HomeMy WebLinkAbout005D]
PERRONE CONSULTING, INC., P.S.
Geotechnical & Underground Engineering
January 12, 2012
David Wayne Johnson, Associate Planner
Department of Community Development
621 Sheridan St
Port Townsend, WA 98368
Subject. Supplemental Environmental Impact Statement
Soil and Earth Impacts & Mitigation
Pleasant Harbor Marina and Golf Resort
Brinnon, Washington
Perrone Consulting Project #06101
Dear Mr. Johnson:
11220 Fieldstone Lane NE
Bainbridge Island, Washington 98110
Tel: 206-778-8074 Fax: 206-780-5669
wwvw,perroneconsuitinq.com
D CECC COVE
JAN 2 7 20112
JEFFERSON COUNTY
This report summarizes our geotechnical engineering and geologic evaluation of the soil and earth
environmental impacts and mitigations for Master Planned Resort Alternatives MPR -1 and MPR -2
at the proposed Pleasant Harbor Marina and Golf Resort in Brinnon, Washington. Alternatives
MPR -1 and MPR -2 arose out of requirements stipulated by the Board of County Commissioners
(BoCC) upon review of the FEIS. This report supplements our August 10, 2007 "Soil and Earth
Impacts and Mitigation report prepared for the EIS.
We understand that Alternative MPR -1 site plan (see Figure 1) was developed through the BoCC
conditions of approval and in response to the Jefferson County locally -approved Shoreline Master
Program (SMP) update (December 2010), that requires a 150 -ft shoreline buffer in the marina
upland area compared to the 30 -ft setback in the adopted Shoreline Master Program . The
shoreline buffer (i.e., an area where no new structures would be allowed) significantly modified the
Marina Center/Maritime Village development concept for the Master Planned Resort, eliminating
the previously proposed new marina center buildings.
Alternative MPR -2 site plan (see Figure 2) was modified to improve constructability by refining the
development within the existing conditions of the site to minimize environmental impacts. We
understand that the golf course was redesigned to flow within the existing contours and the building
locations were adjusted so they are placed on undisturbed native soil in excavated areas (cuts)
instead of on compacted fills. The Marina Center (marina upland) area is the same as in
Alternative MPR -1 with minor changes taking place in the Maritime Village area.
Environmental Impacts of the New Alternatives
Alternatives MPR -1 and MPR -2 contain all of the earth and soil impacts previously described in the
FEIS. Similar to the previous alternatives, site grading will be accomplished as a balanced cut and
fill with significant quantities of fill being placed in the existing kettle holes which will become
stormwater retention ponds. While the balanced cut and fill quantities for MPR -1 are similar to
those in the EIS, Alternative MPR -2 quantities have been significantly reduced from about 2 million
CY to about 1 million CY.
Site grading would occur primarily in the residential dwelling areas, golf resort building areas,
roadways, retention pond areas and in the treatment plant area. These site areas will be stripped
of vegetation and topsoil to expose the underlying soils which will be excavated or buried by
placing new compacted fill. During construction, these areas will be exposed to increased
C:\Projects\06101-Pleasant Harbour\70 Reports\SETS\Technical Menno011212.docx
Mr. David Wayne Johnson
January 12, 2012
Page 2 of 3
stormwater runoff and erosion into adjacent intermittent streams in the Maritime Village and Marina
Area and in the south side of the Golf Course Resort area near Hood Canal.
Grading in the existing marina area would be limited to localized roadway realignment to improve
marina tenant, visitor, and emergency service vehicle access for both MPR -1 and MPR -2. Over
the entire resort project site, it is expected that for Alternative MPR -2 approximately 162 acres or
67 percent of the land will be cleared and graded. As each phase of development occurs and
areas are stabilized with either permanent or temporary methods, another area would be cleared
and graded. Alternative MPR -2 would have about 25 percent less surface area disturbance than
for alternative MPR -1.
Similar to previous alternatives, there should not be any long term project impacts to the stability of
the steep slopes along Hood Canal since the facilities will be designed to capture surface water
runoff and to avoid any increase in groundwater levels on the slope.
Natural aggregate needed for construction will be obtained by on-site processing of the soils
excavated at the site, thereby eliminating construction truck traffic that would occur if the material
were imported from off-site sources. Nearly all of the excavated material at the site (excluding any
organic topsoil or forest duff material at the ground surface) will be suitable for use as compacted
structural fill or could be processed on site to produce gravel or sand aggregate needed for
concrete, pavement and under -slab base course, and for golf fairways and greens. The estimated
aggregate demand (Peck, 2011) is summarized in Table 1 along with the available aggregate
supply based on a total excavated volume of about 1,000,000 CY.
