HomeMy WebLinkAbout053Michelle Farfan From: Sent: To: Cc: Subject: Attachments: David W. J oh nson < djoh nson @co jefferson.wa.us > Monday, October 21,20t3 2:08 PM Barbara Moore-Lewis David W. Johnson RE: Monday 10/20 SEIS Deficiency Memo-CP-L0 21 13.pdf Attached. Hopefulto have these items resolved by November L,2O!3 From : Barbara Moore-Lewis Ima ilto : mooreleb@gma il.com] Sent: Monday, October 21,20L3 B:31 AM To: David W. Johnson Subject: Re: Monday 10/20 If you call me at 2, you'll have to call my cell 503 580 6430. Or you can call me at 3 at 360 796 0378 On Mon, Oct 21 ,2013 at7:45 AM, David W. Johnson <djohnson@cojefferson wrote Yes. From: Barbara Moore-Lewis [mailto:mooreleb@gmail.com] Sent: Sunday, October 20,2073 9:14 PM To: David W. Johnson Subject: Monday 10/20 Call at2? I understand that the marina office and deli is now being taken down. I'm also told they they plan to fill the driveway between the building and the shore. Do they have permits to do this, particularly to change the grade of the driveway? Does any of this depend on future changes to the binding site plan or the SEIS (or the SMA)? 1 Thanks. Barbara XFINITY Connect Page I of2 peckassoc@comcast.ne I Font Size _ Outstanding items for Pleasant Harbor Draft SEIS From : Karen Swenson <ks,venson@eaest.com> Subject : Outstanding items for Pleasant Harbor Draft SEIS To : Craig Peck (peckassoc@comcast.net) <peckassoc@comcast.net> Cc : David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@co.jefferson,wa,us>, Rich Schipanski <rschipanski@eaest.@m>, Kristy Hollinger <khollinger@eaest.com>, Karen Swenson < kswenson@eaest.com> Craig, As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to complete the Draft SEIS for Pleasant Harbor: 1. Energy Demand Memo (short memo to accompanythe conceptual load spreadsheet previously provided by Hargis on 7-3-13)Hargis Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and off-site PUD Water Report Dwight Technica I sewer report outlining the phasing of the WWTP including the onsite septic system for the Maritime Village Revised site plans to show the removal of the two 12-unit buildings in the Maritime Village area and any changes to Marina Access Drive Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village area CP, Natalie 8. Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime Village building but the overall unit count for the project will remain the same)Natalie 9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicatinB redistribution of parking (surface vs structured) in the Maritime Village area due to the consolidation of buildings in this area Natalie 10, Map showing wellhead protection areas around the two existing wells and a list of restrictions in these areas (plus any correspondence with DOH regarding written variances for paving and sanitary sewer forcemains)Dwight, CP 11. wtap showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not owned by the applicant)SEIS Boundary is new map - excludes BSP? 12. lmpactsofconstructionoftherealignedWDFWboatlaunchroad(includingoveralllength,conditionandgradeofexistingroadand proposed road, and quantity of clearing and grading for proposed road)CP - thought covered in previous response 13, Revised phasing list (in Chapter 2 of the Preliminary Draft SElS) to indicate change in tlme of construction of the Maritime Village building and the addition of the onsite septic system, as well as timing of the realigned boat launch road (Stage 1, Phase 1?)CP 14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo).Karen? 15. EditstoSection3.land3.2fromCraigPeck(therestoftheeditsforthePreliminaryDE|SsectionswerealreadyprovidedbyCraigon6-6- 13).CP 16. Clarification/confirmation of what is allowed under the amended BSP (currently the SEIS lndlcates that redevelopment and renovation is CP, David 2. 3, 4. 5. 6. 7. Sewer Report Tue, Oct 08, 2013 01:59 PM Qt hUMarvDw within existing footprints only, but Craig added "or where shown on ) Page? of2 17. Clarification of compliance with the first part of BoCC 63(g) - "The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMl)." The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Job Creation and Value Added to National Economy, did not include salary levels of proposed jobs and/or comparison the the Brinnon AMl. Garth noted that "Aaron Goforth of wright Johnson LLC would address the reports for accuracy and proposed salaries." 18. Revisions to the description of the proposal (Chapter 2) and the list of required permits due to the inclusion of the zipline, the removal of the 2 structures in the Maritime Village area, and the inclusion of the realigned boat launch road in the proposal - the applicant can revise Chapter 2 and the Fact Sheet of the Preliminary Draft SEIS accordingly, or EA can draft changes for applicant review I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the Please let me know if you have any questions. Thanks, Karen Swenson EII Karen Swenson, AICP Senior Planner 2200 Sixth Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest,com David imageo02jpg 997 B @ n