Swenson, Karen < kswenson@eaest.com >
Tuesday, February 26,20L3 5:54 PM
Ga rth M @statesma ncorporation.com; peckassoc@comcast.net;
do n @ p I easa ntha rbo rma ri n a.co m; dwjo h nso n @ co jeffe rso n.wa. u s
csmith@co jefferson.wa.us; shoskins@co jefferson.wa.us; jaustin@co jefferson.wa.us;
Schipanski, Rich
Pleasant Harbor Info Needs Memo - revised 2-26
Pleasant Harbor Info Needs Memo - revised 2-26.doc
It was a pleasure to meet all of you face to face yesterday. lt definitely was beneficial for me to touch base with
everyone as we kick off the SEIS, and make sure we are all on the same page.
ln that vein, I have revised the lnformation Needs Memo again to reflect our discussion on Monday. The updated items
since Monday's meeting are reflected in red text. Please review the memo to see if you have been assigned any items,
and if so, please send them to me this week, electronically if possible.
Thank you,
Karen Swenson
EA I Blumen
1
H5 ISTUMEN-
720 Sixth Street South, Suite 100
Kirkland, WA 98033
Telephone: 425.284.5401
Fax: 425.284.5402
ffi
To: JT Cooke, Perkins Coie; Craig Peck, P.E.
GG: David Johnson and Stacie Hoskins, Jefferson County Planning Department
From: Rich Schipanski and Karen Swenson, EAlBlumen
Date: January 10,2013; Revised January 17,2013, February 25,2013; February
26, 2013 (per A25/13 onsife meeting)
Subjecft lnformation Needs for the Pleasant Harbor SEIS
The purpose of this memo is to provide a preliminary list of information needed to prepare the
Pleasant Harbor SEIS. The following table is considered a preliminary list, because it is possible
that additional information will be required as the SEPA alternatives are fully defined. We have
reviewed the information provided by the applicant to date and identified additional information
that will be required to commence with drafting the SEIS. Ultimately, all technical reports will
need to provide enough detail for adequate SEPA environmental analysis of development under
the Proposed Actions and EIS Alternatives.
We recognize that a considerable amount of existing information has been provided to date. We
have reviewed the information to determine the gaps in information, but not for the quality of the
technical reports. As we continue to review the technical reports in detail over the next week, we
may revise this table to reflect future information needs. To the extent that the information
provided is relevant to the Pleasant Harbor SEIS, it will be used to prepare, or will be referenced
in, the document. As appropriate, information from those documents will be used to prepare the
SEIS analyses. However, since new alternatives will be included in the SEIS (which exclude the
marina portion), certain information may need to be updated for the SEIS.
The following table focuses on additional information that will be needed per our discussions on
January 9, 2013 and February 25, 2013. lt is assumed that the SEIS will address two
development alternatives and one No Action Alternative. The SEIS will recognize the limited
redevelopment in the marina portion of the site under the existing Binding Site Plan Permit, but
that portion of the resort will not be included in the SEIS analyses. Likewise, the potential
environmental impacts from a realigned WDFW access road to the boat ramp (as
acknowledged under Alternative 2) will be assessed under a separate permiUprocess.
The lnformation Needs table includes a column indicating our assumption about the
person/entity anticipated to be responsible for providing the requested information. Where more
than one name is provided in the responsibility column, the first name listed will have the
primary responsibility for coordinating the provision of the information. The table also indicates
the date by which the requested information will be needed (or has been provided), and the
EAIBLUMEN
Pleasant Harbor SEIS lnformation lVeeds
February 26,2013
1
status of receipt of the information (we will periodically update the status column as we receive
information). Refer to the updated schedule for deliverable dates.
Please contact us with any questions on the information needs below.
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
February 26,2013
2
INFORMATION NEEDS SOURCE
DATE
NEEDED STATUS
1) Existing Structureso Number of existing structures (all
structures on site)o Which structures are currently
occupied/utilizedo lf vacant, previous use (if
available)o Square footage (if available)
Craig Peck;
JT - Perkins
Coie
1/18 Rcv'd
425
2) Current impervious surface area (if
available)
Craig Peck;
JT - Perkins
Coie
1/18 Rcv'd
425
Craig Peck;
JT - Perkins
Coie
1/16 Rcv'd
425
1) Earth: Final Geotechnical lnvestigation,
Subsurface Group, January 9, 2008
This report should address the following (as
detailed in the Pleasant Harbor Scoping
Notice):. Geology. Soils. Topography. Slopeso Erosion
o Unique Physical Features
2l Water: Water Supply and Groundwater
lmpact Analysis,2007.