TABLE 1 — ESTIMATED AGGREGATE QUANTITIES
Estimated Aggregate Quantities (CY)
Item Gravel Sand Peat
Average supply 440,000 490,000 0
Demand 77,400 97,500 33,700
Supply less Demand 362,600 392,500 -33,700
The demand is based on the following assumptions:
• 50,000 CY of concrete will be needed for buildings
• Base course layer thickness under roads and parking areas is 8 inches
• Base course layer thickness under parkade slabs is 12 inches.
• Fairways will have a 10 -inch thick sand layer.
• Fairways and greens will have a 4 -inch thick layer of peat.
As seen from Table 1, the estimated gravel and sand supply far exceeds the demand whereas
there is an insufficient supply of naturally occurring peat at the site.
Construction of Roadways
Environmental impacts as presented in the EIS remain appropriate. There are no significant
differences between the environmental impacts of MPR -1 and MPR -2.
Construction of Retention Ponds
Environmental impacts as presented in the EIS remain appropriate. There are no significant
differences between the environmental impacts of MPR -1 and MPR -2.
SPERRONE CONSULTING, INC., P.S.
Mr. David Wayne Johnson
January 12, 2012
Page 3 of 3
Construction of Houses, Hotels and Water Treatment Buildings
Environmental impacts as presented in the EIS remain appropriate. Environmental impacts for
MPR -2 will be less than for MPR -1 due to the lower number of proposed structures in MPR -2.
Construction of Underground Utilities
Environmental impacts as presented in the EIS remain appropriate. There are no significant
differences between the environmental impacts of MPR -1 and MPR -2.
Mitigation Measures
The mitigation measures addressed in the EIS remain appropriate and apply to both Alternatives
MPR -1 and MPR -2.
Significant Unavoidable Impacts
Both Alternatives MPR -1 and MPR -2 would permanently alter the natural topography as described
in the EIS. Alternative MPR -2 would have less impact to the environment due to the lower area of
site stripping and quantity of cut and fill.
We trust that this information suits your current needs. If you need additional information, please
contact us.
Very Truly Yours,
PERRONE CONSULTING, INC., P.S.
Vincent J. Perrone, Ph.D., P. E.
Principal Engineer
Attachments: Figures 1 and 2
cc: Dr. Garth Mann
Mr. Don Coleman
Mr. Craig Peck, P.E.
(5) PERRONE CONSULTING, [NC., P.S.
UNNAMED STREAMS
AND DRAINAGE COURSES
EXISTING MARINA
ACCESS FROM
U.S. HIGHWAY 101
SANITARY SEWER
PUMP STATION AND
CO -GENERATION UNIT
RECONSTRUCTED MARINA 150 FT SHORELINE
CENTER WITHIN EXISTING BUFFER
FOOTPRINT
GARBAGE EXISTING
EXISTING MARINA
SWIMMING POO
MARINA AND
PLEASANT HARBOR HOUSE A. MARINA CENTER
REUNION HOUSE P
EXISTING BED AND BREAKFAST MEAN SEA LEYEL
MARINA ACCESS h' (OWNED BY OTHERS)
DRIVE (PROPOSED J
---- 1plUNNAMED STREAMS
AND DRAINAGE COURSES
HARBOR VIEW HOUSE y _ � WITH APPROXIMATE
MARITIME VILLAG
VISITOR AND SLIP.
OWNER PARKING
JEFFERSON TRANSIT
AND MASON TRANSI
STOP (PROPOSED)
J
RESTROOM
\
TENNIS COURTS
POOL
u E AMPHITHEATER
TENNIS COURTS
s
PUMP STATIONS
AND PARKING -
0 0 650
-U IN IFFY
WDFW BOAT LAU
ACCESS ROAD
J pFFAAI�I,,RWAY 15
"meq
W N
Q
� a �a4
LU ir
r �
w
~ ik
® 11
4r
4'e
STEEP SLOPE SETBACK AND
RIPARIAN BUFFER (30 FT)
David Hamilton Architect
WA 9230
1-800-662-7765
Project Name: PLEASANT HARBOR
Master Planned Resort
Figure: Alternative 1: Overall Site
Date: December 2, 2011
PROPOSED
AREA CALCULATIONS
257 ACRES
GOLF COURSE AND RESORT
AREA: 220.4 ACRES
IMPERVIOUS: 13'%
PERVIOUS: 87%
UNITS: 829
MARINA AND MARITIME VILLAGE
AREA: 36.3 ACRES
IMPERVIOUS. 13`4,
PERVIOUS: Xl",.
