Loading...
HomeMy WebLinkAbout009a L PueesANT Heneon PLEASANT HARBOR MARINA AND GOLF RESORT & SPA The following report is a presentation of the history of approximately 257 acres that is located 1.5 miles south of Brinnon, Washington, and consists of two distinct parcels known as the Marina Uplands (+l- 35 acres of which l5 acres are aquatic), and the Black Point Lands (+l- 221 acres). It is important to note that the history of the property dates back to the turn of the 20th century, where Pleasant Harbor was recognized as a recreational area as well as a 'feeder' for the logging industry because of its passive waters. During the 1960's through to 2008 the property incorporated a 500 unit Campground for recreational vehicles and campers plus an extensive road network, electrical and water utilities for campers, and a series of septic systems and open camp fires. The Black Point lands appear to have been logged twice since the early 1900's. The Marina Uplands also dates back to the same period that includes a grocery store, a laundry and washroom for boaters, a pool and service building, as well as holding tanks for a lift system to pump waste to lands of the north of U.S. Highway l0l. The DNR lease was renewed in 2008 for 35 years to accommodate the existing2S9 moorage slips. During the late 1990's and the early years of the 21st century, a local group submitted for a Master Planned Resort designation for the property through a Jefferson County Comprehensive Plan change. Although never developed, the designation was recognized. The property was sold to The Statesman Group in 2008 with their American office in Scottsdale, Arizona and a Canadian office in Calgary, Alberta. To compensate for impacts to the environment, transportation, planning, and engineering; the Developer provided a 2007 application for a Master Planned Resort through a Final Environmental Impact Statement (FEIS). This document site is subject to 30 conditions and memorandums of understanding (MOU's). The Developer-Applicant addressed the 30 Conditions and MOU's, by amending the proposal and preparing technical reports for a draft Supplemental Environmental Impact Statement (SEIS) by 2010. 9300 E. Raintree Drive, Suite 100 Scottsdale, AZ 85260 USA Telephone: (480)248-3300 Fax 480-248-3700 www.statesmanresorts.com MARINA AND GOLF REsORT Prior to submission of the draft SEIS, the BOCC for Jefferson County amended the Shoreline Management Plan that extended the shoreline setbacks for the Marina Uplands from 30 feet to 150 feet of the OHWM. This revision caused the Developer-Applicant to create a new site plan with alternatives and relocate the Maritime Village since it had been siruated within the revised setbacks. THE PHASING PLAN FOR DEVELOPMENT: 1) Stage 1: PHASE 1A: This Phase is no longer included within the SEIS. The marina and marina uplands are subject to an existing Binding Site Plan (BSP) which allows for re-modeling or completion of previously approved structures. Permits for this re-modeling work have either been received or are pending. * Replace 3 docks (D-E-F), plus the Pier(s) and waste water piping. * Replace the electrical to these docks to code. * Replace the fuel tanks, the fuel pumps and the associated piping. * Remodel the laundry and boaters shower and washroom to code. * Remodel the Pool and Service Building to code. * Re-Place the Grocery Store, Lounge and Yacht Club (same footprint). * Add temporary amenities for families such as Bar-B-Q's, aZip-Line, and a children' s Euro-Bungee Jumping. * Completion of the boater's storage building. 