SITE LOCATION AND PHYSICAL CHARACTERISTICS
The Pleasant Harbor Master Planned Resort (MPR) is proposed on approximately 257 acres of the 710 -
acre Black Point Peninsula along the western side of the Hood Canal. The peninsula is surrounded on the
north, south, and east by the waters of Hood Canal. Pleasant Harbor is formed by the west shore of Black
Point and the east shore of the mainland. The harbor is connected to Hood Canal by a narrow entrance
channel at the north end. The site is about 40 miles north of Shelton and 3 miles south of Brinnon in
Jefferson County, Washington, in Sections 15 and 22 of Township 25 North, Range 2 West of the
Willamette Meridian (see Figure _ [Location Map]).
Existing land use on the Black Point Peninsula is predominantly low-density residential. The Peninsula
was previously logged, and single-family homes have been constructed on the west and east sides. The
northern end of the peninsula is undeveloped. The Washington Department of Fish and Wildlife (WDFW)
owns approximately 30 acres of forest land on the northern portion of the peninsula. Improvements on
WDFW land include a public boat launch and picnic area with access from Black Point Road.
A period of glaciation occurred in the Puget Sound Lowland approximately 30,000 to 15,000 years
ago. It is likely that the glacial ice advanced and withdrew several times over the project area during
the glacial period, depending on climatic conditions. Thus, geologic material beneath the site consists
of sand and gravel outwash with some glacial till exposures. Depressions and hummocks formed in
glacial outwash material deposited on and around stagnant glacial ice as the underlying ice melted.
Numerous potholes identified on the property are "kettles" formed as sand and gravel was deposited
around stagnant ice blocks that subsequently melted. Several of the kettles have silty soils in the
bottom overlying sand and gravel. Three wetlands have been identified on the proposed Master
Planned Resort site: one in the largest kettle, a second in a local depression southeast of the largest
kettle, and a third that extends off-site along the east property line.
The topography of the site ranges from mean sea level to about 320 feet above mean sea level (msl) on
the peninsula, and from mean sea level to about 100 feet above msl in the Pleasant Harbor marina area
(approximately 150 feet msl at the intersection of Black Point Road with U.S. Highway 101). Slopes on
the peninsula range from less than 2 percent in the western portion to more than 100 percent in the area of
steep coastal bluffs along the south boundary. The high point on the peninsula (at existing grades) occurs
in the southeast portion of the proposed MPR site, east of Kettle C.
All areas of the site were formerly logged by others prior to 1970. Historical aerial photographs
reproduced in the Forestry Report prepared for the Pleasant Harbor MPR show that the area now
occupied by the Pleasant Harbor Marina was once used as a log dump and log rafting area. The existing
narrow loop road on the slope and along the waterfront in this area of the site was created by others to
serve that use.
Vegetation presently found on the property consists primarily of an overstory of Douglas -fir
(Pseudotsuga menziesii) with occurrences of red alder (Alnus rubra), black cottonwood (Populus
trichocarpa), bitter cherry (Prunus emarginata), bigleaf maple (Acer macrophyllum), and Pacific
•
1 2/01/11: v15
madrone (Arbutus menziesii). Broadleaf shrubs and other plants found in the understory include: red -
flowering currant (Ribes sanguineum), Scot's broom (Cytisus scoparius), vine maple (Acer circinatum),
salal (Gaultheria shallon), and evergreen huckleberry (Vaccinium ovatum).
The area that includes the site is within the East Olympic and Hood Canal River basins, and within the
Skokomish-Dowewal lips Water Resource Inventory Area (WRIA 16). Intermittent streams flow through
the Maritime Village and marina upland area of the site north of Black Point Road (runoff from U.S.
Highway 101 and the hillside above) and discharge into Pleasant Harbor. There are no existing stream
courses on the Black Point Peninsula portion of the property.
Existing utilities in both areas of the site include electrical power, propane gas, potable water from wells,
wastewater treatment and disposal in on-site sewage disposal systems, telephone, and solid waste
collection and transport.
PRINCIPAL FEATURES OF THE EXISTING MARINA/MARITIME VILLAGE
The Marina/Maritime Village portion of the proposed MPR site encompasses approximately 36.3 acres
extending northeasterly along the east side of U.S. Highway 101 from the Black Point Road intersection
to the north end of the Pleasant Harbor Marina. The existing marina was developed in the late 1960s.
