon at the intersection of Black Point Road with US Highway 101 in Jefferson County, Washington. Parcel numbers include: 502153002, 003, 023, 022, 021 & 020; APN 502154002; APN 502152005, 012, 013, 014, 015, 016 & 017, in Sections 15 & 22, Township 25, Range 02 West, WM, located in Brinnon, WA 98320. ' Where is this so stated in the FEIS? Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2108/10 Preliminary— Do Not Cite or Distribute [VM: Also check brief info in Garth's 1/05/10 text, and draft technical reports for additional information.] 2.4 History and Background [Dates, descriptions, and as much quantitative information as possible] Historical Logging Activity [VM to check Forestry Report for this information.] Campground Use of the Black Point Site [VM: Use brief info in a 3/24/09 document provided by Garth as a starting point] Development of the Marina (floating docks and upland facilities) Evolution of the Master Planned Resort Proposal (from original site plan concepts through the Comp Plan amendment and programmatic EIS process, site plan revisions during the Shoreline Master Program update process, features added to the proposal to comply with BoCC conditions, thorough description of the current proposal). [VM: Use as a starting point brief information provided in Garth's 1/05/10 document under the heading Development Evolution Summary.] Structures and Uses within the Existing Marina Village to be Reconstructed, Relocated and/or Reconfigured. 2.5 Master Planned Resort Approval Process [VM to draft for review by David Wayne Johnson and Sandy Mackie. Preliminary information derived from the SEIS Scoping notice:] Actions required for approval of the proposed action include: • Jefferson County Environmental Review nFF SEPA Responsible Official: Completion and publication of the SEIS, following the SEIS process set forth in WAC 197-11-600(4)(d)(ii) and 620. • Jefferson County Planning Commission: Consideration of the MPR proposal in the context of compliance with BoCC conditions set forth in Ordinance No. 01-0128-08, consideration of proposed Zoning Code text and map changes, and consideration of the proposed Development Agreement subsequent to SEIS review; and recommendation to the Jefferson County Board of County Commissioners. • Jefferson County Board of County Commissioners: Consideration of the MPR proposal in the context of compliance with BoCC conditions set forth in Ordinance No. 01-0128-08, consideration of proposed Zoning Code text and map changes, and consideration of the proposed Development Agreement subsequent SEIS review; consideration of the Planning Commission recommendation for possible approval and adoption; and final decision on approval of Zoning Code and signingof f the Development Agreement. The actions proposed will not authorize construction. If the Development Agreement and Zoning Code are approved and adopted, specific development would require application for development permits consistent with the adopted codes, regulations, and Development Agreement, and approval of such specific development permits by Jefferson County and other agencies with jurisdiction. Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10 Preliminary — Do Not Cite or Distribute 2.6 Description of the Proposed Action and Alternatives [Components common to any alternative; correlate to BoCC conditions] 2.6.1 Alternative 1: FEIS Alternative (2007) [Physical and quantitative description of principal features of proposed development under the FEIS Alternative] 2.6.2 Alternative 2: jnterim'- Alternative (2008-2009)_ ------ Formatted: Highlight [VM: Use info available from a 3/24/09 document provided by Garth as a starting point] [Physical and quantitative description of principal features of proposed development under the Interim Alternative — Golf Resort and Marina Village. Describe efforts to comply with the Jefferson County Shoreline Master Program update (150-11 shoreline buffer, 50-11 structural setback).] 2.6.3 r-ef-erred Alternative (2010-A----------------------------------------------------------------------- Formatted: Highlight [Physical and quantitative description of principal features of proposed development under the Preferred Alternative. Number of units, typical unit size in each configuration, building heights, construction materials, exterior appearance, etc.] 2.6.3.1 Marina Village Commercial Uses (existing and proposed). Residential Units. Marina Terraces. Marina Townhomes. Pleasant Harbor House. 2.6.3.2 Golf Resort Commercial Uses. Residential Units. Multi -Level Terraces. Golf Chalets. Golf Villas. Staff Housing. s Find different term rather than Interim which is more descriptive perhaps "Ordinance Compliant" ° Wasn't this suppose to be the SMP Alternative — descriptive of no or low marina development? 