UNITS. G
GOLF TERRACES AND
CONFERENCE CENTER:' SPA
5()11 UNITS
3WKX1 S.F. COMMERCIAL
SEA VIEW VILLAS
2W UNITS
GOLF VISTAS
76 UNITS
■MARITIME VILLAGE
36 UNITS 12,500 S.F. COMMERCIAL
■RED & BREAKFAST
I UNIT (A LAWFUL EXISTING STRUC
®REUNION HOUSE
12 UNITS
■HARBOR VIEW HOUSE
12 UNITS
EXISTING RESIDENCE:
PLEASANT HARHOR HOUSE.
I UNIT (A LAWFUL EXISTING STRUC
.MARINACENTER
3,500 S.F. COMMERCIAL
MAINTENANCE BUILDING AND
STAFF QUARTERS
52 UNITS
TOTAL RESIDENTIAL: 890 UNITS
TOTAL COMMERCIAL: 52.000 SF
VENTILATED UTILITY BUILDING,
SANITARY SEWER
PUP STATI, COMGENERATOION AND
\\ \CONTROL GA
200 FT SHORELINE ENVIRONME
AND CONSERVATION EASEMENT
!%1 vIliiltiilllit
IJtlJI l/IJIIJ®t
IETLAND D
SECOND WELL
LOCATION OPTION A
EXISTING WELL
GOLF COURSE
AND RESORT
SECOND WELL
LOCATION OPTION B
SANITARY SEWER PUMP
STATION, STORMWATER
PUMP STATION, AND
CO -GENERATION UNIT
FIGURE 1
BOCCE COURT (l)VER
UNDERGROUND WATER
STORAGE TANK)
:RATION UNIT
TATER
WATER FEATUR
ENT PLANT
BAGE
POOL r�DRIVING RANGE
rPUTTING GR
J pFFAAI�I,,RWAY 15
"meq
W N
Q
� a �a4
LU ir
r �
w
~ ik
® 11
4r
4'e
STEEP SLOPE SETBACK AND
RIPARIAN BUFFER (30 FT)
David Hamilton Architect
WA 9230
1-800-662-7765
Project Name: PLEASANT HARBOR
Master Planned Resort
Figure: Alternative 1: Overall Site
Date: December 2, 2011
PROPOSED
AREA CALCULATIONS
257 ACRES
GOLF COURSE AND RESORT
AREA: 220.4 ACRES
IMPERVIOUS: 13'%
PERVIOUS: 87%
UNITS: 829
MARINA AND MARITIME VILLAGE
AREA: 36.3 ACRES
IMPERVIOUS. 13`4,
PERVIOUS: Xl",.
UNITS. G
GOLF TERRACES AND
CONFERENCE CENTER:' SPA
5()11 UNITS
3WKX1 S.F. COMMERCIAL
SEA VIEW VILLAS
2W UNITS
GOLF VISTAS
76 UNITS
■MARITIME VILLAGE
36 UNITS 12,500 S.F. COMMERCIAL
■RED & BREAKFAST
I UNIT (A LAWFUL EXISTING STRUC
®REUNION HOUSE
12 UNITS
■HARBOR VIEW HOUSE
12 UNITS
EXISTING RESIDENCE:
PLEASANT HARHOR HOUSE.
I UNIT (A LAWFUL EXISTING STRUC
.MARINACENTER
3,500 S.F. COMMERCIAL
MAINTENANCE BUILDING AND
STAFF QUARTERS
52 UNITS
TOTAL RESIDENTIAL: 890 UNITS
TOTAL COMMERCIAL: 52.000 SF
VENTILATED UTILITY BUILDING,
SANITARY SEWER
PUP STATI, COMGENERATOION AND
\\ \CONTROL GA
200 FT SHORELINE ENVIRONME
AND CONSERVATION EASEMENT
!%1 vIliiltiilllit
IJtlJI l/IJIIJ®t
IETLAND D
SECOND WELL
LOCATION OPTION A
EXISTING WELL
GOLF COURSE
AND RESORT
SECOND WELL
LOCATION OPTION B
SANITARY SEWER PUMP
STATION, STORMWATER
PUMP STATION, AND
CO -GENERATION UNIT
FIGURE 1
UNNAMED STREAMS
AND DRAINAGE COURSES —
WITH APPROXIMATE BUFFERS
EXISTING MARINA
ACCESS FROM -
HIGHWAY 101
EXISTING
SWIMMING POOL
PLEASANT HARBOR
HOUSE "
200 -FT SHORELINE ENVIRONMENT -,101/45 -�
MARINA
ACCESS DRI
(PROPOSED)
VISITOR AND SLIP.