Vehicular access is provided from U.S. Highway 101 at the north end of the site. The marina is also
accessible by private boat or float plane. Existing improvements within the Marina/Maritime Village area
of the proposed MPR include:
• A real estate office adjacent to U.S. Highway 101
• A driveway to the Bed -and -Breakfast Harbor House owned by others (access from U.S. Highway
• 101
• The Pleasant Harbor House owned by Statesman Corporation
• A grocery store/convenience store/deli and office at the marina
• Restrooms, showers and laundry
C J
• Swimming pool with change rooms
• An asphalt -paved and gravel one-way loop road and parking areas adjacent to the shoreline and
up the slope above the grocery store/convenience store/deli
• Septic tanks, sewage pumps, fuel tanks, wells and pumps, and water storage tanks
• A 286 -slip marina.
PRINCIPAL FEATURES OF THE AREA PROPOSED FOR GOLF COURSE/GOLF RESORT DEVELOPMENT
The area of the MPR site proposed for Golf Course/Golf Resort development (approximately 220.4 acres)
was previously developed by others in the 1950s as a campground. The 500 -unit Thousand Trails
commercial campground has paved and graveled roads and parking areas, tent camp sites, recreational
vehicle (RV) pad sites, picnic areas with shelter buildings, an activity center and swimming pool,
restroom buildings with septic tanks and drainfields, wells for water supply, gravel borrow areas, an entry
guard house, and fenced equipment storage areas. The campground was in use until late 2007. A
Conditional Use permit was obtained in 2010 to allow continued use of the campground and RV sites if
Statesman were to choose to reactivate this use. Some minor grading occurred on the site to create level
campsites and roadways. Gravel borrow pits were excavated east of the large kettle near the center of the
site and in the fenced storage area near the campground entrance.
2 2/01/11: v15
[Note: Each consultant should add to the existing conditions description to include features relevant to
• their analysis.]
Both the Pleasant Harbor Marina and the Black Point Peninsula have access from U.S. Highway 101. The
peninsula is also served by Black Point Road (see Figure __).
BRIEF HISTORY AND BACKGROUND OF THE MASTER PLANNED RESORT DESIGNATION
Statesman Corporation applied to Jefferson County for a Comprehensive Plan amendment in 2006 for a
Master Planned Resort (MPR) designation in the Brinnon subarea. This application was processed with
the County's 2007 docket of annual Comprehensive Plan amendments. An Environmental Impact
Statement (EIS) was prepared on the programmatic land use action. Land use alternatives for MPR
development (including no action) were evaluated in that EIS. The Final EIS was published November
27, 2007. The Jefferson County Board of County Commissioners (BoCC) approved by Ordinance No. 02-
0128-08 amendments to the Comprehensive Plan and a Comprehensive Plan map change to designate the
area Master Planned Resort. The BoCC decision affirmed in Ordinance No. 02-0128-08 that the site is
better suited for a MPR than for commercial timber harvest or agricultural production; the MPR plan is
and will be consistent with all Growth Management Act (GMA)-derived development regulations
pertaining to critical areas and pertaining to all on-site and off-site infrastructure; service impacts will be
mitigated through a Development Agreement; mitigation requirements shall be adhered to through a site-
specific Zoning Code, Development Agreement, and permit applications. The Ordinance states that the
MPR is to be a self-contained and fully -integrated planned unit development, in a setting of significant
natural amenities, with primary focus on destination resort facilities consisting of short-term visitor
accommodations. An 18 -hole golf course and up to 890 residential units were approved with the MPR
designation. No more than 10 percent of total residential units are to be permanently occupied, and short-
term residential units must at all times be not less than 65 percent of total residential units.
The Master Planned Resort designation was approved for the Pleasant Harbor Marina and Black Point
property owned by Statesman east of U.S. Highway 101', subject to 30 conditions imposed by Jefferson
County Ordinance No. 02-0128-08. The BoCC conditions were imposed through the County's legislative
authority under the Washington State Environmental Policy Act (SEPA), as well as the Board's general
police power as a legislative body for the purpose of mitigating potential significant adverse impacts to
the environment, adjacent land use, the existing transportation system, capital facilities, utilities, parks,
and public services. BoCC conditions imposed to mitigate potential adverse impacts related to are
discussed in this technical report.
[Note: Each technical report author to fill in the blank above. Review 7/20/09 "Table of Contents and
BoCC Conditions" distributed at Team rnecting last Summer for this information; scanned version
provided with July 2010 distribution of alternative site plans and project information.]
SUPPLEMENTAL EIS REQUIRED
Prior to entering into a Development Agreement with Statesman Corporation, and prior to adopting a site-
specific Zoning Ordinance for the MPR site, Jefferson County requires preparation of a Supplemental
Environmental Impact Statement (SEIS). The SEIS will provide project -level environmental review to
supplement programmatic environmental review completed with the November 27, 2007 FEIS. MPR land
use alternatives were evaluated in the programmatic EIS; therefore, the SEIS evaluates alternative site
The MPR designation also encompasses a Bed -and -Breakfast House owned by others.
