Loading...
HomeMy WebLinkAbout007Michelle Farfan From: Sent: To: Subject: Swenson, Karen <kswenson@eaest,com> Monday, January 20,2014 8:54 AM David W. Joh nson (djoh nson @co jefferson,wa.us) FW: Draft SEIS I think I got your email wrong when you were included on this email chain.. From : Garth Man n [mailto: Gafth. Man n@statesmangroup.com] Sent: Saturday, January LB,20L4 12:72PM To: Swenson, Karen; Garth Mann; Aaron Goforth; 'Consultares@aol.com' Cc: peckassoc@comcast, net; dwjoh nso n @co.jefferso n. wa. us Subject: Re: Draft SEIS I am in flight and read Aaron's report Although there are a number of errors that I noted, he is showing you the Phase I and part of the Phase 2 Stage 1 of the Resort Development When I am back next week I will work with Aaron to help him through a number of items that need correcting Garth Sent on the TELUS Mobility network with BlackBerry From: "Swenson, Karen" <kswenson@eaest.co Date: Sat, 18 Jan20l4ll:26:32 -0500 To : Garth Mann<Garth. Mann@statesmangroup. com> ; Aaron 'Consultares@aol. com'<Consultares@aol. o Cc : peckassoc@comcast.net<peckassoc@comcast.net> ; dwj ohnson@co j efferson.wa.us<dwj ohnson@co.i efferson.wa.us> Subject: RE: Draft SEIS Garth - was the Economic Analysis of the Reeional Center Encompassing the Counties of Clallam, Jefferson and Kitsap of the State of Washington Final Report Prepared for Puget Sound Regional Center. LLC by Wright Johnson, LLC, August 2013 meant to replace the Economic Impact of Developing the Pleasant Harbor Marina and Golf Resort in Brinnon. Jefferson County. WA as part of New EB-5 Rqgioual Center in Western Washington by Michael Evans, April2012 ? Please clarify. Aaron and Garth: At this point in the Preliminary Draft SEIS, we have stated there will be 191 permanent employees upon buildout of the site. Please confirm this number is correct, or state the correct number. Report #1 listed below provides several different numbers - 156.6,185, and 191 direct permanent jobs. We have also stated that there will be 275 construction jobs. Please confirm this number, or state the correct number. The two reports created by Wright Johnson provide two other different numbers: 213.5jobs and 186 jobs. ohnsonllc.com> 1 Karen: Please provide guidance on this issue, as we want to reference and include the correct documents in the SEIS and include the correct data. Thank you, Karen Swenson, AICP Senior Planner 2200 Sixth Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest.com From: Garth Mann [Garth.Mann@statesmangroup.com] Sent: Monday, January 13,2014 9:30 AM To: Aaron Goforth;'Consultares@aol.com' Cc: Swenson, Karen Subject: FW: Draft SEIS Aaron and Dwight From Karen's message we a.re almost there with the final reports for the SEIS. Please confirm her questions Garth M. Garth Mann President & C.E.O P:403-256-4151 M:403-899-9222 F:403-256-6100 7370 Sierra Morena Blvd. S.W. Calgary, Alberta T3H 4H9 www. statesman group.ca<http ://www. statesmangroup.cal> From: Swenson, Karen [mailto:kswenson@eaest.com] Sent: Monday, January 13,201410:04 AM To: Aaron Goforth; Garth Mann Cc : peckassoc@comcast.net; David W. Johnson (dj ohnson@co j efferson.wa.us) Subject: RE: Draft SEIS To clarify what I requested last Tuesday (1-7-13), we have all the 4 reports below, including #3 and 4, the Wright Johnson LLC reports from Aaron Goforth. My question is whether these two reports supercede reports #1 and 2 (the Job Creation report and the Michael Evans EB-5 report) and whether reports #1 and 2 should NOT be included in the SEIS. To fulfill BoCC Condition 639, we need the correct overall number of direct permanent jobs upon buildout and how many of these jobs will earn less than 80% of the area AMI. If these numbers already exist, please point me to the correct reference. 