Loading...
HomeMy WebLinkAbout018Michelle Farfan From: David W. Johnson <dwjohnson@cojefferson.wa.us> Sent: Wednesday, April 20,20111:06 PM To: Al Scalf; Stacie Hoskins Subject: FW: Pleasant Harbor Documents Attachments: v2-PH-SEIS-Ch2Outline-DescriptionOfTheProposal&Alternatives-Aprl9-ll.doc; v2-PH- SEIS-TableOfContents-Aprl9-1l.doc FYI From: VMorrisCS@aol.com [mailto:VMorrisCS@aol.com] Sent: Wednesday, April 20, 2011 11:38 AM To: David W. Johnson Cc: Garth@statesmancorporation.com; peckassoc@comcast.net Subject: Pleasant Harbor Documents David In response to a 4/15/11 request from Garth, I copied all current SEIS working files to a CD and mailed the CD to him yesterday. In preparation for this, I did a quick update of the preliminary SETS Chapter 2 file (Description of the Proposal and Alternatives) and Table of Contents. I have attached these two files to this message so that the County will have the same version. Chapter 2 is a long way from complete, but the content outline in the chapter is a good start. Vicki Vicki Morris Consulting Services 7732 18th Avenue NE Seattle, WA 98115-4426 206.522.8057 FAX: 206.523.4648 Preliminary — Do Not Cite or Distribute 2. Description of the Proposed Action and Alternatives Draft Outline of Information Requirements: 2/16110 No element of content is yet complete; "placeholder " information only. 2.1 Project Proponent The proponent of the Brinnon Master Planned Resort (MPR) is Pleasant Harbor Marina and Golf Resort, LLC. [Garth: What is this entity as it relates to the Statesman Group? Is it the Statesman Group doing business as the LLC? Overall manager of the LLC?] The MPR will be known as the Pleasant Harbor Marina and Golf Resort. 2.2 Purpose and Objectives of the Proposal The Pleasant Harbor Marina and Golf Resort is a Master Planned Resort (MPR) proposal for the Brinnon Subarea in southeastern Jefferson County, Washington. The County's Comprehensive Plan/Brinnon Subarea Plan designates this area as appropriate for a MPR as provided in RCW 36.70A.360 and Jefferson County Code Chapter 18.15. The Brinnon Subarea Plan has identified the Pleasant Harbor/Black Point area as a potential location for a MPR since 2002. This private application will fulfill this County land use goal. The purpose of the MPR on the subject site owned by the applicant is to: ❖ Design a Master Planned Resort unique to the site that is both constructible and economically viable. ❖ Develop a Golf Resort to include an 18 -hole championship golf course, clubhouse facilities; conference center; and amenities such as a restaurant, spa and athletic facilities. ❖ Develop one-, two- and three-bedroom terraced lofts, villas and chalets available for short-term and long-term vacationers, or retired or semi -retired people. ❖ Significantly expand and upgrade existing commercial uses associated with the 285 boat slip Pleasant Harbor Marina; develop a Maritime Village with water -dependent and water -related commercial uses and commercial amenities to serve residents and visitors to the Master Planned Resort. ❖ Concurrently construct urban -level services for a self-sufficient development: additional wells to provide potable water supply requirements; an on-site wastewater treatment and reclamation facility; a stormwater collection, treatment, and infiltration system compliant with the Washington Department of Ecology 2005 Stormwater Management Manual for Western Washington and Jefferson County standards; an on-site circulation system that meets County design standards and emergency vehicle access requirements; improved points of access to U.S. Highway 101; and coordination with community transit service. ❖ Implement design adaptations that integrate eco -technologies in a setting for resort living: sustainable structures, landscapes and lifestyles. ❖ Design buildings using Leadership in Energy and Environmental Design (LEED) or Built -Green rating system standards. ❖ Implement Sustainable Development Principles to the maximum extent practicable; for example: Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4119/11 Preliminary — Do Not Cite or Distribute • Install geothermal (or comparably energy-efficient) heating and cooling systems. • Operate the resort water supply system in a manner that will balance (or increase) aquifer recharge and avoid saltwater intrusion. • Use Class A reclaimed water from the on-site wastewater treatment system for golf course and landscape irrigation, fire protection, and toilet/urinal flushing systems. • Install locally- or regionally -produced building materials, and materials manufactured from recycled products to the extent practicable. ❖ Restore the site following construction using Low Impact Development/Sustainable Development principles. ❖ Implement site improvements over a period of approximately 10 years, or in response to market demand. ❖ Comply with Jefferson County Comprehensive Plan policies and a MPR Zoning Ordinance, consistent with the intent of Board of County Commissioners Ordinance No. 01-0128-08. The objectives for the specific development proposal on the site were established in the Brinnon Master Planned Resort Final Environmental Impact Statement (Jefferson County Department of Community Development, November 27, 2007). Mandatory elements of the MPR listed on page 1-17 of that document include: Total MPR Golf Resort Side Marina Village Side Total Acres: 241 acres' 220± acres 21± acres (upland) Total Residential Units: 890 within the project limits Up -to -739 units 52 staff apartments 68 permanent residences (up to 10%) 275 long-term tourist use (up to 40%) 344 short-term tourist use (at least 50%) No more than 151 units 16 permanent residences (up to 10%)2 45 seasonal tourist use (up to 30%), not to exceed 6 months 90 short-term tourist use (at least 60%) Impervious Surface Not to exceed 20% Not to exceed 40% 1 The total acreage of the MPR property is approximately 252 acres with 11± acres of submerged lands under WDNR Aquatic Lands Lease within the existing marina. This area is not subject to modification as a result of the MPR proposal and therefore is not included in the upland acres indicated above. 2 The number of permanent residences can be shifted between the Golf Resort side and the Marina Village side, but total permanent residences shall not exceed 84 units. 