2) Stage 1: PHASE 1B: This site servicing Phase commences the installation of the Waste Water Treatment Plant which involves the Mitigation Plan for the wetland in Kettle B. Kettle B is a term for an existing depression in the Black Point Lands created during the ice-age. (see reports of Subsurface Group). This Kettle will be cleaned of organics and plants prior to relocating non-organic materials within the cavity to reduce its volume and to form a polyethylene lined +/- I million gallon reservoir for recycled water. The replacement of the wetland is planned for Kettle C where partial cleaning of the lower portion of the cavity will accommodate a doubling of Kettle B wetland area. (Report of Geo-Engineers) The Water Storage Vault will be constructed including pumping facilities to accommodate the need for potable water and fire safety. The Black Point Lands have yielded exceptional construction materials to off-set the usual transportation needs to import and export materials. Proposed onsite operations include onsite gravel crushing, sorting, and concrete batch plant to produce gravels for road building and concrete for buildings and sands to be mixed with imported peat for and golf course construction. This area will be centrally located within the site to provide screening from neighboring properties. Energy for all phases will be provided by Mason County PUD #l Stage 1: PHASE 2: The Maritime Village building and short-terrn accommodation buildings for boaters have been relocated outside ofthe 150 foot Shoreline setback area. The Maritime Village including surface and subsurface parking will be accessible from Black Point Road. Jefferson Transit and Mason County Transit will be provided a bus stop. These Stage I lands will be serviced with potable water pumped from the existing and a second well. The Maritime Village consists of 11,700 sf of commercial on the main level and a second floor providing a new Yacht Club and Real Estate office. With views towards Pleasant Harbor, I and2 bedroom Resort-Condos (42) will be available for short-term stays within the three storey architectural Maritime motif. Two smaller buildings will be placed between the Maritime Village building and the marina. . These buildings will cater to groups such as wedding parties, yacht clubs, and family reunions where 12 single bedroom suites open to a generous main kitchen and grand room. (Reunion House & Harbor View House have surface parking provided). Black Point Road will be relocated to form a perpendicular intersection with U.S. Highway l0l. Turn lanes will be constructed on U.S. Highway l0l and on Black Point Road. The reconstruction for the Marina Uplands access/egress road will be improved to meet fire codes, as well as the Marina Access Drive. Electric shuttle carts assist pedestrians not wanting to walk to the Marina. The Geothermal heat and cooling system is a thermal-conductivity program based upon an engineered series of core holes and closed polypropylene loops circulating fluids through heat pumps that warm or cool air moved via interior space fan coil units. All structures are engineered after Phase lA to be on geothermal for heat and cooling and domestic water plus the heating of the lagoon pool and spa waters. (see LEED report ) Approximately 25o/o of the conductivity exchange will take place in the basin of the Reservoir. Sewer pump stations are required to move sewage to the wastewater treatment plant. Stage 2: PHASE 1: This phase consists of clearing and contouring of the +l- 60 acres