Swenson, Karen < kswenson@eaest.com >
Thursday, January 17,20L3 1:50 PM
Cooke, John T. (JT) (Perkins Coie); Craig Peck (peckassoc@comcast.net)
David W. Johnson; Stacie Hoskins; Schipanski, Rich
RE:lnformation Needs
Pleasant Harbor Info Needs Memo - revised 1-17.docx
JT and Craig - | have added two items to the lnfo Needs Memo. Do you have any information regarding existing
conditions other than what is presented on pg2-4 of the FEIS (which is dated)?
ln particular, we are looking for:
o Number of existing structures (all structures on site)
o Which structures are currently occupied/utilized
o lf vacant, previous use (if available)
o Square footage (if available)
Current impervious surface area (if available)
Also, we found some project objectives on page 5 of the Pleasant Harbor application binder (pg. 13 of the pdf)
submitted in 2006 (http://www.co.iefferson.wa.us/commdevelopment/PDFS/Black%20Point%20MPR/app binder 3-1-
06.pdf ). JT, is this what you were thinking of? While some of them may not still apply ("designate sufficient land..."),
perhaps this is a starting point.
a
1
Objectiver
a To enoourage deeigns that oomplernent the natural setting and
prornote the alpine and maritime vlllage theme"
r To establish appropriate $tyl66, rnaterials and scale of detrelopment
that contribute to a ooneistent and cornplimentary architectural
clraracter.
To enoourage *le use of the ec<bntive pethway eyetem and open
speffi end tuduce nelianoe on motorized traE$parl.
To reduoe the impact on environrnertally eensitive ereas by
designing a mad netrr$orh to pres€ruo and protect more of the
natura! vegetation, dreinage courtes, and $hpe$.
To establish the eiting of buildings to reduce impads on sensitive
areas.
To incorporate a fire protection plan that preserves a beautiful
hlend of forest end hom6 by adopting FireSmart planning prinoiples
that combine clearing of selective undergrouvth with the use of
proven non-combustible construqtion rnaterie l$.
To incorporate a well designed system for potabie and non-potable
uuater conservetlon and treetrnant,
To incorporate a state-of-th+art sewage and efHuent treafilent
plant to delirrer Class A urater.
a
a
To desfinate sufficient buildabb land for reeidential development to
acoommodate the econornic fuasibility by prouiding a varioty of
housing Spee to rupport an ertay of amenities.
To elirninate the riske to Hood Canalfrorn the eutrophication effecls
of poor development,
To prevent ealt water intrusiott risks to potabta water welle,
J
a
a
I
a
a
a
Thanks so much, and we look forward to receiving the remaining information
Kare*wSvto*tlow
HI
Karen Swenson, AICP
Senior Planner
2200 SDdh Avenue, Suite 707 | Seattle, WA 98121
206.452.5350 x 1716
kswenson@eaest.com
From: Cooke, John T, (JT) (Perkins Coie) [mailto:JCooke@perkinscoie.com]
Sent: Monday, January L4,20L3 11:21 AM
2
To: Swenson, Karen
Subject: RE: Information Needs
Thanks, Karen.
I am working on pulling this together. Have you received a signed contract yet?
JT
From: Swenson, Karen [mailto:kswenson@eaest.com]
Sent: Friday, January 11, 2013 1:48 PM
To: Craig Peck (oeckassoc@comcast.net); Cooke, John T. (JT) (Perkins Coie)
Cc: Schipanski, Rich; Hollinger, Kristy; David W. Johnson; Stacie Hoskins
Subject: Information Needs
As discussed at our meeting on Wednesd aV $/9l1, here is our lnformation Needs Memo (Phase 1, Task 3) that details
additional information that we will need to commence drafting the SEIS. We set a target of next Wednesday l7/L6l for
submittal of these items. We realize not all of these documents will be available at that point, and we'll continue to
revise and circulate this memo as we receive the items requested.
Thanks,
Kore*w Svtl*1,tpr,w
el
Karen Swenson, AICP
Senior Planner
2200 Sixth Avenue, Suite 707 | Seattle, WA 98121
206.452.s350 x 1716
kswenson@eaest.com
IRS CIRCULAR 230 DISCLOSURE: To ensure compliance with Treasury Department and IRS regulations, we inform you
that, unless expressly indicated otherwise, any federal tax advice contained in this communication (including any
attachments) is not intended or written by Perkins Coie LLP to be used, and cannot be used by the taxpayer, for the
purpose of (i) avoiding penalties that may be imposed on the taxpayer under the lnternal Revenue Code or (ii) promoting,
marketing or recommending to another party any transaction or matter addressed herein (or any attachments).
NOTICE: This communication may contain privileged or other confidential information. lf you have received it in error,
please advise the sender by reply email and immediately delete the message and any attachments without copying or
dlsclosing the contents. Thank you.
3
HtlsruMEN-
720 Sixth Street South, Suite 100
Kirkland, WA 98033
Telephone: 425.284.5401
Fax: 425.284.5402
ffi
To:
GG:
From:
Date:
Subject:
JT Cooke, Perkins Coie; Craig Peck, P.E.
