Loading...
HomeMy WebLinkAbout001Michelle Farfan From: Sent: To: Subject: peckassoc@comcast.net Tuesday, January 07, 201,410:10 AM David W. Johnson Re: Pleasant Harbor Marina - BSP David, I like that. We will proceed in that direction Thank you. Craig From: "David W. Johnson" <djohnson@co.jefferson.wa.us> To: peckassoc@comcast. net Cc: "David W. Johnson" <djohnson@co.jefferson.wa.us> Sent: Tuesday, January 7 , 2014 10:05:33 AM Subject: RE: Pleasant Harbor Marina - BSP Let's permit the new water storage tank and system with a shoreline exemption (JCC 18.25.090(3)) and exempt from SEPA if conveyance lines are under eight inches at this time with a condition that when the BSP is amended for the Zipline (after SEIS/DA/DR), the new water tank will be identified on the face of the BSP. From : peckassoc@comcast. net Ima i lto : peckassoc@comcast. net] Sent: Tuesday, January 07,20L4 9:41 AM To: David W. Johnson Subject: Pleasant Harbor Marina - BSP David, We had discussed revising the BSP to allow a future Zip Line landing area at the pool. Since the Zip Line originates in the tt/PR arca - I assume that revising the BSP for that purpose must wait until the SEIS, Zoning, and Development Agreement processes are complete. Do you concur? We are in the process of increasing water storage volume for the marina water system. The BSP shows the water storage existing location but does not specifically call it out on the attached sheet. One option for water tank construction is at the well site at the north end of the marina property. lt is much more accessible for tank and piping construction. Another location is near the old pool. The existing tank site is the third location option.The proposed water tank could be 16' dia X 20' high or similar dimensions. Can we amend the existing BSP to include a new tank at the well site or at the old pool site at this time? lf so, how soon could we complete the amendment process? Thank you 1 Craig