for the Fairways, T- Boxes and Greens for Pleasant Harbor Golf Resort. Since the Golf Course will be mainly developed during the dry-period, this phase will incorporate 2 developmental and growing seasons including sand-peat-organic seeding and geothermal enhanced ground warming greens for growth maturation. Construction of the stormwater detention pond and stormwater pump station will be completed to prevent golf course runoff from entering Hood Canal. Runoff will be pumped to the completed Kettle B irrigation pond. All of the Golf Clubhouse and amenities for golf are incorporated within the Terrace Building l. (Olympic Mountain House) This 4 storey (North-East view) and 6 storey (South-West view) has been designed to maximize the sea views as well as accommodate for the substantive grade drop to the SW. Residents will be able to enjoy evening shows such as the Olympic Orchestra or Indigenous events in the Amphitheatre. There is a total of I 91 Resort Condos of I , 2, or 3 bedroom designs for short-term stays plus 36,000 sf for Conferences, the Health Center and Spa, plus Restaurants and Lounge. Guest parking will be below grade along with the resort laundry. Additional guest and golfer's parking will be surface grade. Staff Housing of 52 twin bedroom suites are planned for this phase above the concrete Agra-Center. This structure is the center for maintenance and storage of lawn equipment and golfcarts. A separate smaller service building on the west side of the surface parking provides two separate storage areas; one for organic fertilizers and the other for non-phosphate cleansers. A separate area with splash-pads is used to safely & to conveniently wash equipment. Above grade commercial fuel is stored within an enclosed area on the perimeter of the Waste Water Treatment plant. Stage 2: PHASE 2: The balance of the 4 storey Terrace Buildings 2,3, and 4 are constructed with a concrete below grade parkade, plus a steel framed structure including sprinklers. (Total 329 Resort Condos for short-term stays). The Pleasant Harbor Golf Resort is opened to the public upon the completion of the widening and re-construction of Black Point Road leading to the stately gated entrance. Those looking to retire at Pleasant Harbor for 6 months of enjoyable weather, purchase one of 36 SEA-VIEW retirement VILLAS or 38 ALPINE family VISTAS in this phase. Sanitary sewer pump stations are required to move sewage for treatment during this phase as well as the final phase 3. Stage 2: PHASE 3: The balance of the construction representing a further 170 SEA VIEW retirement VILLAS and 6 ALPINE family VISTAS will meet the needs of the Mature Purchaser and a second home for Families. The Golf Course Half-Way Chalet provides lunches and snacks for the Golfers or those out for a beautiful walk overlooking the Puget Sound. PRESERVING THE ENVIRONMENT & VALUES * a NET ZERO BALANCE OF WATER WITHDRAWN AND INFILTRATED BACK TO THE AQUIFER. * a STATE-of-ART WASTEWATER TREATMENT PLANT FOR CLASS 'A' WATER FOR IRRIGATION AND FIRE SMART. * a MULTI-PURPOSE RESERVOIR FOR STORAGE OF CLASS A RECYCLED WATER, PLUS A DzuVING RANGE, PLUS WALTZING WATER EVENING ENTERTAINMENT. * a LOW ENERGY CONSUMPTION SYSTEM FOR GEOTHERMAL HEAT AND COOLING, PLUS WATER CONSERVATION, PLUS LOW CONSUMPTION LED LIGHTING. * BELOW GRADE PARKING TO REDUCE IMPERVIOUS AREA TO APPROXIMATELY 12% * STIMULATE THE ECONOMIC RECOVERY OF THE AREA WITH NEEDED QUALITY JOBS AND STAFF HOUSING. * STORM WATER DETENTION AND PUMPING SYSTEM WITH BACK-UP GENERATORS TO PREVENT SURFACE RUN-OFF TO