Loading...
HomeMy WebLinkAbout031ow May 18, 2011 PHMPR meeting Status & Issues: • Tech Team interviews • Outstanding Tech Reports • Payments Prior to drafting preliminary SEIS Short term goal: Completion of Final Technical Reports Priority items for Statesman: • Draft new Alternative • Air Quality/GHG/Climate Report — Richard Steffel Environ Corp y • Lighting/Dark Sky Proposal — Milton Kiehlbauch • Energy/Co-gen — Jonathan Heller? — contact information 4, • Draft MOUS — School, Fire, Public Health, Tribal Priority work items for DCD: sX Revise No Action Alternative X • Revise Scoping Memo V� • Issue instructions to Technical Team on completion Final Tech Reports • Re -produce Status Report e � c �oCC�k�4-(ACc t 1, Co (J._� r UA_'_ q�-V L am- u --e, Q� j W( G"' ." +u,� (o c a scau 7 > (Geotech) 5/3 SEIS format and content input from DCD Revise drawings and amenities based on le (Architect) 5/4 Alternatives Illustrations of buildings for SEIS Needs some data from Craig - run Bender (Hydro) 5/5 calcuations again for construction and OOutstanding reports - Air Reports Quality/GHG/Climate- Energy -Co-gen 1 1 30Contiditons 0 Group Email Lists Protocol Insure clear, consistent and timely communication Sheriff - rec'd Housing - rec'd Transit - rec'd Parks -rec'd OSchool O Fire OPublic Health }/ O%Tnbal Z- X Follow format of FEIS Dwight Holobaugh (Sewer & Water System OHas stopped work (90% done) on sewer plan ,Dwight for non-payment. Water plan is approximately 60%done . Complete set of documents ready - working with Vicki on a "Comparative Table" to ®Mike Read (Transportation) 5/9 compare all elements of the environment - revised channelization plan approved by WSDOT ®Conduct interviews WTech Team &Status ®Joel Purdy& Wayne Wright(Geoengineers- Final reports near completion - need Golf Course, HMP, Wetlands Mitigation) 5/9 payment before release ORick Esvelt - Water/Sewer - left message to call 5/13 OLyndon Lee (Energy) 5/18 - left message to call Glenn Hartmann (Cultural Resources) 5/18 - Garth instructed that Vicki didn't need any thing else - if we do, notify him in writing Brian Merryman - (Plants/Forestry) 5/18 - waiting on further instructions O Milton (lighting/darkskys) - left message to call 5/18 OCraig Peck - Project Manager Draft additional alternative Alternatives based upon advice from Tom Backer -was acceptable to all parties March 2010 -Alts #1 & #2 no longer 7Present WLegal opinion valid per Sandy Mackie April 2011 ®C]Alternatives Alternative analysis consistent between Counry and Proponent's counsels Craig & Natalie to draft new additional Alternative ®Draft new - send to tech team ®UDWJ to revise No Action Alternative :Revise Scoping Memo OOutstanding reports - Air Reports Quality/GHG/Climate- Energy -Co-gen 1 1 30Contiditons 0 Group Email Lists Protocol Insure clear, consistent and timely communication Sheriff - rec'd Housing - rec'd Transit - rec'd Parks -rec'd OSchool O Fire OPublic Health }/ O%Tnbal Z- X Follow format of FEIS lc� ti'O( k � OK? /® 0 1-0 • A L�. -6-- -Z- ) - V\.P-�Jj