HomeMy WebLinkAbout033I IIII 3.1 Earth Construction lmpacts Subsurface so/s . Approximately 2.2 million cubic yards of earthwork would occur on the site. . Approximately 930,000 cubic yards of sand and gravel would be extracted and available for processing from the east-central portion of the Black Point Area; this extraction would not alter hydrology. . Approximately 1 million cubic yards of earthwork would occur on the site. r Approximately 930,000 cubic yards of sand and gravel would be extracted and available for processing from the east-central portion of the Black Point Area; this extraction would not alter hydrology. . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and geotechnical conditions would generally remain as described under existing conditions as development occurred within the existing topography. . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and geotechnical conditions would generally remain as described under existing conditions as development occurred within the existing topography. Erosion . Approximately 167-acres, or 67 percent of the land would be cleared of vegetation, and significant grading would be required. . Buffers would be established for protected areas, including slopes; however, slope instability would be possible if clearing and grading occurred either on slopes or close to the toe of slopes. Erosion could contribute to sediment in wetlands and streams. o Alternative 2 would require approximately 25 percent less surface area disturbance than Alternative 1. . Buffers would be established for protected areas, including slopes; however, slope instability would be possible if clearing and grading occurred either on slopes or close to the toe of slopes. Erosion could contribute to sediment in wetlands and streams. Maritime Village Area . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and geotechnical conditions would generally remain as described under existing conditions as development occurred within the existing topography. o Commercial and residential development would be consolidated into a 3- story building at the intersection of Black Point Road and U.S. Hwy 101 , and two 12-unit buildings; reducing impacts on the existing topography in the Maritime Village Area compared to the 2007 EIS Proposed Action. . Structures would be built into the existing slope. . Commercial and residential development would be consolidated into one 3- story building at the intersection of Black Point Road and U.S. Hwy 101 , further reducing impacts on the existing topography in the Maritime Village Area. o Structures would be built into the existing slope. Black Point Area r The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and geotechnical conditions would generally remain as described under existing conditions as development occurred within the existing topography. . Earth conditions would be similar to those described in the 2007 ElS, and impacts as a result of site grading would be similar. . Alternative 2 was modified to improve constructability by refining development in the existing topographic conditions, resulting in the use of one half less fill when compared to Alternative 1. Water Resources Surface Water . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and potential impacts to water resources would generally remain as described in the 2007 Final ElS. . The two small non fish-bearing streams within the Maritime Village Area would be left in their native condition, buffered, and all stormwater from new pollution generating surfaces would be captured and treated for both solids (turbidity) and water quality prior to discharge. As a result, the flows would be maintained and water quality would be improved. The intermittent non fish-bearing stream within the WDFW-owned property north of Black Point Road is located downslope of the new WDFW boat access roadway alignment, and would not be impacted by construction of the new roadway alionment. . Same as Alternative 1 Groundwater and Aquifer Recharge o This alternative would result in an aquifer recharge of approximately 804 acre- feet per year. This would be higher than current conditions, but less than Alternative 1 due to the reduced amount of impervious surfaces and increased vegetation under Alternative 2. . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and potential impacts to ground water and aquifer recharge would generally remain as described in the 2007 Final ElS. . After completion of the resort, aquifer recharge to the sea level aquifer would be approximately 822 acre-feet per year under Alternative 1, compared with 760 acre-feet under current conditions. An increase in recharge is due to a decrease in vegetation due to construction of roads and buildings. lnfiltration of precipitation would occur more quickly due to changes in the soil moisture associated with golf course irrigation. Pleasant Harbor Draft Supplemental EIS October 2011 Chapter 1 Summary1-4 Alternative 1 Alternative 2 No Action Alternative TABLE {.{ Stormwater . Under Alternative 1, 87 percent of the overall site would be retained as open space, with the golf course, natural areas, and buffers. Stormwater impacts would occur from an increase in the rate and volume of runoff from developed areas. Where development allows, frequent and small distributed bioretention facilities would be provided, and runoff from roof areas would be infiltrated near the structures producing the runoff. An overflow infiltration system would be designed around the perimeter of Kettle B, as well as a direct piped overflow connection to Kettle C for less frequent, larger rainfall events. The use of reuse water for irrigation would be computer controlled to prevent runoff.. To prevent runoff entering the Hood Canal in Basins 1,2, and 12, embankments that change the direction of surface flow would direct runoff away from Hood Canal into natural and created detention areas This modification addresses BoCC condition 63 (q). Maritime Village areas would continue to discharge directly to Pleasant Harbor/Hood Canal, and prevention of channel erosion due to an increase in runoff would be required. . The site would be designed to meet the recommendations of the current edition of the WDOE's Stormwater Management Manual for Western Washington together with WDOE's adopted Low lmpact Development Technical Guidance Manualfor Puget Sound, January 2005. . lmpacts under Alternative 2 would be similar to those discussed for Alternative 1. Under Alternative 2, 88 percent of the site would be retained as open space, and stormwater impacts would be similar to Alternative 1, except that parking areas would be paved with pervious pavements as much as possible under Alternative 2. Basins 16, 17 , and 18 (including the Maritime Village and transit stop parking area) would have higher percentages of change under Alternative 2 because of significantly higher percentages of impervious surface being constructed in those areas. . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and stormwater impacts would generally remain as described in the 2007 Final ElS. Pote nti al Co n str u ctio n I mp a cts o Stormwater impacts would be largely related to potential water erosion of disturbed and exposed soils. During construction, stormwater management measures would be implemented to reduce potential impacts for sediment- laden water and wind-blown particles to leave the site. Grading activities could cause sediment-laden waters to cross the property line without proper mitigation measures. To minimize this potential impact, detailed final designs would consider redirection of runoff into different basins with better permeability. . Similar to Alternative 1 . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and potential impacts to water resources would generally remain as described in the 2007 Final ElS. Pote ntial Operational lmpacts o The replacement of existing surfaces and vegetation with less permeable and impervious surfaces would increase the runoff that enters the stormwater management facilities. With implementation of the proposed stormwater control system, significant impacts from surface water runotf would not be anticipated. The replacement of naturally vegetated areas with newly landscaped areas would alter surface water runoff and infiltration. The proposed development would increase stormwater recharge into the groundwater by approximately 10 percent. New pollutant-generating impervious surfaces would add additional pollutants to the site from gasoline, oils, and other mechanicalfluids. These pollutants have the potential to degrade the quality of water being infiltrated into the ground if not properly treated. . Similar to Alternative 1 o The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and potential impacts to water resources would generally remain as described in the 2007 Final ElS. Construction . Proposed development would disturb approximately 73 percent of the site and existing plant communities. These areas would be cleared of vegetation and new, maintained landscaping would be provided in pervious areas. . Proposed development would disturb approximately 55 percent of the site and existing plant communities. These areas would be cleared of vegetation and new, maintained landscaping would be provided in pervious areas. . The site would continue to develop as a single-family residential area based on the underlying rural residential zoning and plant and vegetation removal in areas of new development would be limited. Pleasant Harbor Draft Supplemental EIS October 2014 Chapter 1 Summary1-5 Alternative 1 Alternative 2 No Action Alternative Plants