2.3 Location The proposed Master Planned Resort is located adjacent to Pleasant Harbor, south of Brinnon at the intersection of Black Point Road with US Highway 101 in Jefferson County, Washington. Parcel numbers include: 502153002, 003, 023, 022, 021 & 020; APN 502154002; APN 502152005, 012, 013, 014, 015, 016 & 017, in Sections 15 & 22, Township 25, Range 02 West, WM, located in Brinnon, WA 98320. [Provide more narrative description.] Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute 2.4 History and Background [Dates, descriptions, and as much quantitative information as possible: see Findings at the beginning of the Draft Development Agreement as a starting point.] Historical Logging Activity [Check Forestry Report for this information.] Campground Use of the Black Point Site [Use brief info in a 3/24/09 document provided by Garth as a starting point] Development of the Marina (floating docks and upland facilities) Evolution of the Master Planned Resort Proposal (from original site plan concepts through the Comp Plan amendment and programmatic EIS process, site plan revisions during the Shoreline Master Program update process, features added to the proposal to comply with BoCC conditions, thorough description of the current proposal). [Use as a starting point brief information provided in Garth's 1/05/10 document under the heading Development Evolution Summary.] Structures and Uses within the Existing Marina Village to be Reconstructed, Relocated and/or Reconfigured. [Also use the History and Background of the Master Planned Resort Designation information in Vicki's 2/01/11 Intro and Comparison of Alternatives document] 2.5 Master Planned Resort Approval Process [Prepare draft for review by David Wayne Johnson and Sandy Mackie. Preliminary information derived from the SEIS Scoping notice is entered below:] Actions required for approval of the proposed action include: • Jefferson County SEPA Responsible Official: Completion and publication of the SEIS, following the SEIS process set forth in WAC 197-11-600(4)(d)(ii) and 620. • Jefferson County Planning Commission: Consideration of the MPR proposal in the context of compliance with BoCC conditions set forth in Ordinance No. 01-0128-08, consideration of proposed Zoning Code text and map changes, and consideration of the proposed Development Agreement subsequent to SEIS review; and recommendation to the Jefferson County Board of County Commissioners. • Jefferson County Board of County Commissioners: Consideration of the MPR proposal in the context of compliance with BoCC conditions set forth in Ordinance No. 01-0128-08, consideration of proposed Zoning Code text and map changes, and consideration of the proposed Development Agreement subsequent SEIS review; consideration of the Planning Commission recommendation for possible approval and adoption; and final decision on approval of the Zoning Code and execution of the Development Agreement. The actions proposed will not authorize construction. If the Development Agreement and Zoning Code are approved and adopted, specific development would require application for development permits consistent with the adopted codes, regulations, and Development Agreement, and approval of such specific development permits by Jefferson County and other agencies with jurisdiction. Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute [Note here and in Chapter 1: Summary, SEPA procedures followed to -date and the intent for SEPA review during phased implementation of the project. Include the Supplemental EIS Required narrative from Vicki's 2/01/11 Intro and Comparison of Alternatives document.] 2.6 Description of the Proposed Action and Alternatives [Components common to any alternative: use narrative in Vicki's 2/01/11 Intro and Comparison of Alternatives document; correlate to BoCC conditions] 890 residential units Permanent residents in no more than 10 percent of total residential units Seasonal tourist residents 40 percent subject to an overall limitation that short-term residential units must at all times be not less than 65 percent of total residential units. Proposed Zoning Ordinance and Zoning Districts [List zoning districts from most current draft Zoning Ordinance; describe proposed development standards] Marina Village Commercial (MPR -MVC) Marina Village Residential (MPR -MVR) Golf Resort Commercial (MPR-GRC) Golf Resort Residential Village (MPR-GRRV) Open Space Reserve (MPR-OSR) Draft Development Agreement 2.6.1 Alternative 1 (2007) Alternative 1 for development of the Master Planned Resort is the site plan described, illustrated, and evaluated in the Final Environmental Impact Statement [FEIS] for the Proposed Brinnon Master Planned Resort (November 27, 2007). This Alternative is distinguished by intensive redevelopment in the Marina/Maritime Village area and a large number of relatively small residential structures in the Golf Course/Golf Resort area of the site. See the Alternative 1 figures: Overall Site, Marina Village and Golf Course/Resort (January 31, 2011). The Alternative 1 development proposal for the Marina/Maritime Village area includes 151 residential units and 16,000 sf of commercial space within 14 buildings adjacent to the shoreline, to replace upland improvements associated with the existing marina. Existing buildings at the waterfront and the two existing residences south of the marina (the Pleasant Harbor House owned by Statesman Corporation, and the Bed -and -Breakfast House owned by others) would be demolished and replaced with new multiple - unit residential buildings. The new Marina Village would consist of four 4 -story buildings that would contain retail and interior parking on the main floor with 48 Marina Villa apartments, 40 Marina Townhomes and additional parking in the three stories above. All residential units and commercial spaces would be built into the hillside, overlooking the marina. The main access to the Marina/Maritime Village would be a new Marina Access Drive constructed in a northeasterly direction from the intersection of Black Point Road with U.S. Highway 101. The existing marina access road between the shoreline and the grocery store/convenience store/deli would be improved to create a 15 -ft wide promenade between new buildings and the waterfront for pedestrian and emergency vehicle access. A new one-way road system would be built for northbound access from Black Point Road down through the Marina Village then (a two-way road) up to U.S. Highway 101 using the existing roadway at the north end of the site. A new 4 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute swimming pool