HOOD CANAL FROM GOLF COURSE FAIRWAYS. * NON COMBUSTIBLE STEEL AND CONCRETE CONSTRUCTION FOR RECYCLED BENEFITS & LEED SHADOWING. * DARK SKY EXTERIOR LIGHTING STANDARDS. * ELIMINATION OF SYNTHETIC NITRATES AND PHOSPHATES THAT NEGATIVELY IMPACT THE AQUIFER * DAKOTA PEAT MIXTURE FOR ROOT ENHANCEMENT AND REDUCING WATER IRRIGATION PLUS NATURAL FERTILZER. T REDUCED TREE REMOVAL AND LESS ACREAGE FOR GOLF FAIRWAYS. REPLANTING PROGRAM IN DISTURBED AREAS. * SAFE ACCESS/EGRESS WITH RECONFIGURATION OF THE INTERSECTION OF HIGHWAY IOI AND BLACK POINT ROAD, & ACCESS/EGRESS TO THE PLEASANT HARBOR BOAT LATINCH. * ELECTRIC SHUTTLE SERVICE BETWEEN MARITIME VILLAGE AND THE MARINA. * PROMOTE HEALTHY LTVING & PEDESTRIAN WALKING PATHS. THE SKY IS JUST A LITTLE BLUER...., .....OVER PLEASANT HARBOR RESORT Site @ Delineated Wetlands -^.aa Delineated Streams (----.., 80-ft Wetland Buffer 7s-ftStream Buffer i 150-ft Wetland Buffer Notes: 1. The locations of all features shown are approximate. 2. This drawing is for information purposes. lt is intended to assist in showing features discussed in an attached document. GeoEngineers, lnc. can not guarantee the accuracy and content of electronic files. The master file is storBd by GeoEngineers, lnc. and will serve as the official record of this communication. 3. lt is unlawful to copy or reproduce all or any part thereof, whether for personal use or resale, without permission. Wetland and Stream Map Pleasant Harbor Master Planned Resort Brinnon, Washington GToENGTN EERS lfr Figure 6 1,000 1,000 -{b" 0 Feel Data Sources: 2005 Aerial lmagery from ESRI Prime World 2D. Lambsrt Confomal Conic, Washington State Plane North, North American Datum '1983 I I I j 7I-I f,tIa fr trT r I I I l I I €+Jdhrp0 a @*[ \rf#land GA I ,'gdlhnrlf,d I Iu I L L oo F ido o t \ \ f;79f'rl E .l \.4it r-ra;'ri {& '''$f r' j,7 \]r ,t F, I*' v,l 1; x l* * \\ STORAGE TANK Project Name:PLEASANT HARBOR Master Planned Resort Alternative 2: Phasing Overal! Site Date: February 11, 2013 EXISTTNG PTIASAXT HARBOR I'ARINA BINDING SITE PIJN IIARINA IYPROVEYENIS UNDER SEPARATE REYIEIV EXISTING BED AND (NO yODTFTCATTON REUNION HARBOR YIEW I'ARITITlE BUILDING US 101 HIGHWAY SCAII IN 'TEI PueasANT HRReoR - MARINA AND GOLF RESORT -flt*il|til Davld Hamllton Archltect wA 9230 1 -800-662-7765 PHASING STAGE I P}IASE I CONSTRUCT WASTEWATER TREATMENT PLAT{T CONSTRUCT WATER STORAGE TANK WTTH NEW PIPING DISIRIBUTION CREATE CONSTRUCTION MATERIAIS PROCESSING I.OCATION ON GOLF COURSE SITE PHASE 2 MARMME VILLAGE BUILDING 42 UNITS 1I,7M S.F. COMMERCIAL REUNION HOUSE 12I.'NITS HARBOR VIEWHOUSE 12 TJNITS US HIGHWAY 1OI AND BT.ACKPOINTROAD INTERSECTION IMPROVEMENTS DEVELOPSECOND WELL CONSTRUCT MARINA ACCESS DRIVE STACE II SEA I,TVEL PIIASE I CREATE WETIAND IN KETTLE C GOLFTERRACE & CONF-ERENCE CENTER/SPA I9I UNITS 36,000 S.F. COMMERCIAL BEGIN GOLF COURSE CONSTRUCTION WDFW BOAT UNDER SEPARATE REVIEW PHASF] 2 GOLF TERRACES TERRACE2,3,AND4 329 UNrrS SEA VIEW VILLAS 36 IJNITS GOLF VISTAS 38I,]NITS MAINTENANCE BUILDING AND STAFF QUARTERS 52 UNITS COMPI-E'fE GOLF CONS-TRUCTION COURSE RECONSTRUCT BI-ACK POINT ROAD CONSTRUCT SANITARY SF]WER PUMP STATIONS PHASII3 SEA VIEW !'ILT-I\S 170 UNTTS GOLFVISTAS 6 UNITS CONSTRUCT TIALF.WAY HOUSE KETru B \ \\ \\ 7 I I \\ t I I L / 7 f \ / -) v // __ \ I 'l \ ,/ 7 -/ -/ Wj'-a 77 aL I t \ -/ o =e T __ E--- u MARITIME VILLAGE 2OO-FT SHORELINE ENVIRONME AND CONSERVATION EASEMENT NT THE RESERVOIR IOO MILLION GAL1ON STORAGE OF CTJSS A \IATER IRRIGATION OI GOL} CDURSL D81YI.\G RNNGE W^LTZNG WTTERS FOR EVENING ENTERT.