OWNER PARKING
JEFFERSON TRANSIT
AND MASON TRANSIT I
STOP (PROPOSED)
i
US 101
HIGHWAY
Q
v T
TENNIS COURT.
AND RESTROOM
1 E
5
ew
SC/4L M iEEi
SHORELINE
42 UNITS
11.700 S.F. COMMERCIAL
PROPOSED
MEAN SEA LEVEL
®
AREA CALCULATIONS
UNNAMED STREAMS
®HARBOR VIEW HOUSE
257 ACRES
AND DRAINAGE COURSES
WITH APPROXIMATE BUF S
■
GOLF COURSE AND RESORT
I UNIT (A LAWFUL. EXISTING STRUCTURE)
AREA: 220.4 ACRES
EXISTING RESIDENCES: PLEASANT HARBOR HOUSE
STORAGE TANK
IMPERVIOUS: 13%
MPHITHEATER
PERVIOUS: 87%
MARINA CEMrER
3.500S.F. COMMF'RCIAIPUTNG
RANG
?rDORLIVITNIG
UNITS_ &A
GREE
TO AL RESIDENT IAL: SIM UNITS
MARINA AND MARITIMF. VILLAGE
TOTAL COMMERCIAL: 53,0110 SY
AREA: 3b.3 ACRES
SANITARY SEWER PUMP STAT(ON, 1 RC
17%
AND CO -GENERATION UNIT
PERVIOUS: w"
UNITS: 82
EXISTING
MARINA
.
GOLFTFRRACF.SAND
CONFERENCECENTERSPA
ORDINARY HIGH
YVATER MARK
Sm UNITS
36.000 S.F. COMMERCIAL
SEA VIEW VILLAS
MARINA AND
2M UNITS
MARITIME VILLAGE
ALPINE VISTAS
44 UNITS
SHORELINE
42 UNITS
11.700 S.F. COMMERCIAL
MEAN SEA LEVEL
®
MAINTENANCE BUILDING AND
STAFFOUARTERS
UNNAMED STREAMS
®HARBOR VIEW HOUSE
52 UNITS
AND DRAINAGE COURSES
WITH APPROXIMATE BUF S
■
MARITIME VILLAGE
�C WDFW BOAT LAUNCH
� ACCESS ROAD
O -GENERATION
NIT
F
T
1/-,
PLEASANT HARBOR
O STEEP SLOPE SETBACK
RIPARIAN BUFFER (30F
David Hamilton Architect
WA 9230
1-800-662-7765 J
Project Name: PLEASANT HARBOR
Master Planned Resort
A
Figure: Alternative 2. Overall Site 00 -FT SHORELINE ENVIRONME
CONSERVATION EASEMENT
Fq�Rw
7y 4
FALfiswgY 10 e
TERFALL
r -RESTROOM
REAM
WETLAND D
XISTING
ELL
GOLF COURSE
AND RESORT
SECOND WELL
LOCATION
OPTION A
SECOND WELL
LOCATION
OPTION B
RESTROOM AND
TURN BUILDING
1,100 S.F.
FIGURE 2
42 UNITS
11.700 S.F. COMMERCIAL
REUNION HOUSE
12 UNITS
®HARBOR VIEW HOUSE
12 UNITS
RED & BREAKFAST
■
I UNIT (A LAWFUL. EXISTING STRUCTURE)
UNDERGROUND WATER
EXISTING RESIDENCES: PLEASANT HARBOR HOUSE
STORAGE TANK
I UNIT(lAWFUL EXISTING STRUCTURE)
MPHITHEATER
MARINA CEMrER
3.500S.F. COMMF'RCIAIPUTNG
RANG
?rDORLIVITNIG
GREE
TO AL RESIDENT IAL: SIM UNITS
TOTAL COMMERCIAL: 53,0110 SY
VENTILATED UTILITY BUILDING
SANITARY SEWER PUMP STAT(ON, 1 RC
AND CO -GENERATION UNIT
PO)N
CONTROL GATE
A
Figure: Alternative 2. Overall Site 00 -FT SHORELINE ENVIRONME
CONSERVATION EASEMENT
Fq�Rw
7y 4
FALfiswgY 10 e
TERFALL
r -RESTROOM
REAM
WETLAND D
XISTING
ELL
GOLF COURSE
AND RESORT
SECOND WELL
LOCATION
OPTION A
SECOND WELL
LOCATION
OPTION B
RESTROOM AND
TURN BUILDING
1,100 S.F.
FIGURE 2