David Wayne Johnson - LEED AP - Neighborhood Development Associate Planner - Port Ludlow Lead Planner
Department of Community Development Jefferson County
360.379.4465
IND_cmyk]
Mission: To preserve and enhance the quality of life in Jefferson County by promoting a vibrant economy, sound
communities and a healthy environment.
P SAVE PAPER - Please do not print this e-mail unless absolutely necessary
All e-mail may be considered subject to the Public Records Act and as such may be disclosed to a third-party requestor
IBrand Promoter lmage small.jpg]
1
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street I Port Townsend, WA 98368 | Web: www,co.jefferson.wa.us/communitydevelopment
Tel: 360.379.4450 | Fax: 360.379.4451 | Email: dcd@co.jefferson.wa.us
Building Permits & /nspecflons I Development Consistency Review I Long Range Planning I Watershed Stewardship Resource Center
TO: Planning Commission
FROM: David Wayne Johnson, Associate Planner
DATE: November24,2014
RE: Pleasant Harbor Draft Supplemental Environmental lmpact Statement (DSEIS)
At long last the Pleasant Harbor DSEIS is available for review and comment. Part of that review by the
Planning Commission (PC) is understanding what role you play in the process. To that end I have
attached several documents designed to help break down the approval process into manageable steps.
The first document is a two page outline of the Phase 2 SEIS Approval Process. We will use this as an
outline for Staffs presentation during the meeting. lt provides some background information on the
project, then breaks down the core elements in the approval process so you may better understand
what they are, and why they are necessary to approval. The outline then details what the Planning
Commission's role is in the process. And lastly, a concise summary of the actions and steps necessary
to approve Phase 2.
The next document is a matrix of the overall MPR approval process by phases. The first page is a
summary of all the phases necessary to build the resort. Notice the little arrow pointing down to Phase
2 - that's where we are today with Phase 1 completed in January 2008. The remaining five pages are
the detail of each Phase. This process matrix is helpful to see the "big picture" of the approval process,
what's involve and why it takes so long. lt also shows who has decision making authority, when the
Public has an opportunity to comment.
The last document is the Phase 2 SEIS Process & Timeline. lt breaks down the Phase 2 process into
individual steps by chronological order in who, what, why and when format with associate dates for
those listed actions. For example, step 7 is the release of the DSEIS and that occurred on November
19,2014. Step 11 is when the Planning Commission would likely hold their official public hearing on
the request to amend the Jefferson County Code. Code cites are also included to help you reference
those sections that are relevant.
lf you have questions on any of this, you should probably save them for the meeting where I can
answer them for the benefit of everyone. We will also have our applicant's representative, Craig Peck
and our SEIS Consultants EA Engineering in attendance to present aspects of the project and answer
any questions you may have.
We look fonruard to seeing you and discussing this very important project at the December 3'd Planning
Commission meeting.
Page 1 of '1
Pleasant Harbor Phase 2 SEIS Approval Process
December 3,2014 Plannlng Commisslon Meetlng
Background: What's been done so far?
. Project initiated in 2005
. Pre-application conference in January 2006
o Comprehensive Plan map change approval and 30 BoCC Conditions on
further development January 2008 - Phase I of approval process
. Request for UDC Text Arnendment and Development Agreement April 2008
- triggers SE|S
. Today - review of DSEIS, Development Agreement and Development
Regulations
Three parts to the Phase 2 Approval Process:
o Supplemental Environmental lmpact ltatementr What is it?
o Draft (as opposed to Final)SEIS- project level EIS. Why is it important?
o Required under Comp Plan approva!- ensures no
Probable Significant Adverse lmpacts through mitigation
or current regulation. What role does it play in the approval process?
o lnforms the decision makers about Environmental
lmpacts - ensures consistency with prior approval and
current regulations.
r Becomes in essence, the "Resort Plan"
o
"'."'"rflffiTAgreement. A contract with the County similar to Port Ludlow -
authorized under RCW 36.708.L70 - 210. Appendix S to
DSEIS.
