Loading...
HomeMy WebLinkAbout057Michelle Farfan From: Sent: To: Cc: Subject: Attachments: FYI David W. Johnson <djohnson@cojefferson.wa.us> Monday, November 25,20L310:57 AM Barbara Moore-Lewis David W. Johnson FW:Conference Call 9am SEIS Deficiency Memo-CP-11.25.13.pdf From : peckassoc@comcast. net Ima ilto : peckassoc@comcast. net] Sent: Monday, November 25,20t3 10:30 AM To: David W. Johnson Cc: Karen Swenson Subject: Re: Conference Call 9am Attached is my understanding of our current status. ALL subject to Karen's review and concurrence, of course. Have a great Thanksgiving holiday Craig From: "David W. Johnson" < > To: "Karen Swenson" <kswenson@eaest.com>, peckassoc@comcast.net Sent: Monday, November 25,2013 8:35:21 AM Subject: Conference Call 9am I will callyou two Thanks ! David Wayne Johnson - LEED Green Associate Associate Planner - Port Ludlow Lead Planner Department of Community Development Jefferson County 360.379.4465 Mission: To preserve and enhance the quality of lfe in Jefferson County by promoting a vibrant economy, sound communities and a healthy environment. SAVE PAPER - Pleose do not print this e-moil unless obsolutely necessory 1 LEEB SRHHN esss0[ATE ^.>-, All e-mail may be considered subject to the Public Records Act and as such may be disclosed to a third-party requestor. 2 Outstanding items for Pleasant Harbor Draft SEIS From : Karen Swenson <kswenson@eaest,com> Subject: Outstanding items for Pleasant Harbor Draft SEIS To : Craig Peck (peckassoc@comcast.net) <peckassoc@comcast.net> Cc : David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@co.jefferson.wa.us>, Rich Schipanski <rschipanski@eaest.com>, Kristy Hollinger <khollinger@eaest.com>, Karen Swenson < ks:wenson@eaest, com > Craig, As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to complete the Draft SEIS for Pleasant Harbor: 1. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13)Done 2, Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and Dwight - responding to DOH to resolve Marina water system issues and working with Fire Chief 11.25.13 3. Water Report 4. Sewer Report 5. Technical Memorandum to sewer the of the WWTP the onsite for the Maritime Village 6. Revised site plans to show the removal of the two l2-unit buildings in the Maritime Village area and any 7. Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village 8. Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime but the overall unit count for the project will remain the same) 9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicating redistribution of parking (surface vs structured) in the Maritime Village area due to the consolidation of buildings in this 10. Map showing wellhead protection areas around the two existing wells and a list , with DOH regarding written variances for paving and sanitary sewer forcemains) of restrictions in these areas us any correspondence 11. Map showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not owned by the 12. lmpactsofconstructionoftherealignedWDFWboatlaunchroad(includingoverall length,conditionandgradeofexistingroadand proposed road, and quantity of clearing and grading for proposed road)CP - to be prepared by Dec 2 13. Revised phasing list (in Chapter 2 of the Preliminary Draft SEIS) to indicate in time of construction of the Maritime bui and the addition of the onsite septic system, as well as timing of the realigned 14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo). 15. Edits tosection 3.1and 3.2from Peck rest of the edits for the Preliminary DEIS sections were already provided by Craig 13). 16. Clarification/confirmation of what is allowed under the amended BSP (currently the SEIS indicates that redevelopment and renovation is UPDATED: 11125113 asonRece PUD memo 11.25.13 DwighUCP - tech report new L being completed by Dec 2 rca 11.25.13 P, Natalie calculating completed by Natalie - shown on tables and in Phasing graphics Natalie revised tables - sendin Mike for ate Dwight, Scott - graphics and text in WSP SEIS Bounda ete w/ note: WDFW parcels NOT owned icant hics and text complete for Karen reviewGra Done - Karen ok Completed - sent to Karen for review Resolved - text updated to current conditionswithin existing footprints only, but Craig added 17. Clarification of compliance with the first part of BoCC 63(8) - "The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMl)." The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Joh Creation and Value Added to National Garth noted that "Aaron Goforth of Wright Johnson LLC would address the reports for accuracy and proposed salaries." 18. I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the Please let me know if you have any questions. Thanks, Karen Swenson Done David Permits text 2) and the list the structures in the Maritime Village area,- the applicant revise 2 and the Fact Sheet of the or applicant review