2/01/11: v15
plans for developing a Master Planned
10 previously approved in principle by the
(predominantly for short-term visitor use)
•
Resort on the site, each of which would include the features
BoCC: an 18 -hole golf course and up to 890 residential units
[Note: Each technical report author should add a separate paragraph at this point to describe technical
report(s) they previously prepared for the same element of the environment, in stipport of the November
2007 programmatic EIS. ']'his paragraph should explain how/whether the content of their 2010 expounds
on the 2006-2007 document, which may have provided baseline information, for example.]
DESCRIPTION OF THE MPR PROPOSAL AND ALTERNATIVES
The site plan alternatives being evaluated in the Pleasant Harbor Master Planned Resort SEIS include the
proposal illustrated and evaluated in the FEIS (Alternative 1); a revised site plan developed during 2008-
2009 to make more efficient use of the site, to minimize environmental impacts, and to address BoCC
conditions of approval (Alternative 2); and the current (2011) site plan revised from the Alternative 2
version, predominantly in response to the Jefferson County locally -approved Shoreline Master Program
(SMP) update (December 2010) that increases the Shoreline buffer in the Marina/Maritime Village area
from 30 feet to 150 feet. More descriptive information about each alternative is provided below and in a
Comparison of Alternatives table.
Features Common to Any Action Alternative
Each of the site plan alternatives includes an 18 -hole golf course, 890 residential units, and commercial
development for resort -related services within the Pleasant Harbor MPR. The location, configuration,
type and number of residential units and commercial space differ somewhat between the alternatives, as
do the amenities to be provided within the development. Structures within the existing Pleasant Harbor
Marina would be renovated or replaced, depending on the alternative selected.
Under any alternative, improvements would be made to Black Point Road, and to the intersection of
Black Point Road with U.S. Highway 101. A 12 -ft wide (with turn -outs) Marina Access Drive would be
improved parallel to the east side of U.S. Highway 101 between Black Point Road and the existing
marina. In order to keep Resort traffic internal to the site to the maximum extent practicable, the Marina
Access Drive would be used by visitors to travel between the main entrance parking lot and the marina.
This drive would accommodate two-way shuttle vehicle service and emergency vehicle access between
Black Point Road and the marina. Access to the Golf Course/Golf Resort from Black Point Road would
be controlled by a gate with a guard house.
Parking for slip owners and Resort visitors would be created at the intersection of Black Point Road with
U.S. Highway 101, with shuttle service from the parking area to the marina using the Marina Access
Drive. The existing real estate office at this intersection would be eliminated. Provisions would be made
for this use within the commercial space of the Maritime Village. Other types of commercial uses
anticipated within the Marina Village include a possible restaurant, dive shop, sightseeing cruises, gifts,
and an upgraded grocery store/convenience store and deli.
The proposed architectural concept for the buildings within the Marina/Maritime Village is a Cape Cod
waterfront style incorporating some stone and cedar accents. Buildings in the Golf Resort, integrated
around the golf course, are proposed in the style of a rustic mountain resort with stone detailing, cedar
accents, and high gabled roof elements.
4 2/01/11: v15
Under any site plan alternative, the main building at the Golf Resort would be the Golf Terrace and
Conference Center/Spa. At four stories in height (approximately 48 feet) and located at approximately
elevation 250 feet mean sea level (msl), this would be the tallest building within the development. A 3 -
story Maintenance Building with Staff Quarters to be provided near the gated entry to the development is
also a consistent feature of proposed development under any action alternative. The maintenance portion
of this building would provide ground -level golf cart and mower storage and servicing and maintenance
supplies for the grounds and golf course. Residential units (52) in the upper two stories would provide
housing for employees. Employee parking would be provided in a surface lot associated with the
Maintenance Building/Staff Quarters.
The Master Planned Resort would be mostly self-sufficient with regard to utilities. An on-site wastewater
treatment plant is proposed, capable of producing Class A reclaimed water for beneficial reuse within the
development. Statesman Corporation received approval of water rights from the Washington Department
of Ecology on June 15, 2010 to serve the site. One or more wells and a water storage tank will be
completed on the property. Stormwater management systems for the control and treatment of runoff
during construction and in the completed condition of the development would be provided on the site in
accordance with the Washington Department of Ecology 2005 Stormwater Management Manual for
Western Washington.
Under any alternative site plan, golf course fairways would be located in areas of permeable soils to allow
for infiltration of stormwater runoff to recharge the local groundwater aquifer. The first nine golf course
fairways would be developed along the eastern side of the peninsula. The second nine fairways would be
developed along the south and west sides of the property. Portions of the area to be used for Golf Course
development would be left undeveloped (or restored) for the retention of wetlands and buffers, and for
storage of golf course irrigation water (Class A reclaimed water from the wastewater treatment plant
• process, and site runoff directed to Kettle B). Existing local depressions throughout the site would be used
to collect and retain runoff for infiltration.
