Schedule
As shown by this timeline below, we anticipate completing the SEIS process in approximately 9 months.
However, the actual schedule will depend upon the level and substance of comments that we receive on
the Preliminary Draft and FinalSElSs, and on the Draft SEIS. EAlBlumen has the capacity and resources
available to meet the schedule indicated below.
Tasks EA Budgeted
time
Peer/County
Review time
Tentative
Date
Phase 1:
1,. Coordinate/meet with Jefferson County and the
peer review team regarding work performed in
support of the SEIS to date.
2 weeks t/17/13
(2/2s/13)
2. Complete a review of the revised technical
studies prepared by the applicant's technical
team to confirm their completeness and
adequacy for inclusion in the SEIS.
3. ldentify additional project information/analysis
needed to prepare the SEIS (we will prepare an
lnformation Needs Memo that lists this
additiona I information/a nalysis).
l week 1.11.8/1.3
4. Compare final round of peer review/county
comments on technical studies to final draft of
alltechnicalstudies. Draft memo to County
regarding adequacy of revisions.
1-2 days L/22/13
5. ldentify critical procedural steps required by
SEPA, including WAC references, and how this
project will meet these requirements (this will
be incorporated into the SEIS).
2 days 1./24h3
(311,/13l,
Phase 2:
1. Complete lhe Description of the Proposed
Actions ond Alternatives chapter of the Draft
SEIS (based on the draft project description
prepared by the previous SEPA consultant and
additional information provided by the
applicant). We will circulate this chapter to
Jefferson County and the applicant early on for
concurrence.
2/7/]-3
(312611,31
2. Jefferson County and applicant review
Description of the Proposed Actions and
l- week 211.4/73
2 weeks
Alternotives cha pter for concurrence
3. Summarize alltechnical analyses prepared in
support of the SEIS.
2 weeks 2/28173
4. Serve as the principal author of the Preliminary
Draft SEIS; directly prepare the Foct Sheet and
Summory chapters, directly prepare certain
sections of the Affected Environment/lmpocts
chapter, and incorporate the technical analyses
prepared by the applicant's team into the
Affected Environment/mpocts chapter (see the
Overall Assumptions above for our assumptions
regarding responsibilities for the various sections
of the sErs).
3 weeks 3/2u13
5. Produce the Preliminary Draft SEIS for review by
Jefferson County and the applicant.
2-3 days 3126h3
(sl20l73)
6. Jefferson County and applicant review
Preliminary Draft SEIS and provide comments.
2 weeks 4lelt3
Phase 3:
1. Revise the Preliminary Draft SEIS based on
commentsreceived.@
3 weeks 4/30113
2.
llanninE €emmissien (PC) meeting and Be€C
Draft EIS and reeeive verbal feedbaek,
{-da.l 'H/E
3. Revi'e deeu+nenFbased en verbal eemments
frem FC and BoCC, Submit te Jeffersen €eunty
+e++lnal+eere+lat"
5/+t
4. Jefferson County reviews revised Preliminary
Draft SEIS for final approval.
L week s/to/13
5. Finalize document and coordinate production of
the Draft SEIS for issuance and public comment.
L week sltT /13
6. 3e{!-day public comment period 46 weeks 6/14/73
7. Prepare for and help conduct the Draft SEIS
@Open Houseduringthe
3@-day comment period to obtain oral
comments.
3 days 6/4h3
8. Attend public hearing of the Planning
Commission's review and recommendation of
the sEts.
1 day 6/6113
Sdays
Phase 4:
1. Review all written (and oral) comments received
on the Draft SEIS.
l week 6/2tlt3
2. Coordinate with Jefferson County to determine
whether any of the comments require further
analysis and the approach to responding to key
comments.
2-3 days 6/26/13
3. Assemble responses to comments and
summaries of any additional analysis in the form
of a Preliminary Final SEIS for review and
comment by Jefferson County and the applicant.
5 weeks 713111.3
4. Jefferson County and applicant review
Preliminary Final SEIS and provide comments.
2 weeks 8/1.41L3
5. Revise the Preliminary FinalSE|S based on
pertinent comments received. Submit to
Jefferson County for final approval.
2 weeks 8128/L3
6. Jefferson County reviews Preliminary Dre+EUd
SEIS for final approval.
L week e/4/13
7. Finalize document and coordinate production of
the Final SEIS for issuance.
l week sl1.LlL3
Budgeted Time Subtotal 24 weeks
(EA)
ll weeks
(County/
applicant/public)
Total Budgeted Time for SEIS 35 weeks