and amenity building for slip owners would be located north of the Marina Village to replace the existing pool and change rooms south of the grocery store/convenience store/deli and office. The Alternative 1 proposal for the shoreline area south of the existing Pleasant Harbor House includes 33 residential units in Marina Stepped and Stacked Townhome buildings, and 30 Marina Rowhouses. The Marina Rowhouses would be two stories in height in six buildings of 4 or 6 units each. The Marina Stepped/Stacked buildings would consist of four 4 -story residential structures built down into the hillside. These buildings would be accessed by a separate roadway system flanked with parking lots. The Alternative 1 proposal for the Golf Course/Golf Resort area of the site includes 739 units within 124 buildings, the 18 -hole golf course, and a Turn Building housed with the wastewater treatment plant near the southeast corner of the site. The 4 -story Golf Terrace and Conference/Spa Center would contain 128 residential units and 36,000 sf of commercial space. Uses planned for the commercial space include a restaurant, spa, conference and meeting rooms, and a pro shop on the lower level adjacent to Fairway #1. Surface parking lots would be provided for both tenants of the residential units and golf course visitors. The Black Point Townhomes would contain 462 units in 111 two-story buildings parallel to the proposed internal roadway system. These buildings would have an underground parkade that would provide two parking stalls per residential unit. The Alternative 1 Black Point Villas would contain 97 residential units in eleven 1- and 2 -story buildings with an underground parkade. The length of the Alternative 1 internal road system from Black Point Road through the Golf Resort would be approximately 13,125 lineal feet 00. 2.6.2 Alternative 2 (2008-2009) The Alternative 2 site plan was modified to respond to the 30 BoCC conditions imposed on the MPR development by Ordinance No. 02-0128-08, and to improve constructability by refining the grading plan. The number of buildings (and thus residential units) within the Marina/Maritime Village area was reduced compared to Alternative 1. A corresponding number of residential units were transferred to the Golf Course/Golf Resort side by introducing three additional 4 -story buildings. In addition, the gated entrance to the Golf Course/Golf Resort area was relocated to the northeast side of the peninsula property off Black Point Road, and the wastewater treatment plant was relocated to the northwest corner of the Golf Course/Golf Resort area. Under Alternative 2, Black Point Road would be improved from U.S. Highway 101 to the proposed site entrance at the northeast corner of the Golf Course/Golf Resort. See Alternative 2 figures: Overall Site, Marina Village and Golf Course/Resort (January 31, 2011). The number of Maritime Village buildings is reduced in Alternative 2 (compared to Alternative 1) to one 4 -story building and one 3 -story building. The 4 -story building would contain 49 residential units with 17,000 sf of commercial space on the main floor and parking on the lower three floors. The 3 -story building would contain six 2 -story units on the second and third floors with a restaurant and yacht club on the main floor. An improved waterfront promenade would provide pedestrian and emergency vehicle access, similar to Alternative 1. The existing swimming pool and change room building would remain as - is. The proposed one-way access drive from Black Point Road to the marina would be the same as Alternative 1. The Pleasant Harbor House would be retained, but the Bed -and -Breakfast Harbor House would be acquired and removed. In its place and extending further south, six buildings Sea View Chalets (one story with basements) would be constructed (26 residential units) in place of the Marina Stepped/Stacked and Rowhouse buildings of Alternative 1. Access to the Sea View Chalets would be from the Marina Access Drive (same as Alternative 1). Parking for these units would be provided in driveways. The Alternative 2 main access to the Golf Course/Golf Resort area would be at the northeast corner of the site from Black Point Road. The Maintenance Building and Staff Quarters would be located near this 5 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute entrance. With the addition of three new Golf Terrace buildings in Alternative 2, the total number of individual buildings would be less in Alternative 2 than Alternative 1. The new 4 -story Golf Terrace buildings would contain 338 residential units with underground and surface parking lots. The Golf Terrace 1 building would be larger in size compared to Alternative 1, and would contain 154 residential units, 36,000 sf of commercial space, and underground parking. Parking within the structure would result in a reduced requirement for the size of surface parking lots. Amenities within the Alternative 2 Golf Terrace 1 building would include a restaurant and lounge, conference and meeting rooms, chapel, billiards and game room, spa and exercise center, and the golf course pro shop. The Black Point Villa unit -type in Alternative 1 would be replaced by Sea View Villas in Alternative 2 (72 residential units compared with 97 villas in Alternative 1). The Black Point Townhome unit -type in Alternative 1 would be replaced by Golf Vistas in Alternative 2, with a reduction in the number of this unit type from 462 units in Alternative 1 to 192 units in Alternative 2. The 49 remaining buildings in the Golf Course/Golf Resort area would provide a total of 808 residential units and front on the internal road system. The internal road system in Alternative 2 (approximately 10,600 lineal feet) would be reduced in length compared to Alternative 1. Golf course fairway configurations are adjusted only slightly from Alternative 1, and a tennis court would be added adjacent to the Golf Terrace 2 building. Innovative measures for conservation of electrical power and golf course/landscaping management were introduced by Statesman Corporation in the Alternative 2 development concept. Geothermal units were proposed attached to heat pumps, and EarthRenew organic matter fertilizer became a significant element of the proposal for soil amendment and nutrient input to the golf course and landscaped areas in lieu of synthetic fertilizers. 