From: Jim Pearson <jpearson@co.jefferson.wa.us>
Sent: Wednesday, June 16, 2010 11:38 AM
To: David W. Johnson
Cc: VMorrisCS@aol.com; peckassoc@comcast.net; Stacie Hoskins
Subject: RE: Pleasant Harbor MPR; SEIS Alternatives; Public Works Department comments
David,
This email follows up on our discussions regarding the three SEIS Alternatives described in the Comparison of
Alternatives to be Addressed in the Project -Level SEIS, 6/14/10 draft v4..
Traffic Impacts
1. Comparison of Alternatives for Unit Mix, Marina Village, Number and Type of Marina Village Residential Units,
Commercial Development Proposed, and New Buildings Proposed within Existing Marina Village
Public Works Comment:
A Transportation Impact Study (TIS) was conducted for the Alternatives assessed under the Programmatic EIS. The TIS
identified probable significant impacts from the alternatives and appropriate mitigations. The components of the SEIS
Alternatives that differ from the PEIS should be assessed to determine probable impacts and appropriate mitigations. The
TIS should be updated to reflect the SEIS Alternatives. The Public Works Department should be consulted prior to
initiating this analysis.
2. Marina Village Access to/from SR 101 (Page 2) refers to "a one-way northbound Marina Access Drive".
Public Works Comment:
The TIS recognized that additional traffic entering and leaving the marina at the existing Highway 101 access would create
significant impacts to safety and mobility. In recognition of this the following mitigation was adopted in the PEIS:
"Residents of the maritime village shall be given access to the golf course resort without traveling US HWY 101. A
detailed traffic design to accommodate traffic on US HWY 101 returning to the resort must be developed, with further
traffic analysis and design approval by WDOT and Jefferson County."
The Draft EIS, Section 1.2.2 The Marina and Maritime Village, Figure 1-12 (Page 1-11) depicts two 12' roads from near
Black Point Road to the Maritime Village that were intended to provide golf course resort access for the Maritime Village
residents without travel on Highway 101. Does the reference to "a one-way northbound Marina Access Drive" indicate a
revision to the proposal that would delete this feature? If so, this would not be acceptable to Jefferson County.
The Project -Level SEIS should also discuss access to the marina by golf course resort residents. This should include
pedestrian, bicycle, and golf cart access to minimize vehicular use. It should also follow up on the "detailed traffic design
to accommodate traffic on US HWY 101 returning to the resort" that is referred to in the PEIS.
3. Main Entrance to the Golf Resort (Page 3): Alternative 1) states "Northwest corner of the site near U.S. Highway 101.
Would only use/improve approximately 250 lineal feet of Black Point Road."
Public Works Comment:
The design of the roadway improvements for the Highway 101 / Black Point Road intersection and the access to the
marina and WDFW boat launch are based on the assumption that the main entrance will be located at the northeast
corner of the site as per Alternatives 2 and 3. This should be corrected.
Jim Pearson
Jefferson County Public Works Department
623 Sheridan Street
Port Townsend, WA 98368
(360) 385-9162
(360) 385-9234 Fax
From: David W. Johnson
Sent: Tuesday, June 15, 2010 10:11 AM
To: Jim Pearson
Subject: FW: Coordination re: June 16 Meeting
FYI — for our meeting tomorrow.
From: VMorrisCS@aol.com [mailto:VMorrisCS@aol.com]
Sent: Monday, June 14, 2010 6:05 PM
To: David W. Johnson
Cc: peckassoc@comcast.net
Subject: Coordination re: June 16 Meeting
Hello David.
Agenda items I had in mind for our meeting on Wednesday, June 16 include:
1. Site Plan Alternatives to be Evaluated in the SETS
2. Matrix of Comparative Information about the Alternatives
3. Phasing Plans
4. Construction Sequence Narrative
5. Narrative Description of the Proposal
A) Uniform introductory information to include in each Technical Report.