JT - Perkins
Coie
1/16 Rcv'd
(Appendix 5
of DEIS)
3) Fish and Wildlife: Habitat Management
Plan, GeoEngineers, 2012.
JT - Perkins
Coie
1/16 David
Johnson to
provide CD
4) Transportation:
Correspondence/documentation of discussion
to construct an alternative WDFW boat ramp
access road
JT - Perkins
Coie
1/16 Craig Peckto
provide e-
mails to date;
will initiate
agreement
process
Existing Gonditions
Elements of the Environment
INFORMATION NEEDS SOURCE
DATE
NEEDED STATUS
5) Air Quality: ESA Review comments on
Greenhouse Gas Emissions Report by Failsafe
Canada (2012)
David -
County;
JT - Perkins
Coie
1/16 Rcv'd
425
5) Plants: Narrative landscaping plan JT - Perkins
Coie
1/16 Craig Peckto
provide
general
landscaping
approach
7) Plants: Confirmation with the County that
tree removal/retention can be addressed in
terms of acreage, not individual trees and their
diameter.
JT - Perkins
Coie
David
Johnson-
County
1/16 County
confirmed
acreage is
acceptable in
SE/S wth
mitigation
measure for
later
individualtree
assessmenf;
David
Johnson to
provide 2008
Forestry Plan
8) Fiscal Analysis: FiscalAnalysis Report JT - Perkins
Coie
1/16 David
Johnson to
provide CD9) Utilities: Electrical documentation
regarding electrical demand/load and PUD's
response when development causes PUD to
reach capacity.
JT - Perkins
Coie
1/16 Don Coleman
and Gafth to
obtain letter of
availability
and future
infrastructure
needs upon
capacW
10) Utilities: Telecommunications, Cable and
Solid Waste - contacts for providers
Don
Coleman
1/16 Rcv'd Don's
contact info
1/31; EA will
contact
111 Public Services - Medical: Confirmation
that a medical clinic will be included in the
project
JT - Perkins
Coie
1/16 Medi-center
to be provided
at Maritime
Village if
Nurse
Practioner
available
EAIBLUMEN
Pleasant Harbor SEIS lnformation lVeeds
February 26,2013
3
SOURGE
DATE
NEEDED STATUSINFORMATION NEEDS
12) Revised Alternatives Description (edits to
12-12-2011 version).
Craig Peck 1/16 Craig Peckto
revise
previous
alternative
description
13) Revised phasing maps to exclude marina
area under existing BSP
Craig Peck 1/16 Rcv'd
2/25
29) Provide a Iist of existing permits that
would affect the site (i.e. regarding the Pleasant
Harbor Resort).
JT - Perkins
Coie; Craig
Peck
1/16
30) Provide a list of all Jefferson Gounty
permits and approvals that would be required
as part of the Proposed Action and future
development.
JT - Perkins
Coie
1/16 David
Johnson and
Sfacie
Hoskins to
develop list
31) Provide a list of Federal and/or State
permits and approvals that would be required
as part of the Proposed Action and future
development.
JT - Perkins
Coie; Craig
Peck
1/16
Digital Copies of all documents provided in
paper form (MS Word preferred; Adobe pdf
documents acceptable)
JT - Perkins
Coie; David
Johnson
1/16 David
Johnson to
provide CD
with all
documents
Draft Zoning Regulations for Pleasant
Harbor MPR
JT - Perkins
Coie; David
Johnson
1/16 David
Johnson to
provide
Draft Development Agreement for Pleasant
Harbor
JT - Perkins
Coie; David
Johnson
1/16 David
Johnson to
provide
Proiect Objectives (required by SEPA)JT - Perkins
Coie
1/16 EA found
objectives in
orioinal2006
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
February 26,2013
4
Alternatives lnformation
Permits
Additional I nformation
application
binder (pg.
13)
EAIBLUMEN
Pleasant Harbor SEIS lnformation Needs
February 26,2013
5
INFORMATION NEEDS SOURGE
DATE
NEEDED STATUS