2.6.3 Alternative 3 (2010-2011) The Alternative 3 site plan was modified in response to the Jefferson County locally -approved Shoreline Master Program (SMP) update (December 2010), that requires a 150 -ft shoreline buffer in the marina upland area compared to the 30 -ft setback in the adopted Shoreline Master Program (1989; revised 1993, 1996, and 1998) at the time the Alternative 1 conceptual site plan was prepared. The substantial shoreline buffer (i.e., an area where no new structures would be allowed) significantly modified the Marina Center/Maritime Village development concept for the Master Planned Resort. See the Alternative 3 figures: Overall Site, Maritime Village and Golf Course/Resort (January 31, 2011). Redevelopment for maintenance, repair and renovation is now limited to occur within existing building footprints in the Marina Center (marina upland) area. Therefore, residential and commercial development contemplated in the Alternative 1 and 2 site plans for this area is relocated in the Alternative 3 site plan to a new 3 -story building proposed at the intersection of Black Point Road with U.S. Highway 101. A new Marina Lofts building at the intersection would include 36 residential units on the east (rear) side of the building with two stories (12,500 sf) of commercial space at the front (west side, facing U.S. Highway 101). Parking would be provided in surface parking lots at this intersection for visitors, residents and marina slip owners. An increase in surface parking would be created on the north side of Black Point Road by a more southerly realignment of the Black Point Road/U.S. Highway 10 intersection in Alternative 3. Sea View Chalets would be eliminated from the site plan on the north side of Black Point Road in Alternative 3. A new residential -type structure is proposed in this area of the Alternative 3 site plan to accommodate group gatherings. Two of these buildings are proposed: Reunion House and Harbor View House. They would provide a common area and kitchen facilities for rental residents staying in 12 individual rooms. The Marina Access Drive would be upgraded to provide access to these two buildings. The Bed -and -Breakfast Harbor House owned by others would remain, with a corresponding minor reduction in the overall developable land area within the MPR compared to Alternative 1 or 2. The Pleasant Harbor House owned by Statesman Corporation may be renovated with no change to the footprint of the structure. The existing swimming pool and change room building for marina slip owners 6 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute would be retained with minor modifications, or reconstructed. Existing buildings in the marina upland area would be reconstructed within their existing footprints to house the marina office, a bistro/lounge, showers, washrooms, and self-service laundry. The existing roadway system and parking areas at the waterfront would be widened and improved to provide better curve radii. This would improve safety and ease of access for large vehicles like garbage collection trucks and emergency vehicles, and provide better connectivity for boaters between short-term parking and the head of docks for transport between their vehicles and their boats. The one-way access (Marina Access Drive) from Black Point Road to the waterfront proposed with Alternative 1 or 2 would be used in Alternative 3 for two-way shuttle service and emergency vehicle access between the Maritime Village improvements at the Black Point Road/U.S. Highway 101 intersection and the marina. The total number of residential units within the Maritime Village area of the MPR would be reduced to 60 new units in three new buildings, and the existing Pleasant Harbor House, and the Bed -and -Breakfast House (owned by others). Residential units would be increased by 20 in the Golf Course/Golf Resort area, transferred from reduced development in the Marina/Maritime Village area of the site. A new unit type is also proposed with Alternative 3, changing the ratio of the two smaller building types. Eight residential units would be relocated to the Golf Terrace 3 building, and 12 residential units would be integrated into the Golf Vistas and Sea View Villas. The Sea View Villas would be 1 -story walk -out units in Alternative 3, narrower than the Sea View Villas of Alternative 2 and with an underground parkade. There would be 828 residential units within 49 buildings in the Golf Course/Golf Resort area in Alternative 3. Golf Course fairways would be the same as Alternative 2. An additional tennis court would be provided next to the Golf Terrace 3 and 4 buildings and a swimming pool would be added next to Golf Terrace 3 building. Other Alternative 3 recreational amenities proposed adjacent to the Golf Terrace 1 building include a Bocce Ball court, pool and deck area. The Alternative 3 on-site electrical power generation proposal would utilize an integrated system of geothermal (geo-exchange) technology and combined heat and power (CHP) derived from co -generation systems fueled by biodiesel. Solar power options are also being explored. The landscaping proposal includes revegetating disturbed areas using healthy trees and shrubs from areas of the site that will be cleared. Consideration will be given to the use of native vegetation as well as ornamental shrubs, perennials and annuals in select locations at the Marina Center, Maritime Village, Terrace Buildings, and along meandering pathways. Landscape restoration in the Marina Center (marina upland) area of the site is planned to create a park -like setting with amenities for seating and sun -rain protection. The proposal includes creating a temporary native plant nursery south of the wastewater treatment plant site in the area of Fairways 15, 16 and 17, as these fairways will be developed during Stage II construction. A sprinkler irrigation system using Class A reclaimed water generated by the treatment process will be installed to temporarily maintain plants kept in this area for relocation during phased development of the site. 2.6.4 Alternative 4: The No Action Alternative If the Pleasant Harbor Marina and Golf Resort did not proceed, it is presumed (based on the Comprehensive Plan MPR designation for the property and absence of site-specific zoning), that the site would not be further developed at this time. The owner would continue to operate the 286 -berth marina and could perform maintenance, repair and replacement on existing improvements until a Master Planned Resort could be successfully implemented, either by the present owner or by others. Campground use of the Black Point Peninsula property could resume under an existing Conditional Use permit. 