The proposal includes preserving a riparian buffer along the south/southwest bluff of the peninsula. This
buffer would permanently preserve the 200 -ft wide Shoreline Environment and a steep slope setback (up
to an additional 35 feet wide in places) in a conservation easement to be administered by one or more
local Tribes.
Alternative 1
Alternative 1 for development of the Master Planned Resort is the site plan described, illustrated, and
evaluated in the Final Environmental Impact Statement [FEIS] for the Proposed Brinnon Master Planned
Resort (November 27, 2007). This Alternative is distinguished by intensive redevelopment in the
Marina/Maritime Village area and a large number of relatively small residential structures in the Golf
Course/Golf Resort area of the site. See the Alternative 1 figures: Overall Site, Marina Village and Golf
Course/Resort (January 31, 2011).
[Note: Each consultant may want to assign and refer to Figure numbers for the alternative site plans, in -
sequence within their report.]
The Alternative 1 development proposal for the Marina/Maritime Village area includes 151 residential
units and 16,000 sf of commercial space within 14 buildings adjacent to the shoreline, to replace upland
improvements associated with the existing marina. Existing buildings at the waterfront and the two
existing residences south of the marina (the Pleasant Harbor House owned by Statesman Corporation, and
the Bed -and -Breakfast House owned by others) would be demolished and replaced with new multiple -
2/01/11: v15
unit residential buildings. The new Marina Village would consist of four 4 -story buildings that would
• contain retail and interior parking on the main floor with 48 Marina Villa apartments, 40 Marina
Townhomes and additional parking in the three stories above. All residential units and commercial spaces
would be built into the hillside, overlooking the marina. The main access to the Marina/Maritime Village
would be a new Marina Access Drive constructed in a northeasterly direction from the intersection of
Black Point Road with U.S. Highway 101. The existing marina access road between the shoreline and the
grocery store/convenience store/deli would be improved to create a 15 -ft wide promenade between new
buildings and the waterfront for pedestrian and emergency vehicle access. A new one-way road system
would be built for northbound access from Black Point Road down through the Marina Village then (a
two-way road) up to U.S. Highway 101 using the existing roadway at the north end of the site. A new
swimming pool and amenity building for slip owners would be located north of the Marina Village to
replace the existing pool and change rooms south of the grocery store/convenience store/deli and office.
The Alternative 1 proposal for the shoreline area south of the existing Pleasant Harbor House includes 33
residential units in Marina Stepped and Stacked Townhome buildings, and 30 Marina Rowhouses. The
Marina Rowhouses would be two stories in height in six buildings of 4 or 6 units each. The Marina
Stepped/Stacked buildings would consist of four 4 -story residential structures built down into the hillside.
These buildings would be accessed by a separate roadway system flanked with parking lots.
The Alternative 1 proposal for the Golf Course/Golf Resort area of the site includes 739 units within 124
buildings, the 18 -hole golf course, and a Turn Building housed with the wastewater treatment plant near
the southeast corner of the site. The 4 -story Golf Terrace and Conference/Spa Center would contain 128
residential units and 36,000 sf of commercial space. Uses planned for the commercial space include a
restaurant, spa, conference and meeting rooms, and a pro shop on the lower level adjacent to Fairway #1.
Surface parking lots would be provided for both tenants of the residential units and golf course visitors.
• The Black Point Townhomes would contain 462 units in 111 two-story buildings parallel to the proposed
internal roadway system. These buildings would have an underground parkade that would provide two
parking stalls per residential unit. The Alternative 1 Black Point Villas would contain 97 residential units
in eleven 1- and 2 -story buildings with an underground parkade. The length of the Alternative 1 internal
road system from Black Point Road through the Golf Resort would be approximately 13,125 lineal feet
00.
Alternative 2
The Alternative 2 site plan was modified to respond to the 30 BoCC conditions imposed on the MPR
development by Ordinance No. 02-0128-08, and to improve constructability by refining the grading plan.
The number of buildings (and thus residential units) within the Marina/Maritime Village area was reduced
compared to Alternative 1. A corresponding number of residential units were transferred to the Golf
Course/Golf Resort side by introducing three additional 4 -story buildings. In addition, the gated entrance
to the Golf Course/Golf Resort area was relocated to the northeast side of the peninsula property off
Black Point Road, and the wastewater treatment plant was relocated to the northwest corner of the Golf
Course/Golf Resort area. Under Alternative 2, Black Point Road would be improved from U.S. Highway
101 to the proposed site entrance at the northeast corner of the Golf Course/Golf Resort. See Alternative 2
figures: Overall Site, Marina Village and Golf Course/Resort (January 31, 2011).