2 This data is one of the last items we need to complete the SEIS, along with the Water and Sewer reports Thank you, Karen Swenson [cid:imaee002 jpg@0 I CF 1 03E.6D976990] Karen Swenson, AICP Senior Planner 2200 Sixth Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest. com<mai lto j cl afl in@eaest.com> From: Swenson, Karen Sent: Tuesday, January 07,2014 2:30 PM To: 'Aaron Goforth'; Garth Mann Cc : peckassoc@comcast. net; David W. Johnson (dj ohnson@co j efferson. wa.us) Subject: RE: Draft SEIS I have been going through the following four reports to determine the accurate employment numbers for the Pleasant Harbor project: 1. Job Creation and Value Added to the National Economy by an unknown author and unknown date - not indicated on document (currently Appendix N of the Preliminary Draft SEIS - attached) 2. Economic Impact of Developing the Pleasant Harbor Marina and Golf Resort in Brinnon, Jefferson County, WA as part of New EB-5 Regional Center in Westem Washington by Michael Evans, April 2012 (cunently Appendix S of the Preliminary Draft SEIS - too large to email - see EA ftp site or County website for document) 3. An Economic Analysis of the Regional Center Encompassing the Counties of Clallam, Jefferson and Kitsap of the State of Washington Final Report Prepared for Puget Sound Regional Center, LLC by Wright Johnson, LLC, August 2013 - attached 4. An Economic Analysis of Earnings Pursuant to Jefferson County Board of County Commissioners' Condition 639 for the Pleasant Harbor Master Planned Resort by Wright Johnson, LLC, November 2013 - attached Report #1 has several different employment numbers. On the Summary Table and the table of page 14, the report indicates 268 jobs from operation of the project, of which 156.6 are direct jobs. On the Key Findings page (pg 2) and page 16, the report indicates 185 direct permanent employees. Figure 4 on page 9 indicates 191 permanent operation employees. Report #2 indicates in its executive summary that for permanent operational employment, there will be: 48 jobs in Stage I;424jobs from Stage II, Phase 1; and 176 jobs in Stage II, Phases 2 and 3. This totals 648 jobs. It is unclear to me, but it seems like this includes direct, indirect and induced employment, Report #3 indicates in Table 2-l (pg l7) that 213.5 direct and indirect construction jobs will be created Operational employment does not appear to be calculated in this report. 3 Report #4 indicates in Table 3-1 (pg 6) that 186 direct and indirect construction jobs will be created. The report calculates that 15 of these jobs will earn less than 80% of the Brinnon arcaaverage median income (AMI) to fulfill BoCC Condition 63g. As you can see from the above, several different employment numbers have been generated over the past couple of years and it is unclear which reports may supercede others for use in the SEIS. Please indicate any reports which no longer should be utilized for purposes of the SEIS. Please also provide the correct overall number of direct jobs upon buildout. For purposes of fulfilling BoCC Condition 639, which addresses affordable housing based on permanent employment jobs/wages, we need the total number of direct permanent jobs and how many of these jobs will earn less than 80% of the area AML Report #4 only addresses construction employment. Thank you, Karen Swenson [cid:imaee003 jpe@0 I CF I 03E.6D976990] Karen Swenson, AICP Senior Planner 2200 Sixth Avenue, Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest.com<mailto j clafl in@eaest.com> From : Aaron Goforth [mailto : aaron@wri ghtj ohnsonllc. com] Sent: Monday, December23,2013 10:19 AM To: Swenson, Karen Cc: peckassoc@comcast.net<mailto:peckassoc@comcast.net>; Garth Mann Subject: Re: Draft SEIS I am not sure the author or the date of the attached. It is not our work. From : " Swenson, Karen" <kswenson@eaest.com<mailto:kswenson@eaest.com>> Date: Mon,23 Dec 2013 13:01:53 -0500 To: Aaron Goforth <aaron@wiehtjohnsonl > Cc: " " <peckassoc@comcast.net<mailto :peckassoc@comcast.net>>, Garth