{INMENT NET ZERO IMPACTON THE AQUITER CEOTI]ERMAL HEAL'I'I{Y HEITING & COOLINC UTILITY TIIE SEAVIEW VILL"AS RETIREMENT HOJSING FOR MATURE OWNER TOW{NERGY CONSI,]MPTION FIXTURES DN RI(.SKY I .IGHTINO ST.AND.{RDS THE ALPINE VISTAS SECOND TIOME FOR FAMILIES BELO}V GRADE P^RIiING TO REDUCE IMPERYIOUS AREA THE GOLF COURSE 6500 YARDS OF CIIIMPIONSHIP GOI.F t TREE-STIRUB PRESERYITION ONLY 60 ACRES OF IRRIGATED SOD LOW-W.{TER-USE FTOM DAXOTA PEAT ROOTING PROGRAM NATUR\L FERTILIZATION AND PEST CONTROIS THE lOTh FAIRWAY POND I.OWEST CONTOUR ACCUMULATES SURFACD WATER TOR RECYCLING OENER.{TOR-LIFT SIATION T-,OVES WATER TO RESERVOIR PLEASANT HARBOR MARINA & GOLF RESORT & SPA PRESERVING THE ENVTRONMENT NDLRGROLND PARI(INC'I'O REDUCE IMPIRVIOUS AREA -IO S IIMI]LA IT YE^R ROUND IOURISM TERRACE 1 BUILDING PLEASANTHARBOR MARINA NO ADDI'I IONAL S I'RUC IURES OU I SIDTJ OF I HE BSP BU I WI IIIIIi I HE -SMP SHORELINE SE1'BACKS EEGIJLAR NMNTINRING OF 1 TIE WA]ERS OF ]I]E HARBOR REGULA'I'IONS FOR BOATERS ON ENVIRONMENTAL STEWARDSHIP THE MARITIME VILLAGE STEEL RETAIL{ONDOTEL DIRECT BLACI(POtIiT ROAD ACCESS CI]ESI' PARKINO PRDSERYING SHORELINE WASTE.WATER TREATMENT PRODUCES RECYCLED WATER FOR CLASS A USES THE RESORTTERRACES NULTI{EVEL I AND 2 BEDROOM CONDOTETS AMPHITHEATER ENTERTAINMEI{T OLYMPIC PHILII.ARMONIC TO INDIGENOUS EVENTS MARITIME VILLAGE HOUSE HARBOR VIEW HOUSE EXISTING },ARINA SHORELINE SEA LEVEL MARITIME BUILDING JEFFERSON AND STOP us 101 HIGHWAY TENNIS GOLF COURSE RESERVOIR PueaseruT HARBoR STEEP SLOPE RIPARIAN BUFFER GOLF COURSE AND RESORT -WAY N *@, S L fltHtil DERGROUNO WATER ACCESS ROAD BOAT LAUNCH w\#W RESERVOIR \ I c 7 I-aI \ o \ I \u,on - r $Lil &il I FE I II STAGI Iffil$ I staot I PI{ASE 2 sTAGI I ffiASE T STAGT I HASE 2 ilace I Pt{as: 3 4 ,/ t, r., (D tl { { I*M \I PLEASANT HARBOR MRINA REGUUR MONITOR]NG OF IHE WATERS OT THE HAREOR REGULANONS FON SOATIRS ON ENVIRONMENTAI. STEWARDSHIP ir/rt (FF $rtrc( ,ott's HARBOn MRINA CAfEr rc ADoITIONAI STRUCTURES WITHIN THE SMP SHOREUNI S€IBACXS, I:iri HOLE I5 'll I I rttrl IHE MANTME VII.UGE STIEI. RETAII,<ONDOTEI DIXEC'T BLACK PolNT RD,HOLE I4 U o U -e{}HOIE 4_ ,'+--#---.-. H OLE 6 I I {rr--=lEI \\ tt\o HOLE 3 I I3 LEI -sAZt,I H r8 THE AIPINE VISIAS SECOND HOMTS TOR FMINTS BELOW GRADE PAR(]NG a HOIE l7 5 t^-'.J o \ II \-^)a HOIE 12 1 /HOIE 2 THE COIF COURSE 6500 YARDS OF CHAMPIONSHIP GOIF A IRIT SHRUS PRESERVATION ONIY 60 ACRES OT IRIIGATED SOD TOW WATER USE TROM DAKOTA PEAT ROOIING PROGTAM, NATURAI TENIUZATION ANO PTSI coNno$ IHE R€SoRTTERRACES: LNDEXGROUND PAR(NG TO REDT CE IMPtMUS ANEA MTNMES TO SIMUhTE YTAR ROUND TOURISM MT'LTII,EV€I, I AND 2 BEDROOM CONOOIELS HOLE 6I I a : ta \ \t'HOIE t I :: -- -- ,- orE 8!,r, LE7 ,t, ! THE SEAVIEW VITUS RETIREMINT HOUSING IOR MATURE OWN€R LOW ENERGY coNsuMpiroN flxruREs oARK sKy LIGHTTNG srANDARos o o o o WASTE YVATE R TnEATMENT: PROoUCES R ECyCt E0 WATT R FOR CI.ASS A TE USES GEOTHENMAL HEAITHY HEATING & coouNc urLnY \ THE,*TPHIIHEAIER: ENTERTAINMENT : OLYMPIC PHITHARMONIC TO INDIGENOUS EVEMS ,6Ih 'qry/olHE tEsElvOlR: | 00 MltllON GAIION STORAGE Or CusS A WATIT: RRGANON GOTT COURSE DRIVING RANGI WATTZNG WAIERS TOR EVENING EMERTAINMENT NET ZENO MPACT ON THE AOUfEN BE |OTH TARWAY POND: tOwESI CONTOUR ACCUMUI^NS SURTACE WATER FOR RECYCUNG GENERATORTIN SIAIION MOVES WATER TO RESERVOIR r0 1(}0 650 UIEIIIAIIRESORTSE@@ ,ATI RENDfP'T\,GS ARf ARN57 CONCPIS AND l/.nftcr lo cHANcE SCALE IN FEET HOLE I O s. dr,>- I I Ir e, - MARTNA AND GOLF RESORT a ./e / i 4 ) \ $ \J 7 r ( / \.A I I \ rr-!L -l e f.\\\h-L t/'ttii}, s .\ ffi"**-s. ! -\1 r t I \\'! S