David Johnson and Stacie Hoskins, Jefferson County Planning Department
Rich Schipanski and Karen Swenson, EAlBlumen
January 10, 2013; Revised January 17, 2013
lnformation Needs for the Pleasant Harbor SEIS
The purpose of this memo is to provide a preliminary list of information needed to prepare the
Pleasant Harbor SEIS. The following table is considered a preliminary list, because it is possible
that additional information will be required as the SEPA alternatives are fully defined. We have
reviewed the information provided by the applicant to date and identified additional information
that will be required to commence with drafting the SEIS. Ultimately, all technical reports will
need to provide enough detail for adequate SEPA environmental analysis of development under
the Proposed Actions and EIS Alternatives.
We recognize that a considerable amount of existing information has been provided to date. We
have reviewed the information to determine the gaps in information, but not for the quality of the
technical reports. As we continue to review the technical reports in detail over the next week, we
may revise this table to reflect future information needs. To the extent that the information
provided is relevant to the Pleasant Harbor SEIS, it will be used to prepare, or will be referenced
in, the document. As appropriate, information from those documents will be used to prepare the
SEIS analyses. However, since new alternatives will be included in the SEIS (which exclude the
marina portion), certain information may need to be updated for the SEIS.
The following table focuses on additional information that will be needed per our discussion on
January 9, 2013. lt is assumed that the SEIS will address two development alternatives and
one No Action Alternative. The SEIS will recognize the limited redevelopment in the marina
portion of the site under the existing Binding Site Plan Permit, but that portion of the resort will
not be included in the SEIS analyses. Likewise, the potential environmental impacts from a
realigned WDFIV access road to the boat ramp (as acknowledged under Alternative 2) will be
assessed under a separate permiUprocess.
The lnformation Needs table includes a column indicating our assumption about the
person/entity anticipated to be responslble for providing the requested information. Where more
than one name is provided in the responsibility column, the first name listed will have the
primary responsibility for coordinating the provision of the information. The table also indicates
the date by which the requested information will be needed (or has been provided), and the
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
January 10,2013
1
status of receipt of the information (we will periodically update the status column as we receive
information). Refer to the updated schedule for deliverable dates.
Please contact us with any questions on the information needs below.
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
January 10,2013
2
SOURCE
DATE
NEEDED STATUSINFORMATION NEEDS
1) Existing Structureso Number of existing structures (all
structures on site)o Which structures are currently
occupied/utilizedo lf vacant, previous use (if
available)o Square footage (if available)
Craig Peck;
JT - Perkins
Coie
1/18
2) Current impervious surface area (if
available)
Craig Peck;
JT - Perkins
Coie
1/18
1) Earth: Final Geotechnical lnvestigation,
Subsurface Group, January 9, 2008
This report should address the following (as
detailed in the Pleasant Harbor Scoping
Notice).. Geologyo Soils. Topographyo Slopes. Erosiono Unique Physical Features
Craig Peck;
JT - Perkins
Coie
1/16
2l Water: Water Supply and Groundwater
lmpact Analysis,2007.
JT - Perkins
Coie
1/16 Rcv'd
(Appendix 5
of DEIS)
3) Fish and Wildlife: Habitat Management
Plan, GeoEngineers, 2012.
JT - Perkins
Coie
1/16
4) Transportation:
Correspondence/documentation of discussion
to construct an alternative WDFW boat ramp
access road
JT - Perkins
Coie
1/16
Existing Gonditions
Elements of the Environment
5) Air Quality: ESA Review comments on
Greenhouse Gas Emissions Report by Failsafe
Canada (2012)
David -
County;
JT - Perkins
Coie
1/16
6) Plants: Narrative landscaping plan JT - Perkins
Coie
1/16
7) PIants: Confirmation with the County that
tree remova!/retention can be addressed in
terms of acreage, not individual trees and their
diameter.
JT - Perkins
Coie
David
Johnson-
County
1/16
8) Fiscal Analysis: Fiscal Analysis Report JT - Perkins
Coie
1/16
9) Utilities: Electrical documentation
regarding electrical demand/load and PUD's
response when development causes PUD to
reach capacity.
JT - Perkins
Coie
1/16
10) Utilities: Telecommunications, Cable and
Solid Waste - contacts for providers
Don
Coleman
1/16 EA will
contact;
Craig to
provide
Coleman's
phone
number
111 Public Services - Medical: Confirmation
that a medical clinic will be included in the
project
JT - Perkins
Coie
1/16
12) Revised Alternatives Description (edits to
12-12-2011 version).
Craig Peck 1/16
13) Revised phasing maps to exclude marina
area under existing BSP
Craig Peck 1/16
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
January 10,2013
3
INFORMATION NEEDS SOURCE
DATE
NEEDED STATUS
Alternatiyes lnformation
*ptffi*,*
SOURGE
DATE
STATUS
29) Provide a list of existing permits that
would affect the site (i.e. regarding the Pleasant
Harbor Resort).
JT - Perkins
Coie
1/16
30) Provide a list of all Jefferson Gounty
permits and approvals that would be required
as part of the Proposed Action and future
development.
JT - Perkins
Coie
1/16
31) Provide a list of Federal and/or State
permits and approvals that would be required
as part of the Proposed Action and future
development.
JT - Perkins
Coie
1/16
Digital Copies of all documents provided in
paper form (MS Word preferred; Adobe pdf
documents acceptable)
JT - Perkins
Coie
1/16
Draft Zoning Regulations for Pleasant
Harbor MPR
JT - Perkins
Coie
1/16
Draft Development Agreement for Pleasant
Harbor
JT - Perkins
Coie
1/16
Project Objectives (required by SEPA)JT - Perkins
Coie
1/16
4
INFORMATION NEEDS
Additioaal lnformation
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
January 10,2013