Mann <Garth.Mann@statesmang > Subject: RE: Draft SEIS Aaron - could you clarify if the Economic Analysis of the Regional Center Project report you drafted supersedes the attached report? I am unsure of the author or the date, but have been told it was written in June 20t2. Thanks, Karen Swenson 4 Karen Swenson, AICP Senior Planner 2200 Sixth Avenueo Suite 707 | Seattle, WA 98121 206.452.5350 x 1716 kswenson@eaest.com From : Aaron Gofonh [mailto :aaron@wri ghtj ohnsonllc.com] Sent: Wednesday, November 06,2013 4:1 I AM To: Garth Mann; peckassoc@comcast.net<mailto:peckassoc@comcast.net>; 'Don Coleman'; Erik Steams Cc: Swenson, Karen Subject: Re: Draft SEIS Sorr), for the delaYed resPonse. Attached is the report that was used with USCIS to gain Regional Center designation. I am not sure what purpose you would like to use it for but EB_5 job studies do not typically include salary levels. Aaron From: Garth Mann <Garth.state .com<mailto:Garth. Date: Mon, 4 Nov 2013 20:40:39 +0000 To: "'peckassoc@comcast.net(mailto:'peckasso "'<peckassoc@comcas ),'Don Coleman'<don@pleasantharbo >, Erik Stearns <ErikS@Hargis.biz< > Cc: "'Swenson, Karen"' <kswenson@eaest.com<mailto:kswenson@eaest.com)), Aaron Goforth <aaron@rwishtjohnsonll >> Subject: RE: Draft SEIS Craig et al: Please see below in Green M. Garth Mann President & C.E.O P:403-256-4151 M:403-899-9222 F:403-256-6100 7370 Siena Morena Blvd. S.W. Calgary, Alberta T3H 4H9 www. statesmangroup. ca<http ://www. statesmangroup. cal> From: peckassoc@comcast.net<mailto:peckassoc@comcast.net> Imaitto:pect<assoc ] Sent: Monday, November 04, 2013 7:34 ltM To: Garth Mann Subject: Draft SEIS Garth, 5 Here is the list of outstanding items prepared by Karen (and supplemented by me) that address deficiencies to be provided to EA to complete the Draft SEIS for Pleasant Harbor: l. Energy Demand Memo (short memo to accompany the conceptual load spreadsheet previously provided by Hargis on 7-3-13). The spreadsheet must be updated to reflect the revised Stage/Phase plan that re-schedules treatment plant for later phases and combines the removal of Reunion House and Harbor View House into re- designed Maritime Building We provided to Karen Swenson the report from the Energy Firm of FAILSAFE CANADA INC. who detailed the Greenhouse Gas Emissions Report prepared May 2012 which is still current in terms of the source emissions relative to the phased development. The phasing plan should not materially impact the end result except positively through the elimination of the Reunion House and Harbor View House.? l. Energy Supply Report/Memo from Scott (STEVE) Taylor at the PUD regarding transmission capacity and transformers on- and off-site. Steve Taylor of the PUD has been asked to provide the Transmission capacity including Transformers based on the Phasing Plan. I have not been successful in having them provide this as an update to the phasing plan working with Eric and Team @ Hargis Eng.. Please see if you or Eric c/o Hargis can describe for Steve c/o the PUD #l to complete this exercise for us. 1. Clarification of compliance with the first part of BoCC 63(g) - "The developer shall commission a study of the number ofjobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMI)." The2012 Jobs Study,Summary of Pleasant Harbor Impacts: Job Creation and Value Added to National Economy, did not include salary levels of proposed jobs and/or comparison the the Brinnon AMI. Garth noted that "Aaron Goforth of Wright Johnson LLC would address the reports for accuracy and proposed salaries." This report had been completed by Aaron and his team at Wright Johnson LLC. I am copying this email to Aaron who would be pleased to send this information from their various reports for USCIS approvals as a Rural Regional Center. Please direct those responsible for this work to proceed immediately to complete these items. Thank you. Craig 6