2.7 Principal Features of Proposed Development Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute 2.7.1 LEEDS Principles [summarize narrative demonstrating compliance with the intent of LEEDS standards: version 3, 2/01/11] 2.7.2 Marina Center and Maritime Village Commercial Uses (existing and proposed). Residential Units. Marina Terraces. Marina Townhomes. Pleasant Harbor House. 2.7.3 Golf Resort Commercial Uses. Hotel and Associated Uses. Conference, Banquet and Food Service Facilities. Residential Units. Multi -Level Terraces. Golf Chalets. Golf Villas. Staff Housing. 2.7.4 Golf Course Fairways and Greens Driving Range Cart Paths and Trails Maintenance and Operation Proposal [Golf Course BMPs: application of fertilizers, pesticides, herbicides] [Additional subheadings re: the golf course development proposal?] 2.7.5 Amenities [include table and draft narrative around amenities chart dated 1/31/11] Tennis courts, Bocce ball Number and size of natural areas to be preserved (and/or to be replanted; distinguish these) Amount of open space required/proposed in Development Agreement, Zoning Ordinance Trails, including connection to regional trail systems, if any (including bicycle routes) Restaurants Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute Spa 2.7.6 Natural Environment Features to be Preserved Conservation Easements and Natural Forest Land Buffers 200 -foot minimum -width riparian buffer along the steep bluff of the South Canal shoreline Steep slope setback from the South Canal shoreline Strip of mature trees between SR 101 and the Existing Marina Village Mature trees associated with wetlands and wetland buffers Coordination with Tribes Cultural Resources Management Plan Administration of the Conservation Easement Other Buffers, Greenbelts, Tree Retention and Landscaping Proposal Describe and illustrate compliance with BoCC Conditions 63 s, u, v and w. Approved Landscaping Plan Marina shoreline Between the Preferred Alternative Maritime Village location and SR 101 Associated with the golf course and golf resort Wildlife Management Plan 2.8. Phased Development Proposal Statesman Corporation proposes to complete the Pleasant Harbor Marina and Golf Resort over the course of approximately 10 years, or in response to market demand. STAGE I: Phase 1 Begin clearing drainage basins that produce no runoff that leaves the site (Basins 4, 5, 7, 13, and 14) and that will provide excavated material for construction aggregates material processing or for mass fill of Kettles B and C. The entire Kettle B area will be cleared. Large areas where deep excavation is proposed lie to the south, west, and north of the kettle. Kettle B will receive approximately 1,000,000 cy of fill before it can be finish -graded and lined with synthetic liners to start receiving site runoff and Class A effluent from the wastewater treatment plant. Liners could be installed during the wet season, though dry season installation is preferred. Channels and culverts to be constructed will convey surface water runoff overflows to infiltration areas within golf course fairways. Place erosion control measures and perhaps redirect runoff into the large kettle (Kettle B) prior to clearing and rough -grading to create the construction aggregates material processing site/plant(s). The relatively flat, centrally -located site proposed for materials processing is at the base of one of several 40+ foot cut areas. This will be the source of construction materials and fill material for early portions of the project. As excavation progresses and runoff is directed northward, Drainage Basin 13 will be expanded to the south which will allow for additional clearing. If clearing is limited to the south edge of the Drainage Basin 13, work could progress into the wet season. Existing roads on the site could be used to transport materials. • Build the construction aggregates material processing plant and begin operations. 9 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute • Construct the 260,000 gallon underground water storage facility and water piping to the existing well. Rough grade the resort road from the water storage facility to Black Point Road. Install water main and sewer piping from the water storage facility to Black Point Road in the resort road alignment. • Install erosion control measures along the base of the wastewater treatment plant site prior to clearing. Place fill material behind a retaining wall to create the site for construction of the wastewater treatment plant. Construct the treatment plant. Construct the co -generation unit to power the treatment plant. • Clear area south of treatment plant site to create a temporary native plant nursery for trees and shrubs removed during site development that will be relocated within the project area. STAGE I: Phase 2 • Develop the second on-site well. Connect the well to the domestic water distribution system as soon as practicable after rough grading the areas through which this piping must pass. • Place erosion control measures at the edge of the buffer along the east property line of the Maritime Village area of the site prior to clearing. Grade the building, parking, and entry roads to prepare this area for construction. • Install erosion control measures along the existing (unpaved) marina access drive that parallels U.S. Highway 101. • Widen and reconstruct the Marina Access Drive between Black Point Road and the marina. • Install erosion control measures, implement traffic controls, and relocate utilities in preparation for constructing improvements to the Black Point Road/U.S. Highway 101 intersection relocation and expansion. Reconstruct and realign Black Point Road and expand U.S. Highway 101. Underground utility services must cross Black Point Road. The WDFW boat launch access road intersection with Black Point Road will be reconfigured and reconstructed concurrent with the Black Point Road/U.S. Highway 101 intersection reconstruction. • Install the sewage collection system, water distribution/temporary fire protection system, reuse water systems, electrical power transmission, and communications facilities to serve the wastewater treatment plant, the marina area, and Maritime Village Building. • Construct Maritime Village building, Harbor View House, Reunion House, roads, utilities, and parking