4 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08110 Preliminary — Do Not Cite or Distribute Amenities. Tennis courts, Bocce ball Number and size of natural areas to be preserved (and/or to be replanted; distinguish these) Amount of open space required/proposed in Development Agreement, Zoning Ordinance Trails, including connection to regional trail systems, if any (including bicycle routes) Restaurants Spa 2.6.3.3 Golf Course Fairways and Greens Driving Range Cart Paths and Trails Maintenance and Operation Proposal [Golf Course BMPs: application of fertilizers, pesticides, herbicides] [Additional subheadings re: the golf course development proposal? Also see 2.8.5 below.] 2.6.3.4 Natural Environment Features to be Preserved Conservation Easements and Natural Forest Land Buffers 200 -foot minimum -width riparian buffer along the steep bluff of the South Canal shoreline Steep slope setback Strip of mature trees between SR 101 and the Existing Marina Village Mature trees associated with wetlands and wetland buffers Coordination with Tribes Cultural Resources Management Plan Other Buffers, Greenbelts, Tree Retention and Landscaping Proposal Marina shoreline Between the Preferred Alternative Maritime Village location and SR 101 Associated with the golf course and golf resort Describe and illustration compliance with BoCC Conditions 63 s, u, v and w. Wildlife Management Plan 2.6.4 Alternative 4: The No Action Alternative Current MPR zoning with no development pending execution of a Development Agreement and Zoning Ordinance with Statesman or some other applicant, or Comprehensive Plan amendment and rezone for some other use. Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10 Preliminary — Do Not Cite or Distribute 2.7. Phased Development Proposal Land use segregations? Sequencing of residential, commercial and golf course construction Infrastructure improvements and amenities to be implemented with each phase [Correlate to the Construction Sequencing document developed the first week of February 2010 (version 3 sent 2/03/10 to Rick Esvelt for his input)] 2.8 Construction Management and Construction Sequencing Proposal 2.8.1 Clearing Proposal Selective? [VM: Correlate to the Forestry Report] How much at one time? [VM: Correlate to phasing proposal and construction sequencing] Proposal for biomass disposal (including stumps) 2.8.2 Grading Proposal [CP: Narrative description and illustration] [somewhere in here include a brief description of demolition of existing campground facilities, particularly things like the 17 septic drainfields; some existing structures to remain?] Overall estimated earthwork quantities Phased grading proposal Types of equipment Export/import (types of materials, quantities, truck trips) Types of materials to be generated on-site Stockpiling proposal Seasonal constraints Construction BMPs and stormwater management during construction 2.8.3 On -Site Materials Processing Proposal Gravel Crushing Operation Concrete Batch Plant 2.8.4 Temporary Site Stabilization Measures Proposed During Clearing and Grading 2.8.5 Golf Course Construction Proposal [CP: Detailed description of fairway construction requirements: subgrade preparation, the EarthRenew soil amendment proposal, irrigation proposal, surface water runoff management proposal] 2.8.6 Construction Material Sourcing Proposal Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10 Preliminary — Do Not Cite or Distribute 2.9 The Infrastructure Proposal 2.9.1 Water Supply and Service [Scott Bender to describe, working with Craig on civil engineering components] Comprehensive Water Plan Water District Groundwater Supply Water Treatment Plant Distribution System Neighborhood Water Policy 2.9.2 Wastewater Collection, Treatment, Reuse, Disposal [Rick Esvelt to describe, working with Craig] Comprehensive Sewer Plan Sewer District Wastewater Treatment Plant Collection System Reclaimed Water Reservoir Reuse Proposal (golf course and landscape irrigation, other?) Discharge Proposal? 