The number of Maritime Village buildings is reduced in Alternative 2 (compared to Alternative 1) to one
4 -story building and one 3 -story building. The 4 -story building would contain 49 residential units with
17,000 sf of commercial space on the main floor and parking on the lower three floors. The 3 -story
building would contain six 2 -story units on the second and third floors with a restaurant and yacht club on
• the main floor. An improved waterfront promenade would provide pedestrian and emergency vehicle
6 2/01/11: v15
access, similar to Alternative 1. The existing swimming pool and change room building would remain as -
is. The proposed one-way access drive from Black Point Road to the marina would be the same as
Alternative 1. The Pleasant Harbor House would be retained, but the Bed -and -Breakfast Harbor House
would be acquired and removed. In its place and extending further south, six buildings Sea View Chalets
(one story with basements) would be constructed (26 residential units) in place of the Marina
Stepped/Stacked and Rowhouse buildings of Alternative 1. Access to the Sea View Chalets would be
from the Marina Access Drive (same as Alternative 1). Parking for these units would be provided in
driveways.
The Alternative 2 main access to the Golf Course/Golf Resort area would be at the northeast corner of the
site from Black Point Road. The Maintenance Building and Staff Quarters would be located near this
entrance. With the addition of three new Golf Terrace buildings in Alternative 2, the total number of
individual buildings would be less in Alternative 2 than Alternative 1. The new 4 -story Golf Terrace
buildings would contain 338 residential units with underground and surface parking lots. The Golf
Terrace 1 building would be larger in size compared to Alternative 1, and would contain 154 residential
units, 36,000 sf of commercial space, and underground parking. Parking within the structure would result
in a reduced requirement for the size of surface parking lots. Amenities within the Alternative 2 Golf
Terrace 1 building would include a restaurant and lounge, conference and meeting rooms, chapel,
billiards and game room, spa and exercise center, and the golf course pro shop. The Black Point Villa
unit -type in Alternative 1 would be replaced by Sea View Villas in Alternative 2 (72 residential units
compared with 97 villas in Alternative 1). The Black Point Townhome unit -type in Alternative 1 would
be replaced by Golf Vistas in Alternative 2, with a reduction in the number of this unit type from 462
units in Alternative 1 to 192 units in Alternative 2. The 49 remaining buildings in the Golf Course/Golf
Resort area would provide a total of 808 residential units and front on the internal road system. The
internal road system in Alternative 2 (approximately 10,600 lineal feet) would be reduced in length
• compared to Alternative 1. Golf course fairway configurations are adjusted only slightly from Alternative
1, and a tennis court would be added adjacent to the Golf Terrace 2 building.
Innovative measures for conservation of electrical power and golf course/landscaping management were
introduced by Statesman Corporation in the Alternative 2 development concept. Geothermal units were
proposed attached to heat pumps, and EarthRenew organic matter fertilizer became a significant element
of the proposal for soil amendment and nutrient input to the golf course and landscaped areas in lieu of
synthetic fertilizers.
Alternative 3
The Alternative 3 site plan was modified in response to the Jefferson County locally -approved Shoreline
Master Program (SMP) update (December 2010), that requires a 150 -ft shoreline buffer in the marina
upland area compared to the 30 -ft setback in the adopted Shoreline Master Program (1989; revised 1993,
1996, and 1998) at the time the Alternative 1 conceptual site plan was prepared. The substantial shoreline
buffer (i.e., an area where no new structures would be allowed) significantly modified the Marina
Center/Maritime Village development concept for the Master Planned Resort. See the Alternative 3
figures: Overall Site, Maritime Village and Golf Course/Resort (January 31, 2011).
Redevelopment for maintenance, repair and renovation is now limited to occur within existing building
footprints in the Marina Center (marina upland) area. Therefore, residential and commercial development
contemplated in the Alternative 1 and 2 site plans for this area is relocated in the Alternative 3 site plan to
a new 3 -story building proposed at the intersection of Black Point Road with U.S. Highway 101. A new
Marina Lofts building at the intersection would include 36 residential units on the east (rear) side of the
• building with two stories (12,500 sf) of commercial space at the front (west side, facing U.S. Highway
2/01/11: v15
101). Parking would be provided in surface parking lots at this intersection for visitors, residents and
marina slip owners. An increase in surface parking would be created on the north side of Black Point
Road by a more southerly realignment of the Black Point Road/U.S. Highway 10 intersection in
Alternative 3. Sea View Chalets would be eliminated from the site plan on the north side of Black Point
Road in Alternative 3. A new residential -type structure is proposed in this area of the Alternative 3 site
plan to accommodate group gatherings. Two of these buildings are proposed: Reunion House and Harbor
View House. They would provide a common area and kitchen facilities for rental residents staying in 12
individual rooms. The Marina Access Drive would be upgraded to provide access to these two buildings.