lots. • Widen existing roadways to 20 feet for two-way and 12 feet for one-way travel, and provide turn- arounds. Construct a new section of road between the existing marina access road and upper parking area to increase the curve radius for larger vehicles (including firefighting equipment. • Clear and excavate the small "hill" from U.S. Highway 101 on the north side of the marina access road to improve sight distance and visibility for entering vehicles. • Relocate the fuel storage tanks and equipment closer to U.S. Highway 101, near the unused pool. STAGE I: Phase 3 10 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute • Relocate existing marina office, convenience store, deli, and self-service laundry to the new Maritime Village building. • Remodel/reconstruct the Marina Center (marina upland) commercial uses. • Remodel/reconstruct existing swimming pool and change building at the marina. • Install sewage pumps and forcemains to convey sewage from the marina and marina upland facilities to the wastewater treatment plant. Abandon the existing septic tank drainfield that now serves the marina buildings and moored vessels. STAGE II: Phase 1 Construct the wetland in the bottom of the south kettle (Kettle C). This kettle is to be converted to a created wetland with an enhanced buffer. The bottom of the basin will be filled approximately 30 feet to create a relatively level wetland. Fill materials will be selected from on-site materials that have low permeability, such as those that may be found in the existing wetland to be filled in the large kettle (Kettle B). Buffer enhancement may take the form of clearing invasive plant species and replacement with native plant material harvested from the site or purchased from local nurseries. Temporary irrigation may be required for the wetland and the buffer plantings to improve the survival rate during the first growing season. The existing closed drainage basin and the drainage basin created in the developed condition around Kettle C will provide and maintain hydrology for the created wetland. When wetland creation in Kettle C is complete, construct a fence around the buffer edge to prevent construction activities and resort visitors from entering and potentially damaging the wetland and buffer vegetation. • Place erosion control measures along the east property line buffer of the Golf Course/Golf Resort area of the site near Black Point Road to prepare this area for construction of the Golf Terrace 1 access road. Excavated materials from the Maintenance Building/Staff Quarters area and from Fairways 3 and 4 could be used to construct this road embankment. Install the storm drainage system within the road to direct runoff to stormwater treatment and detention facilities. • Complete the Golf Terrace 1 building pad and associated parking areas. This construction may not require significant additional erosion control measures since the runoff can be directed to the enclosed drainage basin to the south. • Install the sewage collection system, water distribution system, fire protection system (a function of the fairway/landscape irrigation system), reuse water systems, power transmission, and communications facilities to serve the Golf Terrace 1 building, and the Maintenance Building/Staff Quarters. • Install erosion control measures and clear sufficient area during the dry season to rough -grade Fairways 11 and 12 and construct the embankment for Fairway 10, including two lined detention ponds. This embankment will create building sites for the Sea View Villas, and significant portions of Fairways 7 and 8. This grading will form Drainage Basins 8 and 9. Large areas of excavation lie to the east and west of Fairway 10 and the building site to the north. These detention ponds will be lined with synthetic liners to prevent saturation of the embankment. Pumps will be permanently installed adjacent to these ponds to move collected runoff northward into the irrigation pond (Kettle B). These pumps will be powered by cogeneration units. Construction of the embankment, ponds, pumps, forcemains, and soil stabilization must be completed during the dry season. It might be necessary to 11 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute delay completion of Fairways 7, 8, 9, 10 and part of Fairway 11 until the dry season in the following year. Install erosion control and wetland buffer area protection along the west side of Wetland D (along the east property line of the Golf Course/Golf Resort area of the site) before work begins on Fairways 2, 4, 5, and 6. Since this drainage basin (Basin 10) discharges to Wetland D and then offsite, it may require that clearing and grading in this area occur in the dry season. Very large subsurface infiltration galleries are planned beneath these fairways. Excavation depths of 20 feet will be common within these fairways to finished grade. Cuts to 30 feet will be required in some areas. Excavations of more than 10 feet below finished grades will be required for installation of the infiltration piping and select backfill. These fairways will require stabilization before the wet season begins. Fairway 1, and the area north of Fairways 12, 13, 14, 15, 16, 17, and 18 could be worked during wet weather. The area north of Fairway 14 may require additional erosion control measures near the wastewater treatment plant site in order to work during wet weather conditions. The preferred method of fairway construction will proceed in the order of clearing and grubbing, rough grading, drainage installation, irrigation installation, fine grading, and seeding progressing along the fairways using specialized types of equipment. This will allow a minimum of clearing and grubbing to occur and will reduce the amount of time the ground is not being actively worked. The fairways in many cases can be seeded and stabilized before the wet season arrives. • Rough -grade roads, driveways, and building pads for improvements that will be made in Stage II Phase 2 and Stage II Phase 3 as part of adjacent fairway construction. Installation of underground wet and dry utilities can be delayed until the Stage II Phase 2 and Phase 3 building construction occurs. Sanitary sewer service will require pumping raw sewage from the south-central portion of the site. A pump station will be required near the south end of the pond (Kettle B). STAGE II: Phase 2 • Install erosion/sedimentation control measures around building construction sites to