2.9.3 Stormwater Management Proposal [Craig to describe] During construction Developed -condition stormwater management proposal Marina Village Maritime Village (upland complex at the intersection of Black Point Road with SR 101) Golf Resort Golf Course 2.9.4 Transportation System Proposal [Craig to describe, working with TENW] Planned roadway improvements correlated to phased development proposal Points of connection to SR 101 and cost responsibility for improvements (draft MOU with WSDOT? and with Jefferson County Public Works) Internal roadways (road standards and phased development proposal) Site Access, Safety and Circulation proposal (including emergency vehicle access) Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10 Preliminary — Do Not Cite or Distribute Parking proposal Public Transportation proposal and draft MOU Non -motorized circulation proposal: pedestrian pathways, golf cart pathways (show on site plan), bicycles 2.9.5 Electrical Power Proposal Mason County PUD electrical service to the MPR [Mike McInnis (Brown & Kysar) to describe? Also — considerable information needed from Garth] Co -generation proposal: detailed description of all fuel sources proposed, transportation and storage requirements, storage facilities and locations, combustion proposal (facilities, emissions), air quality analysis by a qualified professional who routinely prepares GHG emission analyses in Washington State for use in SEPA documents. Solar energy proposal Wind energy proposal (?) 2.9.6 Heating and Air Conditioning Proposal [Stuart Yanow (Geotility Geothermal Installations Corp) to describe] Geo -exchange heating and air conditioning proposal Supported by thermal efficient CHP cogeneration [what does the acronym CHP stand for? Need a thorough description of the co -generation proposal] 2.9.7 Other Utilities Natural Gas Cable Television Telecommunications 2.9.8 Proposed Energy Conservation Measures During Construction Developed Condition of the Project: Design Features Consistent with Leadership in Energy and Environmental Design (LEED) Standards Greenhouse Gas Emissions Management Proposal [Note: A comprehensive GHG emissions analysis must be prepared by a qualified professional who routinely prepares these analyses in Washington State for use in SEPA documents. Need to add this consultant to team. Richard Steffel of Environ Corporation recommended (425.412.1800). Information Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2108110 Preliminary — Do Not Cite or Distribute provided to -date by consultants to Statesman (Geotility, EarthRenew) is incomplete and too general. Does not demonstrate experience with the comprehensive analysis needed.] 2.9.9 Lighting Proposal Also address International Dark Sky Association Zone E-1 standards required by BoCC Condition 63z 2.9.10 Employment and Employee Housing Proposal Proposal for compliance with BoCC Conditions 63 e, g and dd. Describe the proposal during construction and in the developed condition of the MPR. 2.9.11 Maintenance and Operations Proposal Golf Resort Maritime Village (upland) Existing Marina Village Marina Management Plan Comprehensive Water Quality Monitoring Plan Tunicate Monitoring Plan and Adaptive Management Plan MOU with Pleasant Tides Yacht Club and Slip Owners Association Pet Waste Management Plan 2.9.12 public Services Proposals------------------------------------------------------------------------ Formatted: Highlght Draft MOU with Jefferson County FPD #4 (Brinnon Fire District?) re: fire protection services and EMS Draft MOU with Jefferson County Sheriffs Department Draft MOU with Brinnon School District #46 Draft MOU with Jefferson Transit Draft MOU with Jefferson County (?) re: the Housing proposal Draft MOU with Jefferson General Hospital and Mason General Hospital re: public health Draft MOU with Jefferson County Parks and Recreation Department Draft MOU with Jefferson County Public Works to specify development standards and procedures for plan review, construction inspections, materials sampling and testing; requirement for supervision by Jefferson County Public Works project engineer; and provisions for developer cost reimbursement to the Public Works Department for these services (per James Pearson memorandum of comment during SEIS Scoping, 11/30/09). 2.10 Comparison of the Environmental Impacts of the Alternatives [VM to prepare comparative table during PDEIS review; summary of impacts described in Chapter 3] s There needs to be an MOU with Dosewallips State Park to address concerns stated in there Oct 30 comment letter, and with the Olympic National Park since the Dosewallios Road will be eventually be re -opened 9 Pleasant Harbor Marina and Go f Resort PDSEIS Chapter 2 —2108110 Preliminary — Do Not Cite or Distribute 2.11 Benefits and Disadvantages of Reserving Project Implementation to Some Future Time The SEPA Guidelines encourage applicants and permitting agencies to view each generation as a trustee for succeeding generations. With this perspective, environmental review is encouraged to consider whether approving a proposal at this time would foreclose future options (WAC 197-11-440[5][c][vii]). [VM to draft discussion specific to the Pleasant Harbor MPR] 10 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 —2/08/10