Why is it important?
. Contract on how the Resort shall be built, vesting for
developer, vesting, phasing, MOUs, etc,r What role does it play in the approval process?
. Required for any MPR under JCC 18.15.125(2)
o pevelopmentRegulations
What is it?
o Determines standards for development and includes
zoning, setbacks, density, etc. to be codified as Title 17
Article ll - Appendix S to DSEIS.
What role does it play in the approval process?
. Resort cannot be built as proposed since current
underlying zoning is residentia!- must have resort
zoning and standards for development
o What's the Planning lommlsslon's role?
o Hold Public Hearing in April or Mayr Occurs after release of Final SEISr Hear applicant's presentation, staffs report and take public
testimonY
o Study & Deliberationr Occurs after public hearing per PC schedule
o Eoard gf County lommissioner Recommendation. Required under JCC 18.45.090 - Amendments to GMA
implementing regulations - UDC Title t7 Article ll of the JCCr lncludes the customary "growth indicators."r Recommend either approval, approval with conditions or
denial.
. What's the timellne?
o See Attachment - Phase 2 SEIS Process and Timeline
Summary. PC receives a Draft SEIS that includes the DA, DR and compliance with 30
BoCC Conditions.. PC Holds public hearing to present project, staff report and hear public
testimony.. PC Studies, deliberates and makes a recommendation to the BoCC -
satisfies 18.45.090 & GMA to amendment JCC.. BoCC with either accept PC recommendation or hold public hearing - must
hold public hearing for DA.
Programmatic
EIS
wAc'197-11-192
1
Non-project
SEPA EIS
BoCC
Public Comment
Completed
January 2008
Today
Project-level SE SEIS
BoCC
Pleasant Harbor
MPR
Approva! Phases
3
Administrative and
Hearing Examiner
Public CommentPublic Comment
Comprehensive
Plan
Amendment
MPR Boundary
30 conditions
Draft & Final
sEts Pre-application
Conferences for
Development
Permits
Development
Regulations -
Zoning
Amends JCC
Title 17
Development
Agreement
(Gontract
between
Applicant and
County)
Applications for
Development
Permits - Plat or
Binding Site
Plan - Forest
Practice,
Stormwater, etc.
4
Administrative Oversight
(with Legislative action on
ConsentAgenda)
Phase 1 of Resort
Build-out starts -
SEIS Page 2-35
Complete
PIaUBSP
Build
lnfrastructure
Project Level
EIS
5
Administrative
Building
Permits
2
Programmatic
EIS
wAc 197-11-192
Comprehensive PIan (CP)
Policy Guidance
Conceptua! Master Plan
Change CP Land Use Map to one color for BMPR
Draft Environmental lmpact Statement (DEIS)
Final Environmental lmpact Statement (FEIS)
-Chapter 5: Mitigations. Shellfish. Water resources. Transportation. Rural character. Public services. Critical areas
TI
Planning Agency advises
G decision (January 14, 2008)
Type V (Legislative) Review
ase
Project level EIS
o Zoning Regulations
Zones (including open space
and natural areas)
Bulk and dimension
Setbacks
Height
lmpervious surfaces
Uses
Development standards
Zoning map (denoting zones
with colors within BMPR)
Development Agreement
Requirement to have MOUs
Land use and density
Goals and Objectives
Standards for review
SEPA
Vesting
Phasing
Amenities
Disputes
o
Must be consistent with CP, Land Use Map, and Adopting Ordinance
Supplement Environmental Impact Statement (SEIS)
Type V (Legislative)
UDC Amendment Review
PC Recommendation & BoCC Decision
Phase 2
Project Level EIS
Applications for Development Permits
P re-a ppl ication Conferences
PlaUBinding Site PIan (BSP) Preliminary Approval
Forest Practice Class !V General "Conversion to another use" Permit
Shoreline Permits
Stormwater Permits. Entire site. Habitat plan
Water System Plan Approval (DOE and DOH)
Sewer Plan (DOE)
Resort PIan Approval M construction-level detail. Buffers. Open space
Mitigations
Types l, ll, and lll (Administrative and Quasi-Judicial) Review
Administrative and Hearing Examiner Decisions
Phase 3
Project Level
EIS
Final PIaU Binding Site PIan approved by BoCC & recorded
Phase 1 of Resort build-out starts
I nfrastructu re Construction. Roads
. Sewer
o Water
. Sewer treatment plant
Type IV Review (Administrative Oversight
with Legislative on Consent Agenda)
Phase 4
Project Level
EIS
Building Permits
Construct Buildings
Open for Business!