protect completed portions of the golf course (if any). Buildings to be constructed in Stage II include Golf Terrace 2 west of Fairway 16; Golf Terrace 3 east of Fairway 14; Golf Vistas south of Fairway 15 and west of Fairway 18; Sea View Villas west of Fairway 18; and the Maintenance Building and Staff Quarters north of Fairway 3. • Extend roads and utility services to the Stage II Phase 2 building sites. • Construct two sanitary sewer pump stations: one at the south end of Kettle B to serve building construction to the northwest (Sea View Villas and Golf Vistas), and one adjacent to the Maintenance Building/Staff Quarters. • Construct the sanitary sewer pump station and co -generation unit at the Maintenance Building/Staff Quarters. • Reconstruct Black Point Road from the end of Stage I Phase 2 intersection improvements east of U.S. Highway 101 to the resort east entrance in the northeast corner of the Golf Course/Golf Resort area of the site. Install erosion/sedimentation control measures, as required. STAGE II: Phase 3 12 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute • Install erosion/sedimentation control measures around building construction sites for the Golf Terrace 4 building north of Fairway 12; Sea View Villas adjacent to Kettle C, north of Fairways 10, 11, and 12, west of Fairway 7, and south of Fairway 4; and Golf Vistas east of Kettle C. • Extend roads and utility services to the Stage II Phase 3 building sites. • Construct the sanitary sewer pump station at the southeast corner of the site to serve the Sea View Villas west of Fairway 7, north of Fairway 10, and north of Fairway 11. 2.9 Construction Management Proposal 2.9.1 Clearing Proposal Selective? [Correlate to the Forestry Report] How much at one time? [Correlate to phasing proposal and construction sequencing] Proposal for biomass disposal (including stumps) 2.9.2 Grading Proposal [CP: Narrative description and illustration] [somewhere in here include a brief description of demolition of existing campground facilities, particularly things like the 17 septic drainfields; some existing structures to remain?] Overall estimated earthwork quantities Phased grading proposal Types of equipment Export/import (types of materials, quantities, truck trips) Types of materials to be generated on-site Stockpiling proposal Seasonal constraints Construction BMPs and stormwater management during construction 2.9.3 On -Site Materials Processing Proposal Gravel Crushing Operation Concrete Batch Plant 2.9.4 Temporary Site Stabilization Measures Proposed During Clearing and Grading 2.9.5 Golf Course Construction Proposal [CP: Detailed description of fairway construction requirements: subgrade preparation, the EarthRenew soil amendment proposal, irrigation proposal, surface water runoff management proposal] 2.9.6 Construction Material Sourcing Proposal 13 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute 2.10 Infrastructure Proposal 2.10.1 Water Supply and Service [Scott Bender to describe, working with Craig on civil engineering components] Comprehensive Water Plan Water District Groundwater Supply Water Treatment Plant Distribution System Neighborhood Water Policy 2.10.2 Wastewater Collection, Reclamation, and Reuse Proposal [Rick Esvelt to describe, working with Craig] Comprehensive Sewer Plan Sewer District Wastewater Reclamation Plant Collection System Reclaimed Water Reservoir Reuse Proposal (golf course and landscape irrigation, other?) Discharge Proposal (interim during early phases of development?) 2.10.3 Stormwater Management Proposal [Craig to describe] During construction Developed -condition stormwater management proposal Marina Village Maritime Village (upland complex at the intersection of Black Point Road with SR 10 1) Golf Resort Golf Course 2.10.4 Transportation System and Parking Proposal [Craig to describe, working with TENW] Planned roadway improvements correlated to phased development proposal Points of connection to SR 101 and cost responsibility for improvements (draft MOU with WSDOT? and with Jefferson County Public Works) Internal roadways (road standards and phased development proposal) Site Access, Safety and Circulation proposal (including emergency vehicle access) Parking proposal Public Transportation proposal and draft MOU Non -motorized circulation proposal: pedestrian pathways, golf cart pathways (show on site plan), bicycles 2.10.5 Onsite Energy Generation Proposal 14 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19111 Preliminary — Do Not Cite or Distribute Co -generation proposal: detailed description of all fuel sources proposed, transportation and storage requirements, storage facilities and locations, combustion proposal (facilities, emissions), air quality analysis by a qualified professional who routinely prepares GHG emission analyses in Washington State for use in SEPA documents. [If no longer proposed with Alternative 3, describe for comparison in Alternative 2] Solar energy proposal Mason County PUD electrical service available to marina (and as back-up?) 2.10.6 Proposed Energy Conservation Measures During Construction Developed Condition of the Project: Design Features Consistent with Leadership in Energy and Environmental Design (LEED) Standards Greenhouse Gas Emissions Management Proposal [Note: A comprehensive GHG emissions analysis must be prepared by a qualified professional who routinely prepares these analyses in Washington State for use in SEPA documents. Need to add this consultant to team. Richard Steffel of Environ Corporation recommended (425.412.1800). Information provided to -date by consultants to Statesman (Geotility, EarthRenew) is incomplete and too general. Does not demonstrate experience with the comprehensive analysis needed.] 