The Bed -and -Breakfast Harbor House owned by others would remain, with a corresponding minor
reduction in the overall developable land area within the MPR compared to Alternative 1 or 2. The
Pleasant Harbor House owned by Statesman Corporation may be renovated with no change to the
footprint of the structure. The existing swimming pool and change room building for marina slip owners
would be retained with minor modifications, or reconstructed. Existing buildings in the marina upland
area would be reconstructed within their existing footprints to house the marina office, a bistro/lounge,
showers, washrooms, and self-service laundry. The existing roadway system and parking areas at the
waterfront would be widened and improved to provide better curve radii. This would improve safety and
ease of access for large vehicles like garbage collection trucks and emergency vehicles, and provide better
connectivity for boaters between short-term parking and the head of docks for transport between their
vehicles and their boats. The one-way access (Marina Access Drive) from Black Point Road to the
waterfront proposed with Alternative 1 or 2 would be used in Alternative 3 for two-way shuttle service
and emergency vehicle access between the Maritime Village improvements at the Black Point Road/U.S.
Highway 101 intersection and the marina. The total number of residential units within the Maritime
Village area of the MPR would be reduced to 60 new units in three new buildings, and the existing
Pleasant Harbor House, and the Bed -and -Breakfast House (owned by others).
• Residential units would be increased by 20 in the Golf Course/Golf Resort area, transferred from reduced
development in the Marina/Maritime Village area of the site. A new unit type is also proposed with
Alternative 3, changing the ratio of the two smaller building types. Eight residential units would be
relocated to the Golf Terrace 3 building, and 12 residential units would be integrated into the Golf Vistas
and Sea View Villas. The Sea View Villas would be 1 -story walk -out units in Alternative 3, narrower
than the Sea View Villas of Alternative 2 and with an underground parkade. There would be 828
residential units within 49 buildings in the Golf Course/Golf Resort area in Alternative 3. Golf Course
fairways would be the same as Alternative 2. An additional tennis court would be provided next to the
Golf Terrace 3 and 4 buildings and a swimming pool would be added next to Golf Terrace 3 building.
Other Alternative 3 recreational amenities proposed adjacent to the Golf Terrace 1 building include a
Bocce Ball court, pool and deck area.
•
The Alternative 3 on-site electrical power generation proposal would utilize an integrated system of
geothermal (geo-exchange) technology and combined heat and power (CHP) derived from co -generation
systems fueled by biodiesel. Solar power options are also being explored.
The landscaping proposal includes revegetating disturbed areas using healthy trees and shrubs from areas
of the site that will be cleared. Consideration will be given to the use of native vegetation as well as
ornamental shrubs, perennials and annuals in select locations at the Marina Center, Maritime Village,
Terrace Buildings, and along meandering pathways. Landscape restoration in the Marina Center (marina
upland) area of the site is planned to create a park -like setting with amenities for seating and sun -rain
protection. The proposal includes creating a temporary native plant nursery south of the wastewater
treatment plant site in the area of Fairways 15, 16 and 17, as these fairways will be developed during
Stage II construction. A sprinkler irrigation system using Class A reclaimed water generated by the
2/01/11: 05
•
treatment process will be installed to temporarily maintain plants kept in this area for relocation during
phased development of the site.
NO ACTION ALTERNATIVE
If the Pleasant Harbor Marina and Golf Resort did not proceed, it is presumed (based on the
Comprehensive Plan MPR designation for the property and absence of site-specific zoning), that the site
would not be further developed at this time. The owner would continue to operate the 286 -berth marina
and could perform maintenance, repair and replacement on existing improvements until a Master Planned
Resort could be successfully implemented, either by the present owner or by others. Campground use of
the Black Point Peninsula property could resume under an existing Conditional Use permit.
PHASED DEVELOPMENT PROPOSAL
Statesman Corporation proposes to complete the Pleasant Harbor Marina and Golf Resort over the course
of approximately 10 years, or in response to market demand.
STAGE I: Phase 1
• Begin clearing drainage basins that produce no runoff that leaves the site (Basins 4, 5, 7, 13, and 14)
and that will provide excavated material for construction aggregates material processing or for mass
fill of Kettles B and C. The entire Kettle B area will be cleared. Large areas where deep excavation is
proposed lie to the south, west, and north of the kettle. Kettle B will receive approximately 1,000,000
cy of fill before it can be finish -graded and lined with synthetic liners to start receiving site runoff and
Class A effluent from the wastewater treatment plant. Liners could be installed during the wet season,
though dry season installation is preferred. Channels and culverts to be constructed will convey
surface water runoff overflows to infiltration areas within golf course fairways.
