Loading...
HomeMy WebLinkAbout054Michelle Farfan From: Sent: To: Cc: Subject: Attachments: David W. Johnson < djohnson@cojefferson.wa.us> Friday, November 01, 2013 9:54 AM peckassoc@comcast,net; Karen Swenson David W. Johnson; Stacie Hoskins RE: PH SEIS SEIS Deficiency Memo-CP-10 2L 13.pdf Craig, ls it possible to get anticipated dates for completion for these items? We are trying to plan our Planning Commission schedule for next year and it would be helpfulto get a more firm date on when the DEIS will be released. Thanks! From : peckassoc@comcast. net Imailto : peckassoc@comcast. net] Sent: Monday, October 27,20t3 8:46 AM To: David W. Johnson; Karen Swenson Subject: PH SEIS David and Karen, Please see attached for today's call at 9:00. Thank you, Craig 1 XFINITY Connect Page I of2 peckassoc@comcast.ne + Font Size I Outstanding items for Pleasant Harbor Draft SEIS From : Karen Swenson <ks,venson@eaest.com> Subject : Outstanding items for Pleasant Harbor Draft SEIS To : Craig Peck (peckassoc@comcast. net) <peckassoc@comcast.net> Cc: David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@co.jefferson.wa.us>, Rich Schipanski <rschipanski@eaest.com>, Kristy Hollinger <khollinger@eaest.com>, Karen Swenson < ksalenson@eaest.com > Craig, As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to complete the Draft SEIS for Pleasant Harbor: 1. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13)Hargis Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and off-site PUD Water Report Dwight Technical Memorandum to sewer report outlining the phasing of the WWTP including the onsite septic system for the Maritime Village Revised site plans to show the removal of the two 12-unit buildings in the Maritime Village area and any changes to Marina Access Drive Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village area CP, Natalie Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime Vil lage building but the overall unit count for the project will remain the same)Natalie 9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicating redistribution of parking (surface vs structured) in the Maritime Village area due to the consolidation of buildings in this area Natalie 10, fUapshowingwellheadprotectionareasaroundthetwoexistingwellsandalistofrestrictionsintheseareas(plusanycorrespondence with DOH regarding written variances for paving and sanitary sewer forcemains)Dwight, CP 11. Map showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not owned by the applicant)SEIS Boundary is new map - excludes BSP? 12. lmpactsofconstructionoftherealignedWDFWboatlaunchroad(includingoveralllength,conditionandgradeofexistingroadand proposed road, and quantity of clearing and grading for proposed road)CP - thought covered in previous response 13. Revised phasing list (in Chapter 2 of the Preliminary Draft SEIS) to indicate change in time of construction of the Maritime Village building 2. 3. 4. 5. 6. 7. 8, Sewer Report and the addition of the onsite septic system, as well as timing of the realigned boat launch road (Stage 1, Phase 1?) 14. ConfirmationthatAlternative2shouldbenotedasthePreferredAlternativeintheDraftSEls(perSandyMackie's5-23-13memo). 15. Edits to Section 3.1 and 3.2 from Craig Peck (the rest of the edits for the Preliminary DEIS sections were already provided by Craig on 6-6- 13)CP 16. Clarification/confirmation of what is allowed under the amended BSP (currently the SEIS indicates that redevelopment and renovation is CP, David @ Tue, Oct 08, 2013 01:59 PM &1 attachment rV within existing footprints only, but Craig added 'qrryhele$Atu orlj ) PageZ of2 17. Clarification of compliance with the first part of BoCC 63(g) - "The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80o/o or less of the Brinnon area average median income (AMl)." The 2012 Jobs study, Summary of Pleasant Harbor lmpacts: Job Creation and Value Addecl to National Economy, did not include salary levels of proposed jobs and/or comparison the the Brinnon AMl. Garth noted that "Aaron Goforth of Wright Johnson LLC would address the reports for accuracy and proposed salaries."Garth 18. Revisions to the description of the proposal (Chapter 2) and the list of required permits due to the inclusion of the zipline, the removal of the 2 structures in the Maritime Village area, and the inclusion of the realigned boat launch road in the proposal - the applicant can revise Chapter 2 and the Fact Sheet ofthe Preliminary Draft SEIS accordingly, or EA can draft changes for applicant review I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the Please let me know if you have any questions. Thanks, Karen Swensons lGren Swenson, AICP Senior Planner 2200 Sixth Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 ksalenson@eaest.com CP, David imageOO2jpg 997 B