Phase 5
Type I (Administrative) Review
PTEASANT HARBOR PHASE 2 SEIS PROCESS & TIMETINE
PC = Planning Commission BoCC = Board of County Commissioners * = Completed
20L4
STEP wHo WHAT WHY WHEN
!r1 Applicant All Final Reports to consultant For Production of Preliminary Draft SEIS October 20u
*2 Consultant Preliminary/Working Draft SEIS to County For County & Applicant Review and
comment October 27th (1week)
*3 County Staff Review & comment due back to
Consultant
Ensure accuracy and readability November 1Oh
(2 week)
*4 Consultant Produce FinalDraft lncorporate staff & applicant comments November 17s
(l weeks)
*5 County PC meeting & BoCC Afternoon Briefing Opportunity to inform of upcoming
release, requirements, work schedule...completed
*6 County Notice of Availability, Press Release and
Notice of Public Hearing
To inform the public of availability Concurrent with Draft SEIS release
- SteP 7
*7 County &
Consultant
Publish Final Draft and release to public Public review for 45 day public
comment period
November 19th
(1.5 weeks)
8 County &
Consultant
Open House (Brinnon SchoolGym) and
PC Public Meeting on Draft SEIS - after
release of the Draft but before end of
comment period
Present Projed, Staff Report & Take
Public verbal and written comments December 3d
9 County &
Consultant
Staff Review of public & agency
comments
Compile comments to address in Final
sEts
45 davs after release of Draft SEIS
January 5s
10 County &
Consultant
lncorporate staff, agency and public
comment from Draft - Produce Final SEIS
PC holds Public Hearing, Deliberates &
makes Recommendation to BoCC
Release to public - seven days before
BoCC action. 60 day notice to Commerce
- intent to amend UDC prior to BoCC
decision
Approx. March 3Oh 2015
(12 weeks)
11 County Required per JCC 18.45.090(3)April 1'r or May 6th 2015
72 County BoCC considers PC recommendation on
UDC Amendment & schedules Public
Hearing on Development Agreement
Required per JCC 18.45.090(4) &
18.40.8s0(s)
TBD
13 County BoCC holds Public Hearing on
Development Agreement
Required per JCC 18.40.850(5)TBD
74 County BoCC decision to adopt Development
Agreement & regulations by resolution
Required per JCC 18.45.090(4) &
18.40.8s0(s)
TBD
Prepared by Project Planner, David Wayne Johnson revised November 24, 2Ot4
PTEASANT HARBOR PHASE 2 SEIS PROCESS & TIMELINE
PC = Planning Commission BoCC = Board of County Commissioners
Prepared by Project Planner, David Wayne Johnson
20t4
* = Completed
revised November 24, 2Ol4
STEP wHo WHAT WHY WHEN
*1 Applicant All Final Reports to Consultant For Production of Preliminary Draft SE|S october 2Oh
*2 Consultant Preliminary/Working Draft SEIS to County For County & Applicant Review and
comment october 27th (1 week)
r3 County Staff Review & comment due back to
Consultant
Ensure accuracy and readability November lOth
(2 week)
Consultant Incorporate staff & applicant comments November 17th
(l weeks)
*5 County PC meeting & BoCC Afternoon Briefing Opportunity to inform of upcoming
release, requirements, work schedule...Completed
*6 County Notice of Availability, Press Release and
Notice of Public Hearing
To inform the public of availability Concurrent with Draft SEIS release
- Step 7
|7 County &
Consultant
Publish Final Draft and release to public Public review for 45 day public
comment period
November 19th
(1.5 weeks)
8 County &
Consultant
Open House (Brinnon SchoolGym) and
PC Public Meeting on Draft SEIS - after
release of the Draft but before end of
comment period
Present Project, Staff Report & Take
Public verbal and written comments December 3'd
9 County &
Consultant
Staff Review of public & agenry
comments
Compile comments to address in Final
sErs
