HomeMy WebLinkAbout057Michelle Farfan
From:
Sent:
To:
Cc:
Subject:
Attachments:
FYI
David W. Johnson <djohnson@cojefferson.wa.us>
Monday, November 25,20L310:57 AM
Barbara Moore-Lewis
David W. Johnson
FW:Conference Call 9am
SEIS Deficiency Memo-CP-11.25.13.pdf
From : peckassoc@comcast. net Ima ilto : peckassoc@comcast. net]
Sent: Monday, November 25,20t3 10:30 AM
To: David W. Johnson
Cc: Karen Swenson
Subject: Re: Conference Call 9am
Attached is my understanding of our current status. ALL subject to Karen's review and
concurrence, of course.
Have a great Thanksgiving holiday
Craig
From: "David W. Johnson" < >
To: "Karen Swenson" <kswenson@eaest.com>, peckassoc@comcast.net
Sent: Monday, November 25,2013 8:35:21 AM
Subject: Conference Call 9am
I will callyou two
Thanks !
David Wayne Johnson - LEED Green Associate
Associate Planner - Port Ludlow Lead Planner
Department of Community Development
Jefferson County
360.379.4465
Mission: To preserve and enhance the quality of lfe in Jefferson County by promoting a vibrant economy,
sound communities and a healthy environment.
SAVE PAPER - Pleose do not print this e-moil unless obsolutely necessory
1
LEEB
SRHHN
esss0[ATE
^.>-,
All e-mail may be considered subject to the Public Records Act and as such may be disclosed to a third-party requestor.
2
Outstanding items for Pleasant Harbor Draft SEIS
From : Karen Swenson <kswenson@eaest,com>
Subject: Outstanding items for Pleasant Harbor Draft SEIS
To : Craig Peck (peckassoc@comcast.net) <peckassoc@comcast.net>
Cc : David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@co.jefferson.wa.us>, Rich
Schipanski <rschipanski@eaest.com>, Kristy Hollinger <khollinger@eaest.com>, Karen
Swenson < ks:wenson@eaest, com >
Craig,
As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to
complete the Draft SEIS for Pleasant Harbor:
1. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13)Done
2, Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and
Dwight - responding to DOH to resolve Marina water
system issues and working with Fire Chief 11.25.13
3. Water Report
4. Sewer Report
5. Technical Memorandum to sewer the of the WWTP the onsite for the
Maritime Village
6. Revised site plans to show the removal of the two l2-unit buildings in the Maritime Village area and any
7. Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village
8. Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand
that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime but the overall unit
count for the project will remain the same)
9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicating redistribution of parking (surface vs structured) in
the Maritime Village area due to the consolidation of buildings in this
10. Map showing wellhead protection areas around the two existing wells and a list ,
with DOH regarding written variances for paving and sanitary sewer forcemains)
of restrictions in these areas us any correspondence
11. Map showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not
owned by the
12. lmpactsofconstructionoftherealignedWDFWboatlaunchroad(includingoverall length,conditionandgradeofexistingroadand
proposed road, and quantity of clearing and grading for proposed road)CP - to be prepared by Dec 2
13. Revised phasing list (in Chapter 2 of the Preliminary Draft SEIS) to indicate in time of construction of the Maritime bui
and the addition of the onsite septic system, as well as timing of the realigned
14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo).
15. Edits tosection 3.1and 3.2from Peck rest of the edits for the Preliminary DEIS sections were already provided by Craig
13).
16. Clarification/confirmation of what is allowed under the amended BSP (currently the SEIS indicates that redevelopment and renovation is
UPDATED: 11125113
asonRece
PUD memo
11.25.13
DwighUCP - tech report new L being completed by Dec 2
rca 11.25.13
P, Natalie calculating
completed by Natalie - shown on tables and in Phasing graphics
Natalie revised tables - sendin Mike for ate
Dwight, Scott - graphics and text in WSP
SEIS Bounda ete w/ note: WDFW parcels NOT owned icant
hics and text complete for Karen reviewGra
Done -
Karen ok
Completed - sent to Karen for review
Resolved - text updated to current conditionswithin existing footprints only, but Craig added
17. Clarification of compliance with the first part of BoCC 63(8) - "The developer shall commission a study of the number of jobs
expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median
income (AMl)." The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Joh Creation and Value Added to National
Garth noted that "Aaron Goforth of
Wright Johnson LLC would address the reports for accuracy and proposed salaries."
18.
I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the
Please let me know if you have any questions.
Thanks,
Karen Swenson
Done
David Permits
text
2) and the list the
structures in the Maritime Village area,- the applicant
revise 2 and the Fact Sheet of the or applicant review