Swenson, Karen < kswenson@eaest,com>
Friday, December 06, 2013 4:55 PM
peckassoc@comcast.net
David W. J ohnson (djoh nson @co jefferson.wa.us)
RE: Pleasant Harbor SEIS
SEIS Deficiency Memo-CP-11.25.13.pdf
Looking through what I have received to date, I believe we still need these outstanding items
3. Water Report
4. Sewer Report
7. Revised impervious surface area calculations perthe removalof the two 1.2-unit buildings in the marina upland area
(your previous note indicated Natalie was calculating this)
10. Map showing wellhead protection areas around the two existing wells and a list of restrictions in these areas (plus
any correspondence with DOH regarding written variances for paving and sanitary sewer forcemains) - this was
requested to be included by Sandy Mackie.
A few items have been sent to me but need to be revised
2. Energy Supply memo from Scott Taylor of Mason County PUD - the 'xxx years' needs to be replaced with more
specific timeframes.
8and9. ReviseddatatablesfromGMHArchitects(Natalie)-yousentmethetablesforAltsland2,butyouexpressed
concern about the accuracy of the data and were going to get back to me
The other items in the attached deficiency memo have been received and are adequate for the SEIS.
Thanks,
K*retw Sw*vto+v
HT
Karen Swenson, AICP
Senior Planner
2200 Sixth Avenue, Suite 707 | Seattle, WA 9812,|
206.452.5350 x 1716
kswenson@eaest.com
From: peckassoc@comcast.net Imailto: peckassoc@comcast.net]
Sent: Thursday, November 28, 20L3 7:50 AM
To: Swenson, Karen
Subject: Pleasant Harbor SEIS
1
Karen,
Please review attached and let me know what we are missing
Thank you.
Craig
2
Outstanding items for Pleasant Harbor Draft SEIS
From : Karen Swenson <kswenson@eaest.com>
Subiect: Outstanding items for Pleasant Harbor Draft SEIS
To : Craig Peck (peckassoc@comcast.net) < peckassoc@comcast.net>
Cc: David W. Johnson (djohnson@co.jefferson.wa.us) <djohnson@co.jefferson.wa,us>, Rich
Schipanski <rxhipanski@eaest.com>, Kristy Hollinger <khollinger@eaest.com>, Karen
Swenson < ksrrlenson@eaest,com >
Crai&
As requested during our conference call with Kitsap County yesterday, here is the list of outstanding items that will need be provided to EA to
complete the Draft SEIS for Pleasant Harbor:
1. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13)Done
2. Energy Supply Report/Memo from Scott Taylor at the PUD regarding transmission capacity and transformers on- and
3. Water Report
4, Sewer Report
Dwight - responding to DOH to resolve Marina water
system issues and working with Fire Chief 11.25.13
5. Technical Memorandum to sewer the of the WWTP the
Maritime Village
6. Revised site plans to show the removal of the two 12-unit buildings in the Maritime Village area and any
7 , Revised impervious surface area calculations per the removal of the two l2-unit building in the Maritime Village
8. Any revisions to the Maritime Village building including commercial building square footage, height or building footprint (we understand
that the 24 units from the Harborview House and Reunion House will be shifted to the Maritime but the overall unit
count for the project will remain the same)
9. Revised data tables from GMH Architects (Natalie) for Alternatives 1 and 2 indicating redistribution of parking (surface vs structured) in
the Maritime Village area due to the consolidation of buildings in this
10. Map showing wellhead protection areas around the two existing wells and a list of restrictions in these areas
with DOH regarding written variances for paving and sanitary sewer forcemains)
11. tvtap showing revised SEIS site boundary to include 28-acre WDFW property (this map should indicate that this WDFW property is not
owned by the
12. lmpacts of construction of the realigned WDFW boat launch road (including overall length, condition and grade of existing road and
proposed road, and quantity of clearing and grading for proposed road)
13. Revised phasing list (in Chapter 2 ofthe Preliminary Draft SEIS) to indicate in time of construction of the Maritime
and the addition of the onsite septic system, as well as timing of the realigned
14. Confirmation that Alternative 2 should be noted as the Preferred Alternative in the Draft SEIS (per Sandy Mackie's 5-23-13 memo).
15. Edits to Section 3.1 and 3.2 from Peck rest of the edits for the Preliminary DEIS sections were already provided by Craig
13)
16. Clarification/confirmation of what is allowed under the amended BSP (currently the sEls indicates that redevelopment and renovation is
UPDATED: 11125113
Received Mason
PUD memo
11.25.13
DwighUCP - tech report for new LOSS being completed by Dec 2
CP, Natalie calculating
area 11.25.13
completed by Natalie - shown on tables and in Phasing graphics
Natalie revised tables - send Mike for u
Dwight, Scott -raphics and text in WSP
SEIS Bound Ma com lete w/ note: WDFW ls NOT owned a licant
P-tobe Dec 2
ete for Karen reviewGrahics and text
Done -
Karen ok
r revtew- sent to np
Resolved - text updated to current conditionswithin existing footprints only, but Craig added "or
t
D
17. Clarification of compliance with the first part of BoCC 63(g) - "The developer shall commission a study of the number of jobs
expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median
income (AMl)." The 2012 Jobs Study, Summary of Pleasant Harbor lmpacts: Job Creation and Value Added to National
Economy, did not include salarv levels of proposed iobs and/or comparison the the Brinnon AMl. Garth noted that "Aaron Goforth of
Wright Johnson LLC would address the reports for accuracy and proposed salaries."Done
18. Revisions to the description of the prooosal (Chapter 2) and the list of due to the inclusion of the the removal of
the 2 structures in the Maritime Village area, and the inclusion applicant
revtse 2 and the Fact Sheet of the or EA can changes applicant review
I believe this covers all the outstanding items that are needed to complete the Draft SEIS and to complete revisions due to changes to the
Please let me know if you have any questions.
Thanks,
Karen Swenson