Place erosion control measures and perhaps redirect runoff into the large kettle (Kettle B) prior to
clearing and rough -grading to create the construction aggregates material processing site/plant(s). The
relatively flat, centrally -located site proposed for materials processing is at the base of one of several
40+ foot cut areas. This will be the source of construction materials and fill material for early portions
of the project. As excavation progresses and runoff is directed northward, Drainage Basin 13 will be
expanded to the south which will allow for additional clearing. If clearing is limited to the south edge
of the Drainage Basin 13, work could progress into the wet season. Existing roads on the site could be
used to transport materials.
• Build the construction aggregates material processing plant and begin operations.
• Construct the 260,000 gallon underground water storage facility and water piping to the existing well.
Rough grade the resort road from the water storage facility to Black Point Road. Install water main
and sewer piping from the water storage facility to Black Point Road in the resort road alignment.
Install erosion control measures along the base of the wastewater treatment plant site prior to clearing.
Place fill material behind a retaining wall to create the site for construction of the wastewater
treatment plant. Construct the treatment plant. Construct the co -generation unit to power the treatment
plant.
9 2/01/11: 05
• Clear area south of treatment plant site to create a temporary native plant nursery for trees and shrubs
• removed during site development that will be relocated within the project area.
STAGE I: Phase 2
• Develop the second on-site well. Connect the well to the domestic water distribution system as soon
as practicable after rough grading the areas through which this piping must pass.
• Place erosion control measures at the edge of the buffer along the east property line of the Maritime
Village area of the site prior to clearing. Grade the building, parking, and entry roads to prepare this
area for construction.
• Install erosion control measures along the existing (unpaved) marina access drive that parallels U.S.
Highway 101.
• Widen and reconstruct the Marina Access Drive between Black Point Road and the marina.
• Install erosion control measures, implement traffic controls, and relocate utilities in preparation for
constructing improvements to the Black Point Road/U.S. Highway 101 intersection relocation and
expansion. Reconstruct and realign Black Point Road and expand U.S. Highway 101. Underground
utility services must cross Black Point Road. The WDFW boat launch access road intersection with
Black Point Road will be reconfigured and reconstructed concurrent with the Black Point Road/U.S.
Highway 101 intersection reconstruction.
• • Install the sewage collection system, water distribution/temporary fire protection system, reuse water
systems, electrical power transmission, and communications facilities to serve the wastewater
treatment plant, the marina area, and Maritime Village Building.
•
• Construct Maritime Village building, Harbor View House, Reunion House, roads, utilities, and
parking lots.
• Widen existing roadways to 20 feet for two-way and 12 feet for one-way travel, and provide turn-
arounds. Construct a new section of road between the existing marina access road and upper parking
area to increase the curve radius for larger vehicles (including firefighting equipment.
• Clear and excavate the small "hill" from U.S. Highway 101 on the north side of the marina access
road to improve sight distance and visibility for entering vehicles.
• Relocate the fuel storage tanks and equipment closer to U.S. Highway 101, near the unused pool.
STAGE I: Phase 3
• Relocate existing marina office, convenience store, deli, and self-service laundry to the new Maritime
Village building.
• Remodel/reconstruct the Marina Center (marina upland) commercial uses.
• Remodel/reconstruct existing swimming pool and change building at the marina.
10 2/01/11: v15
• Install sewage pumps and forcemains to convey sewage from the marina and marina upland facilities
• to the wastewater treatment plant. Abandon the existing septic tank drainfield that now serves the
marina buildings and moored vessels.
STAGE II: Phase 1
Construct the wetland in the bottom of the south kettle (Kettle C). This kettle is to be converted to a
created wetland with an enhanced buffer. The bottom of the basin will be filled approximately 30 feet
to create a relatively level wetland. Fill materials will be selected from on-site materials that have low
permeability, such as those that may be found in the existing wetland to be filled in the large kettle
(Kettle B). Buffer enhancement may take the form of clearing invasive plant species and replacement
with native plant material harvested from the site or purchased from local nurseries. Temporary
irrigation may be required for the wetland and the buffer plantings to improve the survival rate during
the first growing season. The existing closed drainage basin and the drainage basin created in the
developed condition around Kettle C will provide and maintain hydrology for the created wetland.
When wetland creation in Kettle C is complete, construct a fence around the buffer edge to prevent
construction activities and resort visitors from entering and potentially damaging the wetland and
buffer vegetation.
• Place erosion control measures along the east property line buffer of the Golf Course/Golf Resort area
of the site near Black Point Road to prepare this area for construction of the Golf Terrace 1 access
road. Excavated materials from the Maintenance Building/Staff Quarters area and from Fairways 3
and 4 could be used to construct this road embankment. Install the storm drainage system within the
road to direct runoff to stormwater treatment and detention facilities.
i• Complete the Golf Terrace 1 building pad and associated parking areas. This construction may not
require significant additional erosion control measures since the runoff can be directed to the enclosed
drainage basin to the south.