2.10.7 Lighting Proposal Also address International Dark Sky Association Zone E-1 standards required by BoCC Condition 63z 2.10.8 Employment and Employee Housing Proposal Proposal for compliance with BoCC Conditions 63 e, g and dd. Describe the proposal during construction and in the developed condition of the MPR. 2.10.9 Maintenance and Operations Proposal Golf Resort Maritime Village (upland) Existing Marina Village Marina Management Plan Comprehensive Water Quality Monitoring Plan Tunicate Monitoring Plan and Adaptive Management Plan MOU with Pleasant Tides Yacht Club and Slip Owners Association Pet Waste Management Plan 2.10.10 Public Services Proposal [Summarize the contents of the following documents] 15 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Preliminary — Do Not Cite or Distribute Draft MOU with Jefferson County FPD #4 (Brinnon Fire District?) re: fire protection services and EMS Draft MOU with Jefferson County Sheriff's Department Draft MOU with Brinnon School District 446 Draft MOU with Jefferson Transit Draft MOU with Jefferson County (?) re: the Housing proposal Draft MOU with Jefferson General Hospital and Mason General Hospital re: public health Draft MOU with Jefferson County Parks and Recreation Department Chapter 3 impact analysis re: use of Dosewallips State Park and eventual re -opening of Dosewallips Road for access to Olympic National Park (per letter of comment received during SEIS Scoping) Draft MOU with Washington Department of Fish and Wildlife re: use of the Pleasant Harbor boat launch by resort visitors (per letter of comment received during SEIS Scoping) Draft MOU (or Development Agreement) with Jefferson County Public Works to specify development standards and procedures for plan review, construction inspections, materials sampling and testing; requirement for supervision by Jefferson County Public Works project engineer; and provisions for developer cost reimbursement to the Public Works Department for these services (per James Pearson memorandum of comment during SEIS Scoping, 11/30/09). 2.11 Comparison of the Environmental Impacts of the Alternatives [Prepare comparative table during PDEIS review; summary of impacts described in Chapter 31 2.12 Cumulative Impacts 2.13 Benefits and Disadvantages of Reserving Project Implementation to Some Future Time The SEPA Guidelines encourage applicants and permitting agencies to view each generation as a trustee for succeeding generations. With this perspective, environmental review is encouraged to consider whether approving a proposal at this time would foreclose future options (WAC 197-11-440[5][c][vii]). [Draft discussion specific to the Pleasant Harbor MPR] 16 Pleasant Harbor Marina and Golf Resort PDSEIS Chapter 2 Outline —4/19/11 Pleasant Harbor Marina and Golf Resort Draft SEIS Table of Contents Fact Sheet Reader's Guide 1.0 Summary 1.1 Purpose and Objectives of the Proposal 1.2 SEPA Procedures and Public Involvement (Include description of compliance with BoCC Condition 63b) 1.3 The Proposed Action and Alternatives 1.4 Significant Impacts and Mitigation Measures 1.5 Major Issues, Significant Areas of Controversy and Uncertainty, and Issues to be Resolved 2.0 Description of the Proposal and Alternatives' 2.1 Project Proponent 2.2 Purpose and Objectives of the Proposal 2.3 Location 2.4 History and Background 2.5 Master Planned Resort Approval Process 2.6 Description of the Proposed Action and Alternatives 2.7 Principal Features of Proposed Development (include at appropriate locations: description of compliance with BoCC 63.d, .u, .v, .w, .x, .y, .z) 2.8 Phased Development Proposal 2.9 Construction Management Proposal 2.10 Infrastructure Proposal 2.11 Comparison of the Impacts of Alternatives 2.12 Cumulative Impacts 2.13 Benefits and Disadvantages of Reserving Project Implementation for Some Future Time 3.0 Affected Environment, Potential Impacts, and Mitigation Measures Note: All sections in Chapter 3 to include and address these 8 subheadings: Affected Environment Potential Impacts During Construction Potential Impacts in the Developed Condition Mitigation Measures — Compliance with FEIS Conditions Mitigation Measures — Compliance with BoCC Conditions Mitigation Required by Applicable Regulations Other Mitigation Measures Proposed by the Applicant Other Mitigation Recommendations ' Chapter 2 format modified from the FEIS format to discuss the proposal and all alternatives here, rather than a separate Chapter 4, because it was agreed that the FEIS concept plan would be discussed as Alternative 1. i Pleasant Harbor MPR SEIS Table of Contents — 4/19111 draft v2 Table of Contents, continued Natural Environment 3.1 Earth 3.2 Air Quality (Include description of compliance with BoCC Condition 63. cc) 3.3 Water Quantity and Quality 3.3.1 Surface Water (Include description of compliance with BoCC Conditions 63.r and 63.y) 3.3.2 Groundwater 3.3.3 Water Resources (Include description of compliance with BoCC Conditions 63. m, . n, . o and .p) 3.4 Wetlands and Streams (Include description of compliance with BoCC Conditions 63. h and. i) 3.5 Forest Resources (Include description of compliance with BoCC Conditions 63. s, . u, . v, and. w) 3.6 Wildlife and Habitats (Include description of compliance with BoCC Condition 63.1) 3.7 Fish, Shellfish, and Tunicates (Include description of compliance with BoCC Condition 63. t) 3.8 Energy and Natural Resources (regional context) (Include description of compliance with BoCC Conditions 63.x and 63. bb) Built Environment 3.9 Relationship to Jefferson County Shoreline Master Program Update 3.10 Rural Character (Include description of compliance with BoCC 63. u) 3.11 Population, Housing and Employment (Include description of compliance with BoCC Conditions 63. e, .f, .g, .aa, .dd) 3.12 Light and Glare (Include description of compliance with BoCC Condition 63.z) 3.13 Archaeological and Cultural Resources (Include description of compliance with BoCC Conditions 63j and 631) 3.14 Transportation and Parking (Include description of MOUfor compliance with BoCC Condition 63. c) 3.15 Parks, Recreation, Public Amenities, and Public Access (Include description of compliance with BoCC Condition 63.d) 3.16 Public Services (Summarize/append draft MO Us demonstrating compliance with BoCC 63. c) 3.17 Utilities 3.17.1 Water Supply (Include description of compliance with BoCC Conditions 63. m, . n, . o, .p) 3.17.2 Sewage Collection and Treatment: Wastewater Reclamation 3.17.3 Stormwater Management (Include description of compliance with BoCC Conditions 63.a and 63. q) 3.17.4 On -Site Power Generation: Supply and Demand (Include description of compliance with BoCC Condition 63. bb) 3.17.5 Solid Waste Collection 4.0 Summary of Mitigating Conditions - Compliance with FEIS Conditions for Permit Approval in Any Phase of the Approved Proposed MPR ti Pleasant Harbor MPR SEIS Table of Contents - 4119111 draft v2 Table of Contents, continued 5.0 Summary of Mitigating Conditions — Compliance with Board of County Commissioners Conditions Setforth in Ordinance No. 01-0128-08 6.0 References 7.0 Distribution List List of Figures List of Tables Pleasant Harbor MPR SEIS Table of Contents — 4119111 draft v2