Loading...
HomeMy WebLinkAbout051Michelle Farfan From: Sent: To: Cc: Subject: Attachments: peckassoc@comcast. net Tuesday, October 08, 2013 2:4LPM Karen Swenson David W. Johnson (djohnson@cojefferson.wa.us); Rich Schipanski; Kristy Hollinger; Garth Mann; Paul Hospelhorn Re: Outstanding items for Pleasant Harbor Draft SEIS image002jpg Thank you Karen. Craig As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to complete the Draft SEIS for Pleasant Harbor: 1. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13) 2. Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and off-site 3. Water Report 4. Sewer Report 5. Technical Memorandum to accompany sewer report outlining the phasing of the WWTP including the onsite septic system for the Maritime Village 6. Revised site plans to show the removalof the two 12-unit buildings in the Maritime Village area and any changes to Marina Access Drive 7. Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village a rea 8. Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime Village building but the overall unit count for the project will remain the same) 1 From: "Karen Swenson" <kswenson@eaest.com> To: "Craig Peck (peckassoc@comcast, net)" <peckassoc@comcast. net> Cc: "David W. Johnson (djohnson@co.jefferson.wa.us)" <djohnson@co.jefferson.wa.us>, "Rich Schipanski" <rschipanski@eaest.com>, "Kristy Hollinger" <khollinger@eaest.com>, "Karen Swenson" <kswenson@eaest.com> Sent: Tuesday, October 8,2013 1:59:38 PM Subject: Outstanding items for Pleasant Harbor Draft SEIS Craig, 9. Revised data tables from GMH Architects (Natalie) for Alternatives L and 2 indicating redistribution of parking (surface vs structured) in the Maritime Village area due to the consolidation of buildings in this area 10. Map showing wellhead protection areas around the two existing wells and a list of restrictions in these areas (plus any correspondence with DOH regarding written variances for paving and sanitary sewer forcemains) 11. Map showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not owned by the applicant) 12. lmpacts of construction of the realigned WDFW boat launch road (including overall length, condition and grade of existing road and proposed road, and quantity of clearing and grading for proposed road) 13. Revised phasing list (in Chapter 2 of the Preliminary Draft SEIS)to indicate change in time of construction of the Maritime Village building and the addition of the onsite septic system, as well as timing of the realigned boat launch road (Stage 1, Phase 1?) 14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo). 15. Edits to Section 3.1 and 3.2 from Craig Peck (the rest of the edits for the Preliminary DEIS sections were already provided by Craig on 6-6-13). 16. Clarification/confirmation of what is allowed under the amended BSP (currently the SEIS indicates that redevelopment and renovation is within existing footprints only, but Craig added "or where shown on the BSP") 17. Clarification of compliance with the first part of BoCC 63(e) - "The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMl).' The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Job Creation and Value Added to National Economy, did not include salary levels of proposed jobs and/or comparison the the Brinnon AMl. Garth noted that "Aaron Goforth of Wright Johnson LLC would address the reports for accuracy and proposed salaries." 18. Revisions to the description of the proposal (Chapter 2) and the list of required permits due to the inclusion of the zipline, the removalof the 2 structures in the Maritime Village area, and the inclusion of the realigned boat launch road in the proposal - the applicant can revise Chapter 2 and the Fact Sheet of the Preliminary Draft SEIS accordingly, or EA can draft changes for applicant review I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the proposal. Please let me know if you have any questions. Thanks, K*re*l,, Sweu.o+p r:IL{+l+ Kareri5wenson, AICP Senior Planner 2200 SiXh Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest.com 2