B) Sufficient information to describe every element of the proposal listed in PDSEIS Chapter 2.
6. Consolidated Instructions for Finalizing the Draft Technical Reports
7. Anything else you would like to discuss related to the monthly Status Report (5/25/10 most recent version).
Craig and I are prepared to discuss items 1 through 4. 1 have described below the status of each of these agenda items
Alternative Site Plans and Comparative Matrix. The level of effort required to review and comment on the Alternative
site plans and Phasing Plans, and to update the matrix that compares the features of the Alternatives, consumed my
available time to prepare for the meeting on June 16th. I sent to you via Federal Express today the 5/05/10 draft
Alternative site plans including mark-ups that consolidate Craig's comments and mine on these 15 drawings. I have
attached to this message the 6/14/10 narrative summary of our comments on the Alternative site plans, and the updated
comparative matrix (6/14/10). This is a complex amount of information. I doubt that you will feel you have thoroughly
reviewed the Alternatives and Phasing Plans by the time we are scheduled to meet on Wednesday.
Phasing Plans and Construction Sequence. I included a set of the 5/05/10 draft Phasing Plans in the Fed Ex package I
sent to you today, marked with a consolidated set of comments prepared by Craig and me. I have attached to this
message the 5/29/10 Construction Sequencing Narrative in which I entered some comments to be addressed by Craig.
To my knowledge, the project architect has not prepared a drawing of proposed repair and replacement at the existing
Marina Village to submit to the County for a determination whether these improvements can proceed separately, or
whether they will be an element of the MPR proposal. I would like this to be clear before we convey project description
and phasing information to the technical consultants. Craig indicated to me this morning that he will take the initiative to
prepare the repair/replacement proposal for Garth's review.
Narrative Description of the Proposal. I have not received any additional information from Statesman to complete
narrative descriptions of elements of the proposal listed in the 2/16/10 draft I prepared for SEIS Chapter 2. 1 have,
however, been in communication with consultants retained by Statesman to request detailed and project -specific
information about unique elements of the proposal, including use of the Earth Renew product, the co -generation proposal
(integrated with the geothermal proposal), and the lighting proposal. I provided outlines for the reports I would like to
receive from these consultants, and requested draft reports by mid-June.
Technical Report Review and Comments. I have not yet completed my detailed comments on each of the technical
reports to identify additional requirements for these reports to fully support SEIS preparation (mostly related to the impact
analysis of the site plan alternatives and no action, and the formulation of mitigation measures with emphasis on
Alternative 3). Craig suggested that we could use our time this week to discuss a representative example, looking at
County staff comments, Peer Review Team comments, and my comments to prepare the consolidated list of
requirements for additional work to finalize a draft technical report. I suggest that we use his Grading and Drainage
Technical Report (9/04/09 draft) for this example.
There are six technical reports not yet prepared/submitted to the County for draft review
The EarthRenew Proposal for Soil Amendment
The Co -Generation Proposal
The Lighting Proposal
The Greenhouse Gas Emissions Analysis*
General Sewer Plan (to be coordinated with the Department of Ecology)
Comprehensive Water Plan (to be coordinated with the Department of Health)
* I have not yet received a proposal for the GHG Emissions Analysis pending receipt of draft reports on the EarthRenew
proposal and Co -Generation proposal. These are unique project elements. I advised the GHG emission consultant to wait
to review these draft reports because of the significant affect they will have on his scope of work.
Question for You: Would it be most beneficial to meet on Wednesday, or should we do a conference call to touch base
and clarify the direction we are proceeding at this time? I anticipate a need for a meeting when you, Stacie, Craig and I
are all ready to discuss the Alternative site plans, Phasing Plans, and all of the reports. What is the status of your
preparation with regard to the technical reports?
If we do a conference call in lieu of a meeting on Wednesday, I would suggest that you initiate the call at 11:00 (or shortly
thereafter) when you are through with your duties at the counter.
Let me know your preference. We're ready to proceed either way
Thank you,
Vicki