Loading...
HomeMy WebLinkAbout058David W. Johnson From: Sent: To: Cc: Subject: Swenson, Karen Ikswenson@eaest.com] Monday, November 25, 2013 2:22 PM David W. Johnson Craig Peck (peckassoc@comcast.net) RE: Draft SEIS Release Strategy lwould also include Completion of the Distribution List and who will get a hard copy (most of the agencies and individuals will just receive a mailed notice with a link to the webpage) Sending a hard-copy to Department of Ecology and submitting information online Where are we with the development agreement and the development regulations? I know these were in a preliminary draft stage earlier. -Karen a a Attached, Please comment. David Wayne Johnson - LEED Green Associate Associate Planner - Port Ludlow Lead Planner Department of Community Development Jefferson County 360.379.4465 Mission: To preserve and enhance the quality of lfe in Jffirson County by promoting a vihrant economy, sotrnd communities and a healthy environment. gf, SlVe PAPER - Pleose do not print this e-moil unless obsolutely necessory All e-mail may be considered subject to the Public Records Act and as such may be disclosed to a third-party requestor. LEET} SREEN ASSOCIATE 1 From: David W. Johnson [mailto:djohnson@co.jefferson.wa.us] Sent: Monday, November 25,20L3 9t42 AM To: peckassoc@comcast.neU Swenson, Karen Cc: David W. Johnson Subject: Draft SEIS Release Strategy Outstanding items for Pleasant Harbor Draft SEIS From : Karen Swenson <kswenson@eaest.com> Subject : Outstanding items for Pleasant Harbor Draft SEIS To : Craig Peck (peckassoc@comcastnet) < peckassoc@comcastnet> Cc : David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@cojefferson.wa.us>, Rich Schipanski <rschipanski@eaest.com>, Kristy Hollinger <khollinger@eaest.com>, lGren Swenson < kswenson@eaest.com > Craig, As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to complete the Draft SEIS for Pleasant Harbor: 1, Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13)Done 2. Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and 3. Water Report 4. Sewer Report Dwight - responding to DOH to resolve Marina water system issues and working with Fire Chief 11.25.13 5. Technical Memorandum to accom sewer outlin the of the wwTP i the onsite for the Maritime Village 6. Revised site plans to show the removal of the two 12-unit buildings in the Maritime Village area and any 7. 8. Revised impervious surface area calculations per the removal of the two 12-unit building in the Maritime Village Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime but the overall unit count for the project will remain the same) 9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicating redistribution of parking (surface vs structured) in the Maritime Village area due to the consolidation of buildings in this 10. Map showing wellhead protection areas around the two existing wells and a list of restrictions in these areas with DOH regarding written variances for paving and sanitary sewer forcemains) 11. MapshowingrevisedSE|Ssiteboundarytoinclude28-acreWDFWproperty(thismapshouldindicatethatthisWDFWpropertyisnot owned by the 12. lmpactsofconstructionoftherealignedWDFWboatlaunchroad(includingoveralllength,conditionandgradeofexistingroadand proposed road, and quantity of clearing and grading for proposed road)CP - to be prepared by Dec2 13. Revised phasing list (in Chapter 2 ofthe Preliminary Draft SEIS) to indicate char and the addition of the onsite septic system, as well as timing of the realigned in time of construction of the Maritime 14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo). 15. Editstosection 3.1 and 3.2from Peck rest of the edits for the Preliminary DEIS sections were already provided by Craig 13). 16. Clarification/confirmationofwhatisallowedundertheamendedBSP(currentlytheSElsindicatesthatredevelopmentandrenovationis UPDATED:11125113 Received Mason PUD memo 11.25.13 DwighUCP - tech report for new LOSS being completed by Dec 2 CP, Natalie calculating area 11.25.13 completed by Natalie - shown on tables and in Phasing graphics Natalie revised tables - sendi Mike for Dwight, Scott - graphics and text in WSP SEIS Bound Ma ete w/ note: WDFW rcels NOT icant Gra ics and text com for Karen review Done - Karen ok eted - sent to Karen for review Resolved - text updated to current conditionswithin existing footprints only, but Craig added 17. Clarification of compliance with the first part of BoCC 53(g) - "The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMl)." The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Job Creation and Value Added to National . Garth noted that "Aaron Goforth of Wright Johnson LLC would address the reports for accuracy and proposed salaries." 18, Revisions to the description ofthe proposal (Chapter 2) and the list of the removal of the 2 structures in the Maritime Village area, and the inclusion appl ica nt revise 2 and the Fact Sheet of the SEIS or EA can draft changes for applicant review I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the Please let me know ifyou have any questions. Thanks, Karen Swenson CP text Done, David Permits