• Install the sewage collection system, water distribution system, fire protection system (a function of
the fairway/landscape irrigation system), reuse water systems, power transmission, and
communications facilities to serve the Golf Terrace I building, and the Maintenance Building/Staff
Quarters.
• Install erosion control measures and clear sufficient area during the dry season to rough -grade
Fairways 11 and 12 and construct the embankment for Fairway 10, including two lined detention
ponds. This embankment will create building sites for the Sea View Villas, and significant portions of
Fairways 7 and 8. This grading will form Drainage Basins 8 and 9. Large areas of excavation lie to
the east and west of Fairway 10 and the building site to the north. These detention ponds will be lined
with synthetic liners to prevent saturation of the embankment. Pumps will be permanently installed
adjacent to these ponds to move collected runoff northward into the irrigation pond (Kettle B). These
pumps will be powered by cogeneration units. Construction of the embankment, ponds, pumps,
forcemains, and soil stabilization must be completed during the dry season. It might be necessary to
delay completion of Fairways 7, 8, 9, 10 and part of Fairway 11 until the dry season in the following
year.
• Install erosion control and wetland buffer area protection along the west side of Wetland D (along the
east property line of the Golf Course/Golf Resort area of the site) before work begins on Fairways 2,
4, 5, and 6. Since this drainage basin (Basin 10) discharges to Wetland D and then offsite, it may
•
11 2/01/11: v15
require that clearing and grading in this area occur in the dry season. Very large subsurface
• infiltration galleries are planned beneath these fairways. Excavation depths of 20 feet will be common
within these fairways to finished grade. Cuts to 30 feet will be required in some areas. Excavations of
more than 10 feet below finished grades will be required for installation of the infiltration piping and
select backfill. These fairways will require stabilization before the wet season begins.
Fairway 1, and the area north of Fairways 12, 13, 14, 15, 16, 17, and 18 could be worked during wet
weather. The area north of Fairway 14 may require additional erosion control measures near the
wastewater treatment plant site in order to work during wet weather conditions. The preferred method
of fairway construction will proceed in the order of clearing and grubbing, rough grading, drainage
installation, irrigation installation, fine grading, and seeding progressing along the fairways using
specialized types of equipment. This will allow a minimum of clearing and grubbing to occur and will
reduce the amount of time the ground is not being actively worked. The fairways in many cases can
be seeded and stabilized before the wet season arrives.
• Rough -grade roads, driveways, and building pads for improvements that will be made in Stage II
Phase 2 and Stage 1I Phase 3 as part of adjacent fairway construction. Installation of underground wet
and dry utilities can be delayed until the Stage II Phase 2 and Phase 3 building construction occurs.
Sanitary sewer service will require pumping raw sewage from the south-central portion of the site. A
pump station will be required near the south end of the pond (Kettle B).
STAGE II: Phase 2
• Install erosion/sedimentation control measures around building construction sites to protect
• completed portions of the golf course (if any). Buildings to be constructed in Stage II include Golf
Terrace 2 west of Fairway 16; Golf Terrace 3 east of Fairway 14; Golf Vistas south of Fairway 15 and
west of Fairway 18; Sea View Villas west of Fairway 18; and the Maintenance Building and Staff
Quarters north of Fairway 3.
• Extend roads and utility services to the Stage II Phase 2 building sites.
• Construct two sanitary sewer pump stations: one at the south end of Kettle B to serve building
construction to the northwest (Sea View Villas and Golf Vistas), and one adjacent to the Maintenance
Building/Staff Quarters.
• Construct the sanitary sewer pump station and co -generation unit at the Maintenance Building/Staff
Quarters.
• Reconstruct Black Point Road from the end of Stage I Phase 2 intersection improvements east of U.S.
Highway 101 to the resort east entrance in the northeast corner of the Golf Course/Golf Resort area of
the site. Install erosion/sedimentation control measures, as required.
STAGE II: Phase 3
• Install erosion/sedimentation control measures around building construction sites for the Golf Terrace
4 building north of Fairway 12; Sea View Villas adjacent to Kettle C, north of Fairways 10, 11, and
12, west of Fairway 7, and south of Fairway 4; and Golf Vistas east of Kettle C.
• • Extend roads and utility services to the Stage II Phase 3 building sites.
12 2/01/11: v15
•
• Construct the sanitary sewer pump station at the southeast corner of the site to serve the Sea View
Villas west of Fairway 7, north of Fairway 10, and north of Fairway 11.
13 2/01/11: v15