Good Morning Craig,
I took a look at the grading plan and was comparing it to the habitat corridor figure (attached) we have in our habitat
management plan report. I realize there will be less cut and fill with the new alternative and therefore more of the
native vegetation will remain. However, although it is hard to tell from the grading plan, it looks like the habitat
corridors are more isolated and connections to other areas have been cut off. The point of the habitat corridors is that
they would connect to other native vegetated areas. For instance, one of the areas l'm looking at are the areas east and
south of the wetland B pond.
I just wanted to check in with you about that and check if some of the corridors have changed? Or is it because we are
only looking at the grading plan?
Thanks,
Jennifer
Jennifer L. Dadisman, PWS
Biologist I GeoEngineers, lnc.
Telephone: 253.7 22.2445
Fax: 253.383.4923
Email : idadisman@qeoenqineers.com
1 101 Fawcett Avenue, Suite 200
Tacoma, WA 98402
www.geoenqineers.com
Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if
provided, and any attachments are only a copy of the original document. The original document is stored by
GeoEngineers, lnc. and will serve as the official document of record.
From: peckassoc@comcast.net Imailto:peckassoc@comcast.net]
Sent: Wednesday, November 18, 2015 8:08 AM
To: Jennifer L. Dadisman <jdadisman@geoengineers.com>
Cc: Hollinger, Kristy <khollinger@eaest.com>; djohnson@co.jefferson.wa.us; Schipanski, Rich <rschipanski@eaest.com>
Subject: Re: Pleasant Harbor - Alternative 3
Jennifer,
Please see the attached grading graphic.
Craig
From: "Jennifer L. Dadisman" <j >
To: "Kristy Hollinger" <khollinqer@eaest.conr>
1
Gc: "diohnson@co.iefferson.wa.us" <diohnson@co.iefferson.wa.us>, "Rich Schipanski"
<rschipanski@eaes >, "peckassoc@comca " <peckassoc@comcast.fl€t>
Sent: Tuesday, November 10,2015 8:46:45 AM
Subiect: RE: Pleasant Harbor - Alternative 3
HiKristy,
Thanks for the information; l'm going through this now. But I did want to check in with you because I don't think l've
seen an updated grading plan yet. Have we received that? lf so, can you send it to me?
I also took a look at the reports you listed. The Habitat Management Plan and the mitigation plan are finalized and you
have the latest version. I have looked into the Golf Course Development and Operation Best Management Practices
Plan report. lt turns out that we never finalized that report because Garth was going to have another company finalize
the report.
Thanks for the help and let me know if you have any questions.
Jennifer
Jennifer L. Dadisman, PWS
Biologist I GeoEngineers, lnc.
Telephone: 253.7 22.2445
Fax: 253.383.4523
Emai I : i d ad is m an @-geoengileef s-conr
1101 Fawcett Avenue, Suite 200
Tacoma, WA 98402
www.qeoenqineers.com
Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if
provided, and any attachments are only a copy of the original document. The original document is stored by
GeoEngineers, lnc. and will serve as the official document of record.
From: Hollinger, Kristy [mailto:khollinger@eaest.com]
Sent: Thursday, November 5, 2015 1:45 PM
To: Jennifer L. Dadisman <idad isma n@geoengineers.com>
Cc: David W. iohnson (diohnson@co.iefferson.wa.us)<diohnson@co.iefferson.wa.us>; Schipanski, Rich
<rschipanski@eaest.com>;'peckassoc@comcast.net'<peckassoc@comcas >
Subject: Pleasant Harbor - Alternative 3
Hi Jennifer,
Thanks for your call this morning. As per our discussion, attached are the sections of the Final SEIS that are related to
reports by GeoEngineers. These sections show new information for Alternative 3 (9-hole golf course) shaded in
gray. Can you let us know if a brief review of Alt. 3 site plan, data, and SEIS sections (including additional info if
necessary) will be outside your current scope of work, and if so what additional level of effort this might entail?
Also, we have the following GeoEngineers reports as appendices in the SEIS.
o Golf Course Development and Operation Best Management Practices Plan - Jan. 6,2072
o Habitat Management Plan, Pleasant Harbor Master Planned Report - Jan.27,2012
o Wetland and Wetland Buffer Mitigation Plan Report - Jan.26,2012
2
Thanks for your help Jennifer.
Best,
Kristy
Kristy M. Hollinger
Planner
gT
EA Engineering, Science, and Technology, lnc., PBC
2200 Sixth Ave, Suite 707 | Seattle, WA 98121
(t)206.452.5350 ext. 1726 | (f)206.443.7646
khollinger@eaest.com
http://www.eaest.com
Confidentiality: This message is confidential and intended solely for use of the individual or entity to
whom it is addressed. lf you are not the person for whom this message is intended, please delete it
and notify me immediately, and please do not copy or send this message to anyone else.
Confidentiality: This message is confidential and intended solely for use of the individual or entity to whom it is
addressed. If you are not the person for whom this message is intended, please delete it and notify me
immediately, and please do not copy or send this message to anyone else.
3
Golf Course Wetland Mitigation Plan
and Wildlife Corridor Map
Pleasant Harbor Master Planned Resort
Brinnon, Washington
GeoErarn EERO Figure 1{
\
us 10t
HldlwA Y,
WLDLIFE
l-,roa,,
CORRIDOR
IER FEATURES
ADANON
REDUCfION
CORRIDOR
'o'
BUFFER
200-Foor A00tnoN
MARINE
CORRIDOR
POND
T MARINE OHWI
SHORELINE BUFFER
CORRIDOR
HOOD CANAL
Not6:
1 . The lo€lions of aU f€aluEs shM aB apprcximto.
2. This dEving is for intomation poDc6. lt is intond€d to assist in sho\Ning feafuE dscEs€d in en attehod
Legend
-
Weiand
-WetlamlBulIor
-
oHt \l[4
-
ot{til,}, Blt er
-
ToPot-SloPo
-
Top{f-slopo Buftar
----Prcpoily Bound.ry
ffiwilaff"c-ruo,
m Wali,alrd C Buller Redudion: 4.201 6q. t.ru W.lland O Biller Reduclion: 1E,344 iq. fr.
ffi Wodand C Buffor Addition: ,1,201 sq. lt@ We{and D Bufl€r Addition: 1 8,3,&l sq. n.
document.lnc. €n not guarantoe the 6cd6c, and contenl of eledronic f 16. Ths msrd f lo is "t'sto€d by
3- Lrdar @ntou6 are 20 iool inloryab.
Referen@: Drawing prwklod by WH Pacmc Statesman and C6ig A. Pod( ard Asfijat6.
Lidar Oata Sour6s: lmgsry and LjDAR dala obbin6d tom Pugot Sound Rsgional Coumil. UOAR data
interpoLted to OEM with 1 mt€r GSD. Coordinate SFtem is UTM Zqe'10 t'lodh Foiared to l-bdzontalOelum
NAD83i Vedical Datum is
sfl)500
O
(:
J
-"9 :o
J
)
C
7 (
t o
0
)I')
a
a
/t
({/