45 davs after release of Draft SEIS
January Sth
10 County &
Consultant
lncorporate staff, agency and public
comment from Draft - Produce Final SEIS
Release to public - seven days before
BoCC action. 60 day notice to Commerce
- intent to amend UDC prior to BoCC
decision
Approx. March 30th 2015
(12 weeks)
11 County PC holds Public Hearing, Deliberates &
makes Recommendation to BoCC
Required per JCC 18.45.090(3)April 1't or May 5th 2015
t2 County BoCC considers PC recommendation on
UDC Amendment & schedules Public
Hearing on Development Agreement
Required per JCC 18.45.090(4) &
18./!0.8s0(s)
TBD
13 County BoCC holds Public Hearing on
Development Agreement
Required per JCC 18.40.850(5)TBD
14 County BoCC decision to adopt Development
Agreement & regulations by resolution
Required per JCC 18.45.090(4) &
18.40.8s0(s)
TBD
*4 Produce FinalDraft
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street I Port Townsend, WA 98368 | Web: www.co.jefferson.wa.us/communitydevelooment
Tel: 360.379.4450 | Fax: 360.379.4451 | Email: dcd@co.iefferson.wa.us
Building Permits & /nspecflons I Development Consisfency Review I Long Range Planning I Watershed Stewardshp Resource C,enter
TO: Planning Commission
FROM: David Wayne Johnson, Associate Planner
DATE: November24,2014
RE: Pleasant Harbor Draft Supplemental Environmental lmpact Statement (DSEIS)
At long last the Pleasant Harbor DSEIS is available for review and comment. Part of that review by the
Planning Commission (PC) is understanding what role you play in the process. To that end I have
attached several documents designed to help break down the approval process into manageable steps
The first document is a two page outline of the Phase 2 SEIS Approval Process. We will use this as an
outline for Staff's presentation during the meeting. lt provides some background information on the
project, then breaks down the core elements in the approval process so you may better understand
what they are, and why they are necessary to approval. The outline then details what the Planning
Commission's role is in the process. And lastly, a concise summary of the actions and steps necessary
to approve Phase 2.
The next document is a matrix of the overall MPR approval process by phases. The first page is a
summary of allthe phases necessary to build the resort. Notice the little arrow pointing down to Phase
2 - that's where we are today with Phase 1 completed in January 2008. The remaining five pages are
the detail of each Phase. This process matrix is helpful to see the "big picture" of the approval process,
what's involve and why it takes so long. lt also shows who has decision making authority, when the
Public has an opportunity to comment.
The last document is the Phase 2 SEIS Process & Timeline. lt breaks down the Phase 2 process into
individual steps by chronological order in who, what, why and when format with associate dates for
those listed actions. For example, step 7 is the release of the DSEIS and that occurred on November
19,2014. Step 11 is when the Planning Commission would likely hold their official public hearing on
the request to amend the Jefferson County Code. Code cites are also included to help you reference
those sections that are relevant.
lf you have questions on any of this, you should probably save them for the meeting where I can
answer them for the benefit of everyone. We will also have our applicant's representative, Craig Peck
and our SEIS Consultants EA Engineering in attendance to present aspects of the project and answer
any questions you may have.
We look forward to seeing you and discussing this very important project at the December 3'd Planning
Commission meeting.